Wednesday, August 10, 2011

STS-105 (Discovery)

 2001-035A


Discovery will fly STS-105, a crew rotation mission to the ISS. It carries the MPLM-1 Leonardo on its second flight. Among the cargo was an unusual item - a guitar, still in use aboard ISS a dozen years later.

OV-103 arrives at the -R-bar at 180m and moves to the +Vbar before making the final approach.

Discovery docks with PMA-2. MPLM will be berthed on Unity. The EX-3 crew then transfer their seat liners to the Soyuz TM, and become the official station crew. EXPRESS racks for Destiny are loaded aboard from the MPLM.

Expedition 3 began on Aug 13 at 1915 UTC when the new crew's seat liners were installed on the Soyuz transport ship. The formal EX-2/EX-3 change-of-command ceremony was held on Aug 17 in Destiny.

Barry (EV1) and Forrester (EV2) made two spacewalks from the external airlock on Discovery. EVA-1, on Aug 16, transferred the Early Ammonia Servicer (EAS) device from the ICC carrier in the payload bay to the P6 truss on the station. Then the astronauts took two MISSE materials exposure experiment boxes from the ICC and attached them to the outside of the Quest airlock. The airlock was depressurized at about 1356 UTC and the duration was 6h18m (depress/repress), 6h10m (hatch open/close), or 6h16m (NASA rule).

The second spacewalk on Aug 18 installed Orbit-Installed Handrails and Launch-to-Activation Heater Cables on Destiny. The cables are needed by the S0 truss to be launched in early 2002. The airlock was depressurized at about 1339 UTC and spacewalk duration was 5h31m (depress/repress), 5h24m (hatch open/close), or 5h29m (NASA rule).

On separation, Discovery will make a 1-1/4 turn flyaround from the +Vbar and depart on the +R-bar.

The cargo bay contains the Integrated Cargo Carrier platform and the Leonardo module, and a set of canisters on the sidewall.

The ICC will carry the Early Ammonia Servicer for the P6 truss, and two small exposure experiments PEC-1 and PEC-2 under the MISSE materials exposure program, which will be installed on Quest. The Leonardo module contains Express Racks 4 and 5, as well as resupply stowage racks.

HEAT is a Hitchhiker payload comprising Simplesat, AMTEC and SEM-10, on two adapter beams on the port and starboard sides of bay 13. The 13P beam carries AMTEC in the forward position and SEM-10 in the aft position. AMTEC, the Alkali Metal Thermal-to-Electric Converter, is a JPL technology experiment. SEM-10 is a canister with 11 high school experiments and AMTEC's avionics. The 13S beam carries the Simplesat can forward and the ACE avionics plate aft. The octagonal cylinder Simplesat will be ejected from one canister and will test out GPS attitude control.

Another adapter beam, somewhere else in the payload bay carries two more canisters. G-780 is a Mayo High School (Rochester, Minnesota) experiment to study germination of faba beans. G-774 is the Microgravity Smoldering Combustion (MSC) experiment.

OV-103 launch mass is 116912 kg, landing mass is 100822 kg. 3300 kg of cargo were transferred to ISS; 1700 kg of cargo was brought back.

 


STS-105 
 

DateTimeEventOrbit  

2001 Jun 13   Tow to VAB/3 
2001 Jun 14   Mate to ET/SRB 
2001 Jul 2   Roll to LC39A 
2001 Aug 9   Scrub WX at T-20min
2001 Aug 10  2110:14  Launch 
 2112:16 SRB sep 
 2118:41 MECO   
 2119:00 ET-110 sep 87.42 58 x 234 x 51.6  
 2148:48  T+38:30 OMS-2 1:04 31m/s? 
 2149:52  OMS-2 CO  88.38 155 x 233 x 51.6 
 2253 PLBD open 
2001 Aug 11  0056:16  OMS-3 NC1 
 0057:12  OMS-3 CO  89.27 198 x 277 x 51.6 
 1632  NC2 
 2323:07  OMS-4 R NC3 
 2323:21  OMS-4 CO  89.37 199 x 287 x 51.6 
2001 Aug 12  1312   91.12 273 x 384 x 51.6 
 1344:58  OMS-5 NH 
 1346:44  OMS-5 CO 
 1437:36  OMS-6 NC4 
 1438:42  OMS-6 CO 
 1519  NCC 0.3m/s 
 1616:34  OMS-7 TI 15s 3.5m/s 
 1616:49  OMS-7 CO 
 1638  MC 
 1714  MC2 4km range 
 1732  MC3 1.5km 
 1740  730m range 
 1742  MC4 
 1755  On -Rbar 180m 
 1755  TORVA to +Vbar  
 1809  On +Vbar at 120m 
 1830  30m from PMA-2 
 1838  10m begin final approach 
 1842  Capture 
 1852  Problems with hard dock ring retract 
 1905  Hard dock 
 2035  Hatch open on ISS side 
 2042  Hatch open to ISS 
 2200   92.40 384 x 399 x 51.6 
2001 Aug 13  1250?  RMS grapple MPLM 
 1326  Unberth MPLM 
 1400  Transfer of Soyuz seat liners 
 1500  Transfer APCS experiment 
 1502  Near berthing on Unity 
 1554  MPLM berthed on Unity 
 1915  EX-3 begins after seat transfer 
2001 Aug 14  0600   92.39 384 x 399 x 51.64 
  Reboost 
2001 Aug 15  0000   92.46 388 x 401 x 51.64 
 2152  HC to ISS 
2001 Aug 16   EVA-1 Barry, Forrester  92.43 387 x 400 x 51.64 
  RMS grapple EAS 
 1340  Begin AL depress 
 1346  5psi leak check 
 1349  Resume depress 
 1356? Depress complete 
 1357? Hatch open 
 1358  Comms to EVA 
 1358  On battery power 
 1409? TC open 
 1411  Egress EV1 (SAFER 6) 
  EV2 egress (SAFER 7) 
 1447  Unberth EAS from ICC 
 1525  EV1/2 on P6, manual grapple of EAS 
 1534  RMS ungrapple EAS 
 1541  EAS soft docked to P6 
 1600  EAS installation complete 
 1830? MISSE 1 off ICC 
 1840? MISSE 2 off ICC 
 1840  Attaching MISSE 1  
 1900  Attaching MISSE 2 
 1950? Ingress Forrester 
 2003  Ingress EV1 Barry  
 2003  TC cover 
 2007  HC 
 2014  Repress 6:16 
2001 Aug 17  0600   92.43 386 x 400 x 51.64 
  Reboost 
 1855   92.50 391 x 402 x 51.64 
2001 Aug 18   EVA-2 Barry, Forrester  
 1325  Begin depress 
 1336  Resume depress from 5psi 
 1339  Depress complete 
 1342? HO 
 1342  Battery power 
 1349  TC open 
 1351  EV1 egress 
 1412  EV2 egress 
 1513  Handrail 285 installed on Destiny 
 1527  Fourth HR (292,293,294) installed 
 1545  HR 296 installed 
 1545  Begin stbd cable installation 
 1645  Begin port cable 
 1745  Complete work, return toward airlock 
 1835  EV2 ingress 
 1837  EV1 off RMS 
 1856  EV1 ingress 
 1903  TC closed 
 1905  HC 
 1911  Repress 5:29 (NASA) 
 1917  At 5psi 
 2016  HO to ISS 
2001 Aug 19  1600  RMS grapple MPLM 
 1816  Unberth Leonardo MPLM from Unity 
 1901  Berthing in progress in bay 
 1917  MPLM latched 
2001 Aug 20  1330  Hatch closed to ISS  92.50 391 x 402 x 51.6 
 1452  Undocking from PMA-2 
  Sep along +Vbar to 120m 
 1525? On +Rbar 
 1537  On -Vbar 
 1611 On +Rbar 
 1612 Sep burn at 140m  92.43 385 x 401 x 51.6 
 1829:14  Simplesat deployed
 2040:14  OMS-8  
 2040:28  OMS-8 CO 
 2044   92.31 373 x 401 x 51.6 
2001 Aug 22  1303  PLBD closed 92.30 372 x 402 x 51.6 
 1715:23 Deorbit burn 97m/s? 3:11 
 1718:36  OMS DO CO  42 x 401 x 51.6 
 1751:15  Entry interface 
 1822:59 Landed KSC RW15 
 1823:09 NGTD 
 1824:06 WS 
 2030Tow to OPF/2 

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...