Thursday, September 14, 2017

Kaguya

 2007-039A


The ISAS Selenological and Engineering Explorer (SELENE) was the most ambitious lunar probe in a generation. It was named Kaguya after a Japanese mythological figure. The spacecraft was built by NEC Toshiba Space Systems. Launch mass 2779 or 2885 kg (COSPAR), 1720 kg dry A 113 kg prop reserve was quoted so in orbit mass was at least 1840 kg. Orbiter size 2.1 x 2.1 x 4.7m, shape was box + panel + 4 radar sounder booms + magnetometer mast.

The H2A 2022 launch vehocle was an H2A with 4S fairing and 2360SA PAF. It launched Kaguya into highly elliptical Earth orbit, where the probe's own propulsion was used to raise apogee to lunar distance and perform the lunar orbit insertion burn. Kaguya was captured into a 101 x 11741 km orbit and then performed burns to lower itself to a circular 100 km path. Two Toshiba relay satellites were carried, and were ejected during the orbit lowering process. 


Selene 
 

DateTimeEventOrbit  

2007 Sep 14  0131:01  Launch by H2A F13  TNSC 
  T+0:10 SSB ignition 
  T+1:08 SSB burnout 
  T+1:30 SSB jettison 
  T+1:55 SRB-A burnout 
  T+2:05 SRB-A jettison 
  T+4:25 Fairing sep
  T+6:40 MECO 
  T+6:48 Stage 1 sep 
 0137:55 T+6:54 SEIG 1 
 0143:08 T+12:07 SECO-1 157E 25.5N? 270 x 300 x 30.4?  
  Equator crossing 149W 0 N 
 0211:34  T+40:33 H2A st 2 TLI SEIG2 104W 24S 
 0215:03 T+44:02 SECO-2 87W 28S 
2007 Sep 14 0216:33 T+45:32 H2A st 2 sep  281 x 232805 x 29.9  
   282 x 231910 x 30.0 (UN) 
 1929  Pass EL1:4 
  Phasing orbits 
2007 Sep 14  2011:01 DVc1 Injection error corr.  956 x 232782  
2007 Sep 15  2300s DVa1 Control error burn  924 x 232731  
2007 Sep 18  2352s DVp1 Period adjust maneuver 1039 x 377809  
2007 Sep 19  0100? Possible stage 2 reentry after 1st orbit 
2007 Sep 19  1959s  DVc2 Period error corr burn  1055 x 379196  
2007 Sep 29  0258  DVp2 Period Adjustment  2243 x 378132  
2007 Oct 3  0308  Enter L sphere 
2007 Oct 3  2101:01s  LOI1 
   101 x 11741 km (JAXA) 
2007 Oct 5  2301  LOI2  108 x 5694  
2007 Oct 6  2240  LOI3  115 x 2399  
2007 Oct 9 0036  Rstar Relay satellite deploy  100 x 2400 x 95  
2007 Oct 10  0024  LOI4  127 x 795  
2007 Oct 12 0428 100 x 800 km Vstar deploy 
2007 Oct 14?  LOI5  103 x 502 
2007 Oct 18?  LOI6  80 x 123 
2007 Oct 21  1027s  Begin science data  
  Final orbit  100 x 100 km x 95  
2009 Jun 10  1740  Deorbit 3m/s 
 1825  Impact at 80.4E 65.5S 

Payload:

  • Mission Module

    • High Def TV Camera

    • XRS X-ray spectrometer

    • GRS Gamma spectrometer

    • MI Multispectral imaging system, 20m res

    • SP Spectral profiler, Visible and Near IR image spectrometer.

    • TC Terrain Camera, Stereo topographic camera, 10m res

    • LRS Radar sounder, 4 antennae each 15m, at 5 MHz 30m tip-tip

    • LALT Laser altimeter res 800m, height res 5m.

    • LMAG Magnetometer, 12m mast

    • UPI Plasma imager

    • CPS Charged particle spectrometer

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...