Friday, February 15, 2019

Echostar 1

 1995-073A


The second AS7000 launched from China in quick succession, Echostar 1 was a direct broadcast TV satellite for Echostar Satellite Corp., a subsidiary of Echosphere Corp of Denver, Colorado. In 1998 the FCC ordered Echostar 1 and 2 to be moved to their legally allocated positions of 118.8W and 119.2W. In 2009 Echostar 1 was moved to 77W to provied QuetzSat service for Mexico. It was retired in 2018.

The satellite had a launch mass of 3287 kg and carried dual Leros engines.


Echostar 1 
 

DateTimeEventOrbit  

1995 Dec 28  1150  Launch by CZ-2E  XSC 
  T+2:05 Booster CO 
  T+2:07 Booster sep 
  T+2:39 Stage 1 MECO 
  T+2:40 Stage 1 sep 
  T+3:20 Fairing sep
  T+7:40 Stage 2 MECO 
 1159 T+9:33 Stage 2 VECO 
 1200 T+10:00? Stage 2 sep 
 1344 PKM burn over 155E 0N 
 1345 burnout 
 1345? PKM sep 
1995 Dec 28    617.97 228 x 35080 x 24.4 
1996 Jan 2  1200?  LAM burn  
1996 Jan 2    980.57 17561 x 35071 x 5.1 
1996 Jan 4  1500? LAM-2 burn 
1996 Jan 4    1105.37 22970 x 35100 x 3.1 
1996 Jan 6?  LAM-3 burn 
1996 Jan 22    1436.16 35765 x 35810 x 0.1 GEO 119.1W+0.01W 
1996 Mar 23    1436.06 35771 x 35800 x 0.0 GEO 119.0W 
1999 Oct 16    1436.06 35777 x 35794 x 0.1 GEO 119.2W 
2000 Oct   mv out 119W 
2000 Dec   mv in 148W 
2001 Jun 3    1436.05 35776 x 35794 x 0.1 GEO 148.0W 
2006 Aug 4    1436.11 35778 x 35795 x 0.0 GEO 148.0W 
2009 Jun 29    1436.09 35776 x 35796 x 0.1 GEO 148.1W 

Tuesday, February 12, 2019

Rossi X-Ray Timing Explorer

 1995-074A


The Bruno B. Rossi X-Ray Timing Explorer (RXTE) was intended for studies of the time variability and spectra of bright X-ray sources in the hard X-ray (2 keV and above). Known before Mar 1996 as simply XTE, the satellite used a bus built at NASA-Goddard with steerable solar arrays, reaction wheels, and high gain TDRS antennae to allow all-sky access and rapid maneuvrability. The bus was 5.8 x 1.8 x 1.8m in size. It could point to 6 arcmin with a 10 degree per minute slew rate; mass of XTE was 2955 kg. XTE was named after Bruno Rossi (1905-1993), a former MIT physicist who was one of the founders of X-ray astronomy.

Launch was postponed many times because of the Koreasat launch problem and because of weather delays. The first ignition attempt on Dec 22 was aborted when a frozen LOX valve prevented main engine ignition. Launch finally came on 1995 Dec 30.

The satellite was retired in 2012 after a successful career.


RXTE 
 

DateTimeEventOrbit  

1995 Dec 30  1348:00  Launch by Delta 7920-10 (Delta230)  CC LC17A 
 1347:57  Verniers ignite (T-3s) 
 1347:57  Main engine ignition (T-2.5s) 
 1348:00  GEM 1,2,3,7,8,9 ignite (T-0.25s) 
 1348:00  Liftoff 
 1349:03  GEM 1-3,7-9 burnout (T+1:03) 
 1349:05  GEM 4-6 ignite (T+1:05) 
 1349:06  GEM 1-3,7-9 sep (T+1:06) 
 1350:08  GEM 4-6 burnout (T+2:08) 
 1350:11  GEM 4-6 sep (T+2:11), 60 km 
 1352:20  RS-27 MECO (4:20), 133 km 
 1352:29  Thor sep (4:29) 
 1352:34  Delta ignition (4:34), 140 km 
 1352:40  Fairing (10-foot) sep (T+4:40), alt 143 km 
 1357:55  Delta SECO1 (T+9:55), 181 km  157 x 613 x 28.73 
 1456:18  Delta burn 2 (T+1:08:18 for 1:31) 
 1457:49  Delta SECO2 (T+1:09:49) 
 1506:25  Delta sep from XTE (T+1:18:25)  565 x 583 x 23.0  
 1507:07 Delta retro cutoff (T+1:19:07) 
 1526:45 Delta evasive burn (T+1:38:45)  
 1526:50 Delta SECO 3 (T+1:38:50) 
 1534:40  Delta depletion burn (T+1:46:40) 
 1536  Delta SECO 4 command  176 x 575 x 25.0 (Delta) 
2012 Jan 4   Last science data 
2012 Jan 5   Decommissioned 
2018 Apr 30   Reentered 

Payload:

  • PCA Proportional Counter Array 5 Xe pc's 6250cm2 2-60 keV 1 deg FOV, 1 mus

  • HEXTE High Energy X-ray Timing Experiment1600 cm2 20-200 keV 1 deg FOV, 10 mus

Wednesday, February 6, 2019

Kibo

 2008-009A


ELM-PS Experiment Logistics Module - Pressurized Section; also known as JLP (Japanese Logistics Pressurized module). Cylinder,4.4d 4.2l 8484 kg

Kibo's ELM-PS was manufactured in the Tobishima Factory of Mitsubishi Heavy Industry (MHI) located in Nagoya city, Aichi prefecture, Control from JAXA/Tsukuba.

STS-123/1JA

On 2008 Aug 26 Express racks ER4 and ER5 were transferred from Destiny to Kibo.

The NRCSD cubesat deployers are usually stored in ELM-PS.


ELM-PS 
 

DateTimeEventOrbit  

2008 Mar 15  0322  SRMS grapple JLP 
 0632  JLP latches open 
 0634  JLP unberthed by RMS 
 0804  JLP RTL on Node 2 
 0806  JLP berthed on Harmony zenith 
 2257  JLP power OK 
2008 Mar 15  0125  HO to JLP, ingress 
2008 Jun 6  1817  SSRMS grapple JLM 
 1839  Unbolting JLM 
 1917  Unberth JLM 
 1951  Ready to berth on Kibo PM 
 1959  Bolting JLM 
 2004  JLM bolting complete 
 2013  SSRMS ungrapple JLM 

Payload:

  • ICS-PM Rack, Inter Orbit Communication System (Port)

  • DMS1 Rack, Data Management System (Port)

  • PSRR, Pressurized Section Resupply Rack (Stbd)

  • EPS1, Electrical Power System 1 rack

  • RYUTAI (Fluid) experiment rack (Fwd)

  • JEMRMS rack for JEM Remote Manipulator System (Fwd)

  • WS Rack, Workstation (Aft)

  • SAIBO (Living Cell) experiment rack


2008-027A

Kibo (

\uni{ きぼう, }{ }
"Hope") is the Japanese Experiment Module (Nihon jikken-to,
\uni{ 日本実験棟),}{ }
the NASDA contribution to ISS. Kibo consists of Pressurized Module (Sen'nai jikken-shitsu,
\uni{ 船内実験室 }{ }
) and Exposed Facility. Contractor is Mitsubishi Heavy Industries.

Launch on 1J STS-124. Control is from the Space Station Integration and Promotion Center (SSIPC) at Tsukuba.

4.4d 11.2l 14800? kg (as of 2006).

With JEM RMS, 9.9m long main arm, 1.7m small arm, 1700 kg. The JEM PM has both an FRGF and a PDGF grapple fixture.

On 2010 Mar 10, the Small Fine Arm was delivered from Kibo interior through the airlock to the JEM RMS Main Arm. Mar 12, SFA installed on the SSE.


Kibo 
 

DateTimeEventOrbit  

2008 May 31  2102:12  Launch on STS-124 
 2104:14 T+2:03? SRB sep 
 2104:24  OMS ASS 
 2106:47  OMS ASS CO 
 2110:39 T+8:24? MECO  
 2110:00 T+8:50? ET sep  59? x 228?  
2008 Jun 3  2049  JEM unberthed 
 2213  JEM close to berthing on Harmony 
 2240  JEM berthed RTL on Harmony CBM 
 2301  JEM stage 2 capture, attached 
2008 Jun 4  2105  Kibo PM ingress 
2012 Oct 4  
  SSOD-1,2 outside 
 1437  Cubesat release 
 1544  Cubesat release; TechEdSat 
  SSOD-1,2 inside 
2013 Nov 15   Attached SSOD to MPEP 
2013 Nov 19   JEM RMS extract MPEP 
2013 Nov 19  1218  Ejected from JEM SSOD4 
2013 Nov 20   SSOD-3,4 inside 
2014 Jan 31   NRCSDs on MPEP 
2014 Feb 11  0831:32  Dep 1, Flock-1 1,2  
2014 Feb 11  1241:00  Dep 2, Flock-1 3,4 
2014 Feb 12   Dep 4 failed 
2014 Feb 12  0830:00  Dep 3, Flock-1 5,6 
2014 Feb 12   Dep 5 failed 
2014 Feb 13  0820:00  Dep 6, Flock-1 11,12 
2014 Feb 14  0415:46  Dep 7, Flock-1 13,14 
2014 Feb 14  1145:00  Dep 8, Flock-1 15,16 
2014 Feb 15  0645  Dep 4 failed 
 0651:30? Dep 4 failed 
 0700:00  Dep 4, Flock-1 7,8  
 1050  Dep 5 failed 
 1055  Dep 5, Flock1 9,10 
2014 Feb 19   MPEP back inside airlock 
2014 Feb 20   MPEP inside Kibo 
  New NRCSDs on MPEP 
2014 Feb 25?  MPEP on JRMS 
2014 Feb 25  1700:03  F1-17,18 
2014 Feb 26  0420:02  F1-21,22 
 0735:01  F1-19,20 
2014 Feb 27  0150:11  F1-23,24 
 0740s  F1-25,26 
2014 Feb 20    JEM RMS grapple MPEP 
2014 Feb 28  0420s  F1-27,28 
2014 Feb 28  0730  Cubes deployed from MPEP 
  MPEP back in airlock 
2014 Mar 3   MPEP inside Kibo 
  MPEP and NRCSDs stowed 
2014 Mar 4   JOTI (JEM ORU TRANSFER INTERFACE) attached to JEMAL slide 
2014 Jul 24   Two NRCSD-Q packages installed on JEMAL slide 
2014 Aug 19   MPEP on JEM RMS outside Kibo 
2014 Aug 19  1825  F1b-23,24 
2014 Aug 20  0226:13  F1b-25, 26 
2014 Aug 20  0950:02  Deploy F1b-15,16 
2014 Aug 21  1337:00  F1b-1,2 
2014 Aug 23  1943:57  F1b-7,8 from Deployer 5, inadvertent 
2014 Sep 5  0929:40  F1b-17,18, from Deployer 7, uncommanded  
2014 Sep 16   NRCSD-3/MPEP returned inside Kibo 
2014 Sep 17   Secured doors of Dep-4 and Dep-8 with tape 
2014 Nov 4   Moved NRCSD3, MPEP from JEM-AL to JEM for repairs 
2014 Nov 26?  SSIKLOPS/Spinsat and MPEP in JEM AL 
2014 Nov 28  1100? JEM RMS extract MPEP 
 1430:42  Ejected Spinsat 
2014 Nov 29?   MPEP/Cyclops back inside 
2014 Dec 17   Cyclops removed from JEM Slide table 
  MPEP back on JEM slide 
2015 Jan 29   SSOD on MPEP, open AL 
2015 Feb 5   SSOD/MPEP on JRMS 
2015 Feb 5  1250? AESP-14 ejected  
2015 Feb 6   MPEP back inside JEM 
  NRCSD off MPEP? 
2015 Feb 18   2 x NRCSD Quad on MPEP 
2015 Feb 27   MPEP on JRMS 
2015 Feb 27  1430:00  F1b-27,28 deployed 
2015 Mar 2  0125:10  F1b 21,22 deploy from Deployer 2 
 0835  F1b-9,10 from Deployer 4  
2015 Mar 3  0300:39  F1d'-1,2, Deployer 5  
 1050  F1b-5,6, Deployer 6 
2015 Mar 4  0120  Teched, GEARRS 
 0830  Micromas, Lambda 
2015 Mar 5  0145:07  F1b 11,12 
2015 Mar 13?   MPEP inside 
2015 Mar 13   MPEP off JRMS 
2015 Mar 25   MPEP off slide table 
  NRCSDs off MPEP for SpX6 return 
2015 Mar 26   RRM-2 on slide table 
2015 May 12   RRM-2 removed from JEMAL 
2015 May 13   SFA and MPEP on table 
2015 May 14   ExHAM/Tanpopo (HXP) on MPEP 
  In JEMAL for outgas 
2015 May 25   JRMS grapple SFA 
2015 May 26   JRMS extract HXP from JEMAL 
  JRMS install HXP on Kibo EF 
2015 Jun 15   JRMS with Free-Space PADLES on MPEP  
  JRMS puts Free-Space PADLES in AL 
2015 Jun 17   MPEP/FSPADLES removed from AL 
  and packed for return 
2015 Jul 9   NRCSDs/MPEP on slide table 
2015 Jul 10   JRMS move SEDA from EFU9 to EFU11 
2015 Jul 13   NRCSDs/MPEP on JRMS 
2015 Jul 13  1640:00  Flock 1e-1,2 
2015 Jul 14  0431:12  Flock 1e-3,4 
2015 Jul 14  1545:00  Flock 1e-5,6 
2015 Jul 14  2340:00  Flock 1e-7,8 
2015 Jul 15  0601:05  Flock 1e-9,10 
 1315:00  Flock-1e 11,12 
 2249:39  Flock-1e 13,14 
2015 Jul 16  0641:39  Centennial/Arkyd 
2015 Jul 21   NRCSD-5 back in JEMAL, repressed 
2015 Sep 8   NRCSD-5 off MPEP 
2015 Sep 9   SSOD-4 on MPEP 
2015 Sep 17  1203 Deploy SCUBE 
2015 Sep 17  1215 Deploy SERPENS 
2015 Sep 18   MPEP back to AL 
2015 Sep 25   JSSOD off MPEP 
2015 Oct 1   NRCSD-6 on MPEP 
2015 Oct 2   NRCSD-6/MPEP outside 
2015 Oct 5  1405:00  AAUSAT, GOMX 
2015 Oct 6  0115:02  Flock 2b-1,2 
 0430  Flock 2b-3,4 
 0831:35 Flock 2b-5,6 
 1145:00 Flock 2b-7,8 
2015 Oct 7  0010:00  Flock 2b-9,10 Dep 5 
  Deployer 6 failed 
 1225:00  Flock-2b 13,14, Dep 7 
2015 Oct 20   MPEP back inside 
2015 Oct 26   NRCSD removed from AL 
2015 Nov 12   EXHAM-2 outside 
  EXHAM-2 put by JRMS onto EF 
2016 Jan 8   SPDM put RMCT-1, TB4 on AL slide 
2016 Jan 8   RRM TB4 inside JEM AL for SPX-8 return 
2016 Jan 28   Aggiesat in SSKILOPS 
2016 Jan 29   SSIKLOPS outside JEMAL 
2016 Jan 29  1550:10  SSIKLOPS deploy Aggiesat 
2016 Feb 1   SSIKLOPS inside JEMAL/Kibo 
2016 Mar 29   EFU adapter on slide table 
2016 Apr 18   MPEP on slide table 
2016 Apr 21?   JSSOD-M1 on MPEP 
2016 Apr 27   MPEP outside 
 1145 Diwata-1 ejected 
2016 Apr 28  MPEP inside 
2016 May 12   NRCSD-7 on MPEP 
2016 May 12   MPEP on slide table  
2016 May 16  1005:26  Silo 8: MINXSS, CADRE 
 1440:00  Silo 7: STMSAT, NODES 
2016 May 17  0845  Silo 1: Flock 2e'-1,2 
 1200  Silo 2: Flock 2e'-3,4 
 2300  Silo 3: Flock 2e-1,2 
2016 May 18  0215  Flock 2e-3,4 
 0705  Lemur-2 5,6 
 1115  Lemur-2 7,8 
2016 May 20   Slide table inside 
2016 May 29?  NRCSD-8 on MPEP 
2016 May 30   MPEP outside 
 1140  Flock-2e 5,6 
2016 May 31  0045  Flock-2e 7,8 
 0400  Flock-2ep 5,6 
 0935  Flock-2ep 7,8 
 2355  deploy 2e 9,10 
2016 Jun 1  0310  deploy 2e 11,12 
2016 Jun 1  0625  deploy 2ep 9,10 
2016 Jun 2  0215  Deploy 2ep 11,12 
2016 Jun 6   MPEP inside 
2016 Jun 6   Remove NRCSD from MPEP 
2016 Jun 13   Retrieve Exham1-2 
2016 Jun 29   EXHAM on slite table 
  EXHAM out; JRMS install on EF handrail 
2016 Aug 5   NREP on slide table 
  JRMS install NREP on JEM-EF EFU4 
2016 Sep 14  1525:01  Deploy 2ep 13,14 
2016 Sep 14  2315  Deploy 2ep 15,16? 
2016 Sep 15  0235:00  Dep 2ep 17,18? 
2016 Sep 15  0540  Dep 2ep 19,20 
2016 Sep 23   NRCSD off MPEP 
2016 Sep 26   MPEP/SAM off slide table 
2016 Sep 27?  JOTI (JEM ORU Transfer Interface) moved from PMA2 to slide table 
2016 Sep 27   RELL (Robotics External Leak Indicator) on JOTI 

2016 Nov 29  

 RELL grappled by SPDM 
2016 Dec 5   RELL returned to JEMAL 
2016 Dec 7   RELL off slide table 
  MPEP on slide table 
2016 Dec 16   SSOD 5 on MPEP 
2016 Dec 19   SSOD 5/MPEP outside 
2016 Dec 19  0855  Deploy STARS-C 
2016 Dec 19   SSOD/5 MPEP on slide table 
2016 Dec 22   SSOD 5 inside, off MPEP 
2016 Dec   SSOD 6 on MPEP 
2017 Jan 10  0910? ITF-2, Freedom, WasedaSat 3 
 0920? EGG 
 1040  AOBA-Velox III 
 1050  TuPOD 
2017 Jan 18   MPEP inside 
  SSOD 6 off MPEP 
2017 Feb 3   JRMS remove EFU adapter from EFU5 
  JRMS return EFU adapter to JEMAL 
2017 Feb 7   HTDV on EFU adapter, onto slide table 
2017 Feb 8   JOTI transferred from PMA-2 storage 
  JOTI in JEM 
2017 Feb 10  JOTI on slide table 
2017 Feb 11   JOTI/RELL outside 
  SPDM use RELL 
2017 Feb 12   JOTI/RELL inside 
2017 Feb 17   NRCSD-10 on MPEP 
2017 Mar 6  1025:01  Lemur x 2 deploy 
2017 Mar 6  1505:00 Lemur x 2 deploy 
2017 Mar 6  1820:00 Techedsat 5 deploy 
2017 Mar 9   MPEP inside, remove NRCSD 
  Install HXP on MPEP  
2017 Apr 13   Exham 2 on EP 
2017 Apr 18   MPEP inside, replaced with Cyclops 
2017 Apr 18   NREP on slide table 
2017 Apr 25   NREP inside: remove Gumstix 
  Attach NR-CID and HM DM7 to NREP 
2017 Apr 28   NREP installed on EF  
2017 Apr?   NRCSD-11 on MPEP 
2017 May 1   MPEP in JEMAL 
2017 May 16  0824:59  Deploy SOMP 2, HAVELSAT, Columbia Sat 
2017 May 16  1154:59  Deploy CXBN-2, IceCube, KySat-3/SGSAT 
2017 May 17  0145:00  Deploy Phoenix, X-Cubesat, qbee50 
 0812:59  Deploy Altair 
 1240:01  Deploy SHARC 
2017 May 18  0100:00  Deploy ZA-Aerosat, LINK 
 0415:00  Deploy CSUNSat 
 0825:00  Deploy UPSat, SpaceCube, Hoopoe 
2017 May 24   NRCSD-11 off MPEP 
  NRCSD-12 on MPEP 
2017 May 25  0525  Deploy Challenger, NJUST1, UNSW-EC0 
 0835  Deploy DUTHSat, Lilacsat1, nSIGHT1 
 1155 Deploy QBITO, Aalto2,SUSAT 
 2340  Deploy SNUSAT 1b 
2017 May 26  0400  Deploy i-INSPIRE2, PolyITAN, SNUSAT 1 
 0855  Deploy Ex-Alta 1 
 1215  Deploy Aoxiang 1,BeEagleSat, Atlantis 
2017 May 30   NRCSD-12 off MPEP 
2017 Jun 16   J-SSOD7 on MPEP 
2017 Jul 7   J-SSOD7 outside 
2017 Jul 7  0850  Deploy BIRD J G M 
 0910  Deploy BIRD B N 
2017 Jul 20   Redeploy EXHAM-1 
2017 Aug 9   SSRMS put MBSU on JOTI 
  MBSU inside JEM AL 
2017 Sep 7   MBSU inside JEM for repair 
2017 Sep   MBSU stored in JEM AL 
2017 Oct 18   MBSU stored in JEM 
  Kaber on slide table 
2017 Oct 24  0945 KE2M deploy 
2017 Oct 25   Kaber inside 
2017 Oct 25   SIMPL on Kaber 
2017 Oct 27  0915:23 SIMPL deploy 
2017 Oct 28?  Kaber back inside 
2017 Oct 30   MBSU on slide table 
2017 Nov 4   MBSU extracted by SPDM 
2017 Nov 5   JOTI off table, MPEP on 
2017 Nov 17   NRCSD-13 on MPEP 
2017 Nov 20  0805:00  ECAMSAT deployer 3 
 1225:01  ASTERIA deployer 1 
 1702:02  Deillingr RBLE, deployer 5 
2017 Nov 21  0825  TES-6, deployer 7 
 1140  OSIRIS-3U, deployer 8 
  NRCSD-13 inside 
2017 Dec 21   NREP retrieved from EFU4 
2018 Jan 4   Remove CID (EPM2) and DM (EPM4) from NREP 
  Install Cavalier (EPM5) on NREP 
2018 Jan 10   NREP reinstalled on EFU4 
2018 Apr 13   MISSE-FF Transfer Tray on slide table 
  4 MISSE sample carriers on Tray 
2018 May 11   J-SSOD8 outside 
 1030  Deploy 1KUNS-PF, Irazu 
 1040  Deploy Ubakusat 
2018 May 14   J-SSOD inside 
  ExHAM/HXP on MPEP 
  ExHAM/HXP/MPEP outside  
2018 May 17   Bring ExHAM2 samples back inside 
2018 May 18   Attach new samples to ExHAM2 
  ExHam in airlock 
2018 Jun 20  1135:00 RemoveDebris deployed by SPDM 

Payload:

  • KOBAIRO ISPR-1 rack, Gradient Heating Furnace

  • SAIBO ISPR-2 rack, CBEF (Cell Biology Expt Facility) and CB (Clean Bench)

  • TAIKIRO ISPR-3 rack, AFEX floating zone furnace (Advanced Furnace for Experiments with X-ray radiography)

  • RYUTAI ISPR-4 rack, Fluid Physics; PCRF (Protein Crystallization Research Facility), IPU (Image Processing Unit), SCOF (Solution Crystallization Observation Facility), FPEF (Fluid Physics Experiment Facility)

  • JEM RMS control station

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...