Thursday, December 5, 2019

Orion EFT-1

 2014-076A


Exploration Flight Test of Orion on Delta 4, two orbits. SV is assembled at Michoud, outfitted at LM/OCF-KSC and then tested at LM/Denver. The flight is operated by LM Space Systems/Denver, rather than by NASA.

Flight capsule, dummy SM and test fairings. SM fairings provide structural strength during stage 1 burn and are jettisoned during the stage 2 burn to save mass.

Mass is 21000 kg including SM and LAS; 8600 kg CM at landing. CM+LAS at lanch 17000 kg. LAS motor is 3464 kg, with 1780 kN thrust. LAS ACS motor is 760 kg. LAS jettison motor is 410 kg, giving a lower limit of 4650 kg to LAS and upper limit of 12350 kg to the CM; infer service module is about 2650 kg. Orion to stage adapter connects to DCSS. Fairings 450 kg x 3.


CM  9400?  
SM  2650?  
LAS  7650?  
Panels 1383  


Total  21083  
OSA  510  


EFT1 
 

DateTimeEventOrbit  

2014 Dec 5  1205 Launch by Delta 4H  CC SLC37 
  T+3:58 Side CBC MECO, sep 
  T+5:31 CBC Core MECO 
 1210 T+5:38 Stage 1 sep 
 1210 T+5:51 Stage 2 MES 
 1211 T+6:16 SM fairings sep 
 1211 T+6:20 LAS sep 
 1222 T+17:17 Stage 2 MECO-1 185 x 888 x 28.8  
 1400  T+1:55:20 Rev 2 Stage 2 MES-2 4:45 
  T+2:00:11 MECO-2  -37 x 5807 km x 28.8  
 1510 T+3:05 Apogee 5807 km 
 1528 T+3:23:36 Stage 2 sep from CM -8.36 113.67 5275 km 
 1550 Stage 2 burn 3, 1 min 
 1602 T+3:57:11 RCS burn 10s, translation 
 1616  T+4:11:05 Stage 2 reentry over Pacific 
 1618 T+4:13:35 Orion reentry interface 8.9 km/s  
  T+4:19:29 Forward bay cover sep, para deploy 
 1629  T+4:23:29 Splashdown off Baja 
  23.60N 116.46W  
  Recovery by USS Anchorage 