Thursday, January 30, 1992
Sunday, January 26, 1992
Corona 51
1962-046
KH-4 Mission 9043 was launched by Thor Agena B on 1962 Sep 17. It entered a high apogee 207 x 670 km x 81.9 deg orbit compared to the planned 207 x 446 km x 82.6 deg one. The SRV was recovered after a one day flight as a test of improvements to the recovery procedure. The capping shutter had malfunctioned and there was slight corona and radiation fog on the photos but the photos were of satisfactory quality.
| KH-4 Mission 9043 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1962 Sep 17 | 2346:18 | Launch by Thor Agena B | V Pad 4 |
| 2348 | Thor MECO (T+2:27) | ||
| 2348 | Thor VECO (T+2:36) | ||
| 2348 | Thor sep (T+2:46) | ||
| 2349 | Agena burn (T+3:13) | ||
| 2353 | Agena cutoff (T+7:16) | 93.32 207 x 670 x 81.76 (VCR) | |
| ERS 2 failed to separate | |||
| 1962 Sep 18 | 0046 | 93.37 201 x 677 x 81.87 | |
| 1962 Sep 19 | 93.3 204 x 668 x 81.8 (SATCAT) | ||
| 1962 Sep 19 | 0210? | SRV sep after 1.10d, rev 17 | |
| 0255 | SRV recovered from air | ||
| 1962 Sep 19 | 1059 | 93.20 196 x 672 x 81.83 | |
| 1962 Sep 20 | 1200 | 93.33 204 x 668 x 81.84 | |
| 1962 Sep 21 | 0631 | 93.12 192 x 662 x 81.83 | |
| 1962 Oct 17 | 1430 | 91.87 196 x 533 x 81.84 | |
| 1962 Nov 7 | 1430 | 90.09 191 x 363 x 81.84 | |
| 1962 Nov 12 | 88.1 179 x 179 x 81.8 (SATCAT) | ||
| 1962 Nov 17 | 2340 | 88.06 178 x 178 x 81.83 | |
| 1962 Nov 19 | 0400? | CORONA/Agena reentered | |
Friday, January 24, 1992
Luna 2
1959-014A
In Sep 1959 an attempt was made to launch E-1A No. 6, but although the strapons began to fire, the booster core stage failed to ignite properly. The rocket did not take off and was removed from the launch pad. A backup vehicle was called into service with payload E-1A No. 7; E-1A No. 6 was used as a testbed.
The Korolyov team's efforts were crowned with success on the seventh attempt - E-1A No. 7, another AMS `Luna' probe, now known as Luna-2, impacted the lunar surface. It was launched on 1959 Sep 12 and hit the Moon at 30 deg N, 0 deg W at 2102 UTC on Sep 13.
Lunar impact velocity was 3.3km/s at an angle of 60 deg to the surface. The asymptotic geocentric velocity was (if the translation of one source is correct) 2 km/s. Inclination of the orbit was 65 deg.
| AMS Luna-2 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1959 Sep 12 | 0639:26 | Launch by 8K72 | KB |
| 0644? | Blok A sep | ||
| 0644? | Blok-E burn | ||
| 0651? | Blok-E sep | ||
| 1959 Sep 13 | 2102:23 | Lunar impact | |
Thursday, January 23, 1992
Wednesday, January 22, 1992
STS-51-D (Discovery)
1985-028A
After cancellation of 51-E and replanning, the mission was referred to in some internal documents as 51-DR or 51D(R).
After ET sep, a test to dump excess fuel was performed; the LOX vent torque was larger than expected and put Discovery into a 45 degree roll, which was quickly removed by RCS firings.
Deployment of the Anik satellite went smoothly, but Syncom failed to boot up after ejection. Discovery made a burn to reverse its separation maneuver as a plan was developed to fix the problem. A lever on the side of the satellite is normally knocked to the on position by the system that spins the Syncom out of the payload bay; triggering the lever is meant to active the electronics on the satellite. NASA's theory was that the lever had not been triggered. On April 15 the astronauts assembled two 'flyswatter' devices in the cabin, and the next day Hoffman and Griggs made a spacewalk to attach them to the RMS arm. On Apr 17 Discovery reapproached Syncom and used the robot arm to swat the Syncom's lever. The flyswatter made contact with the lever twice during the encounter but with no effect. Plans were drawn up to repair the satellite on a subsequent mission.
| STS 51-D mission events | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1985 Mar 23 | Roll to VAB | VAB | |
| 1985 Mar 28 | Rollout | LC39A | |
| 1985 Apr 12 | 1359:05 | Launch from LC39A | |
| 1401:12 | SRB sep at 46.7 km | ||
| 1407:57 | MECO at 109.9 km | ||
| 1408:16 | ET sep at 112.7 km | 89.75 64 x 459 x 28.5 (dV) | |
| 1442:20 | OMS-2 (2:23) 70m/s | ||
| 1444:43 | OMS-2 CO | 92.17 302 x 459 x 28.53 | |
| 1534 | PLBD open | ||
| 2012 | RMS tests | ||
| 2037 | RMS checkout complete | ||
| 2338:38 | Anik C1 deploy | ||
| 2354? | SEP-1 (OMS-3 RH 13s) 3m/s | 92.30 314 x 460 x 28.52 | |
| 1985 Apr 13 | 1458:22 | Leasat deploy | |
| 1510 | Stationkeep with Syncom IV-3 | ||
| 1514 | SEP-2 (OMS-4 8s) 4m/s | 92.30 314 x 460 x 28.52 | |
| 1543 | Planned Syncom PKM burn | ||
| 1636 | RETRO (OMS-5 8 s) 4m/s burn to stay 65 km from Syncom | ||
| 1985 Apr 14 | 1647 | 92.32 314 x 461 x 28.52 | |
| 1985 Apr 15 | 1045 | 92.31 314 x 460 x 28.52 | |
| 2000 | Two flyswatters assembled in cabin | ||
| 1985 Apr 16 | 1219 | Airlock at 3.1psi | |
| 1221 | Depressing to zero | ||
| 1225 | Vacuum reached | ||
| 1233 | HO | ||
| 1236 | Out in bay | ||
| 1240 | EVA (Hoffman;Griggs) (03:07, dp =03:10) | ||
| 1250 | EV2 biomed sensor failed | ||
| 1315? | Attach `flyswat' device to RMS | ||
| 1350 | Flyswat attach complete | ||
| 1420? | RMS cradled | ||
| 1507 | PSA stowed | ||
| 1519 | Ingress | ||
| 1530 | HC | ||
| 1535? | Repress | ||
| 1550? | EVA complete | ||
| 2054? | NSR (OMS-6 LH 12s) 3m/s | ||
| 1985 Apr 17 | 0700 | 92.31 315 x 459 x 28.52 | |
| 0929 | NCC mv | ||
| 1035 | NC3 (OMS-7 LH 13s) 3m/s | ||
| 1100 | TI (OMS-8 LH 9s) 3m/s | ||
| 1200 | MC3 burn RCS? | ||
| 1307 | At 15m from Syncom | ||
| 1400 | Rendezvous Syncom | ||
| 1405 | Arm in movement | ||
| 1414:56 | RMS contact with Leasat 3 | ||
| 1415:30 | Second RMS contact with Leasat 3 | ||
| 1418 | Contact time window closed | ||
| 1422? | RMS cradled | ||
| 1430? | Sep (OMS-9/LH 22s) 7m/s | 92.54 336 x 461 x 28.5 | |
| 1985 Apr 18 | 1610 | 92.55 337 x 461 x 28.52 | |
| 1985 Apr 19 | 0831 | PLBD closed | |
| 1244:25 | OMS DO (238s) 138m/s | ||
| 1248:23 | OMS DO CO | ||
| 1324 | Entry | ||
| 1354:28 | Landed RW33 KSC | ||
| 1354:36 | NGTD | ||
| 1355:31 | Wheels stop | ||
| 1820 | Tow to OPF | ||
Tuesday, January 21, 1992
Monday, January 20, 1992
Insat 1A
1982-031A
Insat 1A was built by Ford Aerospace for ISRO. It was launched on 1982 Apr 10 by Delta 3910/PAM-D. After launch, the solar panel and the C-band antenna did not deploy. After 12 days the C-band system was activated but the solar panel problem affected many of the systems; the VHRR imager failed in August, and attitude control was lost in September.
| Insat 1A | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1982 Apr 10 | 0647 | Launch by Delta 3910/PAM-D | CC LC17 |
| T+0:57 SRM 1-6 off | |||
| T+1:02 SRM 6-9 on | |||
| T+1:10 SRM 1-3 sep | |||
| T+1:24 SRM 4-6 sep | |||
| T+1:59 SRM 6-9 off | |||
| T+2:05 SRM 6-9 sep | |||
| T+3:43 MECO | |||
| T+3:45 St 1 sep | |||
| T+3:51 SES-1 5:04 | |||
| T+4:01 Fairing | |||
| 0655 | T+8:55 SECO-1 | ||
| T+18:45 spinup | |||
| 0705 | T+18:47 St 2 sep | -579? x 228 x 28.1 | |
| 0706 | T+19:26 TES 86s | ||
| 0707 | T+20:52 TECO at 17W 0N | ||
| 0717 | Stage 2 reentry over 17E 18S? | ||
| 0727 | T+40? PAM sep (20 min after burnout) | ||
| 1982 Apr 10 | 1230 | 631.33 223 x 35776 x 28.1 | |
| 1982 Apr 11 | LAM-1 Apogee burn | ||
| 1982 Apr 12 | LAM-2 burn | ||
| 1982 Apr 12 | 1416.73 35031 x 35781 x 0.5 GEO 75.8E+4.9E | ||
| Solar sail failed to deploy | |||
| 1982 Apr 15 | LAM | ||
| 1982 Apr 22 | C-band deployed | ||
| 1982 May 4 | 1436.08 35394 x 36178 x 0.5 GEO 73.5E | ||
| 1982 Jun 25 | 1436.03 35393 x 36176 x 0.4 GEO 72.6E | ||
| 1982 Jun 25 | On station | GEO 72.4E | |
| 1982 Aug 13 | VHRR failed | ||
| 1982 Sep 4 | Attitude control lost | ||
| 1982 Sep 6 | Decommissioned | ||
| 1983 Dec 29 | Drifting | 1434 GEO 89Wdr | |
| 1984 May 3 | 1434.14 35561 x 35935 x 0.1 GEO 19.3W+0.5E | ||
SNAPSHOT
1965-027A
Project SNAPSHOT was a joint effort between the US Air Force and the Atomic Energy Commission (AEC) to test a fully functioning nuclear reactor in Earth orbit. The vehicle was attached to Agena 7001.
SNAP 10A was 440 kg including a 102 kg shield and a 14 kg heat shield.
A secondary payload sometimes described as an ionosphere beacon experiment is actually the SECOR geodetic satellite.
A fairing covered the reactor at launch; two side panel heat shields were jettisoned on orbit.
The SNAP is 436 kg, but there is also a cylindrical instrument section carrying secondary payloads and equipment; the Agena/instrument section was 1964 kg for a total dry mass of 2400 kg. Actual on orbit mass would be less than this by the mass of the heat shield and possibly the nose fairing.
SNAP is a cone 3.5m long 1.3m dia, the instrument section is around 1.3m long 1.5m dia and the Agena about 6.3m long 1.5m dia.
The reactor (40 kW nominal reactor power for 500W of provided electrical power) had U235 fuel moderated by ZrH and with beryllium reflectors; NaK-78 coolant was circulated through the system. It converted heat to energy via a SiGe thermoelectric converter. The reactor is shielded using lithium hydride. In addition to an aerodynamic nose fairing, the thermoelectric converter is surrounded by an ejectable heat shield "to prevent NaK plugging prior to startup", i.e. to prevent freezing of the NaK. The reactor had 37 fuel elements in a triangular array.
An ion engine test was carried; electromagnetic interference caused false horizon sensor data and `severe' attitude perturbations.
The reactor is described in SNAP Reactor Overview (S. Voss, 1984), AFWL-TN-84-14.
1965-27E, Catalog SSN 01399, has been associated with three different objects.
(1) An object in a 111.51 min, 1270 x 1321 km x 90.2 deg orbit was observed from Jun 1965 to Apr 1971. It appears to be a duplicate of the SNAPSHOT payload.
(2) An object in a 106.89 min, 1024 x 1141 km x 89.9 deg orbit was observed from Dec 1968 to Sep 1970. Based on its orbit and orbital plane it was probably a duplicate of 1965-48A, Transit NNS O-4; element sets on 1969 Feb 11 and 1970 Sep 13 are essentially identical.
(3) An object in a 101.07 min, 750 x 867 km x 90.5 deg orbit was first observed in Nov 1972. In Jul 1988 it had decayed to 671 x 739 km; all SSN 01399 elements since 1972 have been for this object. It is probably Transit debris - and might be associated with the 1972 TRIAD launch which was in a similar orbit and was close in orbital plane in Nov 1972. However, the inclination is different by 0.4 deg.
In around 1979, small debris objects began to be cataloged from SNAPSHOT. It is believed they emanate from the Agena and are similar to other small debris from SEASAT's Agena. The objects were released over many years rather than in one event.
| SNAPSHOT | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1965 Apr 3 | 2124 | Launch by Atlas Agena D | V |
| T+2:14 BECO | |||
| 2126 | Booster sep | ||
| 2128 | T+4:29 Atlas SECO | ||
| 2128 | Atlas sep | ||
| 2130 | T+6:00 Agena MES-1 | ||
| Nose cone ejected | |||
| 2133:40 | T+9:40 Agena MECO-1 | 161 x 1290? x 90.0 | |
| 2222? | Ionosphere beacon jettison at 1300 km | ||
| 2222:17? | T+58:17 Agena MES-2 10s | 111.6 1282 x 1313 x 90.0 | |
| 2222:27? | T+58:27 MECO-2 | ||
| 2230? | EGRS sep (rev 0) | ||
| 1965 Apr 4 | 0105 | Reactor startup | |
| Ion engine telemetry failed | |||
| 0300? | Reactor critical | ||
| 1965 Apr 4 | 0500? | Full power 600W | |
| 0738? | `sensible heat' generated, H+0 | ||
| 1965 Apr 4 | 0744? | H+6min Heat shield halves ejected (reactor at 275F, L+10:20?) | |
| 0942? | Rev 7, Temp switch closure | ||
| 1965 Apr 5 | 0530? | Rev 18, ion engine operation | |
| EMI problems cause vehicle slew | |||
| Ion engine shut down | |||
| 1965 Apr 10 | 0524 | Passive control phase begins | |
| 1965 May 16 | 1635 | Voltage regulator failed, auto shutdown, rev 555. | |
| F+1h reflectors ejected but connected by cables | |||
Jumpseat 4
1975-017A
This launch was initially reported to be SDS 1 but it is now clear that the first SDS launch was later. The mission was a success,with the satellite still operating as late as Jun 1983.
| JUMPSEAT 4 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1975 Mar 10 | 0441 | Launch by Titan 34B Agena D | |
| 0443 | Stage 2 burn | ||
| 0446 | Stage 2 MECO | -3800? x 180 x 63.3 | |
| 0448 | Agena MES-1 | ||
| 0451? | Agena MECO-1 | 180? x 360? x 63.3? | |
| 0455? | Stage 2 reentry | ||
| 0519? | Agena MES-2 | ||
| 0521? | Agena MECO-2 | 702.0 295 x 39337 x 63.5 | |
| 0525? | Agena sep | ||
Saturday, January 18, 1992
Kosmos 2049
1989-088A
| Kosmos-2049 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1989 Nov 17 | 1050:00 | Launch by Soyuz | Baykonur |
| 1059 | Blok-I sep | ||
| 1989 Nov 17 | 89.00 181 x 268 x 64.8 | ||
| 1989 Nov 18 | 0416? | Raise orbit | 89.36 210 x 274 x 64.8 |
| 1989 Nov 18 | 0640? | Raise orbit | 89.77 236 x 289 x 64.8 |
| 1989 Nov 21 | 89.64 231x282x64.8 | ||
| 1989 Nov 26.0 | 89.63 237x274x64.8 from 89.44 223x269 | ||
| 1989 Nov 26.1 | 89.85 240x293x64.8 from 89.63 237x274 | ||
| 1989 Dec 6.9 | 89.99 242x305x64.8 from 89.42 224x267 | ||
| 1989 Dec 24.6 | 89.74 246x276x64.8 from 89.33 219x263 | ||
| 1990 Jan 3.0 | 89.80 247x281x64.8 from 89.31 231x249 | ||
| 1990 Jan 15.4 | 89.96 241x303x64.8 from 89.33 226x255 | ||
| 1990 Jan 29.3 | 89.79 249x287x64.8 from 89.47 223x273 via 89.62 240x271 | ||
| 1990 Feb 10.2 | 89.81 241x288x64.8 from 89.34 223x259 | ||
| 1990 Feb 22.9 | 89.80 239x289x64.8 from 89.34 224x259 | ||
| 1990 Mar 4.8 | 89.80 241x287x64.8 from 89.36 223x262 | ||
| 1990 Mar 18.4 | 89.77 240x286x64.7 from 89.33 223x259 | ||
| 1990 Mar 30.4 | 90.14 241x321x64.7 from 89.19 217x251 | ||
| 1990 Apr 15 | 89.78 239x288x64.7 from 89.63 224x287 | ||
| 1990 Apr 24 | 89.78 235x291x64.7 from 89.41 221x269 via 89.61 247x263 | ||
| 1990 May 4.0 | 89.79 240x288x64.7 from 89.42 227x264 | ||
| 1990 May 17 | 89.76 240x284x64.7 from 89.41 227x263 | ||
| 1990 May 26 | 89.78 242x284x64.7 from 89.41 227x263 | ||
| 1990 Jun 11.8 | 89.74 238x284x64.7 from 89.24 223x250 | ||
Kosmos 320
1970-005A
DS-MO No. 2 (Kosmos-320) was similar to the first DS-MO atmospheric drag experiment satellite, Kosmos-149.
| Kosmos-320 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1970 Jan 16 | 1100 | Launch by 11K63 | GTsP4 |
| 1102 | Stage 2 burn | ||
| 1110? | Stage 2 sep | ||
| 1970 Jan 17 | 1430 | 90.18 247 x 326 x 48.40 | |
| 1970 Jan 28 | 0028? | Stage 2 reentered | |
| 1970 Feb 10 | 0307? | Reentered | |
Thursday, January 16, 1992
Foton 2
1989-032A
The Foton No. 3 reentry vehicle was refurbished again for the second named Foton mission.
| Foton No. 5 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1989 Apr 26 | 1700:00 | Launch by Soyuz | PL LC41/1 |
| 1704 | Blok-I burn | ||
| 1708 | Blok-I sep | ||
| 90.52 222 x 378 x 62.8 | |||
| 1989 May 8 | 1700 | 90.23 213 x 359 x 62.8 | |
| 1989 May 11 | 0500 | 90.17 212 x 355 x 62.8 | |
| 1989 May 11 | 0724? | Deorbit | |
| 0731? | PO sep | ||
| 0742? | Entry | ||
| 0756? | Landed | ||
Wednesday, January 15, 1992
Kosmos 1943
1988-039A
This was the first operational Tselina-2 satellite in plane 2.
| Kosmos-1943 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1988 May 15 | 0920:00 | Launch by Zenit-2 | KB |
| 0922:23 | T+2:23 St 1 MECO | ||
| 0922:25 | T+2:25 Stage 1 sep | ||
| 0922:25 | T+2:25 Stage 2 burn | ||
| 0922:40 | T+2:40 GO sep | ||
| 0926:42 | T+6:42 Stage 2 MECO | 150? x 850? x 71.0 | |
| 0933 | Sep motor cover perigee | ||
| 0935? | T+15m? Stage 2 VECO | ||
| 0935? | Stage 2 sep motor covers | ||
| 0935? | T+15m? Stage 2 sep | ||
| 1988 May 16 | 101.93 849x852x71.0 | ||
Friday, January 10, 1992
Intelsat 203
1967-026A
The Intelsat II F-3 satellite (nicknamed Lani Bird or Atlantic 2) was stationed over the Eastern Atlantic to supplement Early Bird. From 1967 to 1969 it remained over 0-20W. In late 1969 it was stationed at 13W, remaining there as a backup until May 1971 when stationkeeping was somewhat relaxed. 2F3 remained over the Atlantic until May 1974 when it began to drift. It was switched off in May 1977.
| Intelsat II F-3 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1967 Mar 23 | 0130:12 | Launch by Delta E1 | CK LC17B |
| 0132:42 | T+2:30 Thor S/N 20210 MECO | ||
| 0132 | Delta S/N 20211 burn 6:13 | ||
| 0138 | Delta SECO | 93.3 246 x 633 x 28.7 | |
| 0154? | FW-4D S/N 00005 burn 30s | ||
| FW-4D cutoff | 672.9 289 x 37830 x 26.7 | ||
| 0156? | FW-4D sep | ||
| 1967 Mar 25 | 1530? | SVM-1 S/N A-24 burn | |
| 1967 Apr 7 | Communications on | ||
| 1967 Apr | On station | GEO 5W | |
| 1967 May 1 | 1436.07 35777 x 35795 x 1.3 GEO 11.3W+0.00 | ||
| 1967 Jul 20 | 1436.14 35774 x 35801 x 1.1 GEO 3.6W | ||
| 1967 Oct 27 | 1436.14 35774 x 35801 x 1.1 GEO 17.3W | ||
| 1968 Mar 17 | 1436.03 35774 x 35795 x 0.5 GEO 14.7W | ||
| 1968 Oct 16 | 1436.09 35776 x 35796 x 0.2 GEO 10.4W | ||
| 1969 Mar 17 | 1436.11 35776 x 35797 x 0.5 GEO 8.2W | ||
| 1969 Dec 1 | 1436.17 35773 x 35802 x 1.1 GEO 12.9W+0.02E | ||
| 1970 Feb 9 | 1436.21 35772 x 35805 x 1.4 GEO 13.9W+0.03E | ||
| 1970 Feb | Retired | ||
| 1970 Oct 26 | 1436.20 35780 x 35797 x 2.0 GEO 12.5W | ||
| 1971 May 25 | 1436.32 35780 x 35801 x 2.6 GEO 14.4W+0.06E | ||
| 1972 Apr | GEO 35W | ||
| 1973 Jun | GEO 14.3W+0.01 4.4 | ||
| 1973 Oct | GEO 14.3W+0.00 4.6 | ||
| 1974 Jan | GEO 18.3W+0.05 | ||
| 1974 May 3 | GEO 26.3W+0.1 | ||
| 1974 Sep 20 | GEO 50W+0.2, dr | ||
| 1975 Jan 10 | GEO 87W+0.4, dr | ||
| 1975 Jun 2 | GEO 143.6W+0.3 5.9 | ||
| 1975 Sep 11 | GEO 168.8W+0.2 6.1 | ||
| 1975 Dec 30 | GEO 180.3E | ||
| 1977 Feb 24 | 1434.51 35670 x 35840 x 7.2 GEO 87.0W+0.4W | ||
| 1977 May | Decommissioned | ||
| 1977 Aug 12 | 1435.37 35684 x 35860 x 7.4 GEO 36.4E+0.2W | ||
| 1993 Apr 28 | 1434.97 35634 x 35894 x 14.0 GEO 152.5W+0.2W | ||
| 1998 Apr 25 | 1435.22 35662 x 35876 x 14.1 GEO 18.3E+0.2W | ||
Thursday, January 9, 1992
Kosmos 1702
1985-106A
| Kosmos-1702 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1985 Nov 13 | 1225 | Launch by Soyuz | PL |
| 1229 | Blok I burn | ||
| 1234 | Blok I MECO | ||
| 1985 Nov 13 | 90.09 198 x 358 x 72.9 | ||
| 90.19 194 x 373 x 72.9 | |||
| 1985 Nov 14 | 0130? | Orbit raise | 92.25 355 x 414 x 72.9 |
| 1985 Nov 24 | 92.27 357 x 413 x 72.9 | ||
| 1985 Nov 25 | 92.27 357 x 413 x 72.9 | ||
| 1985 Nov 27 | |||
| 0625? | Deorbit | ||
| 0635? | PO sep | ||
| 0650? | Entry | -75 x 401 | |
| 0705? | Landed | ||
Monday, January 6, 1992
Kosmos 1786
1986-080A
Kosmos-1786 was a calibration satellite launched on a Zenit-2 test flight. It has been identified by Mark Wade's web site as the 17F115 Koltso calibration satellite.
| Kosmos-1786 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1986 Oct 22 | 0800:00 | Launch by Zenit-2 | KB |
| T+2:23 St 1 MECO | |||
| T+2:25 Stage 1 sep | |||
| T+2:25 Stage 2 burn | |||
| T+2:40 GO sep | |||
| T+6:42? Stage 2 MECO | |||
| 0807 | Perigee | ||
| 0807? | Stage 2 VECO | ||
| 0807? | Stage 2 sep | ||
| 1200 | 197 x 2538 x 64.9 | ||
| 1986 Oct 27 | 191 x 2564 x 64.9 | ||
| 1986 Nov 5 | 190 x 2564 x 64.8 | ||
| 1986 Nov 16 | 188x2525x64.9 | ||
| 1986 Dec 22 | 186x2471x64.9 | ||
Kosmos 2154
1991-059A
| Kosmos-2154 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1991 Aug 22 | 1235:46 | Launch by 11K65M | Plesetsk |
| T+2:10 St 1 MECO | |||
| T+2:12 St 1 sep | |||
| T+2:12 St 2 burn 59km | |||
| T+2:27 Fairing sep 76km | |||
| 1243? | T+8:03 St 2 MECO 150 km | 150 x 1003? x 83 | |
| T+1:02:19 St 2 MES2 | |||
| T+1:02:30 St 2 MECO2 | |||
| 1338? | T+1:02:50 St 2 sep | ||
| 1991 Aug 23 | 969x1028x82.9 | ||
Thursday, January 2, 1992
Wednesday, January 1, 1992
Kosmos 1970
1988-085A
Uragan No. 42L (238) was inserted into a slightly higher orbit than usual,according to Western sources,
| Kosmos-1970 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1988 Sep 16 | 0525 | Launch by Proton | KB |
| 1988 Sep 16 | 87.53 143x161x64.8 | ||
| 1988 Sep 16 | (R/B) 674.90 19093x19124x64.9 | ||
| 1988 Sep 19 | 674.61 19075x19129x64.9 | ||
| 1988 Sep 21 | 667.42 18702x19138x64.9 | ||
| 1988 Sep 26 | 674.42 19053x19141x64.9 | ||
| 1988 Sep 27 | 677.87 19141x19226x64.9 | ||
| 1988 Sep 30 | 675.68 19115x19142x64.9 | ||
| 1988 Oct 11 | In service | ||
| 1991 Sep 15 | end of ops | ||
Korabl-Sputnik 1
1960-005
The prototype Vostok spaceship, Vostok-1P (Article 1KP), was launched in May 1960. The launching was announced as the first Korabl'-Sputnik (Spaceship-Satellite), and in the West it was nicknamed Sputnik 4. Vostok-1P was intended to test the basic attitude control systems and the retrorocket, but it did not have a heat shield and it was not intended to survive reentry.
After 4 days in orbit its retrorocket fired in the wrong direction, and both the descent module (Spuskaemiy Apparat) and the service module (Priborniy Otsek) were left in an elliptical orbit together with seven fragments. The PO reentered in 1962 and the SA in 1965.
| Korabl-Sputnik 1 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1960 May 15 | 0000:05 | Launch by 8K72 | KB LC1 |
| 0002 | Blok BVGD sep | ||
| 0002 | Fairing sep | ||
| 0005 | Blok-A sep | ||
| 0005 | Blok-E burn | ||
| 0011 | Blok-E sep | 91.17 313 x 350 x 65.0 | |
| 1960 May 18 | 1904 | 91.20 303 x 363 x 65.0 | |
| 1960 May 18 | 2352 | Rev 64 retrofire, wrong orientation | |
| 1960 May 18 | 2355 | PO sep | |
| 1960 Jun 17 | (Eps 1) | 94.16 291 x 664 x 65.0 | |
| 1960 Jun 20 | (Eps 3) | 94.11 277 x 674 x 65.0 | |
| 1960 Jul 2 | End of transmissions? | ||
| 1962 Sep 5 | 0950 | (Eps 1) PO reentry over Wisconsin | 87.82 166 x 166 x 65.0 |
| 1962 Oct 8 | (Eps 3) | 92.46 273 x 516 x 65.0 | |
| 1965 Oct 15 | SA reentry | ||
Resurs 40
1989-038A
The first satellite to be acknowledged with the Resurs F name was 14F43 No. 45, a Resurs F-1 flight. It carried two Pion subsatellites into orbit. The flight lasted 23 days, a week longer than previous 14F43 missions.
| Resurs F (14F43 No. 45) | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1989 May 25 | 0850 | Launch by Soyuz-U | PL LC43/3 |
| Blok-I sep | 88.62 177 x 236 x 82.3 | ||
| 1989 May 26 | 88.59 166 x 244 x 82.3 | ||
| Orbit raise | 89.78 255 x 272 x 82.3 | ||
| 1989 Jun 2 | 89.72 253 x 269 x 82.3 | ||
| Orbit trim | 89.77 256 x 272 x 82.3 | ||
| 1989 Jun 7 | 89.74 253 x 270 x 82.3 | ||
| Orbit trim | 89.70 259 x 270 x82.3 | ||
| 1989 Jun 8 | Pion 1 released | ||
| 1989 Jun 9 | Pion 2 released | ||
| 1989 Jun 12 | 89.72 255 x 267 x 82.3 | ||
| 1989 Jun 16 | 89.65 251 x 262 x 82.3 | ||
| 1989 Jun 17 | |||
| 0400? | Deorbit | ||
| 0410? | PO sep | ||
| 0419? | Entry | ||
| 0435? | Landed | ||
Tenma
1983-011A
The ASTRO B satellite, Tenma (`Pegasus') was launched on 1983 Feb 20. It carried a complement of X-ray astronomy experiments and studied bright galactic X-ray sources.
| Tenma | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1983 Feb 20 | 0510 | Launch by Mu-3S-3 | KASC |
| T+0:08 SB burnout | |||
| T+0:09 SB sep | |||
| T+1:10 B1 burnout | -6195 x 99 x 31.39 | ||
| T+1:20 B1 sep | |||
| T+1:26 B2 start | |||
| T+2:38 B2 burnout | -5428 x 502 x 31.46 | ||
| T+2:42 Fairing sep ( 2 parts) | |||
| T+4:00 Spinup | |||
| 0517 | T+7:37 B2 sep | ||
| 0517 | T+7:42 B3 start | ||
| 0518 | T+8:35 B3 burnout | ||
| 0519 | T+9:32 B3 sep | 94.4 487 x 503 x 31.5 | |
| Yo-yo deploy | |||
| 1984 Jul | battery failed, daytime obs only | ||
| 1985 Nov 22 | end of ops | ||
| 1988 Dec 17 | reentered | 167 x 168 x 31.4 | |
These Are Not My Beautiful Stories
Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...
-
If "The Clique" series were set in Clifton Park instead of Westchester, here's how the stories might be similar or different:...
-
The Degrassi Quarternarians: Overview The Quarternarians are a Canadian Cadets unit of exactly 25 Degrassi Junior High / High stude...
-
Season 1 (1985-1986, episodes 1-16) Introduced in Episode 1 ( Double Love) Jeanne Tripplehorn as Elizabeth Wakefield Vicki Lewis as Je...