Thursday, August 28, 2003
Sunday, August 24, 2003
Wednesday, August 20, 2003
Mir Core Module
1986-017A
The DOS-7 station was a further evolution of the earlier DOS (Salyut) vehicles and represented the culmination of the Soviet space station program. Launched in 1986, it remained in operation to the beginning of the new century.
The Mir basovoi blok (core module or base block) consists of four segments. A cylindrical work compartment consists of two cylinders. One, 2.9m in diameter and 3.4 m long contains the central control room for Mir (I will refer to it as Base Block Cylinder 1). The forward (-X axis in the Mir coordinate system; up at launch) end of this cylinder has a 0.3m long spherically curved bulkhead with a central 0.8m diameter hatch. The rear (+X axis; down at launch) of the cylinder connects to a 1.1m long conical transition section widening to a larger, 4.15m diameter cylinder 2.8m long. This cylinder, which I will call Base Block Cylinder 2, has a 1.3m long spherical bulkhead at the rear, with a 0.9m diameter hatch at the center. The work compartment has a floor (-Y axis) and a ceiling (+Y axis). An astronaut standing in the compartment facing the -X (forward) direction with their feet on the floor has the +Z axis to their left and the -Z axis to their right. Cylinder 2 has an airlock in the floor (-Y) through which garbage bags and small satellites may be ejected.
To the rear of cylinder 2 is the intermediate compartment, a small transfer tunnel 1.4m in length and 2.1m in diameter, containing the base block's 1.4m diameter +X docking port. This compartment is completely surrounded by the aggregate compartment, an unpressurized continuation of Cylinder 2, 4.15m in diameter and 2.2m long.
Forward of cylinder 1 a conical adapter section from 2.1 to 1.4m in diameter leads to the transfer compartment, an approximately spherical 1.8m diameter pressurized compartment with a docking port at the -X end, and four berthing ports at +Y, -Y, +Z, and -Z. Spacecraft can’t dock directly at these four ports, but once docked at -X they can be rotated to use the other ports.
Two solar panels are attached to the midpoint of cylinder 1 on the +Z and -Z sides.
| Mir (DOS 7) | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1986 Feb 19 | 2128:23 | Launch by Proton-K | KB |
| 2138 | Stage 3 MECO | ||
| 2138:07? | T+9:44? Proton stage 3 sep, reentered Feb 24 | ||
| 2246 | 89.1 170 x 301 x 51.6 | ||
| 1986 Feb 20 | 0600 | 172 x 300 x 51.6 | |
| 1986 Feb 22 | 170 x 335 x 51.6 | ||
| 89.66 210 x 335 x 51.6 | |||
| 0500 | 270 x 348 x 51.6 | ||
| 0930 | 324 x 340 x 51.6 | ||
| 1986 Mar 8 | 91.12 322 x 337 x 51.6 | ||
| 91.27 333 x 341 x 51.6 | |||
| 1986 Mar 14 | 330 x 344 x 51.6 | ||
| 1986 Mar 15 | 1338 | Soyuz T-15 docked -X | 330 x 341 x 51.6 |
| Crew entry: | |||
| EO-1 Kdr: Leonid Kizim | |||
| EO-1 BI: Vladimir Solov'yov | |||
| 1986 Mar 18 | 332 x 339 x 51.6 | ||
| 1986 Mar 21 | 1116 | Progress-25 docked +X | 333 x 338 x 51.6 |
| 1986 Mar 25 | P25 raise orbit | 91.50 338 x 358 x 51.6 from 91.24 332 x 339 | |
| 1986 Apr 8 | 91.53 339 x 360 x 51.6 from 91.49 337 x 358 | ||
| 1986 Apr 17 | 91.33 337 x 343 x 51.6 from 91.52 338 x 360 | ||
| 1986 Apr 20 | 1924 | Progress-25 undocked +X | 335 x 343 x 51.6 |
| 1986 Apr 26 | 2126 | Progress-26 docked +X | 335 x 345 x 51.6 |
| 1986 May 4 | 91.07 309 x 345 x 51.6 from 91.33 335 x 345 | ||
| 1986 May 5 | EO-1 Kdr, BI to Soyuz T-15 | ||
| 1212 | Soyuz T-15 undocked from -X | 310 x 345 x 51.6 | |
| 1986 May 10 | 91.28 331 x 344 x 51.6 from 91.07 309 x 345 | ||
| 1986 May 23 | 1012 | Soyuz TM docked at -X | 331 x 342 x 51.6 |
| 1986 May 25 | 341 x 359 x 51.6 from 331 x 342 | ||
| 1986 May 29 | 334 x 340 x 51.6 from 340 x 359 | ||
| 0923 | Soyuz TM undocked -X | 334 x 341 x 51.6 | |
| 1986 Jun 18 | 91.20 332 x 335 x 51.6 from 91.25 333 x 339 | ||
| 1986 Jun 20 | Orbit adjust, P26 | 332 x 337 x 51.6 | |
| 1986 Jun 22 | 1825 | Progress-26 undocked +X | 332 x 335 x 51.6 |
| 1986 Jun 24 | 91.22 332 x 337 x 51.6 from 91.19 332 x 335 | ||
| 1986 Jun 25 | 91.51 332 x 366 x 51.6 from 91.22 332 x 337 | ||
| 1986 Jun 26 | 1946 | Soyuz T-15 docked at -X | 332 x 366 x 51.66 |
| Crew transfer: EO-1 Kdr, BI aboard Mir | |||
| 1986 Jul 16 | EO-1 Kdr, BI to Soyuz T-15 | ||
| 0907 | Soyuz T-15 undocked -X | 329 x 365 x 51.6 | |
| 1986 Jul 24 | 328 x 365 x 51.6 | ||
| 1986 Aug 23 | 327 x 363 x 51.6 | ||
| 1986 Oct 6 | 325 x 358 x 51.6 | ||
| 1986 Dec 13 | 318 x 347 x 51.6 | ||
| 1987 Jan 1 | 317 x 344 x 51.6 | ||
| 1987 Jan 18 | 0727 | Progress-27 docked +X | 315 x 344 |
| 1987 Jan 21 | 315 x 344 x 51.6 | ||
| 1987 Jan 26 | Orbit adjust, P27 | 328 x 363 x 51.6 | |
| 1987 Feb 7 | 2228 | Soyuz TM-2 docked -X | 328 x 363 x 51.6 |
| Crew entry: | |||
| EO-2 Kdr: Yuriy Romanenko | |||
| EO-2 BI: Aleksandr Laveykin | |||
| 1987 Feb 10 | Orbit adjust, P27 | 342 x 368 x 51.6 from 328 x 363 | |
| 1987 Feb 20 | 346 x 370 x 51.6 from 338 x 368 | ||
| 1987 Feb 23 | 1129 | Progress-27 undocked +X | 345 x 370 x 51.6 |
| 1987 Mar 5 | 1143 | Progress-28 docked +X | 344 x 369 x 51.6 |
| 1987 Mar 9 | Orbit adjust, P28 | 354 x 369 x 51.6 from 344 x 369 | |
| 1987 Mar 26 | 0507 | Progress-28 undocked +X | 349 x 368 x 51.6 |
| 17C,D tracked | |||
| 1987 Apr 5 | Flyby by 37KE, 200m | ||
| 1987 Apr 6 | 0230 | 91.62 344 x 364 x 51.6 from 91.69 350 x 366 | |
| 1987 Apr 9 | 0036 | 37KE (Kvant) docked +X | 344 x 364 x 51.6 |
| 1987 Apr 11 | 1941 | EO-2 EVA-1 (Kdr, BI 03:40) | |
| Freed obstruction in +X port | |||
| 1987 Apr 12 | 2018 | Kvant SB undocked from 37KE +X | 344 x 364 x 51.6 |
| 1987 Apr 13 | Hatch open to Kvant | ||
| 1987 Apr 23 | 1705 | Progress-29 docked at 37KE +X | 343 x 363 x 51.6 |
| 1987 Apr 25 | 2130 | 91.61 343 x 364 x 51.6 from 91.59 342 x 363 | |
| 1987 Apr 28 | 91.62 343 x 365 x 51.6 | ||
| 1987 May 11 | 1310 | Progress-29 undocked 37KE +X | 343 x 365 x 51.6 |
| 1987 May 21 | 0553 | Progress-30 docked 37KE +X | 343 x 366 x 51.6 |
| 1987 May 22 | 91.63 343 x 366 x 51.6 | ||
| 1987 Jun 12 | 1655 | EO-2 EVA-2 (Kdr, BI 01:53) | |
| Erected solar panel at Mir +Z | |||
| 1987 Jun 13 | 342 x 367 x 51.6 from 341 x 365 | ||
| 1987 Jun 16 | 1530 | EO-2 EVA-3 (Kdr, BI 03:15) | |
| Solar panel erection | |||
| 1987 Jul 9 | 91.26 312 x 361 x 51.6 from 91.60 341 x 364 | ||
| 1987 Jul 19 | 0020 | Progress-30 undocked from 37KE +X | 312 x 360 x 51.6 |
| 1987 Jul 24 | 0331 | Soyuz TM-3 docked at 37KE +X | 311 x 359 x 51.6 |
| Crew entry: | |||
| EP-1 Kdr: Aleksandr Viktorenko | |||
| EP-1 BI Aleksandr Aleksandrov | |||
| EP-1 KI Mohammed al Faris | |||
| 1987 Jul 29 | EO-2 BI and EP-1 BI exchange roles | ||
| EP-1 crew to Soyuz TM-2 | |||
| EO-2a crew on Mir: | |||
| EO-2a Kdr: Yuriy Romanenko | |||
| EO-2a BI: Aleksandr Aleksandrov | |||
| 2034 | Soyuz TM-2 undocked from Mir -X | 309 x 360 x 51.6 | |
| 1987 Jul 30 | EO-2a crew to Soyuz TM-3 | ||
| 2328 | Soyuz TM-3 undocked from 37KE +X | 310 x 359 x 51.6 | |
| 2348 | Soyuz TM-3 docked at Mir -X | ||
| EO-2a crew enter from Soyuz TM-3 | |||
| 1987 Aug 5 | 2228 | Progress-31 docked at 37KE +X | 310 x 360 x 51.6 |
| 1987 Sep 2 | Small orbit adjust | ||
| 1987 Sep 17 | Lower perigee | 91.08 298 x 358 x 51.6 from 91.12 306 x 354 | |
| 1987 Sep 21 | 2358 | Progress-31 undocked from 37KE +X | 295 x 357 x 51.6 |
| 1987 Sep 26 | 0108 | Progress-32 docked at 37KE +X | 295 x 356 x 51.6 |
| 1987 Nov 10 | 0409 | Progress-32 undocked 37KE +X to 2.5km | |
| 0547 | Progress-32 docked 37KE +X | 288 x 344 x 51.6 | |
| 1987 Nov 16 | Orbit raise | 91.23 326 x 344 x 51.6 from 90.81 287 x 342 | |
| 1987 Nov 17 | 1925 | Progress-32 undocked 37KE +X | 327 x 343 x 51.6 |
| 1987 Nov 23 | 0139 | Progress-33 docked 37KE +X | 295 x 356 x 51.6 |
| 1987 Dec 12 | 1500 | Orbit raise (P33) | 344 x 360 x 51.6 from 323 x 340 |
| 1987 Dec 19 | Progress-33 undocked 37KE +X | 344 x 359 x 51.6 | |
| 1987 Dec 23 | 1251 | Soyuz TM-4 docked 37KE +X | 344 x 359 x 51.6 |
| 1420 | Crew entry: | ||
| EO-3 Kdr: Vladimir Titov | |||
| EO-3 BI: Musa Manarov | |||
| TM-4 KI: Aleksandr Levchenko | |||
| 1987 Dec 29 | EO-2 Kdr, BI and TM-4 KI to Soyuz TM-3 | ||
| Mir crew is now EO-3 | |||
| 0555 | Soyuz TM-3 undocked from Mir -X | 335 x 358 | |
| 1987 Dec 30 | EO-3 crew to Soyuz TM-4 | ||
| 0910 | Soyuz TM-4 undocked from 37KE +X | ||
| 0929 | Soyuz TM-4 docked at Mir -X | ||
| EO-3 crew return to Mir | |||
| 1988 Jan 23 | 0039 | Progress-34 docked at 37KE +X | 334 x 356 x 51.6 |
| 1988 Feb 26 | 0930 | EO-3 EVA-1 (Kdr, BI 04:25) | |
| Solar panel maintenance | |||
| 1355 | EO-3 EVA-1 complete | ||
| 17E,F,G,H tracked, down by 1988 Mar | |||
| 1988 Mar 4 | 0340 | Progress-34 undocked 37KE +X | 328 x 346 x 51.6 |
| 1988 Mar 25 | 2222 | Progress-35 docked at 37KE +X | 326 x 341 x 51.6 |
| 1988 Mar 26 | 91.20 326 x 341 x 51.6 | ||
| 1988 Apr 22 | Orbit raise | 91.46 331 x 362 x 51.6 from 91.03 318 x 333 | |
| 1988 May 5 | 0136 | Progress-35 undocked 37KE +X | 330 x 360 x 51.6 |
| 1988 May 15 | 0213 | Progress-36 docked 37KE +X | 330 x 358 x 51.6 |
| 1988 May 30 | 327 x 355 x 51.6 from 325 x 356 | ||
| 1988 Jun 2 | 1700 | 91.58 348 x 355 x 51.6 from 327 x 355 | |
| 1988 Jun 5 | 1112 | Progress-36 undocked 37KE +X | 349 x 356 x 51.6 |
| 1988 Jun 9 | 1557 | Soyuz TM-5 docked 37KE +X | 349 x 356 x 51.6 |
| Crew entry: | |||
| EP-2 Kdr, Anatoliy Solov'yov, VVS | |||
| EP-2 BI, Viktor Savinykh, NPOE | |||
| EP-2 KI, Alexander Alexandrov, Bulgaria | |||
| 1988 Jun 17 | EP-2 Kdr, BI, KI to Soyuz TM-4 | ||
| 0618 | Soyuz TM-4 undocked from Mir -X | 347 x 353 x 51.6 | |
| 1988 Jun 18 | EO-3 crew to Soyuz TM-5 | ||
| 1011 | Soyuz TM-5 undocked from 37KE +X | ||
| 1027 | Soyuz TM-5 docked to Mir -X | 347 x 353 x 51.6 | |
| EO-3 crew return to Mir | |||
| 1988 Jun 30 | 0533 | EO-3 EVA-2 (Kdr, BI 05:10) | |
| Rontgen/TTM repairs | |||
| 1043 | EO-3 EVA-2 completed | ||
| 17J,K cataloged, d Aug 8 | |||
| 1988 Jul 20 | 2234 | Progress-37 docked at 37KE +X | |
| 1988 Aug 6 | 91.69 345 x 369 x 51.6 from 91.44 343 x 348 | ||
| 1988 Aug 12 | 0932 | Progress-37 undocked from 37KE +X | |
| 1988 Aug 16 | 17L,M cataloged, really P37 debris | ||
| 1988 Aug 22 | 17N,P,Q cataloged, d Oct 88 | ||
| 1988 Aug 31 | 0541 | Soyuz TM-6 docked at 37KE +X | |
| 1988 Aug 31 | Crew entry: | ||
| EP-3 Kdr, Vladimir Lyakhov | |||
| EP-3 KI, Abdul Ahad Mohmand, Afghanistan | |||
| Mir VI, Valeriy Polyakov | |||
| 1988 Sep 5 | EP-3 Kdr and KI to Soyuz TM-5 | ||
| 2255 | Soyuz TM-5 undocked from Mir -X | ||
| 1988 Sep 7 | EO-3 Kdr, BI, VI to Soyuz TM-6 | ||
| 1988 Sep 8 | 0105 | Soyuz TM-6 undocked from 37KE +X | |
| 0125 | Soyuz TM-6 docked at Mir -X | ||
| EO-3 Kdr, BI, VI to Mir | |||
| 1988 Sep 12 | 0122 | Progress-38 docked at 37KE +X | |
| 1988 Sep 23 | 17R-V (garbage) d Oct-Nov | ||
| 1988 Oct 10 | 17W-Z (garbage) d Oct | ||
| 1988 Oct 16 | 91.48 331 x 364 x 51.6 from 91.34 328 x 352 | ||
| 1988 Oct 16 | 17AA-AE (garbage) | ||
| 1988 Oct 20 | 0559 | EO-3 EVA-3 (Kdr,BI 04:12) | |
| Rontgen TTM repairs | |||
| 1011 | EO-3 EVA-3 complete | ||
| 17AF,AG,AH,AJ (EVA debris?) | |||
| 1988 Oct 27 | 17AK,AL,AM,AN | ||
| 1988 Nov 13 | 17AP,AQ,AR,AS,AT | ||
| 1988 Nov 19 | 91.65 340 x 371 x 51.6 from 91.24 321 x 350 | ||
| 1988 Nov 23 | 1213 | Progress-38 undocked from 37KE +X | |
| 1988 Nov 28 | 1716 | Soyuz TM-7 docked at 37KE +X | 91.60 337 x 369 x 51.6 |
| Crew entry: | |||
| EO-4 Kdr, Aleksandr Volkov | |||
| EO-4 BI, Sergei Krikalyov | |||
| TM-7 KI, Jean-Loup Chretien | |||
| 1988 Dec 9 | 0957 | EO-4 EVA-1 (Kdr, KI 06:00) | |
| 1016 | Chretien egress | ||
| 1033 | Volkov egress | ||
| ERA structure experiment | |||
| 17AU-AY cataloged | |||
| 1557 | EO-4 EVA-1 complete | ||
| 1988 Dec 15 | 17AZ-BF cataloged | ||
| 1988 Dec 21 | EO-3 Kdr, EO-3 BI, TM7 KI to Soyuz TM-6 | ||
| Mir crew now EO-4 Kdr, BI and Mir VI | |||
| (Volkov, Krikalyov, Polyakov) | |||
| 0332 | Soyuz TM-6 undocked from Mir -X | 91.37 328 x 356 x 51.6 | |
| 1988 Dec 22 | EO-4 Kdr, BI, VI to Soyuz TM-7 | ||
| 0645 | Soyuz TM-7 undocked from 37KE +X | 328 x 356 x 51.6 | |
| 0659 | Soyuz TM-7 docked at Mir -X | ||
| EO-4 Kdr, BI, VI to Mir | |||
| 1988 Dec 27 | 0535 | Progress-39 docked at 37KE +X | 91.34 327 x 354 x 51.6 |
| 1988 Dec 31 | 17BG-BS (11 obj) cataloged | ||
| 1989 Jan 20 | 91.11 319 x 340 x 51.6 | ||
| 1989 Jan 22 | Orbit raise | 91.51 338 x 360 x 51.6 | |
| 1989 Jan 28 | 91.75 353 x 368 x 51.6 from 336 x 358 | ||
| 1989 Feb 7 | 0646 | Progress-39 undocked 37KE +X | 350 x 365 x 51.6 |
| 1989 Feb 12 | 1030 | Progress-40 docked 37KE +X | 347 x 364 x 51.6 |
| 1989 Feb 15 | 17BT cataloged | ||
| 1989 Feb 24 | 91.81 358 x 369 x 51.6 from 91.58 344 x 360 | ||
| 1989 Mar 3 | 0146 | Progress-40 undocked from 37KE +X | |
| 1989 Mar 18 | 2051 | Progress-41 docked at 37KE +X | 360 x 385 x 51.6 |
| 1989 Mar 21 | Orbit raise | 92.01 366 x 381 x 51.6 from 91.66 349 x 364 | |
| 1989 Apr 10 | Orbit raise | 92.17 372 x 390 x 51.6 from 91.91 356 x 381 | |
| 1989 Apr 17 | Orbit raise | 92.45 373 x 416 x 51.6 from 92.13 371 x 387 | |
| 1989 Apr 20 | Progress-41 undocked from 37KE +X | 92.45 374 x 416 x 51.6 | |
| 1989 Apr 23 | Orbit raise (TM7) | 92.63 391 x 416 x 51.6 from 92.45 374 x 416 | |
| 1989 Apr 25 | Orbit raise (TM7) | 92.74 401 x 417 x 51.6 from 92.59 388 x 415 | |
| 1989 Apr 26 | EO-4 and VI to Soyuz TM-7 | ||
| 2328 | Soyuz TM-7 undocked from Mir -X | 92.74 401 x 417 x 51.6 | |
| Mir uninhabited | |||
| 1989 Jun 8 | 92.61 395 x 410 x 51.6 | ||
| 1989 Jul 11 | 92.49 389 x 403 x 51.6 | ||
| 1989 Aug 25 | 0519 | Progress M docked at Mir -X | |
| 1989 Sep 7 | 2225 | Soyuz TM-8 docked at 37KE +X | |
| EO-5 crew entry: | |||
| EO-5 Kdr, Aleksandr Viktorenko | |||
| EO-5 BI, Aleksandr Serebrov | |||
| 1989 Sep 13 | Orbit raise (PM) | 92.31 378 x 397 x 51.6 from 92.29 379 x 394 | |
| 1989 Oct 11 | Orbit raise (PM) | 92.28 376 x 395 x 51.6 from 92.16 372 x 389 | |
| 1989 Oct 17 | Orbit raise (PM) | 92.51 386 x 408 x 51.6 from 92.25 374 x 395 | |
| 1989 Oct 20 | Mir refuelling | ||
| 1989 Oct 25 | Orbit raise (PM) | 92.52 390 x 405 x 51.6 from 92.46 385 x 404 | |
| 1989 Nov 15 | Orbit raise (PM) | 92.56 397 x 402 x 51.6 from 92.52 394 x 401 | |
| 1989 Dec 1 | 0802 | Progress M undocked from Mir -X | |
| 1989 Dec 6 | 1221 | 77KSD (Kvant-2) docked at Mir -X | |
| 1989 Dec 8 | 77KSD moved to Mir +Y | ||
| 1989 Dec 12 | EO-5 crew to Soyuz TM-8 | ||
| 0823 | Soyuz TM-8 undocked from 37KE +X | ||
| 0843 | Soyuz TM-8 docked at Mir -X | ||
| EO-5 crew to Mir | |||
| 1989 Dec 22 | 0541 | Progress M-2 docked at 37KE +X | |
| 1990 Jan 8 | 2023 | EO-5 EVA-1 (Kdr, BI 2:56) | |
| Attached stellar orientation sensors to 77KSD | |||
| Retrieved sample containers | |||
| 2319 | End of EO-5 EVA-1 | ||
| 1990 Jan 11 | 1801 | EO-5 EVA-2 (Kdr, BI 2:54) | |
| Retrieved Obraztsy samples from exterior | |||
| Removed ERA support structure | |||
| Attached Arfa-3 electron beam expt. to 37KE | |||
| Moved docking cone from +Y to -Y | |||
| 2055 | End of EO-5 EVA-2 | ||
| 17BU-CC cataloged | |||
| 17BY RCS = 5sq m, possibly Orlan suit? | |||
| 1990 Jan 16 | Orbit raise (PM2) | 92.39 386 x 396 x 51.6 from 92.29 385 x 387 | |
| 1990 Jan 18 | Orbit raise (PM2) | 92.55 385 x 413 x 51.6 from 92.38 385 x 396 | |
| 1990 Jan 26 | 1209 | EO-5 EVA-3 (Kdr, BI) from 77KSD airlock | |
| Tested Orlan suits | |||
| Mounted SPK docking port | |||
| 1511 | End of EO-5 EVA-3 | ||
| 17CD-CF cataloged | |||
| 1990 Feb 1 | 0815 | EO-5 EVA-4 (Kdr, BI 4:59) from 77KSD | |
| BI tethered flight on SPK unit | |||
| 1314 | End of EO-5 EVA-4 | ||
| 17CG cataloged | |||
| 1990 Feb 5 | 0608 | EO-5 EVA-5 (Kdr, BI 3:45) from 77KSD | |
| Kdr tethered flight on SPK unit | |||
| 0953 | End of EO-5 EVA-5 | ||
| 17CH cataloged | |||
| 1990 Feb 9 | 0233 | Progress M-2 undocked from 37KE +X | |
| 1990 Feb 13 | 0638 | Soyuz TM-9 docked at 37KE +X | |
| EO-6 crew entry | |||
| EO-6 Kdr: Anatoliy Solov'yov | |||
| EO-6 BI, Aleksandr Balandin | |||
| 1990 Feb 19 | EO-5 crew to Soyuz TM-8 | ||
| Soyuz TM-8 undocked from Mir -X | |||
| 1990 Feb 21 | EO-6 crew to Soyuz TM-9 | ||
| 0356 | Soyuz TM-9 undocked from 37KE +X | ||
| 0415 | Soyuz TM-9 docked at Mir -X | ||
| EO-6 crew to Mir | |||
| 1990 Mar 3 | 0105 | Progress M-3 docked at 37KE +X | |
| 1990 Apr 23 | Orbit raise (PM3) | 92.44 385 x 402 x 51.61 from 92.11 369 x 387 | |
| 1990 Apr 27 | Progress M-3 undocked from 37KE +X | ||
| 1990 May 7 | 2245 | Progress-42 docked at 37KE +X | |
| 1990 May 14 | 92.35 382 x 387 x 51.61 | ||
| 1990 May 27 | 0709? | Progress-42 undocked from 37KE +X | |
| 1990 May 28 | EO-6 crew to Soyuz TM-9 | ||
| 1148 | Soyuz TM-9 undocked Mir -X | ||
| 1212 | Soyuz TM-9 docked 37KE +X | ||
| EO-6 crew to Mir | |||
| 1990 May 29 | 92.26 378 x 392 x 51.61 | ||
| 1990 Jun 10 | 1047 | 77KST (Kristall) docked Mir -X | |
| 1990 Jun 11 | 77KST moved from -X to -Y | 92.24 377 x 391 x 51.61 | |
| 1990 Jul 3 | EO-6 crew to Soyuz TM-9 | ||
| 2208 | Soyuz TM-9 undocked 37KE +X | ||
| 2234 | Soyuz TM-9 docked Mir -X | ||
| EO-6 crew to Mir | |||
| 1990 Jul 17 | 1306 | EO-6 EVA-1 7:00 | |
| Repair blankets on TM-9 | |||
| 1835? | Balandin ingress | ||
| 1900? | Solovyov ingress | ||
| 1905 | Failed to close 77KSD hatch | ||
| 1950 | Abandoned attempts to close ShSO hatch | ||
| Emergency return using interior hatch | |||
| PNO depressurized | |||
| PNO hatch open | |||
| Ingress PNO | |||
| 2006 | PNO hatch closed | ||
| 2022 | PNO repress | ||
| 17CJ-CN cataloged | |||
| 1990 Jul 26 | 1115 | EO-6 EVA-2 | |
| Remove ladders from docking unit | |||
| 77KSD hatch closed | |||
| 17CP cataloged | |||
| 1990 Aug 3 | 1146 | Soyuz TM-10 docked at 37KE +X | |
| Crew entry | |||
| EO-7 Kdr, Gennadiy Manakov | |||
| EO-7 BI, Gennadiy Strekalov | |||
| 1990 Aug 9 | 0105 | EO-6 crew to Soyuz TM-9 | |
| 0409 | Soyuz TM-9 undocked Mir -X | ||
| 1990 Aug 17 | 0526 | Progress M-4 docked at Mir -X | 92.03 367 x 380 x 51.6 |
| 1990 Aug 18 | Orbit trim | 92.05 368 x 381 x 51.61 | |
| 1990 Aug 22 | Orbit raise (M4) | 92.27 368 x 403 x 51.61 from 92.03 367 x 380 | |
| 1990 Sep 4 | Orbit trim | 92.25 367 x 402 x 51.61 from 92.21 365 x 400 | |
| 1990 Sep 5 | Orbit trim | 92.31 371 x 403 x 51.61 from 92.25 368 x 400 | |
| 1990 Sep 7 | 92.36 373 x 407 x 51.61 from 92.30 371 x 403 | ||
| 1990 Sep 11 | Orbit raise | 92.41 374 x 411 x 51.61 from 92.35 372 x 406 | |
| 1990 Sep 17 | 1243 | Progress M-4 undocked from Mir -X | |
| 1990 Sep 29 | 1227 | Progress M-5 docked at Mir -X | |
| 1990 Oct 1 | Orbit raise (TM10) | 92.50 373 x 420 x 51.61 from 92.33 370 x 406 | |
| 1990 Oct 29 | 2145 | EO-7 EVA-1 (2:45) | |
| Failed to repair 77KSD hatch | |||
| 17CQ, CR, CS cataloged | |||
| 1990 Nov 11 | Orbit adjust | 92.29 363 x 409 x 51.6 from 92.34 368 x 409 | |
| 1990 Nov 26 | Orbit raise (PM5) | 92.35 371 x 407 x 51.6 from 92.23 361 x 406 | |
| 1990 Nov 28 | Progress M-5 undocked from Mir -X | ||
| 1990 Dec 4 | 0957 | Soyuz TM-11 docked at Mir -X | |
| 1990 Dec 4 | EO-8 crew to Mir: | ||
| EO-8 Kdr, Viktor Afanas'ev | |||
| EO-8 BI, Musa Manarov | |||
| TM-11 KI, Toyohiro Akiyama | |||
| 1990 Dec 9 | 2330 | EO-7 crew and TM-11 KI to Soyuz TM-10 | |
| 1990 Dec 9 | Soyuz TM-10 undocked from 37KE +X | ||
| 1991 Jan 7 | 1703 | EO-8 EVA-1, 77KSD hatch | |
| Repair 77KSD hatch | |||
| 17CT, CU cataloged | |||
| 1991 Jan 16 | 1635 | Progress M-6 docked at 37KE +X | |
| 1991 Jan 23 | 1059 | EO-8 EVA-2, install Strela on Mir +Z | |
| 17CV-CY cataloged | |||
| 1991 Jan 26 | 0900 | EO-8 EVA-3, install boom on 37KE | |
| 1991 Feb 27 | 92.18 371 x 390 x 51.6 from 91.94 354 x 384 | ||
| 1991 Mar 1 | Orbit adjust (PM6) | ||
| 1991 Mar 5 | Orbit adjust (PM6) | 92.20 370 x 393 x 51.6 from 92.15 370 x 389 | |
| 1991 Mar 15 | 1247 | Progress M-6 undocked from 37KE +X | |
| 1991 Mar 22 | Progress M-7 rendezvous, failed to dock +X | ||
| 1991 Mar 23 | 1428 | Progress M-7 rendezvous, failed to dock +X | |
| 1991 Mar 26 | EO-8 crew to Soyuz TM-11 | ||
| Soyuz TM-11 undocked from Mir -X | |||
| Soyuz TM-11 docked at 37KE +X, manually | |||
| EO-8 crew to Mir | |||
| 1991 Mar 28 | Progress M-7 docked at Mir -X | ||
| 1991 Apr 12 | Orbit raise | 91.97 364 x 377 x 51.6 from 91.92 360 x 377 | |
| 1991 Apr 14 | 92.08 370 x 382 x 51.6 from 91.96 364 x 377 | ||
| 1991 Apr 15 | Progress M-7 refuelled from Mir tanks | ||
| 1991 Apr 25 | EO-8 EVA-4, inspected 37KE~antenna | ||
| Cataloged 17CZ-DH | |||
| 1991 May 7 | Progress M-7 undocked from Mir -X | ||
| 1991 May 15 | 91.96 367 x 373 x 51.6 from 91.89 361 x 372 | ||
| 1991 May 20 | Soyuz TM-12 docked at Mir -X | ||
| EO-9 crew entry: | |||
| EO-9 Kdr, Anatoliy Artsebarskiy | |||
| EO-9 BI, Sergey Krikalyov | |||
| TM-12 KI, Helen Sharman | |||
| 1991 May 26 | EO-8 crew and TM-12 KI to Soyuz TM-11 | ||
| 1991 May 26 | 0613 | Soyuz TM-11 undocked from 37KE +X | |
| 1991 May 28 | EO-9 crew to Soyuz TM-12 | ||
| 1991 May 28 | 1010 | Soyuz TM-12 undocked from Mir -X | |
| 1052 | Soyuz TM-12 docked at 37KE +X | ||
| EO-9 crew to Mir | |||
| 1991 May 29 | 1200 | 91.89 363 x 370 x 51.6 | |
| 1991 Jun 1 | 0045 | Progress M-8 docked at Mir -X | |
| 1991 Jun 4 | Refuelling | ||
| 1991 Jun 6? | 17DJ-DS cataloged | ||
| 1991 Jun 7 | Orbit raise (PM8) | 92.15 361 x 397 x 51.6 from 91.84 361 x 368 | |
| 1991 Jun 11 | Orbit raise (PM8) | 92.19 367 x 395 x 51.6 from 92.13 362 x 395 | |
| 1991 Jun 12 | 0700 | 92.23 373 x 395 x 51.6 | |
| 1991 Jun 13 | 17DT,DU cataloged | ||
| 1991 Jun 17 | 0258 | Mak 1 launched from Mir port (17DV) | |
| 1991 Jun 18 | 92.39 388 x 394 x 51.6 | ||
| 1991 Jun 19 | 17DW-ED cataloged | ||
| 1991 Jun 19 | 92.45 391 x 397 x 51.6 | ||
| 1991 Jun 24 | 2111 | EO-9 EVA-1 4:58 | |
| 17EE-EH cataloged | |||
| 1991 Jun 28 | EO-9 EVA-2, UCB experiment | ||
| 17EJ-EL cataloged | |||
| 1991 Jul 6 | 17EM-EN cataloged | ||
| 1991 Jul 15 | EO-9 EVA-3, Sofora deploy | ||
| 17EP-ES cataloged | |||
| 1991 Jul 19 | EO-9 EVA-4,Sofora | ||
| 17ET-EV cataloged | |||
| 1991 Jul 23 | EO-9 EVA-5, Sofora | ||
| 17EW-EX cataloged | |||
| Orlan-DMA No 10 jettison (EX; or EV,EW?) | |||
| 1991 Jul 27 | 0844 | EO-9 EVA-6, Sofora | |
| 17EY-FD cataloged | |||
| 1991 Aug 10 | 17FE-FH cataloged | ||
| 1991 Aug 15 | Progress M-8 undocked from Mir -X | ||
| 1991 Aug 23 | Progress M-9 docked at Mir -X | ||
| 1991 Aug 26 | Demo of Coca-cola can | ||
| 1991 Aug 29 | Orbit raise (PM9) | ||
| 1991 Sep 30 | 0154 | Progress M-9 undocked from Mir -X | |
| 1991 Oct 2 | 92.52 392 x 403 x 51.6 | ||
| 1991 Oct 4 | Soyuz TM-13 docked at Mir -X | ||
| EO-10 crew entry | |||
| EO-10 Kdr, Aleksandr Volkov | |||
| TM-13 BI, Tokhtar Aubakirov | |||
| TM-13 KI, Franz Viehbock | |||
| 1991 Oct 10 | EO-9 Kdr, TM-13 BI, TM-13 KI to Soyuz TM-12 | ||
| Soyuz TM-12 undocked from 37KE +X | |||
| 1991 Oct 15 | EO-10 Kdr, EO-9 BI to Soyuz TM-13 | ||
| Soyuz TM-13 undocked -X | |||
| Soyuz TM-13 docked 37KE +X | |||
| EO-10/9 crew to Mir | |||
| 1991 Oct 19 | Progress M-10 rendezvous, docking failed -X | ||
| 1991 Oct 21 | Progress M-10 docked at Mir -X | ||
| 1991 Dec 10? | 17FK-FM cataloged | ||
| 1991 Dec 25? | 17FN-FQ cataloged | ||
| 1992 Jan 16 | Orbit trim | ||
| 1992 Jan 16 | Gyrodynes break down | ||
| 1992 Jan 20 | Progress M-10 undocked Mir -X | ||
| 1992 Jan 27 | Progress M-11 docked Mir -X | ||
| 1992 Feb 20 | EO-10 EVA-1 | ||
| 17FR-GB cataloged | |||
| 1992 Feb 27 | Orbit adjust (PM11) | 378 x 411 x 51.6 | |
| 1992 Mar 13 | Progress M-11 undocked Mir -X | ||
| 1992 Mar 14 | EO-10 Kdr, EO-9 BI to Soyuz TM-13 | ||
| Soyuz TM-13 undocked from 37KE +X | |||
| Soyuz TM-13 docked Mir -X | |||
| EO-10 Kdr, EO-9 BI to Mir | |||
| 1992 Mar 19 | Soyuz TM-14 docked 37KE +X | ||
| Crew entry: | |||
| EO-11 Kdr, Aleksandr Viktorenko | |||
| EO-11 BI, Aleksandr Kaleri | |||
| TM-14 KI, Klaus-Dietrich Flade | |||
| 1992 Mar 25 | EO-10 Kdr, EO-9 BI, TM-14 KI to Soyuz TM-13 | ||
| Soyuz TM-13 undocked Mir -X | |||
| 1992 Mar 29 | 1200 | 92.35 379 x 400 x 51.60 | |
| 1992 Apr 21 | Progress M-12 docked Mir -X | ||
| 1992 May 14 | 1330 | Orbit raise (PM12) | |
| 1992 May 15 | Orbit raise (PM12) | 374 x 414 x 51.6 | |
| 1992 Jun 25 | Orbit raise (PM12) | 390 x 413 x 51.6 | |
| 1992 Jun 28 | 0134 | Progress M-12 undock Mir -X | |
| 1992 Jul 2 | Progress M-13 rendezvous, failed to dock -X | ||
| 1992 Jul 4 | 1655 | Progress M-13 docked Mir -X | |
| 1992 Jul 8 | 1237 | EO-11 EVA-1, gyrodyne replacement | |
| 17GE-GH cataloged | |||
| 1992 Jul 17 | Orbit raise (PM13) | ||
| 1992 Jul 21 | Orbit raise (PM13) | 407 x 425 x 51.6 | |
| 1992 Jul 24 | 0449 | Progress M-13 undocked Mir -X | |
| 1992 Jul 29 | Soyuz TM-15 docked Mir -X | ||
| Crew entry: | |||
| EO-12 Kdr, Anatoli Solov'yov | |||
| EO-12 BI, Sergei Avdeev | |||
| TM-15 KI, Michel Tognini | |||
| 1992 Aug 9 | EO-11 crew, TM15 KI to Soyuz TM-14 | ||
| Soyuz TM-14 undocked from 37KE +X | |||
| 1992 Aug 18 | Progress M-14 docked 37KE +X | ||
| 1992 Sep 3 | 1332 | EO-12 EVA-1, VDU installation | |
| 1992 Sep 7 | 1147 | EO-12 EVA-2, VDU installation | |
| 17GJ-GL cataloged | |||
| 1992 Sep 11 | 1006 | EO-12 EVA-3, VDU installation | |
| 17GM-GS cataloged | |||
| 1992 Sep 15 | 0749 | EO-12 EVA-4, Kurs relocation | |
| 17GT-GV cataloged (GT has RCS 10 sq m) | |||
| 1992 Oct 21 | Progress M-14 undocked 37KE +X | ||
| 1992 Oct 29 | Progress M-15 docked 37KE +X | ||
| 17GW cataloged | |||
| 1992 Nov 20 | Mak-2 ejected (17GX); 17GY cat. | ||
| 1993 Jan 26 | Soyuz TM-16 docked 77KST -Y | ||
| Crew entry | |||
| EO-13 Kdr, Gennadiy Manakov | |||
| EO-13 BI, Aleksandr Poleshchuk | |||
| 1993 Feb 1 | EO-12 crew to Soyuz TM-15 | ||
| Soyuz TM-15 undocked from Mir -X | |||
| 1993 Feb 4 | Progress M-15 undocked 37KE +X | ||
| 1993 Feb 23 | 2018 | Progress M-16 docked 37KE +X | |
| 1993 Mar 26 | 0650 | Progress M-16 undocked 37KE +X | |
| 1993 Mar 26 | Progress M-16 docked 37KE +X | ||
| 1993 Mar 27 | Progress M-16 undocked 37KE +X | ||
| 1993 Apr 2 | 0516 | Progress M-17 docked 37KE +X | |
| 1993 Apr 8 | 17GZ cataloged | ||
| 1993 Apr 19 | 1715 | EO-13 EVA-1, 37KE MSB work | |
| 17HA-HC cataloged | |||
| 1993 May 24 | 0825 | Progress M-18 docked Mir -X | |
| 1993 Jun 18 | 1725 | EO-13 EVA-2, 37KE MSB work | |
| 17HD-HH cataloged | |||
| 1993 Jul 3 | Progress M-18 undocked Mir -X | ||
| 1993 Jul 3 | 1624 | Soyuz TM-17 docked Mir -X | |
| Crew entry | |||
| EO-14 Kdr, Vasiliy Tsibliev | |||
| EO-14 BI, Aleksandr Serebrov | |||
| TM-17 KI, Jean-Pierre Haignere | |||
| 1993 Jul 22 | EO-13 crew, TM17 KI to Soyuz TM-16 | ||
| Soyuz TM-16 undocked 77KST -Y | |||
| 1993 Aug 11 | 1536 | Progress M-17 undocked 37KE +X | |
| 1993 Aug 13 | 0000 | Progress M-19 docked 37KE +X | |
| 1993 Sep 16 | 0557 | EO-14 EVA-1, Ripana | |
| 17HJ-HK cataloged | |||
| 1993 Sep 20 | 0352 | EO-14 EVA-2, Ripana | |
| 0706 | Rapana part jettisoned | ||
| 17HL-HN cataloged | |||
| 1993 Sep 28 | EO-14 EVA-3, Exposure canister | ||
| 17HP-HT cataloged | |||
| 1993 Oct 5 | 0343 | Orbit adjust (PM19) | |
| 1993 Oct 8 | 17HU cataloged | ||
| 1993 Oct 12 | 1759 | Progress M-19 undocked 37KE +X | |
| 1993 Oct 13 | 2325 | Progress M-20 docked 37KE +X | |
| 1993 Oct 22 | 1351 | EO-14 EVA-4 begin depress | |
| Suit problems | |||
| 1547:28 | HO | ||
| 1615 | Ingress | ||
| 1625 | HC | ||
| 17HV-HX cataloged | |||
| HC | |||
| 1993 Oct 29 | EO-14 EVA-5 | ||
| 1338 | HO | ||
| 1740? | Orlan suit jettisoned | ||
| 17HY-HZ | |||
| 1750 | HC | ||
| 1993 Nov 21 | Progress M-20 undocked 37KE +X | ||
| 1993 Dec 29? | 17JA cataloged | ||
| 1994 Jan 10 | 1150 | Soyuz TM-18 docked at 37KE +X | |
| Crew entry: | |||
| EO-15 Kdr, Viktor Afanas'ev | |||
| EO-15 BI, Yuriy Usachyov | |||
| EO-15 VK, Valeriy Polyakov | |||
| 1994 Jan 14 | EO-14 crew to Soyuz TM-17 | ||
| 0437 | Soyuz TM-17 undocked Mir -X | ||
| Soyuz TM-17 in glancing collision with 77KST | |||
| 1994 Jan 24 | EO-15 crew to Soyuz TM-18 | ||
| 0312 | Soyuz TM-18 undocked 37KE +X | ||
| 0501 | Soyuz TM-18 docked Mir -X | ||
| 1994 Jan 30 | 0356 | Progress M-21 docked 37KE +X | |
| 1994 Mar 23 | Progress M-21 undocked 37KE +X | ||
| 1994 Mar 24 | Progress M-22 docked 37KE +X | ||
| 1994 May 23 | 0057 | Progress M-22 undocked 37KE +X | |
| 1994 May 24 | 0600 | Progress M-23 docked 37KE +X | |
| 1994 Jul 2 | 0847 | Progress M-23 undocked 37KE +X | |
| 1994 Jul 3 | 1355 | Soyuz TM-19 docked 37KE +X | |
| Crew entry: | |||
| EO-16 Kdr, Yuriy Malenchenko | |||
| EO-16 BI, Talgat Musabaev | |||
| 1994 Jul 9 | EO-15 Kdr, BI to Soyuz TM-18 | ||
| Soyuz TM-18 undocked Mir -X | |||
| 1994 Aug 27 | Progress M-24 rendezvous, failed to dock -X | ||
| 1994 Aug 30 | Progress M-24 rendezvous, failed to dock -X | ||
| 1994 Sep 2 | Progress M-24 docked at Mir -X | ||
| 1994 Sep 9 | 0658 | EO-16 EVA-1, inspection and repair | |
| 17JB cataloged | |||
| 1994 Sep 13 | 0631 | EO-16 EVA-2, Sofora inspection | |
| 17JC cataloged | |||
| 1994 Oct 4 | Progress M-24 undocked Mir -X | ||
| 1994 Oct 6 | 0028 | Soyuz TM-20 docked Mir -X | |
| Crew entry | |||
| EO-17 Kdr, Aleksandr Viktorenko | |||
| EO-17 BI, Yelena Kondakova | |||
| TM-17 KI, Ulf Merbold | |||
| 1994 Nov 2 | EO-16 crew and TM20 KI to Soyuz TM-19 | ||
| 1030 | Soyuz TM-19 undocked from 37KE +X | ||
| 1105 | Soyuz TM-19 redocked at 37KE +X | ||
| EO-16 crew, TM20 KI to Mir | |||
| 1994 Nov 4 | EO-16 crew, TM20 KI to Soyuz TM-19 | ||
| Soyuz TM-19 undocked 37KE +X | |||
| 1994 Nov 13 | Progress M-25 docked 37KE +X | ||
| 1995 Jan 11 | EO-17 crew and VK to Soyuz TM-20 | ||
| 0900 | Soyuz TM-20 undocked Mir -X | ||
| 0925 | Soyuz TM-20 docked Mir -X | ||
| EO-17 and VK to Mir | |||
| 1995 Feb 10 | 1835 | TCM (PM-25) | 392 x 415 x 51.6 (AVM) |
| 1995 Feb 16 | Progress M-25 undocked 37KE +X | ||
| 1995 Feb 17 | Progress M-26 docked 37KE +X | ||
| 1995 Feb 23 | 0448 | 92.44 391 x 397 x 51.64 | |
| 1995 Mar 15 | Progress M-26 undocked 37KE +X | ||
| 1995 Mar 16 | Soyuz TM-21 docked 37KE +X | ||
| Crew entry: | |||
| EO-18 Kdr, Vladimir Dezhurov | |||
| EO-18 BI, Gennadiy Strekalov | |||
| EO-18 KI, Norman Thagard | |||
| 1995 Mar 21 | 2135 | EO-17 crew and VK to Soyuz TM-20 | |
| Soyuz TM-20 undocked Mir -X | |||
| 1995 Apr 11 | Progress M-27 docked Mir -X | ||
| 1995 Apr 17 | 0819 | Garbage container ejected 17JD | |
| 1995 Apr 19 | 1912 | GFZ-1 satellite ejected | 92.40 389 x 395 x 51.65 |
| z1995 Apr 20 | 17JF | ||
| 1995 May 5 | 0448 | 92.40 388 x 395 x 51.65 | |
| 1995 May 12 | 0420 | EO-18 EVA-1 (6:15) from TsM-D | |
| 1995 May 12 | 1035 | EO-18 EVA-1 complete | |
| 17JG,JH cataloged | |||
| 1995 May 17 | 0238:21 | EO-18 EVA-2 (6:48 to 6:52) from TsM-D | |
| 1995 May 17 | 0920? | EO-18 EVA-2 complete (hatch closing not recorded) | |
| 17JJ cataloged | |||
| 1995 May | Orbit raise | ||
| 1995 May 18 | 2038 | 92.51 395 x 400 x 51.6 | |
| 1995 May 22 | 0010 | EO-18 EVA-3 (5:15) from PO | |
| 1995 May 22 | 0525 | EO-18 EVA-3 complete | |
| 1995 May 22 | 2342 | Progress M-27 undocks -X | 92.51 394 x 400 x 51.65 |
| 1995 May 26 | 2300s | Kristall rotate from -Y to -X | |
| 1995 May 28 | 2222 | EO-18 EVA-4, move cone from -Y to -Z | |
| 1995 May 28 | 2243 | EO-18 EVA-4 complete | |
| 1995 May 30 | Kristall rotate from -X to -Z | ||
| 1995 Jun 1 | 0056 | Spektr docks -X | |
| 1995 Jun 1 | 2205 | EO-18 EVA-5, move cone from -Z to -Y (0:40 or 0:23) | |
| 1995 Jun 2 | 2228 | EO-18 EVA-5 complete | |
| 1995 Jun 2 | 2000 | Spektr transfer from -X to -Y | |
| 1995 Jun 11 | Kristall transfer from -Z to -X | 92.49 392 x 400 x 51.65 | |
| 1995 Jun 29 | 1300 | Atlantis dock at Kristall port | 92.49 393 x 399 x 51.65 |
| 1500 | STS-71 and EO-19 crew enter Mir | ||
| 1995 Jul 3 | 1930? | STS-71 and EO-18 crew transfer to Atlantis | |
| 1995 Jul 4 | EO-19 crew to Soyuz TM-21 | ||
| 1055 | Soyuz TM-21 undocks Kvant +X | ||
| 1110 | Atlantis undocks Kristall -X | ||
| 1139 | Soyuz TM-21 redocks Kvant +X | ||
| 1240? | EO-19 crew reenter Mir | 92.48 394 x 397 x 51.65 | |
| 1995 Jul 14 | 0356 | EO-19 EVA-1 (5 hr 34 min) from Kvant-2 | |
| 0930 | EO-19 EVA-1 hatch closed | ||
| 1995 Jul 17 | 0230 | Kristall undocked -X, on Lyappa | |
| 0400 | Kristall redocked to -Z | ||
| 1995 Jul 19 | 0039 | EO-19 EVA-2 (3hr 08min) from Kvant-2 | |
| 0347 | EO-19 EVA-2 hatch closed | ||
| 1995 Jul 21 | 0028 | EO-19 EVA-3 (5 hr 50 min) from Kvant-2 | |
| 0618 | EO-19 EVA-3 hatch closed | ||
| 1995 Jul 22 | 0440 | Progress M-28 docked at Mir -X | 92.5 394 x 397 x 51.7 |
| 0705 | Hatch opened | ||
| 1995 Aug 4 | 92.48 393 x 398 x 51.65 | ||
| 1995 Aug 31 | 17JK cataloged | ||
| 1995 Sep 1 | 92.47 393 x 397 x 51.65 | ||
| 1995 Sep 4 | 0607 | Progress M-28 undocked from Mir -X | |
| 1995 Sep 5 | 1030 | Soyuz TM-22 docked with -X Mir | |
| 1995 Sep 11 | 0330:44 | Soyuz TM-21 undocked from 37KE +X | |
| 1995 Oct 1 | 92.45 392 x 396 x 51.65 | ||
| 1995 Oct 10 | Progress M-29 docked 37KE +X | ||
| 1995 Oct 20 | 1150 | Hatch open Kvant-2 for EO-20 EVA-1 | |
| (Avdeev, Reiter) | |||
| Install 2 cassettes and two packages in ESEF Spektr | |||
| Komza package chanegout | |||
| 1706 | Hatch closed, 5h16m | ||
| 17JL-JU | |||
| 1995 Oct 27 | 392 x 395 x 51.6 | ||
| 1995 Oct 31 | Coolant leak in Kvant | ||
| 1995 Nov 15 | 0627 | OV-104/SO docked with Kristall | |
| 0900 | SO hatch to Kristall open | ||
| STS-74 crew to Mir | |||
| 1995 Nov 17 | STS-74 crew return to OV-104 | ||
| SO hatch to OV-104 closed | |||
| 1995 Nov 18 | 0816 | OV-104 undocks from SO | |
| 1005 | OV-104 sep burn | ||
| 1995 Dec 8 | 1923 | EO-20 EVA-2 Hatch open, Kdr BI | |
| Transfer -Z cone to +Z port | |||
| 1952 | EVA hatch closed, 29 min | ||
| 1995 Dec 9 | 1826:07 | Orbit raise burn (M-29) | |
| 1995 Dec 19 | Progress M-29 undocked 37KE +X | ||
| 1995 Dec 20 | Progress M-30 docked 37KE +X | ||
| 1996 Feb 8 | 1403 | EO-20 EVA-3, Kdr, BI-2 | |
| Retrieved ESEF samples from Spektr | |||
| 1709 | Hatch closed | ||
| 17JV cataloged | |||
| 1996 Feb 22 | 0726 | Progress M-30 undocked 37KE +X | |
| 1996 Feb 23 | 1420:36 | Soyuz TM-23 docked 37KE +X | |
| 1600 | Crew entry | ||
| EO-21 Kdr: Yuriy Onufrienko | |||
| EO-21 BI: Yuriy Usachyov | |||
| 1996 Feb 29 | 0720 | EO-20 crew to Soyuz TM-22 | |
| Soyuz TM-22 undocked | |||
| 1996 Mar 15 | 0104 | EO-21 EVA-1, Kdr, BI | |
| Installed Strela-2 crane on BB | |||
| Kvant solar array preps | |||
| 0655 | Hatch closed, 5h51 | ||
| 17JW-JZ cataloged | |||
| 1996 Mar 24 | 0234:20 | OV-104 Docked with Mir SO | |
| 0428 | Hatch open | ||
| 1333 | Lucid transfer to EO-21 crew as KI | ||
| 1996 Mar 28 | 1243 | Hatches to Mir closed | |
| 1996 Mar 29 | 0108 | OV-104 Undocked from Mir | |
| 0208 | OV-104 sep burn | ||
| 1996 May 7 | 0854 | Progress M-31 docked -X | |
| 1025 | PM-31 hatch open | ||
| 1996 May 20 | 2250 | EO-21 EVA-2 5:20 Onufrienko, Usachyov | |
| Transferred MCSA from SO to Kvant -Z | |||
| Deployed inflatable Pepsi-Cola container [472] | |||
| Pepsi can deflated and retrieved | |||
| 1996 May 21 | 0410 | EVA hatch closed | |
| 17KA-KC cataloged | |||
| 1996 May 25 | EO-21 EVA-3, 5:43 | ||
| MCSA array deployed | |||
| 17KD-KE cataloged | |||
| 1996 May 30 | 1820 | EO-21 EVA-4 | |
| MOMS-2 camera installed on Priroda | |||
| 2240 | EVA hatch closed 4:20 | ||
| 17KG-KL, KF | |||
| 1996 Jun 6 | 1656 | EO-21 EVA-5 Kdr/BI-1 | |
| KOZMA cassette installed on Spektr | |||
| SKK-11 and debris cassette on Kvant-2 | |||
| 2030 | Hatch closed 3:34 | ||
| 17KM-KX cataloged | |||
| 1996 Jun 13 | 1245 | EO-21 EVA-6, Kdr/BI-1 5:42 | |
| Deployed jammed Travers antenna on Priroda | |||
| Pepsi-Cola commercial filming, second part | |||
| STROMBUS truss experiment deployed | |||
| Removed Rapana boom, attached it to Sofora | |||
| Fyerma-3 truss replaced Rapana; 5 m long | |||
| 1827 | EVA-6 hatch closed | ||
| 17KY-LT cataloged | |||
| 1996 Aug 1 | 1644:45 | Progress M-31 undocked -X | |
| 1996 Aug 2 | 2203:44 | Progress M-32 docked -X | |
| 1996 Aug 18 | 0933:45 | Progress M-32 undocked -X | |
| 1996 Aug 19 | 1450:21 | Soyuz TM-24 docked -X | |
| TM-24 hatch open | |||
| EO-22, Cassiopee crew to Mir | |||
| Korzun, Kaleri, Andre-Deshays | |||
| 1996 Aug 20 | 17LU cataloged | ||
| 1996 Sep 2 | 0110 | TM-23 HC, EO-21 and Cassiopee | |
| 0420 | Soyuz TM-23 undocked Kvant +X | ||
| 1996 Sep 3 | 0953:21 | Progress M-32 redocked Kvant +X | |
| 1996 Sep 19 | 0313 | OV-104 docked SO | |
| 0540 | Hatch open | ||
| 1100 | Blaha replaces Lucid as EO-22 BI-2 | ||
| 1996 Sep 23 | 1200 | Hatch closed | |
| 1996 Sep 24 | 0133 | OV-104 undocked SO | |
| 0331 | OV-104 sep burn | ||
| 1996 Sep 24 | 17LV cataloged | ||
| 1996 Nov 20 | 1948:19 | Progress M-32 undocked Kvant +X | |
| 1996 Nov 22 | 0101:30 | Progress M-33 docked Kvant +X | |
| 1996 Dec 2 | 1554 | EO-22 EVA-1 Korzun Kaleri, 5:57 | |
| Connect cables to MCSA panel on Kvant-1 | |||
| 2151 | EVA-1 end | ||
| 1996 Dec 2 | 17LY,LW,LX cataloged (using SSNs earlier reserved for Mars-96) | ||
| 1996 Dec 9 | 1350 | EO-22 EVA-2 Korzun Kaleri, 6:38 | |
| Rapana installed on Ferma-3 truss | |||
| Antenna replaced | |||
| 2028 | HC EVA-2 | ||
| 17LZ,MA cataloged | |||
| 1996 Dec 26 | 0915:26 | TCM | |
| 1997 Jan 15 | 0355 | OV-104 docked SO | |
| 0557 | OV-104/SO hatch open | ||
| 0945 | Linenger replaces Blaha as EO-22 BI-2 | ||
| 1997 Jan 19 | Hatch closed | ||
| 1997 Jan 20 | 0215:44 | OV-104 undocked SO | |
| 0402 | OV-104 sep burn | ||
| 1997 Feb 6 | 1213:56 | Progress M-33 undocked Kvant +X | |
| 1997 Feb 7 | HC TM-24, Korzun, Kaleri, Linenger | ||
| 1628:01 | Soyuz TM-24 undocked -X | ||
| 1651:27 | Soyuz TM-24 redocked Kvant +X | ||
| 1997 Feb 12 | 1551 | Soyuz TM-25 docked -X | |
| 1715 | TM-25 Hatch open | ||
| EO-23 crew to Mir | |||
| Tsibliev, Lazutkin | |||
| 1997 Feb 23 | Fire on Kvant, flame and smoke for 15 min | ||
| 1997 Mar 2 | TM-24 Hatch closed | ||
| 0324:57 | Soyuz TM-24 undocked +X | ||
| 1997 Mar 4 | 0741 | Progress M-33 TORU approach aborted | |
| 1997 Mar 19 | Omega rate sensor failed, attitude lost | ||
| Mir to gravity grad mode, then recover | |||
| 1997 Apr 4 | Cooling system leak | ||
| 1997 Apr 8 | 1730:03 | Progress M-34 docked Kvant +X | |
| 1997 Apr 15 | 1246:01 | Orbit raise PM34 5 km, 137s | 389 x 402 x 51.67 |
| 1997 Apr 29 | 0510 | EO-23 EVA-1 Tsibliev, Linenger in Orlan-DMA | |
| Sample retrieval | |||
| Translate to SO | |||
| OPM (Optical Properties Monitor) installed on SO | |||
| Translate on Strela to Kvant-2 | |||
| Retrieve PIE (Partial Impact Expt) | |||
| Retrieve MSE (Mir Sample Expt) | |||
| Install BRD (Benton Radiation Dosimeter) | |||
| 1008:30 | Hatch closed 4:58 | ||
| 1997 May 17 | 0233 | OV-104 docked SO | |
| 0425 | Hatch open | ||
| 1415 | Foale replaces Linenger as EO-23 BI-2 | ||
| 1997 May 21 | 1240 | Hatch closed | |
| 1997 May 22 | 0104 | OV-104 undocked | |
| 0152 | OV-104 sep burn | ||
| 1997 Jun 24 | 1022:50 | Progress M-34 undocked Kvant +X | |
| 1997 Jun 25 | 0910 | Progress M-34 collides with Spektr | |
| Spektr begins to depressurize | |||
| Crew disconnect power lines | |||
| 0924 | Spektr hatch closed | ||
| 17MB,MC cataloged | |||
| 1997 Jul 1 | 1100 | Leak from Spektr tank | |
| 1997 Jul 3 | Gyro problem, attitude restored | ||
| 1997 Jul 7 | 0559:24 | Progress M-35 docked Kvant +X | |
| 1997 Jul 14 | Tsibliev reports heart problem | ||
| 1997 Jul 17 | 1856 | Power outage, crew to Soyuz | |
| Power and attitude restored | |||
| 1997 Jul 25 | Film Israeli milk commercial | ||
| 1997 Aug 6 | 1146:45 | Progress M-35 undocked Kvant +X | |
| 1997 Aug 7 | 1702:08 | Soyuz TM-26 docked Kvant +X | |
| 1832 | Hatch open | ||
| EO-24 crew to Mir | |||
| Solov'yov, Vinogradov | |||
| 1997 Aug 14 | EO-23 to TM-25 | ||
| 0550 | Hatch closed to TM-25 | ||
| 0855:58 | Soyuz TM-25 undocked -X | ||
| 1997 Aug 17 | EO-24, NASA to Soyuz TM-26 | ||
| 1329:20 | Soyuz TM-26 undocked Kvant +X | ||
| 1413:04 | Soyuz TM-26 redocked Mir -X | ||
| 1997 Aug 18 | 1252:47 | Progress M-35 docked Kvant +X | |
| 1997 Aug 18 | 1253 | Main computer failure | |
| 1997 Aug 19 | Main computer repaired | ||
| 1997 Aug 22 | EO-24 EVA-1 for Spektr hatch repair and restore elec. power | ||
| Orlan-DMA suits | |||
| 0959 | Depress transfer node | ||
| 1015 | p = 42mm Hg | ||
| 1020 | Repress to replace BI glove; 0h30? | ||
| 1022 | p = 202mm | ||
| 1022:39 | p = 245mm | ||
| 1029 | p = 600mm | ||
| 1045 | Depress transfer node | ||
| 1114 | Open Spektr hatch | ||
| 1138 | Vinogradov ingress | ||
| 1430 | Spektr hatch resealed | ||
| 1430? | Repress begin (3h50?) | ||
| 1503 | Repress complete (total 5:04) | ||
| 1997 Aug 25 | Oxygen generators fail, repaired | ||
| 1997 Aug 26 | Electrical power restored post EVA | ||
| 1997 Sep 6 | EO-24 EVA-2 Depress Kvant-2 | ||
| 0107 | Hatch open | ||
| By Strela to Spektr | |||
| 0600 | Realign solar arrays | ||
| 0648 | Back at Kvant-2 | ||
| 0652 | Ingress | ||
| 0707 | Hatch closed 6:00 | ||
| 17MD,ME cataloged | |||
| 1997 Sep 16 | MSTI-2 pass at 500m | ||
| 1997 Sep 27 | 1958 | OV-104 docked at SO | |
| 2145 | OV-104/SO hatch open | ||
| 1997 Sep 28 | 1549 | Wolf replaces Foale as EO-24 BI-2 | |
| 1997 Oct 2 | 2245 | OV-104/SO hatch closed | |
| 1997 Oct 3 | 1728 | OV-104 undocked SO | |
| 2016 | OV-104 sep burn | ||
| 1997 Oct 5 | Progress M-35 failed to undock | ||
| 1997 Oct 7 | 1203:47 | Progress M-35 undocked Kvant +X | |
| 1997 Oct 8 | 1707:40 | Progress M-36 docked Kvant +X | |
| 1997 Oct 20 | 0940 | EO-24 EVA-3 with Orlan-DMA | |
| Entered Spektr module | |||
| Connected cables to hatch. | |||
| 1618 | Hatch closed | ||
| 1997 Nov 3 | 0030 | EVA delayed, Solovyov suit problem | |
| 0332:30 | EO-24 EVA-4 with Orlan-M begins | ||
| 0405? | Sputnik-40 deployed by Solov'yov | ||
| On Strela crane to Kvant | |||
| 0443? | At Kvant | ||
| 0510? | MSB-4 removed from Kvant | ||
| 0650 | MSB-4 at parking location on BB | ||
| Work on Vosdukh system | |||
| 0812 | Thermal screen installed | ||
| 0830 | Work on third solar panel | ||
| 0937 | HC, EVA ends after 6 hr 4min | ||
| 0953? | Repress to 500 mmHg | ||
| Hatch failed to close, slow leak | |||
| 1020?? | Depress | ||
| 1025?? | Hatch open for 5 min? | ||
| 1030?? | Hatch closed | ||
| Repress to 260 mmHg | |||
| PNO hatch used as airlock | |||
| 1119 | Already in PNO | ||
| 1997 Nov 4 | Leak emergency declared over | ||
| 1997 Nov 6 | 0012:39 | EO-24 EVA-5, Hatch open Kvant-2 ShSO | |
| MSB-SO transferred from SO to Kvant | |||
| 0624:46 | Hatch closed 06:12 | ||
| 0656 | PNO hatch closed 6:44 | ||
| Repress PNO | |||
| 17MF-MH cataloged | |||
| 1997 Dec 17 | 0601:53 | Progress M-36 undocked Kvant +X | |
| 0735 | Progress M-36 deploy Inspector | ||
| 1997 Dec 22 | 1022:14 | Progress M-37 docked Kvant +X | |
| 1998 Jan 8 | EO-24 EVA-6, PNO hatch open | ||
| 2308 | EVA, ShSO hatch open | ||
| Inspect ShSO lock | |||
| Strela transfer to SO | |||
| Retrieve OPM experiment | |||
| Strela transfer to ShSO | |||
| 1998 Jan 9 | 0214 | EVA end, hatch closed, 3h 06m | |
| 17MJ cataloged | |||
| 1998 Jan 14 | 2112 | ShSO hatch open | |
| EO-24 EVA-7 Solov'yov, Wolf | |||
| Hatch examination | |||
| EVA remote camera test | |||
| Space Portable Spectro--reflectometer measurements | |||
| 1998 Jan 15 | 0104 | ShSO hatch closed | |
| 0233 | PNO hatch closed | ||
| 17MK,ML cataloged | |||
| 1998 Jan 24 | 2014 | Endeavour docked with SO | |
| 2153 | Hatch open to OV-105 | ||
| 1998 Jan 25 | 2335 | Thomas replaces Wolf as EO-24 BI-2 | |
| EO-24: Solov'yov, Vinogradov, Thomas | |||
| 1998 Jan 28 | 2234 | Hatch closed to OV-105 | |
| 1998 Jan 29 | 1656 | Endeavour undocked SO | |
| 1816 | Endeavour complete flyaround, sep | ||
| 1998 Jan 30 | 1250:30 | Progress M-37 undocked Kvant +X | |
| 1998 Jan 31 | 1754 | Soyuz TM-27 docked Kvant +X | |
| Hatch open, EO-25 and Pegase to Mir | |||
| Solov'yov, Vinogradov, Wolf, Musabaev, Budarin, Eyharts | |||
| 1998 Feb 19 | Command to EO-25 | ||
| EO-25: Musabaev, Budarin, Thomas | |||
| EO-24, Pegase crew to Soyuz TM-26 | |||
| 0250 | Hatch closed to Soyuz TM-26 | ||
| 1998 Feb 19 | 0552 | Soyuz TM-26 undocked -X | |
| 1998 Feb 20 | EO-25, NASA-7 to Soyuz TM-27 | ||
| 0848 | Soyuz TM-27 undocked +X | ||
| 0932 | Soyuz TM-27 docked -X | ||
| Hatch open | |||
| EO-25, NASA-7 back on Mir | |||
| 1998 Feb 23 | 0942:28 | Progress M-37 redocked at Kvant +X | |
| 1998 Mar 3 | EO-25 EVA-1 Musabaev, Budarin | ||
| Depress PNO | |||
| Enter ShSO | |||
| 0130 | Fail to open ShSO hatch | ||
| 0240? | Return to PNO, repress | ||
| 1998 Mar 15 | 1916:01 | PM37 Undocked from Kvant | |
| 1998 Mar 17 | 0031:17 | PM38 Docked with Kvant | |
| 0206 | PM38 Hatch open | ||
| 1998 Mar 27 | Fix ShSO hatch | ||
| 1998 Apr 1 | EO-25 EVA-2 Musabaev, Budarin | ||
| 1335 | ShSO hatch open | ||
| Strela to Spektr | |||
| Install handrails | |||
| 2015 | ShSO hatch closed | ||
| 86-17MM | |||
| 1998 Apr 6 | EO-25 EVA-3 Musabaev, Budarin | ||
| 1127 | HO | ||
| Spektr MSB splint | |||
| EVA curtailed, thruster problem | |||
| 1550 | HC | ||
| 86-17MP,MN | |||
| 1998 Apr 11 | EO-25 EVA-4 Musabaev, Budarin | ||
| 0918 | 9mm pressure | ||
| 0955 | HO | ||
| Translate to Kvant | |||
| Removed VDU from Sofora | |||
| 1235:20 | VDU jettisoned (17MQ) | ||
| Return to Kvant-2 | |||
| 1620 | HC | ||
| 1998 Apr 17 | EO-25 EVA-5 Musabaev, Budarin | ||
| 0740:22 | HO | ||
| Translate to Kvant | |||
| Stow third boom | |||
| Stow Rapana boom | |||
| Translate to Progress | |||
| Unlatch VDU and tilt to 35 deg | |||
| 1412:30 | HC | ||
| 1998 Apr 22 | EO-25 EVA-6 Musabaev, Budarin | ||
| 0534 | HO | ||
| Install new 700 kg VDU on Strela | |||
| 1155 | HC | ||
| 17MR to MU cataloged | |||
| 1998 May 15 | 1841 | PM38 Undocked | |
| 1998 May 16 | 2350:34 | PM-39 Docked Kvant | |
| 1998 Aug 12 | 0928:55 | Undocked PM-39 | |
| 1998 Aug 15 | 1056:54 | TM-28 Docked with Kvant | |
| 1229 | Hatch open, EO-26 aboard | ||
| 1998 Aug 24 | 2258s | TM-27 Hatch closed | |
| 1998 Aug 25 | Padalka commander | ||
| 1998 Aug 25 | 0204:55 | TM-27 Undocked Mir -X, EO-25 leaving | |
| 1998 Aug 25 | 17MV cataloged | ||
| 1998 Aug 27 | 0130? | TM-28 Hatch closed | |
| 1998 Aug 27 | 0547 | TM-28 Undocked Kvant +X | |
| 0607:11 | TM-28 Docked PKhO -X | ||
| 0740? | Hatch open | ||
| 1998 Sep 1 | 0534:40 | PM-39 redock Kvant, Kurs | |
| 1998 Sep 15 | EO-26 EVA-1 Padalka, Avdeev | ||
| Depress PKhO | |||
| 2000 | HO to Spektr | ||
| Reconnect cables | |||
| 2030 | HC to Spektr | ||
| Repress PKhO | |||
| 1998 Oct 25 | 2303:24 | PM-39 Undocked from Kvant | |
| 1998 Oct 27 | 0543:41 | PM40 Docked Kvant | |
| 1998 Nov 10 | EO-26 EVA-2 Padalka, Avdeev | ||
| 1924 | Kvant HO | ||
| 1930? | Deploy Spoutnik-41 | ||
| Meteorite trap attached | |||
| Expts retrieved | |||
| 1998 Nov 11 | 0118 | Kvant HC | |
| 0130? | Repress ShSO | ||
| 0300? | In PNO | ||
| 1998 Dec 24 | 91.53 344 x 354 x 51.6 | ||
| 1998 Dec 24 | 0403 | Orbit raise PM40 SKD 2m/s | 91.75 353 x 366 x 51.66 |
| 1998 Dec 28 | 0248 | Orbit raise PM40 DPO engines 2m/s | |
| 1999 Jan 27 | 1418:35 | Orbit raise PM40 DPO, 97s 0.4m/s | 91.63 347 x 361 x 51.6 |
| 1999 Jan 29 | 1336:42s | Orbit raise PM40 DPO 400s, 1.4m/s | |
| 1999 Feb 2 | s | Orbit raise TM28 DPO, 0.9m/s | 91.70 347 x 367 x 51.6 |
| 1999 Feb 4 | 0959:32 | PM40 Undock Kvant | |
| 1999 Feb 8 | 1123:03 | TM28 Undocked PKhO -X | |
| 1139:07 | TM28 Docked Kvant +X | ||
| 1999 Feb 22 | 0536:16 | Soyuz TM-29 Docked with Mir -X | 91.65 346 x 364 x 51.7 |
| 1999 Feb 27 | 1954 | HC | |
| 2255:11 | Undocked TM-28 | ||
| 1999 Mar 10 | 91.58 344 x 360 x 51.6 | ||
| 1999 Apr 4 | 1246:49 | PM41 Docked with Kvant | |
| 1999 Apr 16 | 0437 | EO-27 EVA-1 Afanasev, Haignere | |
| Recover COMET | |||
| Install Exobiology radn exposure expt | |||
| Install Germetisator (leak sealant expt) | |||
| 1030? | Deploy Sputnik-99 | ||
| 1056 | HC 06:19 | ||
| 1999 Apr 23 | 0301:49 | Orbit raise 2m/s | |
| 1999 Apr 28 | 0153:12 | Orbit raise 2m/s, 600s | |
| 1999 May 6 | PM41 orbit raise | ||
| 1999 Jun 23 | 0329:16 | TM29 orbit raise | |
| 1999 Jun 24 | 0219:45 | TM29? DPO orbit raise | |
| 1999 Jul 6 | 2128:53 | PM41 orbit raise, SKD 1.3m/s 89s | |
| 1999 Jul 17 | 1120 | PM41 Undocked | |
| 1999 Jul 18 | 1753:21 | PM42 Docked Kvant +X | |
| 1999 Jul 23 | EO-27 EVA-2 Afanas'ev, Avdeev | ||
| 1106 | HO Kvant-2 | ||
| Reflektor installed on Sofora mast | |||
| Failed to deploy antenna | |||
| 1713 | HC (6hr7m) | ||
| 1999 Jul 28 | EO-27 EVA-3 Afanas'ev, Avdeev | ||
| 0937 | HO | ||
| Deployed 6m Reflektor antenna | |||
| Antenna jettisoned | |||
| 1459 | HC (5:22) | ||
| 1999 Aug 18 | 0422:57 | TCM PM42 SKD 256s | |
| 1999 Aug 20 | 0257:00 | TCM PM42 DPO 553s | |
| 1999 Aug 27 | 1815 | HC | |
| 2117:01 | Undocked Soyuz TM-29 | ||
| 1999 Dec 8 | 0638:00 | TCM PM42 DPO 328s 2m/s | |
| 1999 Dec 9 | 0522:00 | TCM PM42 SKD 49s 2m/s | |
| 2000 Jan 25 | 1002:50 | TCM PM42 SKD 202s 4.6m/s | 312 x 329 |
| 2000 Feb 2 | 0311:52 | PM42 Undock | |
| 2000 Feb 3 | 0802:28 | PM1-1 Docked with Kvant +X | |
| 2000 Feb 5 | 0654:00 | TCM PM1-1 DPO 200s 1.5m/s | |
| 2000 Feb 7 | 0545:00 | TCM PM1-1 DPO 1069s 8.0m/s | |
| 2000 Feb 9 | 0133 | TCM PM1-1 SKD 231s 7m/s | |
| 2000 Feb 9 | 0524 | TCM PM1-1 SKD 296s 9m/s | |
| 2000 Apr 6 | 0631:24 | TM 30 Dock with Mir -X | 329 x 333 x 51.6 |
| EO-28 entry | |||
| 2000 Apr 12 | 0205 | TCM PM1-1 | |
| 2000 Apr 16 | 0043 | TCM PM1-1 | |
| 2000 Apr 17 | 0100 | TCM PM1-1 | |
| 2000 Apr 18 | Leak located in Spektr hatch. | ||
| 2000 Apr 23 | 2310 | TCM PM1-1 | |
| 2000 Apr 26 | 1600? | TCM PM1-1 DPO | |
| 1633 | PM1-1 undock | ||
| 2000 Apr 27 | 2128:47 | PM1-2 Docked Kvant | |
| 2000 Apr 29 | 1858:44 | TCM PM1-2 SKD/DPO 8m/s 295s | |
| 2000 Apr 30 | 1959s | TCM PM1-2 DPO 8m/s | |
| 2000 May 1 | 1900s | TCM PM1-2 SKD/DPO 8m/s | |
| 2000 May 7 | 1517:17s | TCM | |
| 2000 May 12 | 1044 | EO-28 EVA-1 from Kvant-2 | |
| 1100 | Deployed Germitizator 'space glue' experiment | ||
| 1130 | Zalyotin rides Strela to Kvant-1 | ||
| 1300 | Inspected Kvant solar array | ||
| Retrieve thin-film solar panel from Kristall | |||
| 1400 | Back at Kvant-2 | ||
| 1547 | Hatch closed | ||
| 1615 | Still in airlock | ||
| 2000 Jun 15 | 2124:50 | TM30 Undocked | |
| 2000 Oct 15 | 1809:51 | Undock PM1-2 | |
| 2000 Oct 20 | 2116:06 | PM43 Docked with Mir (Kvant +X) | |
| 2000 Oct 25 | TCM Progress M-43 orbit raise | ||
| 2001 Jan 25 | 0519:23 | PM43 Undocked from Kvant | |
| 2001 Jan 27 | 0533:31 | Progress M1-5 docked | |
| Mir complex spin-stabilized | |||
| 2001 Mar 21 | Mir attitude controlled | ||
| 2001 Mar 22 | 88.82 213 x 218 x 51.6 | ||
| 2001 Mar 23 | 0031:59 | Begin M1-5 burn 1 9.3m/s 1257s 460 kg | |
| 0053:38 | M1-5 burn 1 cutoff | 188 x 219 (RAKA) | |
| 0110 | 88.6 190 x 219 x 51.6 | ||
| 0201:11 | M1-5 burn 2 10.4m/s 1374s 510 kg | ||
| 0224:25 | M1-5 burn 2 cutoff | 157.7 x 216.7 (RKKE) | |
| 150 x 215 x 51.6 (TLE) | |||
| 0507:37 | Burn 3, SKD ME+8DAT, 21.1 m/s | ||
| 0519:15 | Burn complete, 713 (RS) + 258 (FS) kg, | 80? x 215 x 51.6 | |
| 0519:15 | Burn 4, ME+8DAT, 50 percent thrust, 0.8m/s, 43 kg RS+FS | ||
| 0519:58 | Burn complete | 78? x 214 x 51.6 | |
| 0519:58 | Burn 5,ME+8DAT, 26 percent thrust, 4.6m/s, 363 kg FS+CPS | ||
| 0529:05 | Burn complete, last from main engine | 65? x 212 x 51.6 | |
| 0529:05 | Burn 6, 8DAT, 0.7m/s, 36 kg FS+CPS | ||
| 0530:40 | Burn complete | 64? x 211 x 51.6 | |
| 0530:40 | Burn 7, 8DAT, 3.1m/s, 155 kg from CPS | ||
| 0537:40 | Burn complete, 120 km 12N 154E | 60? x 204? x 51.6 | |
| 0543 | Entry | ||
| 0544:01 | 85 km 9.2S 170.0E | ||
| 0546:34 | 75 km 17.4S 176.3E | ||
| 0550 | Breakup 25km 26.1S 176.0W | ||
| 0553 | Impact near 26.2S 175.9W | ||
These Are Not My Beautiful Stories
Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...
-
If "The Clique" series were set in Clifton Park instead of Westchester, here's how the stories might be similar or different:...
-
The Degrassi Quarternarians: Overview The Quarternarians are a Canadian Cadets unit of exactly 25 Degrassi Junior High / High stude...
-
Season 1 (1985-1986, episodes 1-16) Introduced in Episode 1 ( Double Love) Jeanne Tripplehorn as Elizabeth Wakefield Vicki Lewis as Je...