Thursday, February 25, 2016

Himawari 6

 2005-006A


Multifunctional Transport Satellite 1R, replaces MTSAT-1 failure. Loral FS-1300 for Ministry of Transport with met (replacing GMS-5) and aeronautical at L Ku and Ka (for aircraft flight control). MTSAT owned by Civil Aviation Bureau (CAB) of Ministry of Land, Infrastructure and Transport of Japan (MLIT) and the JMA. JMA part is successor to Himawari. Ground stations are at Kobe and Hitachi-Ota. Will be stationed at 140E. MTSAT-1R (was renamed Himawari-6 after launch. Satellite is box + 2 dishes + panel + solar sail boom, mass 3300 kg launch 1300 kg dry. Span across panel and boom is 33.1m. Height is 4.0m.


MTSAT-1R 
 

DateTimeEventOrbit  

2005 Feb 24  0925  Launch by H-IIA No. 7  TNSC  
  T+0:45 SSB ignition 6 om 0.6 km/s 
  T+1:45 SSB burnout 38 km 1.6 km/s 
  T+2:07 SRB-A burnout 57 km 1.7 km/s 
  T+2:07 SRB-A sep 59 km  
  T+2:10 SSB jettison 60 km  -6250 x 75?  
  T+4:16 Fairing sep 138 km 2.7 km/s 
  T+6:37 MECO 216 km 5.2 km/s 
  T+6:43 St 1 sep 222 km  
 0931 T+6:53 SEIG-1 226 km 5.2 km/s  -4500 x 250?  
 0937 T+12:32 SECO-1 314 km 7.7 km/s  250 x 314? x 29.0?  
 0949 T+24:36 SEIG-2 258 km 7.7 km/s 
 0952 T+27:28 SECO-2 255 km 10.2 km/s 
 1005 T+40:02 MTSAT-1R sep 
 1035  SEIG-3 test burn  
  SECO-3  
 1125  end of H-IIA mission  
2005 Feb 27    620.90 158 x 35302 x 29.0 
2005 Feb 27  1200? LAM-1 810.01 9093 x 35781 x 9.8  
2005 Mar 1  0510? LAM-2 1361.33 32837 x 35782 x 0.5 GEO 107.1E+19.8E/d 
2005 Mar 3  1500?  LAM-3 
2005 Mar 6?    1435.91 35772 x 35793 x 0.1 GEO 144.1E 
2005 Mar 12    1436.13 35774 x 35799 x 0.1 GEO 145.0E 
2005 Apr 13    1436.14 35777 x 35797 x 0.0 GEO 145.0E 
2005 Apr   Relocate to 140E 
2005 May 15    1436.09 35780 x 35792 x 0.1 GEO 140.3E 
2006 Aug 8    1436.05 35777 x 35793 x 0.1 GEO 140.2E 
2010 Feb Replaced by MTSAT-2, to standby 
2014 May 2    1436.14 35786 x 35788 x 0.1 GEO 140.0E 
2014 May 5   TLEs mistagged
2014 May 30   
2015 Dec 7    1436.09 35769 x 35803 x 0.6 GEO 140.0E 

Tuesday, February 23, 2016

Measat 1

 1996-002B


The Malaysia/East Asia Satellite (MEASat) was built by Hughes using the HS376 bus, for the Malaysian PTT agency Binariang Sdn. Bhd. 

Measat is 2.2m diameter, 3.31m high at launch and 7.82m high once the solar panel skirt and antennae are deployed. Mass is 1450 kg at launch, 839 kg on orbit and 626 kg dry.

In 2007 Measat was retired from its primary role, moved to 46E and renamed Africasat 1. It was replaced by Africasat-1a in 2013.


Measat 1 
 

DateTimeEventOrbit  

1996 Jan 12  2310  Launch by Ariane 44L (V82)  CSG ELA2 
 2315  H-10-3 burn (T+5:48) 
 2328  H-10-3 shutdown (T+18:44) 
 2330  PAS 3R sep (T+20:16) 
 2333  Spelda sep (T+23:52) 
 2336  Measat sep (T+25:58) 
 2336  H-10-3 avoidance burn (T+26:20) 
 2340  End of mission V82 
   630.68 206 x 35760 x 7.0 
1996 Jan 14  0140   631.97 213 x 35819 x 7.0 
1996 Jan 16    631.09 215 x 35772 x 7.0 
1996 Jan 16  0550?  Star 30 AKM burn 
1996 Jan 17  1115   1420.17 34951 x 35998 x 0.25 GEO 72E+4.0E 
1996 Jan 21  1620   1426.22 35381 x 35805 x 0.19  
1996 Jan 22  1150   1437.60 35790 x 35842 x 0.18  
1996 Jan 30  1620   1436.00 35761 x 35808 x 0.21  
1996 Mar 13    1436.13 35777 x 35797 x 0.1 GEO 91.5E 
1997 Feb 23    1436.10 35782 x 35790 x 0.0 GEO 91.5E 
1999 Oct 14    1436.09 35780 x 35791 x 0.0 GEO 91.6E 
2006 Aug 3    1436.17 35783 x 35782 x 0.0 GEO 91.5E 
2007 Nov 13    1436.14 35781 x 35792 x 0.0 GEO 91.5E 
2007 Nov 13?  move out  1400.56 35861 x 35885 x 0.1  
2007 Dec 25   Move in at 46E 
2008 Jan 18    1436.13 35773 x 35801 x 0.3 GEO 46.0E 
2013 Apr 26    1436.08 35778 x 35794 x 4.9 GEO 45.9E 
2013 Apr 28?  Move out 
2013 Apr 30    1446.30 35874 x 36097 x 4.9 GEO 39.9E

Saturday, February 20, 2016

LaoSat 1

 2015-067A


LaoSat 1 will launch on a CZ-3B. It is a DFH-3 satellite owned by Lao Satellite Joint Venture Company (involving Lao government, China APMT), positioned at 128.5E.


Laosat 1 
 

DateTimeEventOrbit  

2015 Nov 20  1607 Launch by CZ-3B  XSC 
  T+2:21 Booster sep 
  T+2:35 St 1 sep 
  T+2:39 St 1 burn? 
  T+3:55 Fairing 
  T+6:37 St 2 sep 
 1613 T+6:44 St 3 MES-1 
 1617 T+10:19 St 3 MECO-1  208 x 635 x 27.1 
 1628 T+21:03 St 3 MES-2 
  T+24:01 St 3 MECO-2  201 x 35824 x 27.1 
 1631 T+24:20 St 3 RCS cutoff 
 1632 T+25:40 Payload sep 
2015 Nov 27    752.45 159 x 41892 x 18.3 
2015 Nov 30    1436.14 35781 x 35793 x 0.1 GEO 128.5E 

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...