2001-028
The Joint Airlock is delivered on Flight 7A. It includes a large diameter equipment lock (E/L) for storage of EMUs and Orlans, and a small diameter crew airlock (C/L). The C/L is the part that is depressurized and its hatch to vacuum is on the nadir side of the cylinder.
The US EVA-1 tested out Quest after problems on its initial use.
The Jan 2003 Stage EVA will include: Release P1 radiator locks, inspect and monitor deployment of P1 radiator beam, clean Unity nadir CBM, install ETSD tool box and light fixture on CETA-2.
On EVA-23 Parmitano's helmet began to fill with water, causing the spacewalk to be cut short. It was later determined that a small leak had been detected at the end of EVA-22 but not taken seriously - a mistake that nearly cost Luca his life.
EVA-40 Mar 24 Kimb EV1 Pesq EV2 PMA from N3port to N2 zenith (ready for IDA)
EV2 PFR from ?ELC to P1 EV2 P1, Inspect RBVM-2-0113 for NH3 leak
EV1 Replace external MDM no. 1 - S0 EV2 to S0, SPDM LEE lubing with BLT tool
EV1 Disconnect PMA EV1 replacements for JEM external cameras on JEM EF -- Robotic move PMA3 -- GA: lens cover, ceta light, FHRC prep work, PM prep work, break batt torque, RGHB adjust
EVA-41 Mar 30 Kimb EV1 Whitson EV2
EV1 to S0, replaceReplace external MDM no. 2? EV2 Connect PMA3 heater cables on N2 EV2 Remove PMA3 cover EV1,2 back to AL, pickup N3 axial shields (instead of usual petals on non axial ports) Install N3 port shields back to al, pick up new shields Install new PMA3/N2 shields
Cygnus brings EVA-42 ExPCA hardware, berthing Apr 2
EVA-42 Apr 6 Whitson EV1, Pesquet EV2
ExPCA Express Pallet Controller Assembly Retrieve upgrade ExPCA and install on ELC-4
ELC avionics box upgrade to supply power to multiple payloads EV1: "1553 feedback terminator" install AMS-2 temrinator cap to prepare for data upgrade (terminator
EV1: Photos of Page3 EV2: HD camera install on cp3 EV1: ret from AL the last sheild to go on PMA-3 - 'Forward Shield' on OA-7 EV2: get Extern WCS antenna from AL, install on ? Lab? Light bulbs Lens cover replacement on a robotic arm
EVA-44 scheduled for 2017 Oct 5; Bresnik and Vande Hei carried out swap of the SSRMS LEE-A. LEE-A was removed from SSRMS and temporarily stowed on CETA cart (A?). The POA LEE was removed from the MBS POA and mated to the SSRMS as the new LEE-A. The old LEE-A was then installed on the MBS POA.
EVA-45 (Bresnik, Vande Hei). PFCS 5 was launched on STS-102 attached to ESP1. The astronauts rotated the PFCS for maintenance. The CP9 EVTCG was removed and replaced; the CP9 HD camera was temporarily removed during the operation and then replaced. The old EVTCG was returned to the airlock. The MT camera lens was replaced and two handrails were removed from Node 3. THe LEE ball screw was lubricated.
EVA-46 (Bresnik, Acaba): an HD camera was added to the CP3 EVTCG. MLI was removed from the MBSU (A08032) and DCSU (A07356) on ESP-2 to allow SPDM access. EVTCG on CP13 was removed to the airlock, and replaced with a new EVTCG/HDC combo. The LEE latches were lubricated.
EMU 3011 flew on STS-96, STS-97, STS-100, and STS-109. It was launched on STS-111 to the station in Jun 2002, and returned to Earth on STS-121 in 2006. It was launched again in 2008, down in 2009; and in May 2010 on STS-132.
On Feb. 8 Lopez-Alegria and Williams will move from the airlock out to Crew Equipment Transfer Aid (CETA) carts on the rails of the main truss. Pushing the cart with their equipment, including a foot restraint, they move to the P3 Truss. Their first job is to remove thermal shrouds from two Rotary Joint Motor Controllers (RJMCs) on P3.
Next they will remove the two large shrouds from P3 Bays 18 and 20. The shrouds, larger than king-size bed sheets, provide thermal shading. With the station in its present orientation, they are no longer needed. They are being removed to avoid trapping heat.
Spacewalkers will work together to fold each into a package a bit smaller than an outdoor garbage can and jettison them, aft and slightly downward.
The 2-hour, 40-minute shroud task will be followed by deployment of an Unpressurized Cargo Carrier Assembly Attachment Systems (UCCAS), on the upper face of the P3 truss. The hour-long job is in preparation for attachment of a cargo carrier during a subsequent shuttle mission.
While Lopez-Alegria finishes the second UCCAS, Williams will move out to the end of the P5 truss to remove two launch locks to prepare for the relocation of the P6 Truss.
The final scheduled task of the spacewalk is connecting four cables of the Shuttle-to-Station Power Transfer System (SSPTS) to Pressurized Mating Adapter-2 (PMA-2) at the forward end of the Destiny laboratory. The SSPTS will allow visiting shuttles to take power from the station and thus extend their missions.
EVA-21 was a contingency EVA in May 2013. The 2B PFCS on P6 was implicated in a major leak in the ammonia cooling system, with flakes of ammonia ejected every few seconds. P6 also carried two spare PFCS, which had been part of the EETCS system when P6 was on top of Z1 in the early stages of assembly. Cassidy and Marshburn swapped the failed unit with one of these spare PFCS.
| Quest | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2002 Feb 20 | US EVA-1 | ||
| Walz EV-1, Bursch EV-2 | |||
| Safer 5, 4 | |||
| 1035 | Begin depress | ||
| 1128 | At 1 psi | ||
| 1134? | Depress | ||
| 1135? | HO | ||
| 1138 | Battery power | ||
| 1144 | TC open | ||
| 1147 | Egress Walz | ||
| 1154 | Egress Bursch | ||
| Cables from Z1 to Destiny | |||
| Remove thermal covers from Z1, store inside Z1 | |||
| Retrieve tools from Z1 | |||
| Inspect MISSE | |||
| Carry EVARM radiation sensors | |||
| Remove Strela base | |||
| Secure latches on O2N2 tanks | |||
| 1703 | EV2 ingress | ||
| 1710 | EV1 ingress | ||
| 1713 | TC closed | ||
| 1719 | HC | ||
| 1725 | Repress | ||
| 2002 Oct 10 | STS-112 EVA-1 Wolf, Sellers | ||
| 1433 | Quest depress begin | ||
| 1443 | At 5psi | ||
| 1458 | Resume depress | ||
| 1502 | 2.5psi | ||
| 1504 | 1.6psi | ||
| 1509 | 1psi | ||
| 1511 | 0.8psi | ||
| 1514 | Adopted depress mark | ||
| 1514 | 0.6 psi | ||
| 1518? | HO | ||
| 1518 | TC open | ||
| 1519 | Depress complete | ||
| 1521 | Battery power | ||
| 1531? | Egress Sellers | ||
| 1534? | Egress Wolf | ||
| 1630 | Connect S0/S1 power/data/fluid | ||
| 1730 | Release radiator launch locks | ||
| 1830 | SASA install on S1 | ||
| 1930 | CETA launch locks | ||
| 2109? | SSRMS close to Shuttle PLB (less than 10 cm?) | ||
| 2130 | S1 nadir camera install, problem with SSRMS | ||
| 2200 | CETA couple to MBS | ||
| 2210? | Ingress Wolf | ||
| 2210 | Ingress Sellers? | ||
| 2212 | TC closed | ||
| 2218? | HC (out of comm) | ||
| 2222:08 | Repress begin NASA 07:01 | ||
| 2002 Oct 12 | STS-112 EVA-2 Wolf, Sellers | ||
| 1407 | 5psi | ||
| 1414 | Resume depress | ||
| 1417 | 2.0psi, pump off | ||
| 1425 | 0.6psi Adopted depress time | ||
| 1428 | 0.5psi | ||
| 1429 | Hatch open | ||
| 1431 | Battery power | ||
| 1440? | Sellers egress | ||
| 1444 | Wolf egress | ||
| Install SPD on Z1/P6 | |||
| Install Z1-Lab loop A | |||
| 1630 | Connect ATA umbilical on S1 | ||
| 1645 | Lab ETVCG from AL | ||
| 1710 | Lab ETVCG attached to second S1 VSSA | ||
| 1714 | CETA launch locks | ||
| 1720? | ETVCG and VSSA removed from S1 | ||
| 1730 | ETVCG/VSSA attached to Lab | ||
| 1800 | S1/S0 SPD installs on NH3 quick disconnects | ||
| 1930 | Radiator launch locks | ||
| 2020? | Ingress Wolf | ||
| 2024? | Ingress Sellers | ||
| 2028 | TC closed | ||
| 2030 | Hatch closed | ||
| 2035 | Repress (NASA 6:04) | ||
| 2002 Oct 14 | STS-112 EVA-3 Wolf, Sellers | ||
| 1330 | Begin depress | ||
| 1404? | Vacuum | ||
| 1408? | HO | ||
| 1411 | Battery | ||
| 1430 | IUA (Interface Umbilical Assy) repair on MT | ||
| 1715 | Fluid line connect | ||
| 1830 | Keel pin removal | ||
| 2035? | Ingress | ||
| 2042? | HC | ||
| 2047 | Repress NASA 6:36 | ||
| 2003 Jan 15 | 0755 | MT from WS7 to WS4 | |
| 0821 | MT at WS4 | ||
| EVA Pettit, Bowersox | |||
| 1131 | Begin depress | ||
| 1138 | At 6 psi | ||
| 1140 | At 5 psi | ||
| 1157 | Resume depress | ||
| 1201 | 2.2psi | ||
| 1208 | Tone? | ||
| 1214 | At vac | ||
| 1216 | Rotating hatch handle, dp=0.5 | ||
| 1230 | 0.2psi | ||
| 1233 | Problem opening hatch | ||
| 1246 | Hatch open | ||
| 1250 | Batt power | ||
| 1308 | Recycle Bowersox suit power | ||
| 1314? | Egress Bowersox | ||
| 1322 | Egress Pettit | ||
| 1452 | P1 central radiator deploy | ||
| 1502 | P1 radiator deploy done | ||
| 1911 | Ingress | ||
| 1928 | TC closed | ||
| 1938? | HC | ||
| 1941 | Repress | ||
| 2003 Apr 8 | EVA Bowersox, Pettit | ||
| Power cable reconnection | |||
| CMG reserve power supply | |||
| Thermal cover on QDs | |||
| Release stanchion on CETA | |||
| 2003 Apr 8 | 1221 | Resume depress at 5psi | |
| 1229 | Almost at vacuum | ||
| 1233 | (Almost at 0.5 psi) | ||
| 1236? | Depress (JCM) | ||
| 1237 | At 0.6 psi | ||
| 1238 | At 0.5psi, go for HO | ||
| 1239 | TC open | ||
| 1239 | HO | ||
| 1240 | Battery power | ||
| 1248 | Egress Bowersox | ||
| 1255 | Egress Pettit | ||
| 1300 | Move CETA 1/2 away from MT | ||
| P1/S0/S1 connectors reconfigured | |||
| CMG power cables reconfigured | |||
| Freed lightning pole stanchion on CETA | |||
| 1855? | Ingress | ||
| 1901? | HC | ||
| 1906 | Repress | ||
| 2005 Nov 7 | EX12 EVA-1 McArthur Tokarev | ||
| 1410 | Begin depress | ||
| 1419 | 5 psi check | ||
| 1425 | Resume depress | ||
| 1429 | 3.3 psi | ||
| 1430 | 2.9 psi | ||
| 1434 | 2.0 psi, end of stage 2 | ||
| 1436 | Stage 3 venting fails, valve wrong | ||
| 1448 | Repressing; quick rise above 3.5 psi | ||
| 1448 | 19 min below 3.5 psi | ||
| 1453 | 14.3psi; reopen CL | ||
| 1455 | Open MTE valve | ||
| 1459 | Close CL | ||
| 1500 | Begin depress again | ||
| 1510 | 5psi check | ||
| 1513 | Resume depress | ||
| 1515 | 3.2 psi | ||
| 1518 | 2.0 psi, stage 3 venting | ||
| 1522 | 1.0 psi | ||
| 1527 | 0.6 psi | ||
| 1529 | Hatch open | ||
| 1532 | Battery power | ||
| 1544 | McArthur egress | ||
| 1550 | Tokarev egress | ||
| 1600 | Tokarev to ESP2 | ||
| 1610 | Retrieve VSSA stanchion | ||
| 1621 | Get camera from AL | ||
| 1640 | Arrive at P1 camera worksite | ||
| 1657 | Attach cam to VSSA | ||
| 1719 | Cam/VSSA installed on P1 as CP9 | ||
| 1750 | Tether swap after VSSA install | ||
| 1800 | Head for S1 Bay 13 RJMC (rotary joint motor contrller) | ||
| 1808 | At RJMC | ||
| 1814 | Failed RJMC removed | ||
| 1824 | Leave S1 Heading for airlock | ||
| 1828 | Back at AL, stowing RJMC etc | ||
| 1831 | Pick up Jettison Stowage Bag (JSB) at AL | ||
| 1833 | McA gets PFR from CETA | ||
| 1836 | McA leaves CETA for P6 | ||
| 1853 | Approaching FPP | ||
| 1856 | Arrive at FPP worksite | ||
| 1904 | 27 kg FPP removed from station by McA | ||
| 1920 | FPP hand jettison by McA | ||
| 1920? | Small washer drifts away | ||
| Inspect P6 MISSE | |||
| 1936 | FPP stanchion stowed in AL | ||
| APFR stowed on WIF12 on AL-EL | |||
| 2012 | Replace MT circuit breaker power module, completed | ||
| 2025 | Tokarev ingress | ||
| 2027 | JSB returned to AL | ||
| 2035 | McArthur ingress | ||
| 2036 | TC closed | ||
| 2046 | HC | ||
| 2054 | Repress | ||
| 2107 | Repress complete, CL open | ||
| 2006 Aug 3 | EVA Williams (EV1), Reiter (EV2) | ||
| 1329 | Depress to 5psi | ||
| 1350 | Depress 35 mm | ||
| 1354 | HO | ||
| 1400 | HO completely, stowed | ||
| 1404 | Battery power | ||
| 1420? | Egress Williams | ||
| 1425 | Egress Reiter | ||
| 1515 | Install FPMU floating point measurement unit on S1 | ||
| 1606 | MISSE-3 and 4 installed near Quest | ||
| 1701 | Install RJMC (Rotary Joint Motor Controller) on S1 | ||
| Thermal Radiator MDM on S1 | |||
| 1737 | Install CETA floodlight on S1 | ||
| 1835 | Install vent valve on Destiny | ||
| 1902 | Install foot restraint on S0 truss | ||
| 1945? | Ingress Reiter | ||
| 1948? | Ingress Williams | ||
| 1950? | HC | ||
| 1958 | Repress US:5:54 | ||
| 2007 Jan 31 | |||
| US EVA-6 | |||
| 1510? | Depress 0.7psi | ||
| 1511 | At 0.5 psi | ||
| 1513 | HO | ||
| 1514 | Battery power | ||
| 1529 | Egress LA | ||
| 1535? | Egress Williams | ||
| Ammonia system reconfigured | |||
| 1921 | P6 Stbd Radiator retract | ||
| 2200 | Preps for ingress | ||
| 2225? | Inside airlock | ||
| Bakeout | |||
| 2247 | Go for TC close | ||
| 2250 | HC | ||
| 2309 | Repress | ||
| 2310 | Hold at 5 psi for decontam | ||
| 2007 Feb 4 | US EVA-7 | ||
| 1334? | Depress | ||
| 1337? | HO | ||
| 1338 | Battery power | ||
| 1350? | Egress LA, Williams | ||
| Loop B reconfigured | |||
| 1545 | Config recomplete | ||
| LA to base of P6 for EAS work | |||
| 1623 | P6 aft radiator retract | ||
| P6 solar array mast inspection | |||
| 1820 | SSPTS cable install on Destiny | ||
| MDM Sunshade to be retrieved | |||
| 2005 | At airlock, cleanup | ||
| 2010 | Williams ingress | ||
| 2025 | LA ingress | ||
| 2027 | TC closed? | ||
| 2033 | HC | ||
| Pause for bakeout | |||
| 2049 | Repress | ||
| 2053 | Halt at 5 psi | ||
| 2109 | Resume repress | ||
| 2113 | Repress complete | ||
| 2007 Feb 8 | EVA | ||
| LA, Williams | |||
| 1322 | AL depress 0.7 psi | ||
| 1324 | HO, TC open | ||
| 1326 | Battery power | ||
| 1331 | Go for egress | ||
| 1332 | Williams egress | ||
| 1340 | LA egress | ||
| To CETA carts | |||
| Translate to P3 | |||
| 1404 | Zenith RJMC shroud removal | ||
| 1500 | First shroud packed and secured | ||
| 1536 | Shroud jettison by LA | ||
| 1542 | Shroud jettison by LA | ||
| 1600 | Work on P3 zenith UCCAS deploy | ||
| 1730 | Work on P5 launch locks | ||
| 1815 | Translate back on CETA | ||
| 1830 | SSPTS cable install | ||
| 1946 | Ingress LA | ||
| 1953 | Ingress Williams | ||
| 1957 | TC closed | ||
| 2002 | HC | ||
| 2006 | Comm hardline | ||
| 2006 | Repress | ||
2007 Jul 23 | EVA-9 | ||
| 1024 | Batt power | ||
| 1035? | Anderson egress | ||
| 1044? | Yu egress | ||
| 1105? | VSSA retrieved from ESP-2 | ||
| 1130? | VSSA installed at CP7 on S0/P1 | ||
| VSSA FSE/FRAM retrieved from ESP-2 | |||
| 1321 | VSSA FSE/FRAM jettison | ||
| 1437 | EAS jettison | ||
| Replace RPCM S04B-F on S0 | |||
| Return failed RPCM to Quest | |||
| 1520 | Clean CBM on Unity nadir | ||
| Remove GPS Antenna No. 4 | |||
| 1805 | Repress NASA 7:41 | ||
| 2007 Nov 9 | STS-120 EVA-5 (Whitson, Malenchenko) | ||
| 0952? | Depress | ||
| 0953 | HO | ||
| 0954 | Battery power | ||
| Egress | |||
| Prepare PMA-3 for unberthing | |||
| Harmony PDGF activated | |||
| 1628? | Ingress | ||
| 1646 | HC | ||
| 1649 | Repress | ||
| 2007 Nov 20 | US EVA-11 (Tani, Whitson) | ||
| 1007 | Depress | ||
| 1008 | HO | ||
| 1010 | Battery power | ||
| 1017 | Egress Whitson | ||
| 1019 | Egress Tani | ||
| Cooling loop A connected to Destiny | |||
| Harmony/Destiny connections | |||
| 1703 | Ingress | ||
| HC | |||
| 1726 | Repress | ||
| 2007 Nov 24 | US EVA-12 (Whitson, Tani) | ||
| 0940? | Depress | ||
| 0949? | HO | ||
| 0950 | Battery power | ||
| 0955 | Egress Whitson | ||
| 0958 | Egress Tani | ||
| 1218 | Loop B umbilical tray connected to Destiny | ||
| 1330 | Ammonia flowing to Harmony | ||
| 1412 | Tani removing thermal cover from SARJ | ||
| 1635 | Tani prep for ingress | ||
| 1645 | Whitson ingress | ||
| 1652 | HC | ||
| 1654 | Repress | ||
| 2007 Dec 18 | US EVA-13 (Whitson, Tani) | ||
| 0948? | Depress | ||
| 0949? | HO | ||
| 0950 | Battery power | ||
| EMU 3006 Tani, EMU 1005 Whitson | |||
| Inspect 1A BGA and BMRMM | |||
| Inspect SARJ | |||
| Remove SARJ TBA-5 Trundle Bearing Assy. | |||
| 1630? | Ingress | ||
| 1642? | HC | ||
| 1646:20 | Repress (NASA 6:56) | ||
| 2008 Jan 30 | USOS EVA-14 (Whitson, Tani) | ||
| 0950? | Depress | ||
| 0955? | HO | ||
| 0956 | Battery power | ||
| BMRRM repair | |||
| 1208 | old S4-1A BMRRM removed | ||
| 1214 | new BMRRM installed | ||
| 1440 | SARJ inspection | ||
| 1645 | Ingress | ||
| 1705 | HC | ||
| 1706 | Repress | ||
2010 Aug 7 | s | USOS EVA-15 | |
| EV-1 Wheelock - 3005. EV-2 Caldwell Dyson - 3009. | |||
| 1107 | 1.5 psi | ||
| 1110 | 1.0 psi | ||
| 1114 | 0.7 psi DEPRESS | ||
| 1116 | 0.5 psi | ||
| 1117 | HO | ||
| 1119 | Battery power | ||
| 1125? | Egress Wheelock | ||
| 1130? | Egress C-D | ||
| 1132 | TC closed | ||
| 1148 | Astros at PM location on S1 | ||
| 1723 | QDs removed on old PM | ||
| 1802 | Cleaning up worksite | ||
| 1824 | Return to vicinity of AL | ||
| NH3 decontam | |||
| 1833 | Go to ingress | ||
| 1841 | Ingress complete | ||
| NH3 bakeout in open hatch | |||
| 1911 | Closing hatch | ||
| 1911? | HC | ||
| 1922 | Starting repress (NASA 8:03) | ||
| 1923 | Crack open hatch handle for decontam | ||
| 1924 | Resume repress | ||
| 1926 | Hold at 5 psi? | ||
| NH3 checking | |||
| 1943 | Continue repress | ||
| 2010 Aug 11 | EVA-16 Wheelock, Caldwell-Dyson | ||
| 1209 | Resume 5psi depress | ||
| 1213 | At 2psi | ||
| 1217 | At 1 psi | ||
| 1221 | 0.7 psi DEPRESS | ||
| 1225 | 0.6 psi | ||
| 1226 | HO | ||
| 1227 | BP, NASA start | ||
| 1233? | Wheelock egress | ||
| 1240? | C-D egress | ||
| 1245 | TC closed | ||
| Translate to S1 to work on QDs | |||
| 1320 | C-D at CETA cart | ||
| 1330 | Adjusting QDs on DDCU | ||
| 1400 | C-D moved Ceta cart | ||
| 1423 | M3 connector finally freed | ||
| 1539 | Wheelock on SSRMS to ESP-2 to get AGB | ||
| 1638 | Final bolt undone on old pump | ||
| 1718 | Adjustable grapple bar on old pump | ||
| 1729 | Wheelock extracts old pump | ||
| 1740 | C-D working at ESP2 on new pump | ||
| 1755 | Old PM on MT POA | ||
| 1900 | New pump prepped | ||
| 1923 | TC open, prepare to ingress | ||
| 1932 | Ingress complete, TC closed | ||
| 1936? | HC | ||
| 1954 | Repress | ||
| 2010 Aug 16 | EVA 17 Wheelock, C-D | ||
| 1017? | Depress | ||
| 1019 | HO | ||
| 1020 | BP | ||
| 1040 | Egress | ||
| 1203 | PM SN4 removed from ESP2 | ||
| 1246 | PM SN4 placed in truss | ||
| 1300 | Bolted in place | ||
| 1322 | PM tests OK | ||
| 1500 | PM valves open | ||
| CETA cart relocation | |||
| 1727 | CD ingress | ||
| 1731 | Wheelock ingress | ||
| 1737 | HC | ||
| 1740 | Repress | ||
| 2012 Aug 30 | US EVA-18 Williams, Hoshide, 3011, 3015 | ||
| EMU3011/SAFER-1003 and EMU3015/SAFER-1005 | |||
| 1157 | 5psi | ||
| 1205 | Depress near complete | ||
| 1214 | HO | ||
| 1216 | BP | ||
| 1500 | Hoshide: MBSU-1 removed from S0 | ||
| 1520 | Hoshide taking old MBSU to ESP2 on arm | ||
| 1533 | Temp mount old MBSU on ESP2 | ||
| 1600? | Unberth new MBSU from ESP2 | ||
| Hoshide and new MBSU moved to S0 by SSRMS | |||
| Suni install cables for MRM | |||
| 1621 | Old MBSU stowed on ESP2 FRAM FSE, soft dock | ||
| 1635 | Old MBSU stow complete, secured on ESP2 | ||
| 1700? | Begin to install new MBSU on S0 | ||
| Installation not completed; ISS power on 6 of 8 arrays | |||
| 1750 | Applying more torque to MBSU | ||
| 1807 | Remove new MBSU again | ||
| 1820 | Cleaning coldplate with nitrogen | ||
| 1835 | Reinstall MBSU in S0 | ||
| Fail to bolt down MBSU again | |||
| 1924 | Final attempt failed | ||
| Array 1A and 1B out of the ISS loop | |||
| 1955 | Suni ingress | ||
| 2018 | Ingress Hoshide | ||
| 2028? | HC | ||
| 2033 | Repress after 8:17 | ||
| 2012 Sep 5 | EVA-19 Williams, Hoshide | ||
| 1101 | Depress | ||
| 1105 | TC open | ||
| 1105 | Hatch open | ||
| 1106 | Power to Bat | ||
| 1113 | Williams egress | ||
| 1118 | Hoshide egress | ||
| 1125 | Aki at S0 | ||
| 1200 | Aki on SSRMS moved to MBSU | ||
| 1245 | MBSU unbolted from partial install on S0 | ||
| 1314 | MBSU stowed on flexible arm, MUT ballstack | ||
| 1400 | Cleaning out shavings from bolt | ||
| 1420 | ACME bolt test | ||
| 1500 | ACME bolt removed | ||
| 1513 | Suni hands MBSU to Aku on SSRMS | ||
| 1514 | Disconnected from MUT | ||
| 1522 | Installing MBSU | ||
| 1540 | H2 bolt locked | ||
| 1550 | H1 bolt locked? | ||
| 1600 | Tool inventory | ||
| SSRMS CLPA camera replacement | |||
| 1708? | Suni ingress | ||
| 1720 | Aki ingress | ||
| 1724 | TC closed | ||
| 1730 | HC | ||
| 1734 | Repress NASA 6:28 | ||
| 1735 | 35 mm Hg | ||
| 1737 | 104 mm Hg | ||
| 1739 | 3psi | ||
| 1742 | 4.5 psi | ||
| 1744 | Pause at 5psi | ||
| 1748 | Resume repress | ||
| 1751 | 9.5 psi | ||
| 2012 Nov 1 | |||
| US EVA-20 (Ex33EVA1) Williams, Hoshide | |||
| 2B PVTCS radiator bypass | |||
| P6 cooling loop reconfigure to isolate PVR | |||
| 1154 | CL/EL IV hatch closed | ||
| 1207 | Pause depress at 5psi | ||
| 1215 | 89 mm | ||
| 1216 | 83 mm | ||
| 1219 | 58mm | ||
| 1220 | 51 mm | ||
| 1221 | 46 mm | ||
| 1223:01 | 36 mm 0.7 psi | ||
| 1224 | 32 mm | ||
| 1225 | 27mm | ||
| 1226 | 23 mm, less than 0.5 psi | ||
| 1228 | HO | ||
| TC open | |||
| 1229 | 1.3mm | ||
| 1229 | Battery power | ||
| 1236 | Williams egress | ||
| 1239 | Hoshide egress | ||
| 1241 | Williams towards P1 | ||
| 1249 | Hoshide towards Z1 toolbox | ||
| 1255 | Williams at P6 | ||
| Hoshide to P6 | |||
| EAS jumper reconfig | |||
| Remove shroud to fluid QDs | |||
| 1419 | FQDC cover reinstalled | ||
| Suni continue QD jumper work | |||
| Replace shroud | |||
| Demate FH01 jumper | |||
| 1440 | vent N2 , install jumper in new loc | ||
| Hoshide translate to aft of P6 | |||
| Remove shroud to P6 trailing TCR (Hoshide) | |||
| 1451 | Hoshide working on shroud | ||
| 1452 | Suni done with 3 of 4 jumper moves | ||
| 1500 | Ammonia flowing | ||
| 1511 | Shroud being folded up | ||
| 1545 | Suni working fix to SPDs with wire ties | ||
| 1547 | Securing shroud | ||
| 1635 | Completed jumper work | ||
| Release radiator cinches | |||
| Ground deploy P6 trailing ETCS radiator (stowed on Ex14 Feb 4 2007) | |||
| Back to P1, retrieve tethers | |||
| 1730 | Radiator prep complete | ||
| 1733 | Go for TCR deploy | ||
| 1734 | TCR deploy begin | ||
| 1740 | TCR deploy complete | ||
| Back to EAS jumpers, for work on SPDs | |||
| 1815 | Complete P6 work | ||
| 1833 | Begin return | ||
| 1845 | TC open, Aki at AL | ||
| 1845 | Suni at P1 | ||
| 1850 | Aki go for ingress | ||
| 1854 | Aki ingresss | ||
| 1855? | SCU locked | ||
| 1857 | Suni ingress | ||
| 1859 | Suni SCU locked | ||
| 1903 | HC 6:35 | ||
| 1907 | Repress NASA 6:38, d/r 6:44 | ||
| 1908 | 44 mm | ||
| 1909 | 75 mm | ||
| 1910 | 135 mm | ||
| 1912 | 258 mm 5 psi | ||
| 1913 | 268 mm holding | ||
| 1916 | Resume press | ||
| 2013 May 11 | US EVA-21 | ||
| Cassidy, Marshburn | |||
| Contingency EVA to replace PFCS on P6, ammonia leak | |||
| 1241 | Depress 35 mm | ||
| 1243 | HO | ||
| 1244 | Batt | ||
| 1250 | TC open | ||
| 1251 | Egress Cassidy | ||
| 1253 | Egress Marshburn? | ||
| 1315 | Arrive P6 truss | ||
| 1332 | Begin PFCS unbolt | ||
| 1349 | Fluid connectors unbolted | ||
| 1412 | PFCS removed, stow on bracket | ||
| 1430 | Spare pump cover removal | ||
| 1505 | New pump unberthed | ||
| 1516 | installing - soft dock | ||
| 1530? | New pump installed | ||
| 1545 | Old pump in storage slot | ||
| 1631 | New PFCS activated | ||
| Watching for leaks | |||
| 1720 | begin Return from P6 | ||
| 1734 | Marshburn in AL vicinity | ||
| 1734? | Marshburn in? | ||
| 1744? | Cassidy in | ||
| 1747 | TC closed | ||
| 1756 | EV off batt | ||
| 1757 | HC | ||
| 15 min vac hold | |||
| 1812 | O2 to press | ||
| 1814 | repress | ||
| 1833 | repress complete | ||
| 2013 Jul 9 | US EVA-22 | ||
| Cassidy 3010, Parmitano 3011 | |||
| 1150 | Depress resume | ||
| 1151 | 112 mm | ||
| 1152 | 96 mm | ||
| 1153 | 86mm | ||
| 1154 | 81mm | ||
| 1156 | 58 mm | ||
| 1159 | 40mm | ||
| 1159 | 37mm | ||
| 1200 | 1mm | ||
| 1201 | HO | ||
| 1202 | Batt power | ||
| 1208? | Cassidy out | ||
| 1211? | Parmitano out | ||
| 1212? | TC closed | ||
| 1223 | Unbolting SGTRC | ||
| 1230 | Old SGTRC off | ||
| 1231 | Installing new SGTRC | ||
| 1243 | Ormate cover on | ||
| 1244 | Ormate retrieve | ||
| 1247 | MISSE 8 retrieve | ||
| 1304 | SGTRC declared in (after bolt doubts) | ||
| 1310 | Luca back to AL with MISSE | ||
| 1312 | Chris heading back to AL | ||
| 1315 | Stow in AL | ||
| 1325 | Cabling | ||
| 1414 | Unberth RGB1 | ||
| 1419 | Remove FSE | ||
| 1434 | Install RGB1 on stbd TRRJ | ||
| 1440 | Bolted | ||
| 1501 | CLPA released | ||
| 1515 | RGB2 unberthed, on way to P1 | ||
| 1526 | Chris carries PMA2 cover to PMA2 | ||
| 1537 | PMA2 cover staged at PMA2 | ||
| 1539 | RGB2 handed to Chris at P1 | ||
| 1543 | RGB2 bolted | ||
| 1551 | Y jumper cable install | ||
| 1623 | APFR install | ||
| 1638 | Luca at PMA2 | ||
| 1648 | PMA2 cover being installed | ||
| 1700? | PMA2 cover complete | ||
| 1756 | Luca ingress? | ||
| 1758 | Cassidy ingress | ||
| 1800 | TC closed | ||
| 1805 | HC | ||
| 1806 | Power to SCU | ||
| 1809 | Repress | ||
| Luca water problems noted | |||
| 2013 Jul 16 | |||
| EVA 23 Cassidy, Parmitano | |||
| 1145 | 2.0 psi | ||
| 1154? | Depress | ||
| 1155? | 0.5 psi | ||
| 1156 | HO | ||
| 1157:00 | Batt power | ||
| 1201 | Parmitano out | ||
| 1204 | Cassidy out | ||
| 1220 | Y-bypass jumper work | ||
| 1230 | MLM 1553 cable work | ||
| 1235 | EV2 CO sensor offscale | ||
| 1240 | Chris to P1 for V-guide work | ||
| 1240 | MLM eth cable work at Node 3 | ||
| 1241 | Luca reports water in comm cap | ||
| 1242 | Chris opens RPCM MLI flap | ||
| 1254 | Troubleshooting loose water in helmet | ||
| 1302 | EV2 report water at back of head | ||
| 1305 | Call to terminate EVA | ||
| 1306 | Luca toward AL | ||
| 1308 | Chris cleanup, Luca to AL, comm problems | ||
| 1312 | Luca ingress | ||
| 1315 | Chris retrieving bags | ||
| V-Guide bag is in | |||
| MBSU bag | |||
| 1321? | Chris inside | ||
| 1325 | Two minute timer up | ||
| 1325 | Closing hatch | ||
| 1326 | HC | ||
| 1329 | Airlock repress 1:32 (NASA) | ||
| 1335 | Internal hatch open | ||
| 1338 | Luca's helmet off | ||
| 2013 Dec 21 | |||
| EVA Mastracchio Hopkins 3010, 3011 | |||
| 1133 | 12.1psi | ||
| 1148 | 2psi | ||
| 1150 | 75mm | ||
| 1152 | 62mm | ||
| 1153 | 56mm | ||
| 1154 | 48mm | ||
| 1155 | 41mm | ||
| 1156 | 39mm | ||
| 1157 | 35mm depress | ||
| 1158 | 30mm | ||
| 1159 | 27mm | ||
| 1159 | HO 2mm | ||
| 1200 | 1.3mm | ||
| 1201 | Battery power | ||
| 1206 | Go for egress | ||
| 1206 | Egress Mas. | ||
| 1210? | Egress Hopkins | ||
| 1457 | Completed PM disconnections | ||
| Head to ESP2 | |||
| 1527 | Get adjustable grapple bar (AGB) from ESP-2 FHRC | ||
| 1610? | Partly remove PM | ||
| 1620 | Attach AGB to PM | ||
| 1625? | Removed PM from truss | ||
| 1646 | Install PM on MBS POA | ||
| 1713 | Back at AL | ||
| 1717 | Hopkins ingress | ||
| 1720 | Rick ingress | ||
| 1723 | TC closed | ||
| 1724 | HC | ||
| 1729 | Repress 5:28:11 | ||
| 2013 Dec 24 | EVA-25 Hopkins, Mast. | ||
| 1124 | Begin depress | ||
| 1128 | 440mm | ||
| 1130 | 373mm | ||
| 1133 | 280mm | ||
| 1139 | 120mm | ||
| 1140 | 110mm | ||
| 1141 | 95mm | ||
| 1142 | 80mm | ||
| 1143 | 75mm, pause? | ||
| 1144 | 66mm | ||
| 1145 | 58mm | ||
| 1146 | 52mm | ||
| 1147 | 45mm | ||
| 1148 | 40mm | ||
| 1149:00 | 35mm Depress | ||
| 1150 | 32mm | ||
| 1151 | 29mm | ||
| 1152 | 26mm | ||
| 1152 | HO, 2mm | ||
| 1153 | Battery power | ||
| 1157 | Egress Hopkins | ||
| 1204 | Egress Mastrach. | ||
| 1230 | At ESP-3 | ||
| Hopkins on RMS | |||
| 1308 | Hopkins arrives ESP-3 | ||
| 1408 | Unbolted PM SN0006 | ||
| 1410 | Removed from ESP3 | ||
| 1450 | Installing in S1 | ||
| 1456 | Installed but not bolted | ||
| 1508 | PM bolted to S1 | ||
| 1515 | Mating QD fluid connectors | ||
| 1525 | PM vented (remove N2) | ||
| NH3 flakes loose, on suits | |||
| 1716 | NH3 lines connected | ||
| 1746 | Cables connected | ||
| 1800 | PM confirmed working | ||
| 1836 | In cleanup | ||
| 1854 | Ingress Mastr. | ||
| 1855? | Ingress Hopkins | ||
| 1857? | TC closed | ||
| 1901 | Off batt power | ||
| 1902 | Go for HC | ||
| 1904 | HC | ||
| Begin 15 min hold for NH3 decontam | |||
| 1923 | Repress | ||
| 30mm | |||
| 1927 | 192 mm | ||
| 1928 | 5psi, holding | ||
| 1935 | Doing NH3 sampling | ||
| 1943 | Resume repress from 5psi | ||
| 1945 | Hold repress at 12psi | ||
| 1948 | Resume repress | ||
| 1952 | Repress almost complete | ||
| 1954 | IV hatch open | ||
| 2014 Apr 23 | EVA-26 Mastracchio, Swanson | ||
| 1340 | p = 90 mm | ||
| 1345 | TDRS LOS, 74mm | ||
| 1346 | 65mm | ||
| 1347 | 54 mm | ||
| 1349 | 45 mm | ||
| 1351 | 35 mm | ||
| 1354 | 25mm, 0.5psi | ||
| HO | |||
| 1356 | Batt power | ||
| 1400 | Egress Mas. | ||
| 1404 | Egress Swanson | ||
| 1409 | At S0 inspecting site | ||
| 1427 | Old MDM out | ||
| 1440 | New MDM installed | ||
| 1450 | Free stuck SPDA door | ||
| 1500 | Cut lanyard on other SPDA door | ||
| 1520 | Ingress SS | ||
| 1522 | Ingress RM | ||
| 1529 | HC | ||
| 1532 | Repress | ||
| 1546 | 636mm | ||
| 2014 Jul 31 | Get ETVCG from PMA2 for EVA27 | ||
| 2014 Aug 1 | Get SSU from Z1 dome for EVA27 | ||
| 2014 Oct 7 | EVA-27 Wiseman 3003, Gerst 3010 | ||
| 1210 | 5psi leak check | ||
| 1216 | 2 psi | ||
| 1222 | 1 psi | ||
| 1225? | Depress | ||
| 1229? | HO | ||
| 1230 | Bat power | ||
| 1237 | Wiseman egress | ||
| 1246 | Gerst egress | ||
| 1246? | MTRA from AL | ||
| 1358 | PM remove from POA | ||
| PM transfer by Gerst on RMS | |||
| 1447 | PM install on PM FSE on ESP2 | ||
| 1510? | PM bolted on ESP2 | ||
| 1530 | PM cleanup, AGB stowage | ||
| 1557 | ETVC CP-13 CLPA repair; light removed | ||
| 1610 | New light installed | ||
| 1634 | MTRA soft docked | ||
| 1646 | APFR stowed | ||
| 1650 | Broken light stowed in AL | ||
| 1700 | Working on MTRA | ||
| 1730 | Cabling for MTRA | ||
| 1826 | Gerst ingress | ||
| 1830? | Wiseman ingress | ||
| 1837 | HC | ||
| 1843 | Repress | ||
| 2014 Oct 15 | EVA-28 Wiseman, Wilmore | ||
| 1201? | Resume Depress from 5 psi | ||
| 1215? | HO | ||
| 1216 | Batt power | ||
| 1300 | At S4 truss to work on SSU 3A | ||
| 1357? | Old SSU 3A removed from S4 | ||
| 1402 | new SSU 3A on truss | ||
| 1412 | SSU 3A bolted in place | ||
| 1430 | Remove tool stanchion, PFR from P1 | ||
| 1506 | Install tool stanchion, PFR on S0 | ||
| 1549 | Removed broken EVTCG from P1 CP7 | ||
| 1600? | Removed WETA VSSA stanchion from P1 nadir CP8 | ||
| 1652 | Bolted VSSA stanchion to Node 2 zenith CP11 | ||
| 1710? | Return broken port truss camera to AL | ||
| 1721 | Attached WETA to Node 2 stanchion | ||
| 1750? | Install new EVTCG camera P1 on CP8 | ||
| 1831 | Go for Ingress | ||
| 1836? | Ingress EV1 | ||
| 1839? | HC | ||
| 1850 | Repress after 6:34 | ||
| 2015 Feb 21 | EVA-29 Wilmore EV1, Virts EV2 | ||
| 1216 | Depressing, at 600 mmHG | ||
| 1221 | 415 mm | ||
| 1222 | 313 mm | ||
| 1223 | 267 mm, 5 psi halt | ||
| 1228 | 234 mm depressing | ||
| 1229 | 187mmm | ||
| 1230 | 149mm | ||
| 1231 | 120mm | ||
| 1232 | 100mm | ||
| 1233 | 89mm, pump off | ||
| 1234 | 78mm | ||
| 1235 | 69mm | ||
| 1236 | 61mm | ||
| 1237 | 53 | ||
| 1238 | 47 | ||
| 1239 | 42 | ||
| 1240 | 37, depress Quest (JCM) | ||
| 1241 | 33 | ||
| 1242 | 2 (Hatch opened) | ||
| 1245 | BP, EVA | ||
| 1252 | Wilmore egress | ||
| 1254? | IDA bag A (Port) handed to Wilmore | ||
| 1257 | Virts egress with IDA Bag B (Stbd) | ||
| 1308 | TC closed | ||
| 1315? | Bag A on Node 2 | ||
| 1320 | Bag B installed on Node 2 | ||
| 1350 | Installing wire ties on NOD2, PMA2 | ||
| PMA-2 umbilical removed to clear C2-02 | |||
| 1429 | Port MMOD shield NOD2/C2-02 removed | ||
| Cable 1 (Blue-white) to P853 connector | |||
| 1505 | Cable 2 (Blue) installed to P852 | ||
| Cable 3 (Green-yellow) to P851 | |||
| Cable 4 (Red-white) to P850 | |||
| 1515 | 4 port cables installed | ||
| 1543 | Harmony port MMOD shield reinstalled | ||
| 1550? | Stbd MMOD shield NOD2/C2-05 removed | ||
| 1559 | Cable 5 (Red) installed to P864 | ||
| 1610 | 4 stbd connections complete | ||
| 1610 | Harmony stbd MMOD shield reinstalled | ||
| Deploy cables along side of Harmony to Destiny | |||
| Purple cable W2258 routed to P102A/P106A on LAB | |||
| Purple cable W2258 routed to HR343 awaiting install of PMA-3 and IDA-2 | |||
| Purple cable W2258 IDA-1 leg routed to PMA2 | |||
| W2254 Red-White from port bag routed to PMA-2 | |||
| W2256 Blue cable routed to PMA-2 | |||
| W2254 Red-White second leg to PMA-2 nadir | |||
| W2256 Blue cable IDA-1 leg routed to PMA-2 zenith | |||
| W2262 Blue-White P103 and P1 installed | |||
| W2252 Stbd bag Yellow-Green routed to PMA-2 nadir | |||
| W2256 Blue cable for IDA-2 routed to HR357 | |||
| W2254 Red-white P204 routed to HR318 | |||
| W2272 Stbd Bag Red cable routined PMA-2 zenith and N2 HR317 for IDA-2 | |||
| Remove SSPTS power cables | |||
| 1909 | Virts ingress | ||
| 1911 | Willmore ingress | ||
| 1913 | TC closed | ||
| 1918? | HC | ||
| 1926 | Repress; 104 m of cable installed | ||
| 1934 | 434mm | ||
| 1937 | CL repressed at 750 mm | ||
| 2015 Feb 25 | EVA-30 Wilmore, Virts | ||
| 1142? | Depress | ||
| 1146 | TC open | ||
| 1148? | HO | ||
| 1151 | Battery power | ||
| 1225 | Removing PMA-2 cover | ||
| 1230 | Cover removed and in bag | ||
| 1240 | Working on cable routing | ||
| 1330? | Cable routing complete | ||
| 1348 | PMA-2 cover bag in airlock | ||
| 1420 | Wilmore remove NPV vent from Node 3 | ||
| 1530 | Wilmore to release Node 3 CBM launch locks | ||
| 1530 | Virts lubricating SSRMS LEE-A | ||
| 1610 | Returning avionics bag from Node 1 exterior to AL | ||
| Deploying wire ties at S1 and P1 for C2V2 cabling | |||
| 1815 | Back at airlock | ||
| 1819? | Ingress Wilmore | ||
| 1823 | Ingress Virts? | ||
| 1826 | Wilmore out again struggling with TC | ||
| 1828 | TC closed | ||
| 1829 | HC | ||
| 1834 | Repress | ||
| 1835:30 | 100 mm | ||
| 1835:45 | 161 mm | ||
| 1836:00 | 210 mm | ||
| 2015 Mar 1 | EVA-31 Virts, Wilmore | ||
| 1141 | Under 2 psi | ||
| 1145? | Depress | ||
| 1150? | HO | ||
| 1152 | Battery power | ||
| 1159 | Virts egress | ||
| 1208? | Wilmore egress | ||
| 1229 | Wilmore install S3 boom | ||
| 1233 | Two S3 antennas installed | ||
| 1240? | Virts install P3 boom | ||
| 1246 | Virts install P3 antennas | ||
| 1250 | Virts install P3 antennas | ||
| 1330 | Routing C2V2 cables | ||
| 1720? | Ingress | ||
| 1727? | HC | ||
| 1730 | Repress | ||
| 2015 Oct 28 | EVA-32 Kelly, Lindgren (3003, 3010) | ||
| 1200? | Depress | ||
| 1201 | HO | ||
| 1203 | BP | ||
| 1205? | Egress Kelly | ||
| 1210? | Egress Lindgren | ||
| 1330? | Adding large MLI blanket to AMS | ||
| 1350? | Remove MLI from failed MBSU | ||
| 1407 | MBSU task complete | ||
| Add small MLI blanket to AMS | |||
| 1430 | Blanket on AMS complete | ||
| 1530 | Working on IDA wiring | ||
| 1540 | LEE-B lubing at ESP-2 | ||
| 1630 | IDA cable installation | ||
| 1818 | End of LEE lubing (one part incomplete) | ||
| 1850? | Ingress | ||
| 1859 | TC closed | ||
| 1911? | HC | ||
| 1919 | Repress 7:19 | ||
| 2015 Nov 6 | EVA-33 Kelly, Lindgren (3003, 3010) | ||
| 1120? | Depress | ||
| 1120? | HO | ||
| 1122 | Battery power | ||
| 1415 | P6 Ammonia system refill | ||
| 1518 | TTCR retracted by Lindgren | ||
| 1556 | P5/P4 strut tightening | ||
| 1728 | TTCR re-deployed due to lack of time | ||
| 1837? | Ingress Kelly | ||
| 1848? | Ingress Lindgren | ||
| 1904 | HC | ||
| 1910 | Repress | ||
| 2015 Dec 21 | EVA-34 Kelly, Kopra (3010, 3011) | ||
| 1213 | Begin depress | ||
| 1225 | Manual pressure valve | ||
| 1233 | 1 psi | ||
| 1238? | Depress | ||
| 1239 | 0.6 psi | ||
| 1243 | HO | ||
| 1245 | Battery | ||
| 1254 | Egress Kelly | ||
| 1300? | Kopra egress | ||
| Translate to WS4 to free CETA brake | |||
| 1309 | Free brake handle | ||
| 1321 | MT back at WS4 | ||
| 1400 | Kopra ethernet cable routing to MLM | ||
| 1400 | Kelly routing IDA cables | ||
| 1449 | Kopra at AL | ||
| 1502 | Kopra retreive EVA bag from Lab exterior | ||
| 1540? | Kopra ingress | ||
| 1543? | Kelly ingress | ||
| 1554? | HC | ||
| 1601 | Repress, PET 3:16 | ||
| 2016 Jan 15 | US EVA-35 | ||
| EVA35 EV1 Kopra 3011, EV2 Peake 3008 | |||
| 1243? | Depress | ||
| 1247? | HO | ||
| 1248 | BP | ||
| 1300? | Kopra egress | ||
| 1304? | Peake egress | ||
| 1348 | At S6 for SSU work | ||
| 1440 | Remove S6 SSU-1B S/N 0012 | ||
| 1446 | Install replacement SSU | ||
| 1532 | Old SSU stowed in AL | ||
| 1600 | Peake working IDA cabling | ||
| 1610 | Kopra N3 NPV vent relocate | ||
| 1645 | NPV vent reinstalled | ||
| 1657 | Korpa reports water in helmet | ||
| 1657 | Terminate EVA | ||
| 1713 | Kopra ingress | ||
| 1717 | Peake ingress | ||
| 1726 | TC close | ||
| 1727 | HC | ||
| 1731 | Repress PET 4:43 | ||
| 2016 Aug 19 | US EVA-36 | ||
| IDA 0.6m from PMA | |||
| 1016 | Dextre touch IDA to PMA | ||
| 1154 | 1psi | ||
| 1158 | Depress | ||
| 1203 | HO | ||
| 1204 | BP (EVA, NASA) | ||
| 1209 | Williams EV-1 egress | ||
| 1216 | Rubins EV-2 egress | ||
| 1219 | Wiliams at EVA-2 | ||
| 1231 | Rubins gets APFR | ||
| 1300 | Attaching tethers between IDA-1, PMA-2 | ||
| 1316 | Dextre release IDA | ||
| 1318 | Dextre/SSRMS in motion away from IDA | ||
| 1320 | Cinched tethers on IDA | ||
| 1325 | IDA confirmed soft docked | ||
| 1330 | Initial electrical connections | ||
| 1350 | Struggling with one connection | ||
| 1400 | Cable connection ok | ||
| 1430 | First set of hooks closed | ||
| 1440 | All hooks closed | ||
| 1440 | IDA-2 hard mate to PMA-2 | ||
| Cover on grapple fixture | |||
| 1500 | Cabling | ||
| 1512 | Power to IDA | ||
| 1520 | IDA cover removed | ||
| 1530 | Williams install new reflectors | ||
| 1530 | IDA cover stuffed in ORU bag | ||
| 1600 | IDA-2 work complete | ||
| 1700 | Cable cleanup | ||
| 1724 | Williams lost audio in right ear | ||
| 1726 | EV1 with CL bag heading to AL | ||
| 1731 | Comm issues, EVA terminated | ||
| 1731 | EV2 with ORU bag near AL | ||
| 1737 | EV2 ingress with ORU bag | ||
| 1743? | EV1 Ingress | ||
| 1744 | TC closed | ||
| 1751 | SCUs locked | ||
| 1757 | HC | ||
| 1802 | Repress, EVA PET 5:58 | ||
| 2016 Sep 1 | US EVA-37 | ||
| 1146 | Depress | ||
| 1150 | HO | ||
| 1153 | BP | ||
| 1159 | Egress williams | ||
| 1202 | Egress Rubins | ||
| 1238 | TTCR retract | ||
| 1248 | TTCR retract complete | ||
| 1300 | Installing cinches | ||
| 1326 | Cinches done | ||
| 1400 | TTCR cover on | ||
| 1450 | P1 CP9 light replacement | ||
| 1520 | Light replaced, start HDTV install | ||
| 1620 | Second HDTV install at CP8 | ||
| 1824? | Ingress | ||
| HC | |||
| 1841 | Repress | ||
| 2017 Jan 6 | EVA-38 Kimbrough, Whitson | ||
| 1220? | Depress | ||
| 1222? | HO | ||
| 1223 | BP | ||
| 1230? | Egress | ||
| 1239 | Egress Whitson | ||
| 1350 | Loosen bolts | ||
| 1400 | Whitson has adap plate | ||
| K connects data cable | |||
| K installs adapter plate in slot 6 | |||
| 1430 | K working on NiH Slot 4 0039 | ||
| 1435 | NiH 4 moved to Slot 6 on plate | ||
| Remove plate from B to slot 4 | |||
| 1447 | Install AP B on slot 4 | ||
| 1515 | Moving NiH from slot 2 to slot 4 | ||
| 1530 | Installing in slot 4 | ||
| 1556 | AP C removed from EP | ||
| 1615 | Move AP C to empty slot 2 | ||
| 1700 | Working at CETA cart to get failed CLPA light | ||
| 1745 | CETA light removed, for brining it inside | ||
| 1800 | Node 3 ACBM bundle installed | ||
| Z1 rat's nest internet cable | |||
| 1838 | TC open | ||
| 1839 | Whitson ingress | ||
| 1842 | Kimbrough ingress | ||
| 1843 | TC closed | ||
| 1852 | HC | ||
| 1855 | Repress | ||
| 2017 Jan 13 | EVA-39 Kimbrough, Pesquet | ||
| 1120? | Depress | ||
| 1120? | HO | ||
| 1122 | Battery power | ||
| 1123 | TC open | ||
| 1130? | Kimbrough egress | ||
| 1135? | Pesquet out | ||
| 1140 | Secure N3ACBM bundle to Quest handrail 0153 | ||
| 1225? | AP F off EP, on Pesquet | ||
| 1235 | AP E off EP, on Kimb? | ||
| 1252 | AP F in slot 6 | ||
| 1311 | NiH2 bat 0080 moved from slot 4 to AP F /slot 6 | ||
| 1324 | AP E on slot 4 | ||
| 1350 | Removing AP D from EP | ||
| 1358 | AP D at IEA | ||
| 1412 | AP D installed slot 2? | ||
| 1449 | Pesquet retrieve CLPA from airlock | ||
| CLPA replace put on MTRA for later SSRMS add | |||
| 1512 | Removed old CLPA | ||
| 1520 | New CLPA on | ||
| 1530 | Working on SSRMS LEE WIF | ||
| 1558 | Stow medium ORU bag in AL | ||
| 1600 | Photo survey of rat's nest avionics tray at Z1/S0 | ||
| 1620 | Removing handrails from Destiny | ||
| 1640 | Stow handrails in AL | ||
| Move shield bundles to Node 3 | |||
| 1658 | Bundles on Node 3 | ||
| 1705 | Begin return to AL | ||
| 1705 | Pesquet ingress | ||
| 1709 | Kimbrough ingress | ||
| 1716 | HC | ||
| 1720 | Repress 5:58 (NASA) | ||
| 2017 Mar 24 | EVA-40 Kimbrough, Pesquet | ||
| 1116 | 50mm | ||
| 1118 | 39mm | ||
| 1118:50 | 35mm | ||
| 1122 | 2mm, HO | ||
| 1124 | BP | ||
| 1131 | Pesquet out | ||
| 1139? | Kimbrough out | ||
| 1203 | Old EXT-2 MDM removed | ||
| 1210 | New EXT-2 MDM installed | ||
| 1326 | P RBVM imaging for leak search | ||
| 1328 | K begin disconnecting PMA-3 cables | ||
| 1354 | K completed PMA-3 work | ||
| 1505 | K gets 2 EF cameras from AL | ||
| 1500 | Pesquet lubing SPDM LEE | ||
| 1515 | K replacing JEM EF cameras | ||
| 1550 | Kimbrough stowing 2 old EF cameras | ||
| 1600? | Kimbrough at AL | ||
| 1622 | K depart AL with replacement CETA light | ||
| 1655 | S1 CETA light replace | ||
| 1706 | Heading back to airlock | ||
| 1716 | K into AL | ||
| P into AL | |||
| 1753 | HC | ||
| 1758 | Repress | ||
| 2017 Mar 30 | EVA-41 Kimbrough, Whitson | ||
| 1122 | Depress | ||
| 1128 | HO | |
| 1129 | BP | ||
| 1136 | Whitson egress | ||
| 1139 | Hand empty PMA cover bag out | ||
| 1144 | Kimbrough egress with MDM ORU bag | ||
| 1155 | Removing MDM-16E-0103 | ||
| 1217 | Removed MDM | ||
| 1223 | Installed new MDM | ||
| 1230 | Whitson removed PMA-3 cover | ||
| 1257 | Kimbrough at PMA3 to help stuff into bag | ||
| 1307 | In cover bag at last | ||
| 1319 | Bag in airlock | ||
| 1319 | Old MDM in airlock | ||
| 1328 | N3 axial shields move from outside AL | ||
| 1348 | Bundles at N3 | ||
| 4 shields, 2 per bundle | |||
| 1354? | S1/S2 sep | ||
| 1357? | Shield 1 floats away | ||
| 1359 | Loss of shield 1 discovered | ||
| 1406 | Shield 2 installed | ||
| 1412 | Working on bundle 2 | ||
| 1444 | Shield 3 and 4 separated | ||
| 1455 | Shields 3 and 4 installed | ||
| 1502 | Wrap up shields work | ||
| 1525 | Back at AL | ||
| 1529 | PMA-3 cover out of AL | ||
| 1540 | Back at N3 with cover bag | ||
| 1549 | Removing cover from bag | ||
| 1615 | PMA3 cover attach to N3 complete | ||
| 1630 | Back at AL | ||
| 1634? | Retrieve cummerbund bag | ||
| 1646 | At PMA3, working with bag | ||
| 1650 | P and S cummerbunds (PMA3 Shield) out of bag, 1 each | ||
| 1705 | Cummerbunds installed on PMA3 | ||
| 1730 | SSRMS translate | ||
| 1730 | Cummerbunds installed | ||
| 1810 | K ingress | ||
| 1815? | W ingress | ||
| 1826? | HC | ||
| 1833 | Repress | ||
| 2017 May 12 | EVA-42 Whitson, Fischer | ||
| One airlock SCU failed | |||
| EV1 and 2 swap other SCU back and forth | |||
| 1200? | SCU to Peggy? | ||
| 1222? | SCU to Fischer, Peggy on battery | ||
| 1229? | CL/EL closed | ||
| 1230 | Ready for depress | ||
| 1300 | Airlock just above 1 psi | ||
| 1303 | Depress 0.7? | |
| 1303 | Almost 0.5 psi | ||
| 1305 | 0.5 psi, go for HO | ||
| 1306 | TC open | ||
| 1306 | HO | ||
| 1308 | hatch stow confirmed | ||
| 1308 | Fischer power to batt | ||
| 1315 | Whitson out | ||
| 1321 | Fischer out | ||
| 1322 | New ExPCA out | ||
| 1341 | Temp stow new ExPCA | ||
| 1423 | Old ExPCA out | ||
| 1427? | Old ExPCA temp stow | ||
| 1435 | New ExPCA in, soft docked | ||
| 1500 | New ExPCA operational | ||
| 1530 | Cable terminator work at AMS2 | ||
| 1545 | Fischer ties down JEM RMS insulation | ||
| 1627 | PMA-3 forward shield installed | ||
| 1639 | PMA-3 forward shield install complete | ||
| 1640 | ExPCA and EV1 back at AL, stow outside | ||
| Relocate PFR from COF to PMA3 | |||
| 1654 | ExPCA into AL? | ||
| 1700 | Fischer ingress | ||
| 1703 | Fischer back on SCU | ||
| 1710 | Whitson ingress | ||
| 1714 | HC | ||
| 1721 | Repress | ||
| 2017 May 23 | EVA-43 Whitson, Fischer | ||
| 1118? | Depress | ||
| 1119 | HO | ||
| 1120 | BP | ||
| 1128 | Whitson egress | ||
| 1132 | Fischer egress | ||
| 1140 | EV1 on S0, EV2 on Lab | ||
| 1153 | EV2 installed STBD EWC antenna on Lab HR 261A | ||
| 1158 | Old 16E-0102 MDM removed | ||
| 1215 | EV2 installed PORT EWC antenna on Lab HR 262A | ||
| 1205 | Failed MDM back in bag | ||
| 1207 | New MDM in | ||
| 1226 7 Removed new MDM again to realign | |||
| 1250 | Clean MDM area | ||
| 1257 | New MDM reinserted | ||
| 1320 | Tightening bolts | ||
| 1352? | EV1 in | ||
| 1355 | EV2 in | ||
| 1402 | HC | ||
| 1406 | Repress | ||
| 2017 Oct 5 | EVA-44 Bresnik, Vande Hei | ||
| 1146 | 2 psi | ||
| 1200? | Depress | ||
| 1203 | HO | ||
| 1205 | BP | ||
| 1214? | Egress Bresnik | ||
| 1220? | Egress Vande Hei | ||
| 1326 | Remove LEE-A SN 202 from SSRMS | ||
| 1335 | Stow LEE 202 on port CETA cart | ||
| 1414 | POA LEE SN 203 removed from MBS | ||
| 1442 | Attach LEE 203 to SSRMS | ||
| 1500? | LEE 203 attach completed | ||
| 1530? | Remove LEE 202 from CETA | ||
| 1600? | Stow LEE 202 on POA | ||
| 1700? | Begin getahead tasks | ||
| 1837 | VDH ingress | ||
| 1843? | Bresnik in | ||
| 1844? | TC closed | ||
| 1854 | HC | ||
| 1900 | Repress | ||
| 2017 Oct 10 | EVA-45 Bresnik, Vande Hei | ||
| 1123 | Begin depress | ||
| 1136 | Resume depress | ||
| 1149 | Depress 0.7 | ||
| 1155 | HO | ||
| 1155:55 | BP | ||
| 1200 | Egress Bresnik | ||
| 1202 | Egress Vande Hei | ||
| 1243 | Rotate PFCS spare | ||
| 1310 | EV1 get ETVCG bag from Quest | ||
| Replace ETVCG CP9 at P1 nadir | |||
| 1340 | HD cam removed from CP9 | ||
| 1402 | Old TVCG removed | ||
| 1415 New TVCG installed | |||
| 1430 | HD cam reinstalled | ||
| 1510 | Replace MBS camera lens cover | ||
| 1527 | Loose bolt floats away? | ||
| 1550 | Lube LEE ball joint | ||
| 1648 | Remove Node 3 handrails | ||
| 1700 | Completed lubing | ||
| 1730 | Remove MLI from ELC-1 BCDU | ||
| 1800? | Ingress EV2? | ||
| 1810 | Ingress EV1 | ||
| 1810 | TC closed | ||
| 1817 | HC | ||
| 1822 | Repress 6:26(NASA) | ||
| 2017 Oct 20 | US EVA46 Bresnik Acaba | ||
| 1132 | Resume depress | ||
| 1144? | Depress | ||
| 1146 | HO | ||
| 1147 | BP | ||
| 1154 | Bresnik out | ||
| 1158? | Acaba out | ||
| 1215 | SPDM EOTP fuse replaced | ||
| 1330 | Working at CP3 | ||
| 1330 | MSBU spare remove MLI at ESP1 | ||
| 1345 | Installing HDTV at CP3 S1 | ||
| 1430 | Replacing CLA on new LEE-A | ||
| 1530 | New CLA installed | ||
| Remove insulation on spares | |||
| 1707 | Acaba SAFER arm broken, return to AL | ||
| 1805? | Ingress EV2 | ||
| 1812? | Ingress EV1 | ||
| 1821 | TC closed | ||
| HC | |||
| 1836 | Repress NASA 6:49 | ||
| 2018 Jan 23 | EVA-47 Vande Hei, Tingle | ||
| 1128 | Resume 5psi depress | ||
| 1145? | Depress | ||
| 1147? | HO | ||
| 1149 | BP | ||
| 1205 | TC open | ||
| 1213 | Egressed | ||
| 1400 | Working on releasing old LEE | ||
| 1457 | LEE 201 removed from SSRMS | ||
| 1515 | LEE 201 soft dock on ESP2 | ||
| 1554 | Remove CLPA from 201 | ||
| 1558 | Install CLPA on 204 | ||
| 1624 | LEE 204 off ESP2 | ||
| 1640 | LEE 204 soft dock on SSMRS as LEE B | ||
| 1654 | LEE 204 installation complete | ||
| 1809 | SSRMS move away from ESP2 | ||
| 1847 | Release piece of rubber from AL region at 1 m/s | ||
| 1847 | TC open | ||
| 1850 | EV2 ingress | ||
| 1856 | EV1 ingress | ||
| 1858 | TC closed | ||
| 1907? | HC | ||
| 1913 | Repress | ||
| 2018 Feb 16 | EVA-48 Vande Hei, Kanai | ||
| 1156? | Depress, About 0.7? | ||
| 1158 | Depress 0.6psi | ||
| 1159 | HO | ||
| 1200 | BP | ||
| 1206 | Egress EV1 | ||
| 1210 | Egress EV2 | ||
| 1230 | Remove CLA cam from LEE 202 on POA | ||
| 1306 | Remove LEE 202 from POA | ||
| 1325 | LEE 202 in Quest | ||
| 1345 | LEE 201 removed from ESP2 | ||
| 1359? | LEE201 soft dock on POA | ||
| 1420? | LEE 201 work done | ||
| 1431 | Reinstall CLA on LEE 201 | ||
| 1520 | Lube LEE-A | ||
| 1610 | Install RMCT tool on SPDM on Lab pdgf | ||
| 1645 | Lube complete | ||
| 1720 | Adjust position of FHRC strut on ESP2 | ||
| 1732 | Kanai ingress | ||
| 1737 | VDH preparing to ingress - ingress? | ||
| 1745 | TC closed | ||
| 1750 | HC | ||
| 1757 | Repress | ||
| 2018 Mar 29 | EVA49 Arnold 3003, Feustel 3006/13 | ||
| 1315 | AL at 1.0psi? | ||
| 1318 | p is 65? | ||
| 1323 | p is 40 | ||
| 1325? | Depress AL | ||
| 1327 | p is 26 mmHg | ||
| 1328 | p is 22 mmHg | ||
| 1329 | HO | ||
| 1333 | BP | ||
| 1340 | EV1 out | ||
| 1345 | EV2 out Arnold | ||
| 1500 | EV1 Zenith wireless antenna installation on N2 | ||
| 1505 | P1 RVBM jumpers removed | ||
| 1520? | Nadir wireless antenna installation on N2 | ||
| 1540 | EV1 back to AL to switch tool bags | ||
| 1600 | EV1 inspect PFCS | ||
| 1630 | Working on P1 CP8 ETVCG replacement | ||
| 1640? | Old ETVCG back in AL | ||
| 1700? | New ETVCG on | ||
| 1740 | old HD cam back from AL | ||
| 1920 | EV1 in | ||
| 1928? | EV2 in | ||
| 1935 | on SCU | ||
| 1938 | HC | ||
| 1943 | Repress | ||
| 2018 May 16 | EVA-50, Feustel and Arnold | ||
| 1118 | 6 psi | ||
| 1122 | Resume depress | ||
| 1124 | 2.5 psi | ||
| 1128 | 1.5 psi | ||
| 1133 | 0.75psi, Airlock depress | ||
| 1137 | 0.5 psi | ||
| 1138 | HO | ||
| 1139 | BP | ||
| 1149 | Egress Feustel | ||
| 1153? | Egress Arnold | ||
| 1302 | PFCS Leaky off EOTP | ||
| 1315? | Leaky on MUTT | ||
| 1320 | PFCS Frosty off ESP | ||
| 1343 | Frosty on EOTP | ||
| 1401 | Leaky on ESP | ||
| 1505? | Remove old CP13 camera | ||
| 1530 | Install CP13 replacement ETVCG | ||
| 1550 | EV1 replace SGTRC box on Z1 | ||
| 1620 | Primary tasks done | ||
| 1642 | MLI removal on ELC2 DCSU | ||
| 1702 | RGB T-handles installed | ||
| FHRC work | |||
| 1748 | Back at AL, ingress EV2 | ||
| 1757 | EV1 ingress | ||
| 1800 | TC closed | ||
| 1808 | HC | ||
| 1810 | Repress | ||
| 2018 Jun 14 | EVA-51 | ||
| 1201 | Depress 0.7 psi | ||
| 1205 | HO | ||
| 1206 | Batt, EVA-51 | ||
| 1212 | Arnold egress with CL bag/eth cable | ||
| 1215? | Feustel egress | ||
| CL bag att to N2 next to Lab | |||
| 1350 | Route cables along N2 to PMA2 | ||
| 1420 | Back to AL to get boom + HDcams | ||
| 1447 | Install EWC/HD cam boom 1 on WIF 16 at N2 front | ||
| 1451 | Install EWC/HD cam boom 2 on WIF 17 at N2 front | ||
| 1620 | Replace CP3 luminaire | ||
| 1633 | Close CATS cover | ||
| 1650 | Remove old HD cam on CP3 | ||
| 1655 | Install new HD cam EDHC S/N 1002 | ||
| 1730 | Move adjustable grapple bar from FHRC on ESP2 to ELC4 | ||
| 1800 | AGB transfer complete | ||
| 1814 | Feustel - Wire tie to secure S4 solar array blanket box | ||
| 1815 | Wire tie floats off nadir fwd | ||
| 1836 | Ingress Arnold | ||
| 1838 | Arnold out again | ||
| 1840 | Arnold ingress | ||
| 1843 | Feustel ingress | ||
| Closing TC | |||
| 1851 | HC | ||
| 1855 | Repress | ||