Monday, January 14, 2019

Quest

 2001-028


The Joint Airlock is delivered on Flight 7A. It includes a large diameter equipment lock (E/L) for storage of EMUs and Orlans, and a small diameter crew airlock (C/L). The C/L is the part that is depressurized and its hatch to vacuum is on the nadir side of the cylinder.

The US EVA-1 tested out Quest after problems on its initial use.

The Jan 2003 Stage EVA will include: Release P1 radiator locks, inspect and monitor deployment of P1 radiator beam, clean Unity nadir CBM, install ETSD tool box and light fixture on CETA-2.

On EVA-23 Parmitano's helmet began to fill with water, causing the spacewalk to be cut short. It was later determined that a small leak had been detected at the end of EVA-22 but not taken seriously - a mistake that nearly cost Luca his life.

EVA-40 Mar 24 Kimb EV1 Pesq EV2 PMA from N3port to N2 zenith (ready for IDA)

EV2 PFR from ?ELC to P1 EV2 P1, Inspect RBVM-2-0113 for NH3 leak

EV1 Replace external MDM no. 1 - S0 EV2 to S0, SPDM LEE lubing with BLT tool

EV1 Disconnect PMA EV1 replacements for JEM external cameras on JEM EF -- Robotic move PMA3 -- GA: lens cover, ceta light, FHRC prep work, PM prep work, break batt torque, RGHB adjust

EVA-41 Mar 30 Kimb EV1 Whitson EV2

EV1 to S0, replaceReplace external MDM no. 2? EV2 Connect PMA3 heater cables on N2 EV2 Remove PMA3 cover EV1,2 back to AL, pickup N3 axial shields (instead of usual petals on non axial ports) Install N3 port shields back to al, pick up new shields Install new PMA3/N2 shields

Cygnus brings EVA-42 ExPCA hardware, berthing Apr 2

EVA-42 Apr 6 Whitson EV1, Pesquet EV2

ExPCA Express Pallet Controller Assembly Retrieve upgrade ExPCA and install on ELC-4

ELC avionics box upgrade to supply power to multiple payloads EV1: "1553 feedback terminator" install AMS-2 temrinator cap to prepare for data upgrade (terminator

EV1: Photos of Page3 EV2: HD camera install on cp3 EV1: ret from AL the last sheild to go on PMA-3 - 'Forward Shield' on OA-7 EV2: get Extern WCS antenna from AL, install on ? Lab? Light bulbs Lens cover replacement on a robotic arm

EVA-44 scheduled for 2017 Oct 5; Bresnik and Vande Hei carried out swap of the SSRMS LEE-A. LEE-A was removed from SSRMS and temporarily stowed on CETA cart (A?). The POA LEE was removed from the MBS POA and mated to the SSRMS as the new LEE-A. The old LEE-A was then installed on the MBS POA.

EVA-45 (Bresnik, Vande Hei). PFCS 5 was launched on STS-102 attached to ESP1. The astronauts rotated the PFCS for maintenance. The CP9 EVTCG was removed and replaced; the CP9 HD camera was temporarily removed during the operation and then replaced. The old EVTCG was returned to the airlock. The MT camera lens was replaced and two handrails were removed from Node 3. THe LEE ball screw was lubricated.

EVA-46 (Bresnik, Acaba): an HD camera was added to the CP3 EVTCG. MLI was removed from the MBSU (A08032) and DCSU (A07356) on ESP-2 to allow SPDM access. EVTCG on CP13 was removed to the airlock, and replaced with a new EVTCG/HDC combo. The LEE latches were lubricated.

EMU 3011 flew on STS-96, STS-97, STS-100, and STS-109. It was launched on STS-111 to the station in Jun 2002, and returned to Earth on STS-121 in 2006. It was launched again in 2008, down in 2009; and in May 2010 on STS-132.

On Feb. 8 Lopez-Alegria and Williams will move from the airlock out to Crew Equipment Transfer Aid (CETA) carts on the rails of the main truss. Pushing the cart with their equipment, including a foot restraint, they move to the P3 Truss. Their first job is to remove thermal shrouds from two Rotary Joint Motor Controllers (RJMCs) on P3.

Next they will remove the two large shrouds from P3 Bays 18 and 20. The shrouds, larger than king-size bed sheets, provide thermal shading. With the station in its present orientation, they are no longer needed. They are being removed to avoid trapping heat.

Spacewalkers will work together to fold each into a package a bit smaller than an outdoor garbage can and jettison them, aft and slightly downward.

The 2-hour, 40-minute shroud task will be followed by deployment of an Unpressurized Cargo Carrier Assembly Attachment Systems (UCCAS), on the upper face of the P3 truss. The hour-long job is in preparation for attachment of a cargo carrier during a subsequent shuttle mission.

While Lopez-Alegria finishes the second UCCAS, Williams will move out to the end of the P5 truss to remove two launch locks to prepare for the relocation of the P6 Truss.

The final scheduled task of the spacewalk is connecting four cables of the Shuttle-to-Station Power Transfer System (SSPTS) to Pressurized Mating Adapter-2 (PMA-2) at the forward end of the Destiny laboratory. The SSPTS will allow visiting shuttles to take power from the station and thus extend their missions.

EVA-21 was a contingency EVA in May 2013. The 2B PFCS on P6 was implicated in a major leak in the ammonia cooling system, with flakes of ammonia ejected every few seconds. P6 also carried two spare PFCS, which had been part of the EETCS system when P6 was on top of Z1 in the early stages of assembly. Cassidy and Marshburn swapped the failed unit with one of these spare PFCS.

 

 

 

 

 

 

 

 

 

 


Quest 
 

DateTimeEventOrbit  

2002 Feb 20   US EVA-1 
  Walz EV-1, Bursch EV-2 
  Safer 5, 4 
 1035  Begin depress 
 1128  At 1 psi 
 1134? Depress 
 1135? HO 
 1138  Battery power 
 1144  TC open 
 1147  Egress Walz 
 1154  Egress Bursch 
  Cables from Z1 to Destiny 
  Remove thermal covers from Z1, store inside Z1 
  Retrieve tools from Z1 
  Inspect MISSE 
  Carry EVARM radiation sensors 
  Remove Strela base 
  Secure latches on O2N2 tanks 
 1703  EV2 ingress 
 1710  EV1 ingress 
 1713  TC closed 
 1719  HC 
 1725  Repress 
2002 Oct 10   STS-112 EVA-1 Wolf, Sellers 
 1433  Quest depress begin 
 1443  At 5psi 
 1458  Resume depress 
 1502  2.5psi 
 1504  1.6psi 
 1509  1psi 
 1511  0.8psi 
 1514  Adopted depress mark 
 1514  0.6 psi 
 1518? HO 
 1518  TC open 
 1519  Depress complete 
 1521  Battery power 
 1531? Egress Sellers 
 1534? Egress Wolf 
 1630  Connect S0/S1 power/data/fluid 
 1730  Release radiator launch locks 
 1830  SASA install on S1 
 1930  CETA launch locks 
 2109?  SSRMS close to Shuttle PLB (less than 10 cm?) 
 2130  S1 nadir camera install, problem with SSRMS 
 2200  CETA couple to MBS 
 2210? Ingress Wolf 
 2210  Ingress Sellers? 
 2212  TC closed  
 2218? HC (out of comm) 
 2222:08 Repress begin NASA 07:01 
2002 Oct 12   STS-112 EVA-2 Wolf, Sellers 
 1407  5psi 
 1414  Resume depress 
 1417  2.0psi, pump off 
 1425  0.6psi Adopted depress time 
 1428  0.5psi 
 1429  Hatch open 
 1431  Battery power 
 1440? Sellers egress 
 1444  Wolf egress 
  Install SPD on Z1/P6 
  Install Z1-Lab loop A 
 1630  Connect ATA umbilical on S1 
 1645  Lab ETVCG from AL 
 1710  Lab ETVCG attached to second S1 VSSA 
 1714  CETA launch locks 
 1720? ETVCG and VSSA removed from S1 
 1730  ETVCG/VSSA attached to Lab 
 1800  S1/S0 SPD installs on NH3 quick disconnects 
 1930 Radiator launch locks 
 2020? Ingress Wolf 
 2024? Ingress Sellers 
 2028  TC closed 
 2030  Hatch closed 
 2035  Repress (NASA 6:04) 
2002 Oct 14   STS-112 EVA-3 Wolf, Sellers 
 1330  Begin depress 
 1404? Vacuum  
 1408? HO 
 1411  Battery 
 1430  IUA (Interface Umbilical Assy) repair on MT 
 1715  Fluid line connect 
 1830  Keel pin removal 
 2035? Ingress 
 2042? HC  
 2047  Repress NASA 6:36 
2003 Jan 15  0755 MT from WS7 to WS4 
 0821  MT at WS4 
  EVA Pettit, Bowersox 
 1131  Begin depress 
 1138  At 6 psi 
 1140  At 5 psi 
 1157  Resume depress 
 1201  2.2psi 
 1208  Tone? 
 1214  At vac 
 1216  Rotating hatch handle, dp=0.5 
 1230  0.2psi 
 1233 Problem opening hatch 
 1246 Hatch open 
 1250 Batt power 
 1308 Recycle Bowersox suit power 
 1314? Egress Bowersox 
 1322 Egress Pettit 
 1452  P1 central radiator deploy 
 1502 P1 radiator deploy done 
 1911  Ingress 
 1928  TC closed 
 1938? HC 
 1941  Repress 
2003 Apr 8   EVA Bowersox, Pettit 
  Power cable reconnection 
  CMG reserve power supply 
  Thermal cover on QDs 
  Release stanchion on CETA 
2003 Apr 8  1221  Resume depress at 5psi 
 1229  Almost at vacuum 
 1233  (Almost at 0.5 psi) 
 1236? Depress (JCM) 
 1237  At 0.6 psi  
 1238  At 0.5psi, go for HO 
 1239  TC open 
 1239  HO 
 1240  Battery power 
 1248  Egress Bowersox 
 1255  Egress Pettit 
 1300  Move CETA 1/2 away from MT 
  P1/S0/S1 connectors reconfigured 
  CMG power cables reconfigured 
  Freed lightning pole stanchion on CETA 
 1855?  Ingress 
 1901?  HC 
 1906  Repress 
2005 Nov 7   EX12 EVA-1 McArthur Tokarev 
 1410  Begin depress 
 1419  5 psi check  
 1425  Resume depress 
 1429  3.3 psi  
 1430  2.9 psi  
 1434  2.0 psi, end of stage 2 
 1436  Stage 3 venting fails, valve wrong 
 1448  Repressing; quick rise above 3.5 psi  
 1448  19 min below 3.5 psi 
 1453  14.3psi; reopen CL 
 1455  Open MTE valve 
 1459  Close CL  
 1500  Begin depress again 
 1510  5psi check  
 1513  Resume depress  
 1515  3.2 psi  
 1518  2.0 psi, stage 3 venting 
 1522  1.0 psi 
 1527  0.6 psi  
 1529  Hatch open  
 1532  Battery power  
 1544  McArthur egress 
 1550  Tokarev egress 
 1600  Tokarev to ESP2 
 1610  Retrieve VSSA stanchion 
 1621  Get camera from AL 
 1640  Arrive at P1 camera worksite 
 1657  Attach cam to VSSA 
 1719  Cam/VSSA installed on P1 as CP9 
 1750  Tether swap after VSSA install 
 1800  Head for S1 Bay 13 RJMC (rotary joint motor contrller) 
 1808  At RJMC 
 1814  Failed RJMC removed 
 1824  Leave S1 Heading for airlock 
 1828  Back at AL, stowing RJMC etc 
 1831  Pick up Jettison Stowage Bag (JSB) at AL 
 1833  McA gets PFR from CETA 
 1836  McA leaves CETA for P6 
 1853  Approaching FPP 
 1856  Arrive at FPP worksite 
 1904  27 kg FPP removed from station by McA 
 1920  FPP hand jettison by McA  
 1920? Small washer drifts away 
  Inspect P6 MISSE 
 1936  FPP stanchion stowed in AL 
  APFR stowed on WIF12 on AL-EL 
 2012  Replace MT circuit breaker power module, completed  
 2025  Tokarev ingress 
 2027  JSB returned to AL 
 2035  McArthur ingress 
 2036  TC closed 
 2046  HC  
 2054  Repress 
 2107  Repress complete, CL open  
 
2006 Aug 3   EVA Williams (EV1), Reiter (EV2) 
 1329 Depress to 5psi 
 1350  Depress 35 mm 
 1354  HO 
 1400 HO completely, stowed 
 1404  Battery power 
 1420? Egress Williams 
 1425 Egress Reiter 
 1515 Install FPMU floating point measurement unit on S1 
 1606  MISSE-3 and 4 installed near Quest 
 1701  Install RJMC (Rotary Joint Motor Controller) on S1 
  Thermal Radiator MDM on S1 
 1737 Install CETA floodlight on S1 
 1835  Install vent valve on Destiny 
 1902  Install foot restraint on S0 truss 
 1945? Ingress Reiter 
 1948? Ingress Williams 
 1950? HC 
 1958 Repress US:5:54 
2007 Jan 31  
  US EVA-6  
 1510?  Depress 0.7psi 
 1511  At 0.5 psi 
 1513  HO 
 1514  Battery power 
 1529 Egress LA 
 1535? Egress Williams 
  Ammonia system reconfigured 
 1921  P6 Stbd Radiator retract 
 2200  Preps for ingress 
 2225?  Inside airlock  
  Bakeout 
 2247  Go for TC close 
 2250  HC 
 2309  Repress  
 2310  Hold at 5 psi for decontam 
 
2007 Feb 4   US EVA-7 
 1334?  Depress 
 1337?  HO 
 1338  Battery power 
 1350?  Egress LA, Williams 
  Loop B reconfigured 
 1545  Config recomplete 
  LA to base of P6 for EAS work 
 1623  P6 aft radiator retract 
  P6 solar array mast inspection 
 1820  SSPTS cable install on Destiny 
  MDM Sunshade to be retrieved 
 2005  At airlock, cleanup 
 2010  Williams ingress 
 2025  LA ingress 
 2027  TC closed? 
 2033  HC 
  Pause for bakeout 
 2049  Repress 
 2053  Halt at 5 psi 
 2109  Resume repress 
 2113  Repress complete 
2007 Feb 8   EVA  
  LA, Williams 
 1322  AL depress 0.7 psi 
 1324  HO, TC open 
 1326  Battery power 
 1331  Go for egress 
 1332 Williams egress 
 1340 LA egress 
  To CETA carts 
  Translate to P3 
 1404 Zenith RJMC shroud removal 
 1500  First shroud packed and secured 
 1536  Shroud jettison by LA 
 1542  Shroud jettison by LA 
 1600  Work on P3 zenith UCCAS deploy 
 1730  Work on P5 launch locks 
 1815  Translate back on CETA 
 1830  SSPTS cable install 
 1946  Ingress LA 
 1953  Ingress Williams 
 1957  TC closed 
 2002  HC 
 2006  Comm hardline 
 2006  Repress 

2007 Jul 23  

 EVA-9 
 1024  Batt power 
 1035? Anderson egress 
 1044? Yu egress 
 1105? VSSA retrieved from ESP-2 
 1130? VSSA installed at CP7 on S0/P1 
  VSSA FSE/FRAM retrieved from ESP-2 
 1321 VSSA FSE/FRAM jettison 
 1437  EAS jettison 
  Replace RPCM S04B-F on S0 
  Return failed RPCM to Quest 
 1520  Clean CBM on Unity nadir 
  Remove GPS Antenna No. 4 
 1805 Repress NASA 7:41 
2007 Nov 9   STS-120 EVA-5 (Whitson, Malenchenko) 
 0952? Depress 
 0953  HO 
 0954  Battery power 
  Egress 
  Prepare PMA-3 for unberthing 
  Harmony PDGF activated 
 1628? Ingress 
 1646  HC 
 1649  Repress 
2007 Nov 20   US EVA-11 (Tani, Whitson) 
 1007 Depress 
 1008 HO 
 1010  Battery power 
 1017 Egress Whitson 
 1019 Egress Tani 
  Cooling loop A connected to Destiny 
  Harmony/Destiny connections 
 1703  Ingress 
  HC  
 1726  Repress 
2007 Nov 24   US EVA-12 (Whitson, Tani) 
 0940? Depress 
 0949? HO 
 0950  Battery power 
 0955 Egress Whitson 
 0958  Egress Tani 
 1218  Loop B umbilical tray connected to Destiny 
 1330  Ammonia flowing to Harmony 
 1412  Tani removing thermal cover from SARJ 
 1635  Tani prep for ingress 
 1645  Whitson ingress 
 1652  HC 
 1654  Repress 
2007 Dec 18   US EVA-13 (Whitson, Tani) 
 0948? Depress 
 0949? HO 
 0950  Battery power 
  EMU 3006 Tani, EMU 1005 Whitson 
  Inspect 1A BGA and BMRMM 
  Inspect SARJ 
  Remove SARJ TBA-5 Trundle Bearing Assy. 
 1630? Ingress 
 1642? HC 
 1646:20 Repress (NASA 6:56) 
2008 Jan 30   USOS EVA-14 (Whitson, Tani) 
 0950?  Depress 
 0955?  HO 
 0956  Battery power 
  BMRRM repair 
 1208  old S4-1A BMRRM removed 
 1214  new BMRRM installed 
 1440  SARJ inspection 
 1645  Ingress 
 1705  HC 
 1706  Repress 

2010 Aug 7  

s  USOS EVA-15 
  EV-1 Wheelock - 3005. EV-2 Caldwell Dyson - 3009.  
 1107  1.5 psi 
 1110  1.0 psi 
 1114  0.7 psi DEPRESS 
 1116  0.5 psi 
 1117  HO 
 1119  Battery power 
 1125? Egress Wheelock 
 1130?  Egress C-D 
 1132  TC closed 
 1148  Astros at PM location on S1 
 1723  QDs removed on old PM 
 1802  Cleaning up worksite 
 1824  Return to vicinity of AL 
  NH3 decontam 
 1833  Go to ingress 
 1841  Ingress complete 
  NH3 bakeout in open hatch 
 1911  Closing hatch  
 1911? HC 
 1922  Starting repress (NASA 8:03) 
 1923  Crack open hatch handle for decontam 
 1924  Resume repress 
 1926  Hold at 5 psi? 
  NH3 checking 
 1943  Continue repress 
2010 Aug 11   EVA-16 Wheelock, Caldwell-Dyson 
 1209  Resume 5psi depress 
 1213  At 2psi 
 1217  At 1 psi 
 1221  0.7 psi DEPRESS 
 1225  0.6 psi 
 1226  HO 
 1227  BP, NASA start 
 1233? Wheelock egress 
 1240? C-D egress 
 1245  TC closed 
  Translate to S1 to work on QDs  
 1320  C-D at CETA cart 
 1330  Adjusting QDs on DDCU 
 1400  C-D moved Ceta cart 
 1423  M3 connector finally freed 
 1539  Wheelock on SSRMS to ESP-2 to get AGB 
 1638  Final bolt undone on old pump 
 1718 Adjustable grapple bar on old pump 
 1729  Wheelock extracts old pump 
 1740  C-D working at ESP2 on new pump 
 1755  Old PM on MT POA 
 1900  New pump prepped 
 1923  TC open, prepare to ingress 
 1932  Ingress complete, TC closed 
 1936? HC 
 1954  Repress 
2010 Aug 16   EVA 17 Wheelock, C-D 
 1017? Depress 
 1019  HO 
 1020  BP 
 1040  Egress 
 1203  PM SN4 removed from ESP2 
 1246  PM SN4 placed in truss 
 1300  Bolted in place 
 1322  PM tests OK 
 1500  PM valves open 
  CETA cart relocation 
 1727  CD ingress 
 1731  Wheelock ingress 
 1737  HC 
 1740  Repress 
2012 Aug 30   US EVA-18 Williams, Hoshide, 3011, 3015 
  EMU3011/SAFER-1003 and EMU3015/SAFER-1005 
 1157  5psi 
 1205  Depress near complete 
 1214  HO 
 1216  BP 
 1500  Hoshide: MBSU-1 removed from S0  
 1520  Hoshide taking old MBSU to ESP2 on arm 
 1533  Temp mount old MBSU on ESP2 
 1600? Unberth new MBSU from ESP2 
  Hoshide and new MBSU moved to S0 by SSRMS 
  Suni install cables for MRM 
 1621  Old MBSU stowed on ESP2 FRAM FSE, soft dock 
 1635  Old MBSU stow complete, secured on ESP2 
 1700?  Begin to install new MBSU on S0 
  Installation not completed; ISS power on 6 of 8 arrays 
 1750  Applying more torque to MBSU 
 1807  Remove new MBSU again 
 1820  Cleaning coldplate with nitrogen 
 1835  Reinstall MBSU in S0 
  Fail to bolt down MBSU again 
 1924  Final attempt failed 
  Array 1A and 1B out of the ISS loop 
 1955  Suni ingress 
 2018  Ingress Hoshide 
 2028? HC 
 2033  Repress after 8:17 
2012 Sep 5   EVA-19 Williams, Hoshide  
 1101  Depress 
 1105  TC open 
 1105  Hatch open 
 1106  Power to Bat 
 1113  Williams egress 
 1118  Hoshide egress 
 1125  Aki at S0 
 1200  Aki on SSRMS moved to MBSU 
 1245  MBSU unbolted from partial install on S0 
 1314  MBSU stowed on flexible arm, MUT ballstack 
 1400  Cleaning out shavings from bolt 
 1420  ACME bolt test  
 1500  ACME bolt removed  
 1513  Suni hands MBSU to Aku on SSRMS 
 1514  Disconnected from MUT 
 1522  Installing MBSU 
 1540  H2 bolt locked 
 1550  H1 bolt locked? 
 1600  Tool inventory 
  SSRMS CLPA camera replacement 
 1708? Suni ingress 
 1720  Aki ingress 
 1724  TC closed 
 1730  HC 
 1734  Repress NASA 6:28 
 1735  35 mm Hg 
 1737  104 mm Hg 
 1739  3psi 
 1742  4.5 psi 
 1744  Pause at 5psi 
 1748  Resume repress 
 1751  9.5 psi 
2012 Nov 1  
  US EVA-20 (Ex33EVA1) Williams, Hoshide 
  2B PVTCS radiator bypass 
  P6 cooling loop reconfigure to isolate PVR 
 1154  CL/EL IV hatch closed 
 1207  Pause depress at 5psi 
 1215  89 mm 
 1216  83 mm 
 1219  58mm 
 1220  51 mm 
 1221  46 mm 
 1223:01  36 mm 0.7 psi  
 1224  32 mm 
 1225  27mm  
 1226  23 mm, less than 0.5 psi 
 1228  HO  
  TC open 
 1229  1.3mm 
 1229  Battery power 
 1236  Williams egress 
 1239  Hoshide egress 
 1241  Williams towards P1 
 1249  Hoshide towards Z1 toolbox 
 1255  Williams at P6 
  Hoshide to P6 
  EAS jumper reconfig 
  Remove shroud to fluid QDs 
 1419  FQDC cover reinstalled 
  Suni continue QD jumper work  
  Replace shroud 
  Demate FH01 jumper 
 1440  vent N2 , install jumper in new loc 
  Hoshide translate to aft of P6 
  Remove shroud to P6 trailing TCR (Hoshide) 
 1451  Hoshide working on shroud 
 1452  Suni done with 3 of 4 jumper moves 
 1500  Ammonia flowing 
 1511  Shroud being folded up 
 1545  Suni working fix to SPDs with wire ties 
 1547 Securing shroud 
 1635  Completed jumper work 
  Release radiator cinches 
  Ground deploy P6 trailing ETCS radiator (stowed on Ex14 Feb 4 2007) 
  Back to P1, retrieve tethers 
 1730  Radiator prep complete  
 1733  Go for TCR deploy 
 1734  TCR deploy begin 
 1740  TCR deploy complete 
  Back to EAS jumpers, for work on SPDs 
 1815  Complete P6 work 
 1833  Begin return  
 1845  TC open, Aki at AL 
 1845  Suni at P1 
 1850  Aki go for ingress 
 1854  Aki ingresss 
 1855?  SCU locked 
 1857  Suni ingress 
 1859  Suni SCU locked 
 1903  HC 6:35 
 1907  Repress NASA 6:38, d/r 6:44  
 1908  44 mm  
 1909  75 mm 
 1910  135 mm 
 1912  258 mm 5 psi 
 1913  268 mm holding 
 1916  Resume press 
2013 May 11   US EVA-21 
  Cassidy, Marshburn 
  Contingency EVA to replace PFCS on P6, ammonia leak 
 1241  Depress 35 mm 
 1243  HO 
 1244  Batt 
 1250  TC open 
 1251  Egress Cassidy 
 1253  Egress Marshburn? 
 1315  Arrive P6 truss 
 1332  Begin PFCS unbolt 
 1349  Fluid connectors unbolted 
 1412  PFCS removed, stow on bracket 
 1430  Spare pump cover removal 
 1505  New pump unberthed 
 1516  installing - soft dock 
 1530? New pump installed 
 1545  Old pump in storage slot 
 1631  New PFCS activated 
  Watching for leaks 
 1720  begin Return from P6 
 1734  Marshburn in AL vicinity 
 1734?  Marshburn in? 
 1744?  Cassidy in 
 1747  TC closed 
 1756  EV off batt 
 1757  HC 
  15 min vac hold 
 1812  O2 to press 
 1814  repress 
 1833  repress complete 
2013 Jul 9   US EVA-22 
  Cassidy 3010, Parmitano 3011 
 1150  Depress resume 
 1151  112 mm 
 1152  96 mm 
 1153  86mm 
 1154  81mm 
 1156  58 mm 
 1159  40mm 
 1159  37mm 
 1200  1mm 
 1201  HO 
 1202  Batt power 
 1208?  Cassidy out 
 1211?  Parmitano out 
 1212? TC closed 
 1223  Unbolting SGTRC 
 1230  Old SGTRC off 
 1231  Installing new SGTRC 
 1243  Ormate cover on 
 1244  Ormate retrieve 
 1247  MISSE 8 retrieve 
 1304  SGTRC declared in (after bolt doubts) 
 1310  Luca back to AL with MISSE 
 1312  Chris heading back to AL 
 1315  Stow in AL 
 1325  Cabling 
 1414  Unberth RGB1 
 1419  Remove FSE 
 1434  Install RGB1 on stbd TRRJ 
 1440  Bolted 
 1501  CLPA released 
 1515  RGB2 unberthed, on way to P1 
 1526  Chris carries PMA2 cover to PMA2 
 1537  PMA2 cover staged at PMA2 
 1539  RGB2 handed to Chris at P1 
 1543  RGB2 bolted 
 1551  Y jumper cable install 
 1623  APFR install 
 1638  Luca at PMA2 
 1648  PMA2 cover being installed 
 1700? PMA2 cover complete 
 1756  Luca ingress? 
 1758  Cassidy ingress 
 1800  TC closed 
 1805  HC  
 1806  Power to SCU 
 1809  Repress 
  Luca water problems noted 
2013 Jul 16  
  EVA 23 Cassidy, Parmitano 
 1145  2.0 psi 
 1154?  Depress 
 1155?  0.5 psi 
 1156  HO 
 1157:00 Batt power 
 1201  Parmitano out 
 1204  Cassidy out 
 1220 Y-bypass jumper work 
 1230  MLM 1553 cable work 
 1235  EV2 CO sensor offscale 
 1240  Chris to P1 for V-guide work 
 1240  MLM eth cable work at Node 3 
 1241  Luca reports water in comm cap 
 1242  Chris opens RPCM MLI flap 
 1254  Troubleshooting loose water in helmet 
 1302  EV2 report water at back of head 
 1305  Call to terminate EVA 
 1306  Luca toward AL 
 1308  Chris cleanup, Luca to AL, comm problems 
 1312  Luca ingress 
 1315  Chris retrieving bags 
  V-Guide bag is in 
  MBSU bag 
 1321? Chris inside 
 1325  Two minute timer up 
 1325  Closing hatch 
 1326  HC 
 1329  Airlock repress 1:32 (NASA) 
 1335  Internal hatch open 
 1338  Luca's helmet off 
2013 Dec 21  
  EVA Mastracchio Hopkins 3010, 3011 
 1133  12.1psi 
 1148  2psi 
 1150  75mm 
 1152  62mm 
 1153  56mm 
 1154  48mm 
 1155  41mm 
 1156  39mm 
 1157  35mm depress 
 1158  30mm 
 1159  27mm 
 1159  HO 2mm 
 1200  1.3mm 
 1201  Battery power 
 1206 Go for egress 
 1206  Egress Mas. 
 1210? Egress Hopkins 
 1457  Completed PM disconnections 
  Head to ESP2 
 1527  Get adjustable grapple bar (AGB) from ESP-2 FHRC 
 1610?  Partly remove PM 
 1620  Attach AGB to PM 
 1625? Removed PM from truss 
 1646  Install PM on MBS POA 
 1713  Back at AL 
 1717  Hopkins ingress   
 1720  Rick ingress 
 1723  TC closed 
 1724  HC 
 1729  Repress 5:28:11 
2013 Dec 24   EVA-25 Hopkins, Mast. 
 1124  Begin depress 
 1128  440mm 
 1130  373mm 
 1133  280mm 
 1139  120mm 
 1140  110mm 
 1141  95mm 
 1142 80mm 
 1143 75mm, pause? 
 1144 66mm  
 1145 58mm 
 1146 52mm 
 1147 45mm 
 1148 40mm 
 1149:00 35mm Depress 
 1150  32mm 
 1151  29mm 
 1152  26mm 
 1152  HO, 2mm 
 1153  Battery power 
 1157 Egress Hopkins 
 1204 Egress Mastrach. 
 1230 At ESP-3 
  Hopkins on RMS 
 1308  Hopkins arrives ESP-3 
 1408  Unbolted PM SN0006 
 1410  Removed from ESP3 
 1450  Installing in S1 
 1456  Installed but not bolted 
 1508  PM bolted to S1 
 1515 Mating QD fluid connectors 
 1525  PM vented (remove N2)  
  NH3 flakes loose, on suits 
 1716  NH3 lines connected 
 1746  Cables connected 
 1800  PM confirmed working 
 1836  In cleanup 
 1854  Ingress Mastr. 
 1855?  Ingress Hopkins 
 1857? TC closed 
 1901  Off batt power 
 1902  Go for HC 
 1904  HC 
  Begin 15 min hold for NH3 decontam 
 1923  Repress 
  30mm 
1927  192 mm 
1928  5psi, holding 
1935  Doing NH3 sampling 
1943  Resume repress from 5psi 
1945  Hold repress at 12psi 
1948  Resume repress 
1952  Repress almost complete 
1954  IV hatch open 
2014 Apr 23   EVA-26 Mastracchio, Swanson 
 1340  p = 90 mm 
 1345  TDRS LOS, 74mm 
 1346  65mm 
 1347  54 mm 
 1349  45 mm 
 1351  35 mm 
 1354  25mm, 0.5psi 
  HO 
 1356  Batt power  
 1400  Egress Mas. 
 1404  Egress Swanson 
 1409  At S0 inspecting site 
 1427  Old MDM out 
 1440  New MDM installed 
 1450  Free stuck SPDA door 
 1500  Cut lanyard on other SPDA door 
 1520  Ingress SS 
 1522  Ingress RM 
 1529  HC 
 1532  Repress 
 1546  636mm 
2014 Jul 31   Get ETVCG from PMA2 for EVA27 
2014 Aug 1   Get SSU from Z1 dome for EVA27 
2014 Oct 7   EVA-27 Wiseman 3003, Gerst 3010 
 1210  5psi leak check 
 1216  2 psi 
 1222  1 psi 
 1225?  Depress 
 1229?  HO 
 1230  Bat power  
 1237  Wiseman egress 
 1246 Gerst egress 
 1246?  MTRA from AL 
 1358 PM remove from POA 
  PM transfer by Gerst on RMS 
 1447 PM install on PM FSE on ESP2 
 1510? PM bolted on ESP2 
 1530  PM cleanup, AGB stowage 
 1557 ETVC CP-13 CLPA repair; light removed 
 1610  New light installed 
 1634  MTRA soft docked 
 1646  APFR stowed 
 1650  Broken light stowed in AL 
 1700  Working on MTRA 
 1730  Cabling for MTRA 
 1826 Gerst ingress 
 1830?  Wiseman ingress 
 1837  HC 
 1843  Repress 
2014 Oct 15   EVA-28 Wiseman, Wilmore  
 1201? Resume Depress from 5 psi 
 1215? HO 
 1216  Batt power 
 1300  At S4 truss to work on SSU 3A 
 1357? Old SSU 3A removed from S4 
 1402  new SSU 3A on truss 
 1412  SSU 3A bolted in place 
 1430  Remove tool stanchion, PFR from P1  
 1506  Install tool stanchion, PFR on S0 
 1549  Removed broken EVTCG from P1 CP7 
 1600? Removed WETA VSSA stanchion from P1 nadir CP8  
 1652  Bolted VSSA stanchion to Node 2 zenith CP11 
 1710? Return broken port truss camera to AL 
 1721  Attached WETA to Node 2 stanchion 
 1750?  Install new EVTCG camera P1 on CP8 
 1831  Go for Ingress 
 1836? Ingress EV1 
 1839? HC 
 1850  Repress after 6:34 
2015 Feb 21   EVA-29 Wilmore EV1, Virts EV2 
 1216  Depressing, at 600 mmHG 
 1221  415 mm 
 1222  313 mm 
 1223  267 mm, 5 psi halt 
 1228  234 mm depressing 
 1229  187mmm 
 1230  149mm 
 1231  120mm 
 1232  100mm 
 1233  89mm, pump off 
 1234  78mm   
 1235  69mm  
 1236  61mm 
 1237  53  
 1238  47 
 1239  42 
 1240  37, depress Quest (JCM)  
 1241  33 
 1242  2 (Hatch opened) 
 1245  BP, EVA  
 1252  Wilmore egress  
 1254? IDA bag A (Port) handed to Wilmore 
 1257  Virts egress with IDA Bag B (Stbd) 
 1308  TC closed 
 1315? Bag A on Node 2 
 1320  Bag B installed on Node 2 
 1350  Installing wire ties on NOD2, PMA2 
  PMA-2 umbilical removed to clear C2-02 
 1429  Port MMOD shield NOD2/C2-02 removed 
  Cable 1 (Blue-white) to P853 connector 
 1505  Cable 2 (Blue) installed to P852 
  Cable 3 (Green-yellow) to P851  
  Cable 4 (Red-white) to P850  
 1515  4 port cables installed 
 1543  Harmony port MMOD shield reinstalled 
 1550? Stbd MMOD shield NOD2/C2-05 removed 
 1559  Cable 5 (Red) installed to P864 
 1610  4 stbd connections complete 
 1610  Harmony stbd MMOD shield reinstalled 
  Deploy cables along side of Harmony to Destiny 
  Purple cable W2258 routed to P102A/P106A on LAB 
  Purple cable W2258 routed to HR343 awaiting install of PMA-3 and IDA-2 
  Purple cable W2258 IDA-1 leg routed to PMA2  
  W2254 Red-White from port bag routed to PMA-2 
  W2256 Blue cable routed to PMA-2 
  W2254 Red-White second leg to PMA-2 nadir 
  W2256 Blue cable IDA-1 leg routed to PMA-2 zenith 
  W2262 Blue-White P103 and P1 installed 
  W2252 Stbd bag Yellow-Green routed to PMA-2 nadir 
  W2256 Blue cable for IDA-2 routed to HR357 
  W2254 Red-white P204 routed to HR318 
  W2272 Stbd Bag Red cable routined PMA-2 zenith and N2 HR317 for IDA-2 
  Remove SSPTS power cables 
 1909  Virts ingress 
 1911  Willmore ingress 
 1913  TC closed 
 1918? HC 
 1926  Repress; 104 m of cable installed 
 1934  434mm 
 1937  CL repressed at 750 mm 
2015 Feb 25   EVA-30 Wilmore, Virts 
 1142? Depress 
 1146  TC open 
 1148? HO 
 1151  Battery power 
 1225  Removing PMA-2 cover 
 1230  Cover removed and in bag  
 1240  Working on cable routing 
 1330? Cable routing complete 
 1348  PMA-2 cover bag in airlock 
 1420  Wilmore remove NPV vent from Node 3 
 1530  Wilmore to release Node 3 CBM launch locks 
 1530  Virts lubricating SSRMS LEE-A  
 1610  Returning avionics bag from Node 1 exterior to AL 
  Deploying wire ties at S1 and P1 for C2V2 cabling 
 1815  Back at airlock 
 1819? Ingress Wilmore 
 1823 Ingress Virts? 
 1826  Wilmore out again struggling with TC 
 1828  TC closed 
 1829  HC  
 1834  Repress 
 1835:30  100 mm 
 1835:45  161 mm 
 1836:00  210 mm 
2015 Mar 1   EVA-31 Virts, Wilmore 
 1141  Under 2 psi 
 1145? Depress 
 1150? HO 
 1152  Battery power 
 1159  Virts egress 
 1208?  Wilmore egress 
 1229  Wilmore install S3 boom 
 1233  Two S3 antennas installed 
 1240?  Virts install P3 boom 
 1246  Virts install P3 antennas 
 1250  Virts install P3 antennas 
 1330  Routing C2V2 cables 
 1720? Ingress 
 1727?  HC 
 1730  Repress 
2015 Oct 28   EVA-32 Kelly, Lindgren (3003, 3010) 
 1200? Depress 
 1201  HO 
 1203  BP 
 1205? Egress Kelly 
 1210? Egress Lindgren 
 1330? Adding large MLI blanket to AMS 
 1350? Remove MLI from failed MBSU 
 1407  MBSU task complete 
  Add small MLI blanket to AMS 
 1430  Blanket on AMS complete 
 1530  Working on IDA wiring 
 1540  LEE-B lubing at ESP-2 
 1630  IDA cable installation 
 1818  End of LEE lubing (one part incomplete) 
 1850? Ingress 
 1859  TC closed 
 1911?  HC 
 1919  Repress 7:19 
2015 Nov 6   EVA-33 Kelly, Lindgren (3003, 3010) 
 1120?  Depress 
 1120?  HO 
 1122  Battery power 
 1415  P6 Ammonia system refill 
 1518  TTCR retracted by Lindgren 
 1556  P5/P4 strut tightening 
 1728  TTCR re-deployed due to lack of time 
 1837? Ingress Kelly 
 1848? Ingress Lindgren 
 1904  HC 
 1910  Repress 
2015 Dec 21   EVA-34 Kelly, Kopra (3010, 3011) 
 1213 Begin depress 
 1225 Manual pressure valve 
 1233 1 psi 
 1238? Depress 
 1239  0.6 psi 
 1243 HO 
 1245 Battery 
 1254 Egress Kelly 
 1300? Kopra egress 
  Translate to WS4 to free CETA brake 
 1309 Free brake handle 
 1321 MT back at WS4 
 1400  Kopra ethernet cable routing to MLM 
 1400  Kelly routing IDA cables 
 1449  Kopra at AL 
 1502  Kopra retreive EVA bag from Lab exterior 
 1540? Kopra ingress 
 1543? Kelly ingress 
 1554? HC 
 1601  Repress, PET 3:16 
2016 Jan 15   US EVA-35  
  EVA35 EV1 Kopra 3011, EV2 Peake 3008 
 1243? Depress 
 1247? HO 
 1248  BP 
 1300? Kopra egress 
 1304? Peake egress 
 1348  At S6 for SSU work 
 1440  Remove S6 SSU-1B S/N 0012 
 1446  Install replacement SSU 
 1532  Old SSU stowed in AL 
 1600  Peake working IDA cabling 
 1610  Kopra N3 NPV vent relocate 
 1645  NPV vent reinstalled 
 1657  Korpa reports water in helmet 
 1657  Terminate EVA 
 1713  Kopra ingress 
 1717  Peake ingress 
 1726  TC close 
 1727  HC 
 1731  Repress PET 4:43 
2016 Aug 19   US EVA-36 
  IDA 0.6m from PMA 
 1016  Dextre touch IDA to PMA 
 1154  1psi  
 1158  Depress 
 1203  HO 
 1204  BP (EVA, NASA) 
 1209  Williams EV-1 egress 
 1216  Rubins EV-2 egress 
 1219  Wiliams at EVA-2 
 1231  Rubins gets APFR 
 1300  Attaching tethers between IDA-1, PMA-2 
 1316  Dextre release IDA 
 1318  Dextre/SSRMS in motion away from IDA 
 1320  Cinched tethers on IDA 
 1325  IDA confirmed soft docked 
 1330  Initial electrical connections 
 1350  Struggling with one connection 
 1400  Cable connection ok 
 1430  First set of hooks closed 
 1440  All hooks closed 
 1440  IDA-2 hard mate to PMA-2 
  Cover on grapple fixture 
 1500  Cabling 
 1512  Power to IDA 
 1520  IDA cover removed 
 1530  Williams install new reflectors 
 1530  IDA cover stuffed in ORU bag 
 1600  IDA-2 work complete 
 1700  Cable cleanup 
 1724  Williams lost audio in right ear 
 1726  EV1 with CL bag heading to AL 
 1731  Comm issues, EVA terminated 
 1731  EV2 with ORU bag near AL 
 1737  EV2 ingress with ORU bag 
 1743? EV1 Ingress 
 1744  TC closed 
 1751  SCUs locked 
 1757  HC 
 1802  Repress, EVA PET 5:58 
2016 Sep 1   US EVA-37 
 1146  Depress 
 1150  HO 
 1153  BP 
 1159  Egress williams 
 1202  Egress Rubins 
 1238  TTCR retract 
 1248  TTCR retract complete 
 1300  Installing cinches 
 1326  Cinches done 
 1400  TTCR cover on 
 1450  P1 CP9 light replacement 
 1520  Light replaced, start HDTV install 
 1620  Second HDTV install at CP8 
 1824? Ingress 
  HC 
 1841  Repress 
2017 Jan 6   EVA-38 Kimbrough, Whitson 
 1220?  Depress 
 1222?  HO 
 1223  BP 
 1230? Egress 
 1239  Egress Whitson 
 1350  Loosen bolts 
 1400  Whitson has adap plate 
  K connects data cable 
  K installs adapter plate in slot 6 
 1430  K working on NiH Slot 4 0039 
 1435  NiH 4 moved to Slot 6 on plate  
  Remove plate from B to slot 4 
 1447  Install AP B on slot 4 
 1515  Moving NiH from slot 2 to slot 4 
 1530  Installing in slot 4 
 1556  AP C removed from EP 
 1615  Move AP C to empty slot 2 
 1700  Working at CETA cart to get failed CLPA light 
 1745  CETA light removed, for brining it inside 
 1800  Node 3 ACBM bundle installed 
  Z1 rat's nest internet cable 
 1838  TC open 
 1839  Whitson ingress 
 1842  Kimbrough ingress 
 1843  TC closed 
 1852  HC 
 1855  Repress 
2017 Jan 13    EVA-39 Kimbrough, Pesquet 
 1120? Depress 
 1120? HO 
 1122  Battery power 
 1123  TC open 
 1130?  Kimbrough egress 
 1135? Pesquet out 
 1140  Secure N3ACBM bundle to Quest handrail 0153 
 1225?  AP F off EP, on Pesquet 
 1235  AP E off EP, on Kimb? 
 1252  AP F in slot 6 
 1311  NiH2 bat 0080 moved from slot 4 to AP F /slot 6 
 1324  AP E on slot 4 
 1350  Removing AP D from EP 
 1358  AP D at IEA 
 1412  AP D installed slot 2? 
 1449  Pesquet retrieve CLPA from airlock 
  CLPA replace put on MTRA for later SSRMS add 
 1512  Removed old CLPA 
 1520  New CLPA on 
 1530  Working on SSRMS LEE WIF 
 1558  Stow medium ORU bag in AL 
 1600  Photo survey of rat's nest avionics tray at Z1/S0 
 1620  Removing handrails from Destiny 
 1640  Stow handrails in AL 
  Move shield bundles to Node 3 
 1658  Bundles on Node 3 
 1705  Begin return to AL 
 1705  Pesquet ingress 
 1709  Kimbrough ingress 
 1716  HC 
 1720  Repress 5:58 (NASA) 
2017 Mar 24   EVA-40 Kimbrough, Pesquet 
 1116  50mm 
 1118  39mm 
 1118:50  35mm 
 1122  2mm, HO 
 1124  BP  
 1131  Pesquet out 
 1139?  Kimbrough out 
 1203  Old EXT-2 MDM removed 
 1210  New EXT-2 MDM installed 
 1326  P RBVM imaging for leak search 
 1328  K begin disconnecting PMA-3 cables 
 1354  K completed PMA-3 work 
 1505  K gets 2 EF cameras from AL 
 1500  Pesquet lubing SPDM LEE 
 1515  K replacing JEM EF cameras 
 1550  Kimbrough stowing 2 old EF cameras 
 1600? Kimbrough at AL 
 1622  K depart AL with replacement CETA light 
 1655  S1 CETA light replace 
 1706  Heading back to airlock 
 1716  K into AL 
  P into AL 
 1753  HC 
 1758  Repress 
2017 Mar 30   EVA-41 Kimbrough, Whitson 
 1122  Depress 

 

1128 HO 
 1129  BP 
 1136  Whitson egress 
 1139  Hand empty PMA cover bag out 
 1144  Kimbrough egress with MDM ORU bag 
 1155  Removing MDM-16E-0103 
 1217  Removed MDM 
 1223  Installed new MDM 
 1230  Whitson removed PMA-3 cover 
 1257  Kimbrough at PMA3 to help stuff into bag 
 1307  In cover bag at last 
 1319  Bag in airlock 
 1319  Old MDM in airlock 
 1328  N3 axial shields move from outside AL 
 1348  Bundles at N3 
  4 shields, 2 per bundle 
 1354? S1/S2 sep 
 1357? Shield 1 floats away 
 1359  Loss of shield 1 discovered 
 1406  Shield 2 installed 
 1412  Working on bundle 2 
 1444  Shield 3 and 4 separated 
 1455  Shields 3 and 4 installed 
 1502  Wrap up shields work 
 1525  Back at AL 
 1529 PMA-3 cover out of AL 
 1540  Back at N3 with cover bag 
 1549  Removing cover from bag 
 1615  PMA3 cover attach to N3 complete 
 1630  Back at AL 
 1634?  Retrieve cummerbund bag 
 1646  At PMA3, working with bag 
 1650  P and S cummerbunds (PMA3 Shield) out of bag, 1 each 
 1705  Cummerbunds installed on PMA3 
 1730  SSRMS translate 
 1730  Cummerbunds installed 
 1810  K ingress 
 1815?  W ingress 
 1826? HC 
 1833  Repress 
2017 May 12   EVA-42 Whitson, Fischer 
  One airlock SCU failed 
  EV1 and 2 swap other SCU back and forth 
 1200? SCU to Peggy? 
 1222?  SCU to Fischer, Peggy on battery 
 1229?  CL/EL closed 
 1230  Ready for depress 
 1300  Airlock just above 1 psi 

 

1303  Depress 0.7? 
 1303  Almost 0.5 psi 
 1305  0.5 psi, go for HO 
 1306  TC open 
 1306  HO 
 1308  hatch stow confirmed 
 1308  Fischer power to batt 
 1315  Whitson out 
 1321  Fischer out 
 1322  New ExPCA out 
 1341  Temp stow new ExPCA 
 1423  Old ExPCA out 
 1427? Old ExPCA temp stow 
 1435  New ExPCA in, soft docked 
 1500  New ExPCA operational 
 1530  Cable terminator work at AMS2 
 1545  Fischer ties down JEM RMS insulation 
 1627  PMA-3 forward shield installed 
 1639  PMA-3 forward shield install complete 
 1640  ExPCA and EV1 back at AL, stow outside 
  Relocate PFR from COF to PMA3 
 1654  ExPCA into AL? 
 1700  Fischer ingress 
 1703  Fischer back on SCU 
 1710  Whitson ingress 
 1714  HC 
 1721 Repress 
2017 May 23   EVA-43 Whitson, Fischer 
 1118? Depress 
 1119  HO 
 1120  BP 
 1128  Whitson egress 
 1132  Fischer egress 
 1140  EV1 on S0, EV2 on Lab 
 1153  EV2 installed STBD EWC antenna on Lab HR 261A 
 1158  Old 16E-0102 MDM removed  
 1215  EV2 installed PORT EWC antenna on Lab HR 262A 
 1205  Failed MDM back in bag 
 1207  New MDM in  
 1226 7 Removed new MDM again to realign 
 1250  Clean MDM area 
 1257  New MDM reinserted 
 1320  Tightening bolts 
 1352? EV1 in 
 1355  EV2 in 
 1402  HC 
 1406  Repress 
2017 Oct 5   EVA-44 Bresnik, Vande Hei 
 1146  2 psi 
 1200? Depress 
 1203  HO 
 1205  BP 
 1214? Egress Bresnik 
 1220? Egress Vande Hei 
 1326  Remove LEE-A SN 202 from SSRMS 
 1335  Stow LEE 202 on port CETA cart 
 1414  POA LEE SN 203 removed from MBS 
 1442  Attach LEE 203 to SSRMS 
 1500? LEE 203 attach completed 
 1530? Remove LEE 202 from CETA 
 1600? Stow LEE 202 on POA 
 1700? Begin getahead tasks 
 1837  VDH ingress 
 1843? Bresnik in 
 1844? TC closed 
 1854  HC 
 1900  Repress 
2017 Oct 10   EVA-45 Bresnik, Vande Hei 
 1123  Begin depress 
 1136  Resume depress 
 1149  Depress 0.7 
 1155 HO 
 1155:55 BP 
 1200  Egress Bresnik 
 1202  Egress Vande Hei 
 1243 Rotate PFCS spare 
 1310  EV1 get ETVCG bag from Quest 
  Replace ETVCG CP9 at P1 nadir  
 1340  HD cam removed from CP9 
 1402  Old TVCG removed 
 1415 New TVCG installed 
 1430  HD cam reinstalled 
 1510 Replace MBS camera lens cover 
 1527  Loose bolt floats away? 
 1550  Lube LEE ball joint 
 1648 Remove Node 3 handrails 
 1700  Completed lubing 
 1730  Remove MLI from ELC-1 BCDU 
 1800? Ingress EV2? 
 1810  Ingress EV1 
 1810  TC closed 
 1817 HC 
 1822 Repress 6:26(NASA) 
2017 Oct 20   US EVA46 Bresnik Acaba 
 1132  Resume depress 
 1144?  Depress 
 1146  HO 
 1147  BP 
 1154  Bresnik out 
 1158? Acaba out 
 1215  SPDM EOTP fuse replaced 
 1330  Working at CP3 
 1330  MSBU spare remove MLI at ESP1 
 1345  Installing HDTV at CP3 S1  
 1430  Replacing CLA on new LEE-A 
 1530  New CLA installed 
  Remove insulation on spares 
 1707  Acaba SAFER arm broken, return to AL 
 1805? Ingress EV2 
 1812? Ingress EV1 
 1821  TC closed 
  HC 
 1836  Repress NASA 6:49 
2018 Jan 23   EVA-47 Vande Hei, Tingle 
 1128 Resume 5psi depress 
 1145? Depress 
 1147? HO 
 1149  BP 
 1205  TC open 
 1213  Egressed 
 1400 Working on releasing old LEE 
 1457  LEE 201 removed from SSRMS 
 1515  LEE 201 soft dock on ESP2 
 1554  Remove CLPA from 201 
 1558  Install CLPA on 204 
 1624 LEE 204 off ESP2 
 1640  LEE 204 soft dock on SSMRS as LEE B 
 1654  LEE 204 installation complete 
 1809  SSRMS move away from ESP2 
 1847 Release piece of rubber from AL region at 1 m/s 
 1847  TC open 
 1850 EV2 ingress 
 1856  EV1 ingress 
 1858  TC closed 
 1907?  HC 
 1913  Repress 
2018 Feb 16   EVA-48 Vande Hei, Kanai 
 1156? Depress, About 0.7? 
 1158  Depress 0.6psi 
 1159  HO 
 1200  BP 
 1206  Egress EV1 
 1210  Egress EV2 
 1230  Remove CLA cam from LEE 202 on POA 
 1306  Remove LEE 202 from POA 
 1325  LEE 202 in Quest 
 1345  LEE 201 removed from ESP2 
 1359? LEE201 soft dock on POA 
 1420? LEE 201 work done 
 1431  Reinstall CLA on LEE 201 
 1520  Lube LEE-A 
 1610 Install RMCT tool on SPDM on Lab pdgf 
 1645 Lube complete 
 1720 Adjust position of FHRC strut on ESP2 
 1732 Kanai ingress 
 1737 VDH preparing to ingress - ingress? 
 1745 TC closed 
 1750 HC 
 1757 Repress  
2018 Mar 29   EVA49 Arnold 3003, Feustel 3006/13 
 1315  AL at 1.0psi? 
 1318  p is 65? 
 1323  p is 40 
 1325? Depress AL 
 1327  p is 26 mmHg 
 1328  p is 22 mmHg 
 1329  HO 
 1333  BP 
 1340 EV1 out 
 1345  EV2 out Arnold 
 1500  EV1 Zenith wireless antenna installation on N2 
 1505  P1 RVBM jumpers removed 
 1520? Nadir wireless antenna installation on N2 
 1540  EV1 back to AL to switch tool bags 
 1600  EV1 inspect PFCS 
 1630  Working on P1 CP8 ETVCG replacement 
 1640? Old ETVCG back in AL 
 1700? New ETVCG on 
 1740  old HD cam back from AL 
 1920  EV1 in 
 1928? EV2 in 
 1935  on SCU 
 1938  HC 
 1943  Repress 
2018 May 16   EVA-50, Feustel and Arnold  
 1118  6 psi 
 1122  Resume depress 
 1124  2.5 psi 
 1128  1.5 psi 
 1133  0.75psi, Airlock depress 
 1137  0.5 psi 
 1138  HO 
 1139 BP 
 1149  Egress Feustel 
 1153? Egress Arnold 
 1302  PFCS Leaky off EOTP 
 1315? Leaky on MUTT  
 1320  PFCS Frosty off ESP 
 1343  Frosty on EOTP 
 1401  Leaky on ESP 
 1505? Remove old CP13 camera 
 1530  Install CP13 replacement ETVCG 
 1550  EV1 replace SGTRC box on Z1 
 1620  Primary tasks done 
 1642  MLI removal on ELC2 DCSU  
 1702  RGB T-handles installed 
  FHRC work 
 1748  Back at AL, ingress EV2 
 1757  EV1 ingress 
 1800  TC closed 
 1808  HC 
 1810  Repress 
2018 Jun 14   EVA-51 
 1201  Depress 0.7 psi 
 1205  HO 
 1206  Batt, EVA-51 
 1212  Arnold egress with CL bag/eth cable 
 1215?  Feustel egress 
  CL bag att to N2 next to Lab 
 1350 Route cables along N2 to PMA2 
 1420 Back to AL to get boom + HDcams 
 1447  Install EWC/HD cam boom 1 on WIF 16 at N2 front 
 1451  Install EWC/HD cam boom 2 on WIF 17 at N2 front 
 1620  Replace CP3 luminaire 
 1633  Close CATS cover 
 1650  Remove old HD cam on CP3 
 1655  Install new HD cam EDHC S/N 1002 
 1730 Move adjustable grapple bar from FHRC on ESP2 to ELC4 
 1800  AGB transfer complete 
 1814  Feustel - Wire tie to secure S4 solar array blanket box 
 1815  Wire tie floats off nadir fwd 
 1836  Ingress Arnold 
 1838  Arnold out again 
 1840  Arnold ingress 
 1843  Feustel ingress 
  Closing TC 
 1851  HC 
 1855  Repress 

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...