Monday, December 19, 2016

GOES 3

 1978-062A


Geostationary Operational Environmental Satellite 03 (GOES C) was the last of the first generation Ford GOES satellites. It was launched at 1049:30 on 1978 Jun 16 by Delta 2914 from Cape Canaveral. It was assigned as the GOES West (135 deg W) satellite for the FGGE experiment and remained at this position until replaced by GOES 4 on 1980 Oct 21. In 1981 a tungsten lamp in the VISSR imager failed and in late 1981 it was moved to 90W. In 1984 Oct it was moved off station again, returning to the GOES W position by 1985 Jan.

From 1996 GOES 3 was parked at 105W. In the 1990s it was used by the Pacific Ocean PEACESAT network for communications. In 2006 it was being operated via the University of Miami supporting S Polar comms.


GOES 3 
 

DateTimeEventOrbit  

1978 Jun 16  1049:30  Launch by Delta 2914  CC LC17 
  T+0:38 SRM 1-6 out 
  T+0:39 SRM 7-9 on 
  T+1:17 SRM 7-9 out 
  T+1:27 SRM 1-9 sep 
  T+3:41 MECO 
  T+3:49 St 1 sep 
  T+3:54 SES-1 
 1054:01 T+4:31 Fairing 
 1058:18 T+8:48 SECO-1  170 x 300?  
 1110:21 T+20:51 SES-2 
 1110:33 T+21:03 SECO-2  180? x 770? x 28.4 
 1111:33 T+22:03 Spin 
 1111:35 T+22:05 St 2 sep 
 1112:16 T+22:46 TES 182 km, 7.9611 to 10.270km/s 
 1112:59 T+23:29 TECO 
 1114:13 T+24:43 St 3 sep  657.43 183 x 37150 x 23.79 
 1212?  St 2 depletion?  108.19 554 x 1732 x 28.43 
1978 Jun 17  0322  AKM burn 
 0326? AKM ejected 
1978 Jun 17    1446.81 35471 x 36520 x 1.8 GEO 71.1W+2.6W 
1978 Jun 29   First pictures 
1978 Jul 5  1600  To NOAA 
1978 Jul 7    1452.64 35791 x 36427 x 1.0 GEO 122.8W+4.1W 
1978 Jul 9   braking 1437.92 35756 x 35888 x 1.0 GEO 131.0W+0.5W 
1978 Jul 13   mv in 1436.08 35782 x 35789 x 1.0 GEO 135.0W 
1978 Jul   GOES W FGGE 135W 
1978 Oct 21    1436.26 35771 x 35808 x 0.8 GEO 135.0W 
1978 Oct   Mv out 
1978 Nov 4   misid? 1436.11 35770 x 35802 x 0.8 GEO 165.3E 
1978 Nov 18   misid? 1436.05 35766 x 35805 x 0.8 GEO 165.3E 
1979 Jan 7   misid? 1436.14 35771 x 35803 x 0.6 GEO 165.3E 
1979 Feb 15    1436.05 35775 x 35795 x 0.5 GEO 135.4W 
1979 Dec 17    1436.03 35762 x 35808 x 0.0 GEO 135.0W 
1980 Sep    135.5W 
1980 Oct 17    1436.04 35778 x 35792 x 0.0 GEO 134.9W 
1980 Oct 21   Replaced by GOES 4 
1981 Mar 17    1436.04 35744 x 35826 x 0.1 GEO 135.2W 
1981 Apr 9   mv out 1435.89 35774 x 35791 x 0.2 GEO 134.4W+0.04E 
1981 May 23    1435.67 35764 x 35791 x 0.3 GEO 130.7W+0.1E 
1982 Jan 3   mv in 1435.39 35760 x 35784 x 0.8 GEO 90.0W+0.2E 
1982 Jan 30    1436.16 35785 x 35790 x 0.9 GEO 90.5W 
1982 Apr 1    1436.29 35783 x 35797 x 1.0 GEO 91.3W 
1982 Oct    91W 
1984 Jan    91W 
1984 Sep 30    1436.13 35777 x 35796 x 1.7 GEO 91.0W 
1984 Oct    91W move out 
1984 Oct 16    1437.89 35773 x 35870 x 1.7 GEO 96.7W+0.5W 
1985 Jan 20   mv in 1436.22 35780 x 35797 x 1.9 GEO 135.8W 
1985 Jan   GOES W 135W 
1986 Oct    136W 
1987 Mar 23    1436.10 35782 x 35790 x 3.9 GEO 136.1W 
1987 Apr 10    1436.01 35781 x 35787 x 4.0 GEO 135.9W 
1987 Apr 28   mv out 
1987 May 1    1435.81 35778 x 35783 x 4.1 GEO 134.8W+0.07E 
1987 May 21   braking 1436.42 35776 x 35809 x 4.1 GEO 128.0W 
1987 Jun 17    1436.29 35774 x 35806 x 4.2 GEO 129.7W+0.06W 
1987 Jul 2    1436.25 35777 x 35801 x 4.2 GEO 130.1W 
1987 Dec 20    1436.00 35774 x 35794 x 4.6 GEO 129.3W 
1989 Oct 4    1436.03 35760 x 35810 x 6.3 GEO 130.0W 
1990 Feb 23    1435.94 35757 x 35809 x 6.7 GEO 129.4W+0.03E 
1990 Mar 26   mv out 1435.79 35727 x 35834 x 6.7 GEO 127.8W+0.07E 
1990 Mar 30    1438.57 35795 x 35874 x 6.8 GEO 128.1W+0.6W 
1990 Jun 11    1438.24 35781 x 35876 x 6.9 GEO 172.1W+0.5W 
1990 Jun 13   mv in 1436.45 35759 x 35827 x 7.0 GEO 173.4W+0.1W 
1990 Jul 31    1436.20 35755 x 35822 x 7.1 GEO 175.9W+0.03W 
1990 Dec 7    1436.01 35750 x 35819 x 7.4 GEO 174.1W 
1991 Sep 3    1435.90 35761 x 35804 x 8.0 GEO 174.9W+0.05E 
1991 Dec 27   1435.86 35758 x 35805 x 8.3 GEO 173.1W+0.05E 
1992 May 24    1435.77 35759 x 35800 x 8.6 GEO 173.1W+0.08E 
1993 Feb 10    1436.36 35777 x 35806 x 9.2 GEO 174.9W+0.07W 
1994 Feb 11    1436.04 35766 x 35804 x 9.9 GEO 175.5W 
1995 Jan 4    1436.31 35771 x 35810 x 10.5 GEO 174.8W+0.06W 
1995 Apr 21   Begin drift 1435.74 35765 x 35793 x 10.7 GEO 172.8W+0.08E 
1995 Aug 3    1435.18 35743 x 35794 x 10.9 GEO 157.9W+0.2E 
1995 Dec 27    1434.49 35717 x 35792 x 11.1 GEO 109.5W+0.4E 
1996 Jan 12    1434.49 35731 x 35778 x 11.1 GEO 103.0W+0.4E 
1996 Jan 24   mv in 1436.00 35774 x 35794 x 11.1 GEO 102.9W 
1996 Nov 29    1436.19 35775 x 35802 x 11.6 GEO 103.5W 
1997 Mar 2    1436.19 35773 x 35803 x 11.7 GEO 106.2W 
1998 Apr 18    1435.97 35768 x 35800 x 12.2 GEO 105.7W 
1999 Apr 24    1436.17 35765 x 35810 x 12.6 GEO 102.5W+0.03W 
2003 Sep 5    1436.01 35767 x 35802 x 13.5 GEO 102.5W 
2016 Jun 15    1436.05 35769 x 35802 x 13.8 GEO 102.0W 
2016 Jun 16   Orbit raise 
2016 Jun 21   Orbit raise  1443.51 35908 x 35954 x 13.8 
2016 Jun 30   Orbit raise, retired 
2016 Jul 7    1449.25 36034 x 36053 x 13.8 

Friday, December 9, 2016

STS-116 (Discovery)

 2006-055A


STS-116 will dock with the ISS on mission 12A.1. Launch mass is 120413 kg, landing is 102217 kg.

Sunita Williams will transfer to the Ex14 crew, joining Lopez-Alegria and Tyurin. Tomas Reiter joins the STS-116 crew.

Discovery's RMS is used to unberth the P5 spacer and hand it to the SSRMS. On EVA-1 (Quest), Curbeam and Fuglesang help install P5 to P4. Then, the port half of the P6 array, side 4B, is powered down and retracted and a TCS is filled with NH3. P3/P4 SARJ solar tracking is now activated. P1-3A DDCU-E thermal covers are removed.

P6 carries 2B and 4B power channels; P4 has 2A and 4A. S4 has 1A/3A, S6 has 1B/3B.

Now, US Segment is configured to get power from P4-2A and P6-4B via MBSU 2 and 3 and EATCS Loop B.

Then, P6 4B is deactivated and US segment is configured for power via P4-4A and MBSU 1 and 4, via EATCS Loop A. S1-4B and S0-4B DDCU-E thermal covers removed.

On EVA-2, Curbeam and Fuglesang reroute power channel 2/3 through the MBSUs. The MBSUs need the ammonia TCS to be working. During this work, channel 1/4 is carrying the load for the entire ISS.

On EVA-3, Williams and Curbeam route power channel 1/4 through their MBSUs while the station runs off channel 2/3.

At last, the P4 arrays will be activated. MT will be moved to the S1 end of the truss. to await S3/S4.

Finally, the SMDPs and adapter are transferred to PMA-3 aft GF.

After undocking, the STP-H2 payloads will be deployed.

According to Spacehab, LSM is 5399 kg full 2858 kg empty. ICC is 839 empty, with 1657 kg of payload. TA is 112 kg. STS 116 cargo transfer MD to ISS 592 kg plus 140 kg consumables, SHAB to ISS 1620 kg; ISS to MD 610 kg, ISS to SHAB 1617 kg.


STS-116 
 

DateTimeEventOrbit  

2006 Nov 1  Roll to VAB 
2006 Nov 9   Roll to LC39B 
2006 Dec 7   Scrub WX 
2006 Dec 10  0147:35  Launch  KSC LC39B 
 0149:39 SRB sep 
 0149:49  OMS ASS 
 0151:27  OMS ASS CO 
 0155:58  MECO  
 0156:19  ET sep  58 x 220 x 51.6 
 0224:42  T+38:11s OMS-2 57.3m/s 124s 
 0226:44 OMS-2 CO  220 x 250 x 51.6 
 0316:09  PLBD open  
 0436:42  OMS-3 T+2:49:07 NC1 OMS both 30.8m/s 1:07  250 x 335 x 51.6 
 0437:47  OMS 3 CO 
 1845:14  T+16:57:39 NC2 OMS-4 both 36s 17.2m/s 112642 kg  293 x 348  
 1845:50  OMS 4 CO 
 1912  Grapple OBSS 
2006 Dec 11  0120?  Reberth OBSS 
 0130?  Ungrapple OBSS 
 0444:18 NC3 RCS 111907 kg  
 1756:32  OMS 5 NC4 OMS 16s 
 1756:48  OMS 5 CO 
 1831  NCC RCS 0.2m/s 
 1912 Tally-ho ISS 15 km 
 1928:22  OMS-6L TI 2.6m/s single OMS-L, 11s, 111448  
 1928:33 OMS 6 CO 
 1948  MC1, 3s 0.8m/s 
 2010? Out of plane tweak 
 2039  MC3 
 2048  MC4 0.3m/s rdot is 1m/s 
 2116  -Rbar 120m 
 2128  +Vbar 110m 
  Approach PMA on +Vbar 
 2158  At 20m 
 2204  At 10m 
 2205  Begin final approach 
 2211:55  Soft dock with PMA 
 2225  Retracted 
 2354  HO, bell rung 
2006 Dec 12 
 0100?  Suni Williams IELK transfer 
 0118  RMS grapple P5 
  SSRMS is at end of truss (W7?) 
 0225  Unberth P5 
 0318? SSRMS grapple P5 
 0324  RMS ungrapple P5 

  EVA-1 from Quest: Curbeam, Fuglesang 
 2022  2 psi 
 2024  0.8psi  
 2026  Airlock depress (JCM) 
 2028  26mm, 0.6psi  
 2030  HO  
 2031  Battery power 
 2040? Egress 
  Translate to P5; remove launch locks 
 2208  Contact between P5 and P4 
 2217  P5 soft dock 
 2243  P5 bolted, still tightening 
 2245  SSRMS ungrapple P5; SSRMS at W7? or W8? 
 2320  P5 work complete 
 2330  Remove GF for stowage on truss 
2006 Dec 13  0015  GF stowed on MBS 
 0115  Moving to S1 
 0205  New S1 camera installed 
 0245  Fuglesang loses PGT extension socket  
  Return to airlock 
 0258  Curbeam ingress 
 0300? F ingress 
 0302  HC  
 0307  Repress 
  
 0400?  MT moves from W8 to W3 
 1828  P6 SAW-4B wing retract begins 
  P6 retract stopped at 17.5 bays 
2006 Dec 14   EVA-2 
 1923  3.5 psi 
 1932  1.0 psi 
 1935  Depress 
 1940  Hatch open 
 1941  Battery power 
 1957  Egress Curbeam 
 2000?  Egress Fuglesang 
  Rewire MBSU, DDCU 
2006 Dec 15    
 0019  Curbeam ingress 
 0029  Fuglesang ingress 
 0033  TC closed 
 0038  HC 
 0041  Repress 
2006 Dec 16  
 1919?  1.4 psi 
 1923?  Depress complete 
 1924? HO 
 1925  Battery power? 
 1934  Egress Curbeam 
 1940 egress williams 
 2112  Reconfiguration complete 
  Ready to install SMDP 
 2139  SW on arm heading to bay 
 2148  SW unberth bundle 4  
 2150? Bundle 4 on adapter 
 2200  SW unberth bundle 3  
 2208  Bundle 3 on adapter 
 2220  Bundle 2 unberthed 
 2226  Bundle 2 on adapter 
 2230  Unberth SMDP adapter 
 2255  Install adapter on PMA3 
 2325  Digital camera floats loose from S Williams 
 2350  Install AGB grapple bar on ESP 
2006 Dec 17  0021  Translating to P6 
 0050  Shaking P6 
 0144  Retract 1 bay  
 0230  Down to 11 bays; run out of time 
 0245?  Ingress 
 0252  HC  
 0256  Repress 7:31 (NASA) 
2006 Dec 18  
  EVA-4 Curbeam, Fuglesang 
 1855  Depress 
 1859  HO 
 1900  Battery power 
 1908  Egress Curbeam 
 1915 Egress Fuglesang 
  Translate to P6 
  Using tool to free up stuck SAW panels 
 2328  At 1-bay position 
 2356  Retract complete, but guide wire loose 
2006 Dec 19  0034  SABB latched 
 0050  Fixing SSRMS elbow insulation 
 0120? Ingress Fuglesang 
 0128  Ingress Curbeam 
 0135  HC 
 0138 Repress 
 1942  Hatches to ISS closed 
 2209:19  Undocking  
 2236  At 120m on Vbar, begin flyaround 
 2248  On +R bar, 200m 
 2257  On -V bar? 
 2259  Sep-1 burn 
  Sep-2 burn  
2006 Dec 20  0011:46  Sep-3 OMS 11s 
 0011:57  OMS-7 CO 
2006 Dec 21 
 0019:50  MEPSI  
 0156:44  RAFT/Marscom deploy  
  
 1822:47  ANDE canister deploy  
 1823:29  ANDE canister top from middle sep 
 1823:35  NRL FCAL separate from top can  
 1823:36  ANDE MAA fails to sep from lower can  
 1823:36  Center disk separate from lower can 
 1852:35  RCS burn (ANDE sep) 106829 kg 0.6m/s 8s 
2006 Dec 22   
 1719:14  PLBD closed 
 2127:05  OMS DO for KSC203 3:46 117.3m/s 
 2130:53  OMS DO CO  33 x  
 2159:55  EI 
 2231:59  MGTD 12:20:44:24 KSC RW15 
 2232:12 NGTD 
 2232:52  WS 
2006 Dec 23  0330Roll to OPF3 

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...