| Pirs |
| |
|
| Date | Time | Event | Orbit |
|---|
|
| 2001 Sep 14 | 2334:55 | Launch by Soyuz-U No 677 | |
| | | T+1:58 Blok BVGD sep |
| | | T+2:37 GO sep |
| | | T+4:47 St 2 sep |
| | | T+5:01 KhO sep |
| | | T+8:45 Blok I MECO |
| | 2343:44 | T+8:49 Blok-I sep | 88.0? 170 x 180 x 51.6 |
| 2001 Sep 15 | 0320:57 | DV1A 47s 18.4m/s |
| | 0358:02 | DV1B 9.6m/s 25s |
| 2001 Sep 16 | 0029:47 | DV2 6.3s 2.0m/s |
| | 1153 | | 89.55 239 x 265 x 51.6 |
| 2001 Sep 16 | 2230 | Begin auto docking sequence |
| | 2255 | DV3A Burn 26m/s |
| | 2301 | | 89.53 238 x 264 x 51.6 |
| | 2318 | DV3B Burn 1m/s |
| | 2341 | MC1 Burn 43 m/s |
| 2001 Sep 17 | 0026 | MC2 Burn 7m/s |
| | 0032 | MC3 Burn 5m/s |
| | 0034 | MC4 Burn 1.5m/s |
| 2001 Sep 17 | 0038 | At 200m, begin flyaround |
| | 0045 | At 165m, stationkeep below Zvezda |
| 2001 Sep 17 | 0105:14 | Docked with Zvezda nadir |
| | | | 92.36 385 x 395 x 51.6 |
| | | HO to ISS |
| 2001 Sep 26 | 1536 | Progress Undock |
| | | Progress sep burn |
| | | Progress at range 24 km |
| | 2330 | Progress deorbit 609.8s 102.3m/s |
| 2001 Sep 27 | 0009 | Reentry over Pacific |
| | 0019 | Debris impact |
| 2001 Oct 8 | | EVA-1 Dezhurov, Tyurin |
| | 1410? | Batt power |
| | 1420? | Depress Pirs and Zvezda SO |
| | 1423 | HO |
| | 1433 | Egress Tyurin |
| | 1440? | Egress Dezhurov |
| | 1600 | Strela installation on Pirs |
| | 1710 | Jettison Pirs hatch thermal covers |
| | | Install EVA ladder |
| | 1909 | Ingress Dezhurov |
| | 1911 | Ingress Tyurin |
| | 1916 | HC attempt, problem closing |
| | 1921 | HC |
| | 1926 | Repress |
| | 1932? | Off power |
| 2001 Oct 15 | 0903 | Depress complete to 0.02bar |
| | 0916 | Opening hatch valve, full depress |
| | 0917 | HO EVA-2 Dezhurov, Tyurin |
| | 0922 | Hatch ring installed |
| | 0925 | Egress Tyurin |
| | 0929? | Egress Dezhurov |
| | | Attach Kromka contamination expt to Zvezda |
| | 1200 | Working at SM rear |
| | | Attach MPAC-SEED capture device |
| | | Attach SEED exposure device |
| | | Replace Russian flag with Kodak sign |
| | 1445 | Ingress |
| | 1457 | First attempt to close hatch |
| | 1509 | Hatch closed |
| | 1510 | Repress |
| 2001 Oct 19 | | |
| | 1048 | Soyuz Undock from Zarya |
| | 1058 | Begin lateral move |
| | 1102 | Approach |
| | 1104 | Dock with Pirs |
| 2001 Nov 12 | | EVA-3 Culbertson, Dezhurov |
| | 1950 | Airlock leack check complete |
| | 2127 | Depress to 35mm |
| | 2135 | Battery power |
| | 2140 | 10mm, 5mm |
| | 2141 | HO |
| | 2147 | Egress Culbertson EV2 |
| | 2155? | Egress Dezhurov EV1 |
| | | Complete electrical connection to Pirs |
| | | Complete Kurs installation |
| | | Inspect Zvezda panel |
| 2001 Nov 13 | 0235? | Ingress |
| | 0245 | HC |
| | 0250? | Repress |
| | 0253 | In repress, 100mm? |
| 2001 Dec 2 | | Fabricate hook tool to remove Progress debris |
| 2001 Dec 3 | | EVA-4 Dezhurov, Tyurin |
| | 1304:30 | 35mm (AK) |
| | 1307 | At 15mm, leak check start |
| | 1312 | At 14mm, end of leak check |
| | 1314 | Battery power |
| | 1319 | 10mm, prepare for HO |
| | 1320 | HO |
| | 1327 | Egress |
| | 1330? | Egress Tyurin |
| | 1440 | EV crew identify rubber seal around docking ring |
| | 1453 | Seal removed |
| | 1454 | Progress hard dock |
| | 1540 | Ingress in prep; begin decontam |
| | 1557 | Ingress EV1 Dezhurov |
| | 1559 | Ingress EV2 Tyurin |
| | 1606 | HC |
| | 1608 | Prep for repress |
| | 1609 | Repressurizing; end of EVA |
| | 1610 | At 100mm in airlock |
| | 1622? | Off power |
| 2002 Jan 14 | | EX-4 EVA-1 (EVA-6) |
| | 2041 | 110 mm depress |
| | 2045 | 20mm depress |
| | 2052 | Batt power |
| | 2059 | HO |
| | 2110? | Egress |
| | | Relocate Strela-2 from PMA-1 to Pirs |
| | 2130 | Working on Strela-1 boom |
| 2002 Jan 15 | 0031 | Strela-2 installed |
| | 0200 | Installing SAREX antenna |
| | 0245 | Returning to Pirs |
| | 0254 | Discard Orlan gloves and wipedown towels |
| | 0255 | Ingress |
| | 0302 | HC |
| | 0303? | Repress |
| | 0304? | Above 35 mm Hg? |
| | 0305 | p=90 |
| | 0306 | p=150 |
| | 0312 | Station power |
| 2002 Jan 25 | | EX-4 EVA-2 |
| | 1457:25 | Depress 90mm |
| | 1502? | Adopt depress |
| | 1502:40 | Depress 15mm |
| | 1512 | Batt power |
| | 1519 | HO |
| | | Retrieve Kromka 1-0 |
| | | Install Kromka 1 |
| | | Installed thruster plume deflectors on SM |
| | | Install Platan-M |
| | 2036 | Am radio antenna open |
| | 2043 | SKK sample exposure installed |
| | 2053 | Jettison towel? |
| | 2054 | Jettison towel? |
| | 2107? | Ingress |
| | 2118 | HC |
| | 2120 | Repress 40mm |
| | 2121 | Repress 70mm |
| 2002 Aug 16 | | EVA |
| | | Whitson (Orlan-M No. 23) |
| | | Korzun (Orlan-M No. 14) |
| | 0718 | PKhO pressure 714 |
| | 0723 | Begin depress 530 |
| | 0725 | At 350mm, hold |
| | 0727 | At 150mm |
| | 0728:02 | 100mm |
| | 0728:40 | 80mm 107mbar |
| | 0729:06 | 65mm 87mbar |
| | 0729:16 | 60mm 80mbar |
| | 0729:41 | 50mm 67mbar 1.0psi |
| | 0730:16 | 40mm 53mbar |
| | 0730 | 35mm 47mbar depress (JCM) |
| | 0730:54 | 30mm 40mbar |
| | 0732:50 | 15mm (AK) |
| | 0733:10 | 15mm 20mbar 0.4psi |
| | | Hold pressure 5 min |
| | 0738:40 | 16mm |
| | 0740:30 | Battery power |
| | 0743 | Suit O2 problem |
| | 0753 | Repress Pirs |
| | 0800 | Pirs still at 30mm? |
| | 0803 | Repress Pirs at 270 |
| | 0806 | Resume repress from 270 |
| | 0812 | Hold pressure at 554 |
| | | Reconfig Orlan-M O2 valves |
| | 0831 | Leak check |
| | 0849 | 590mm begin leak check |
| | 0859 | Resume depress |
| | 0900 | 390mm |
| | 0902:06 | 170mm |
| | 0902:26 | 160mm |
| | 0902:34 | 150mm |
| | 0903:10 | 130mm |
| | 0903:58 | 100mm |
| | 0904:28 | 80mm |
| | 0905:21 | 60mm |
| | 0905:48 | 50mm |
| | 0906:19 | 40mm |
| | 0906 | Depress (JCM) |
| | 0908:48 | 20mm, EVA mode |
| | 0909:18 | 15mm, hold for 5 min check |
| | 0914 | Check complete |
| | 0915 | Battery power |
| | 0919 | Prep to HO |
| | 0921 | Latches open |
| | 0923 | 4mm |
| | 0925:35 | HO |
| | 0931? | Egress Whitson |
| | 0941? | Egress Korzun |
| | | Attach SMDP debris panels to Zvezda |
| | 1335:08 | Ingress Korzun |
| | 1338 | Ingress Whitson |
| | 1348 | HC |
| | 1351:40 | Begin repress |
| | | 1352 | 60mm |
| 2002 Aug 26 | | EVA Korzun, Treshchev |
| | | Korzun (Orlan-M No. 14) |
| | | Treshchev (Orlan-M No. 12) |
| | 0500 | 400mm |
| | 0505 | 60mm |
| | 0507 | Depress? 25mm |
| | 0509 | 16mm |
| | 0511 | Leak check |
| | 0514 | Battery power |
| | 0527 | HO |
| | 0534 | Tr. Egress |
| | 0543 | Kor. Egress |
| | | Install Zarya storage bin frame |
| | | Change out Japanese sample trays (MPAC SEED) |
| | 0900 | Change out Kromka exposure expt trays |
| | 0930 | Mount ARISS antennas |
| | 1016 | Cleaning towels to wipe contam |
| | 1019? | Jettison cleaning towels |
| | 1039 | Ingress Pirs |
| | 1048 | HC |
| | 1050:21 | Repress |
| | 1051 | 190mm |
| 2004 Feb 26 | | R VKD-9 Orlan 14 (Foale) 23 (Kaleri) |
| | | 1330C Hatches closed to Pirs |
| | 2004? | 1504? Depress begin |
| | 2008 | 1508 5 min break |
| | 2013 | 575 |
| | 2039 | Comm checks |
| | 2045 | Prepare to depress to 15mm |
| | 2048 | At 350 |
| | 2049 | At 185 |
| | 2050 | At 130 |
| | 2052 | At 75 |
| | 2053 | At 55 mm |
| | 2054:15 | At 40 mm |
| | 2054:58 | At 30 mm |
| | 2055? | Begin EVA (JCM criterion) |
| | 2056:53 | 15mm |
| | 2057 | Start 5 min timer |
| | 2102? | Depress fully complete |
| | 2105 | Internal suit power |
| | 2113 | HO go; p = 5mm |
| | 2114 | p = 3 mm |
| | 2115 | p = 0mm; cover open |
| | 2117:07? | HO |
| | 2126? | Egress Foale |
| | 2144 | Egress Kaleri |
| | 2145? | Retrieve SKK No. 1-SO |
| | 2145? | Install SKK No. 2-SO on Pirs |
| | 2300? | Retreive MPAC-SEED No. 1(?) from Zvezda |
| 2310? | Relocate MPAC-SEED No. 2(?) |
| | 2348 | Matroshka install complete |
| | 2357 | MPAC-SEED No. 2(?) reopened in new position |
| 2004 Feb 27 | 0000? | Kaleri suit sublimator problem |
| | 0040 | Decision to end early |
| | 0052 | Ingress Kaleri |
| | 0107 | Ingress Foale |
| | 0109 | Off internal power |
| | 0111 | HC per NASA voice rpt |
| | 0113 | HC official |
| | 0115 | Repress begin |
| | 0115:02 | 30 mm |
| | 0115:08 | 40 mm |
| | 0115:32 | 80mm |
| | 0116 | 170mm |
| | 0117:21 | 250mm |
| | 0125 | 270 mm |
| | 0126 | Off internal power? (AK) |
| | 0136 | 440 mm |
| 2004 Jun 24 | | EVA Padalka M-25, Fincke M-26 |
| | 2132 | Depress begin |
| | 2156? | Depress complete |
| | 2156 | HO |
| | 2200? | Fincke egress |
| | | O2 pressure problem, abort EVA |
| | 2208 | Fincke ingress |
| | 2210 | HC after 14:22 |
| | 2213 | Repress begins |
| | 2213:58 | Repress at 70mm Hg |
| | 2215:07 | At 150 mm Hg |
| | 2236 | Off battery power |
| | 2247 | Repress fully complete |
| 2004 Jun 30 | | |
| | 2057 | Begin depress Pirs |
| | 2100 | 180mm |
| | 2103 | 60 mm |
| | 2104 | 40 mm |
| | 2105 | 26 mm |
| | 2106 | Depress complete at 15mm |
| | 2114 | Battery power |
| | 2119 | VL-1 Hatch open |
| | 2121 | Egress Fincke |
| | 2124 | Egress Padalka |
| | 2210 | Reach Unity |
| | 2225 | Astronauts reach S0 |
| | | Open SPDA to change circuit breaker |
| 2004 Jul 1 | | Orlan EVA-9B |
| | 0033 | Circuit breaker changeout complete |
| | 0114 | Back at PMA-1/FGB, to Russian protocol |
| | 0134 | Padalka back near Pirs |
| | 0145 | Strela retracted, Fincke at Pirs |
| | 0200 | Attach BKDO contam monitor and handrail covers to Pirs |
| | 0251 | Padalka ingress |
| | 0253 | Fincke ingressing |
| | 0259 | Hatch closed |
| | 0300 | Repress 50 mm |
| | 0301 | 70 mm |
| | 0303 | 200mm |
| | 0313 | Off battery power |
| 2004 Aug 3 | | EVA Padalka M-25, Fincke M-26 |
| | 0635 | Begin depress |
| | 0637 | 280 mm |
| | 0641:55 | 40 mm |
| | 0642 | Depress (nominal by JCM rule) |
| | 0642:38 | 30 mm |
| | 0654:30 | 15 mm |
| | 0652 | Battery power |
| | 0658 | HO |
| | 0704 | Fincke egress |
| | 0706 | Padalka egress |
| | | DC1 handrail work |
| | | Replace Kromka-2 tray with Kromka-3 |
| | | Replace SKK cassette on SM |
| | | replace LRRs for ATV on SM |
| | | Install WAS-1/WAS-2 PCE and visual video target |
| | | Remove Platan-M detector |
| | | Ingress with six old LRR, Kromka-2, SKK-2, Platan-M |
| | 1116 | Padalka ingress |
| | 1120 | Fincke ingress |
| | 1128 | Hatch closed |
| | 1129:25 | Begin repress |
| | 1129:57 | 50mm |
| | 1133:40 | 240 mm |
| | 1143 | Off battery power |
| 2004 Sep 3 | | EVA-11 Padalka M-25, Fincke M-26 |
| | 1621:25 | 25mm, Depress |
| | 1637 | Battery power |
| | 1643 | HO |
| | 1647 | Fincke egress |
| | 1651 | Padalka egress |
| | 1729 | RRZh1 flow reg panel removed from Zarya |
| | 1740 | New RRZh1 panel installed |
| | | Eject connector cap |
| | | Installed fairlead FGB safety tethers |
| | 1800? | 17 min motionless test |
| | 1838? | Stow old RRZh1 on Pirs |
| | 1930? | Translate to Zvezda aft, inhibit thrusters |
| | 2000? | Install WAL-1,2,3 ATV antennas |
| | | Removed 5 antenna covers |
| | | Eject WAS antenna covers (2) |
| | 2100? | Eject WAL-1,2,3 antenna covers |
| | | Return to Zvezda forward section |
| | 2110 | Eject cleaning towels |
| | | Return to Pirs |
| | 2132 | Reenable thrusters |
| | | Handrail installations |
| | 2151 | Jettison old PIG pressurized container with RRZh1 |
| | | Jettison 70 kg RRZh-1 flow regular valve panel? |
| | 2152 | Padalka ingress |
| | 2154 | Fincke ingress |
| | 2204 | HC |
| | 2206:35 | Start repress |
| | 2206:56 | 30mm Hg |
| | 2207:17 | 60mm Hg |
| | 2218 | Off battery power |
| 2005 Jan 26 | | EX10 EVA1 |
| | 0725 | Depress to 35mm |
| | 0734 | Batt power |
| | 0741 | Hatch open |
| | 0748 | Chiao egress |
| | 0755 | Sharipov egress |
| | | Install Rokviss and Rokviss antenna |
| | | Install TM/TS box |
| | 0817 | two covers were jettisoned |
| | 0819 | two covers were jettisoned |
| | 0924 | protective cover was ejected |
| | 0944 | cover was jettisoned |
| | 0945 | cover was jettisoned |
| | 0947 | cover was jettisoned |
| | 0956 | cover was jettisoned |
| | 1041 | cover was jettisoned |
| | 1050 | cover was jettisoned |
| | 1051 | cover was jettisoned |
| | 1052 | cover was jettisoned |
| | 1057 | cover was jettisoned |
| | | Inspect Elektron vents |
| | 1258 | Sharipov ingress |
| | 1302 | Chiao ingress |
| | 1311 | Hatch closed |
| | 1313 | Repress |
| | 1313:22 | 50 mm |
| | 1314:04 | 100 mm |
| 2005 Mar 28 | | Russian EVA-13 from Pirs |
| | | Sharipov EV1, Chiao EV2 |
| | 0600 | resume depress |
| | 0602 | 470mm |
| | 0605 | 150mm |
| | 0607 | 65mm |
| | 0609 | JCM depress |
| | 0609 | 25mm |
| | 0610 | 20mm |
| | 0611 | 14mm |
| | 0612 | 5 min final leak check |
| | 0617 | 15mm, ready for HO, batt power |
| | 0624 | 15mm, begin HO |
| | 0625 | 2mm |
| | 0626 | HO |
| | 0632? | Chiao egress |
| | 0830 | Nanosat, 0.30m, 5 kg |
| | | Install ATV-PCE WAL4, 5, 6 antennas on Zvezda |
| | | Install ASN-M (ATV GPS) antenna |
| | 1055 | HC |
| | 1057 | Repress |
| 2005 Aug 18 | | EVA Krikalyov M25, Phillips M27 |
| | 1902? | Depress |
| | 1902 | HO |
| | 1930? | Retrieve Biorisk canister 1 |
| | 2038 | Ejected Matroshka-R cover (Krikalyov) |
| | | Retrieve Matroshka inside ISS |
| | 2350? | ingress |
| 2005 Aug 19 | 0000 | HC |
| | 0002 | Repress |
| | 0003 | 90mm |
| | 0004 | 130mm |
| | 0010 | 253mm, repress complete |
| 2006 Feb 3 | | EVA McArthur Tokarev |
| | 2244 | HO |
| | 2302 | Suitsat ejected |
| | | Relocate Strela grapple fixture from PMA1 (or FGB??) to PMA3 |
| | 2355? | Grapple fixture off PMA1 |
| 2006 Feb 4 | 0010? | On PMA3 |
| | 0024 | At MT |
| | 0050 | Problems adding safing bolt to mobile transporter TUS cable |
| | 0145 | Back near Pirs |
| | 0225 | Retrieve Biorisk experiment from Pirs exterior |
| | 0300 | Photo survey of Zvezda aft |
| | 0345 | Begin return to Pirs |
| | 0359 | Cleaning towels jettisoned |
| | 0406 | At Pirs hatch |
| | 0417 | Ingress |
| | 0427 | HC |
| | 0430 | 20 mm? |
| | 0434? | Repress |
| | 0434 | 260 mm? |
| 2006 Jun 1 | | EVA-16 Vinogradov (25), Williams (26) |
| | 2208 | Pressure 619 |
| | 2219 | 340mm depressing Pirs |
| | 2223 | 5min pause? 65mm |
| | 2225 | Depressed to 35mm |
| | 2226:30 | 26mm? |
| | 2228 | Depressurized 15mm, 5 min interval |
| | 2234 | 13mm |
| | 2236 | Battery power |
| | 2248 | HO |
| | 2250 | AOS, installing protective ring |
| | 2254 | Williams Egress Pirs |
| | 2300 | Vinogradov exit |
| 2006 Jun 2 | | |
| | 0135 | Complete Zvezda work, V. clean suit |
| | | Uncapped Elektron vent outlet |
| | | Photography of WAL2 antenna |
| | | Removed cable slack on WAL3 antenna |
| | | Retrieved BKDO from Pirs, Kromka plate from SM, Biorisk-MSN from Pirs |
| | | BKDO is Plume Impingement and Deposit monitoring unit |
| | 0136 | 1 cleaning towel jettison by V from Zvezda |
| | 0238 | APFR Yakor' adapter comes loose from Strela |
| | 0503 | V. ingress |
| | 0507 | W. Ingress |
| | 0519 | HC |
| | 0521 | Repress |
| | 0522:08 | 40mm |
| | 0536 | Station power |
| 2006 Nov 22 |
| | | EVA Orlan M 25, 27 CDR L-A , FE Tyurin |
| | | Tyurin EV1, L-A EV2 |
| | | Delay with problem in Tyurin cooling line |
| | 2340 | In depress |
| | 2341 | 210 mm |
| | 2342 | 140 |
| | 2343 | 120 |
| | 2346 | "Nearly depressurized" |
| | 2348? | Depress less than 35mm (guess) |
| | 2349 | Depress complete 13mm |
| 2006 Nov 23 |
| | 0006 | Opening hatch |
| | 0008 | Problem opening hatch |
| | 0017 | HO |
| | 0030 | L-A egress before now |
| | 0037 | Tyurin egress before now |
| | 0050 | Preparing for golf shot by Tyurin |
| | 0057 | Golf shot, 3g ball |
| 0130 | Moving to work on Progress stuck antenna at Zvezda aft |
| | | Abandoned work on Progress antenna |
| | 0230 | Moving to work on ATV WAL2 antenna at Zvezda aft |
| | 0320 | Complete WAL2 work |
| | 0330? | Jettison 2 cleaning towels |
| | 0400 | Installing BTN-M1 Neutron experiment on Zvezda PKhO |
| | 0522 | Closing velcro flaps |
| | 0526 | jettison BTN-M1 thermal cover |
| | 0528 | jettison 2 more BTN-M1 thermal covers |
| | 0537 | Tyurin ingress Pirs |
| | 0547 | LA ingress |
| | 0556 | HC |
| | 0559? | Repress |
| | 0601 | 100mm |
| 2007 Feb 22 | | EVA-17A L-A M-25, Tyurin M-27 |
| | | EVA to release stuck Progress antenna |
| | 1027 | HO |
| | 1045 | LA Egress |
| | 1049 | T egress |
| | | Tyurin suit sublimator problems |
| | 1215 | Cutting antenna |
| | 1245 | Antenna retracted |
| | 1406 | Towels jettisoned |
| | 1622 | LA ingress |
| | 1626 | T Ingress |
| | 1645 | HC |
| | 1649 | Repress |
| | 1704 | Pressure at 250mm |
| 2007 May 30 | | |
| | 1836 | Depress in work |
| | 1842 | Begin depress to 15mm Hg |
| | 1853 | Pirs at 13mm Hg |
| | 1859 | Battery power |
| | 1905 | HO |
| | 1913 | Yurch. egress |
| | 1915 | Kotov out |
| | 2015 | Kotov transfer SMDPs with Strela |
| | 2110 | SMDP tree attached to Zvezda |
| | Attach ATV GPS cable |
| | 2340 | Attaching Bundle 4 (5 panels) |
| 2007 May 31 |
| | 0019 | Preparing to ingress |
| | 0022 | Ingress complete |
| | 0030 | HC |
| | 0034 | Repress |
| 2007 Jun 6 | 1423 | HO R-EVA-19 |
| | | Yu, Kotov installed Biorisk |
| | | SMDP installation |
| | 2000 | HC |
| 2008 Jul 10 | | Pirs EVA-20A Volkov, Kononenko |
| | 1725 | Begin depress |
| | 1828 | 45mm |
| | 1829 | Airlock at vac |
| | 1830 | 25 mm |
| | 1832 | 12.5mm |
| | 1844 | 12.5mm |
| | 1848 | Hatch open |
| | 1855 | Kono. egress |
| | 1906 | Volkov egress |
| | 2030 | Kono. on Strela |
| | 2040 | Kono. at Soyuz |
| | 2100 | Kono. cutting into MLI |
| | 2153 | Thruster covers removed |
| | 2240 | Pyro bolt removed |
| | 2358 | Install insulation blankets |
| 2008 Jul 11 |
| | 0005 | Thruster covers jettison |
| | | Thruster cover impacts S1 radiator |
| | 0040 | Strela stowed |
| | 0051 | Prepare for ingress |
| | 0056 | Ingress Volkov |
| | 0058 | Ingress Kono. |
| | 0104 | HC loose |
| | 0106 | HCand latched |
| | 0109 | Repress |
| 2008 Jul 15 | | Pirs EVA-20 |
| | 1640 | Begin depress |
| | 1650? | Depress |
| | 1653 | p=12mm Hg |
| | 1659 | Battery power |
| | 1708 | HO |
| | 1718 | Kono egress |
| | 1726 | Volkov egress |
| | 1746 | MRM-2 docking target installed |
| | | Inspect holes for future antenna |
| | 1833 | Foot restraint relocated |
| | | On GStM-1 Strela boom for photos of docking target |
| | | Install Vsplesk particle flux detector (MIFI/Galper) |
| | | on Zvezda |
| | 2040 | Small debris object released |
| | 2050 | Vsplesk installed |
| | 2146 | MLI cover removed from Vsplesk; jettisoned? |
| | 2230 | Biorisk retrieval |
| | | Amateur radio antenna fix |
| | 2231 | Sergey knocks Zvezda solar array |
| | 2245? | Volkov ingress |
| | 2253 | Ingress Kono |
| | 2302 | HC 5:54 |
| | 2305 | Repress |
| | 2307 | 230 mm |
| | 2322 | Repress continues |
| 2008 Dec 23 | | EVA-21 Lonchakov, Fincke |
| | 0004 | 300mm |
| | 0007 | 220 mm |
| | 0009 | 110 mm |
| | 0010 | 50mm |
| | 0011 | DEPRESS |
| | 0012 | 25mm |
| | 0014 | Depress complete, 13mm |
| | 0021 | 17mm |
| | 0028 | 19.5mm |
| | 0035 | 20.5mm |
| | 0037 | 21mm |
| | 0038 | Suit power |
| | 0043 | 13mm |
| | 0045 | Demate electrical umb |
| | 0047 | 13mm |
| | 0050 | 4mm |
| | 0051 | HO |
| | 0056 | Fincke egress |
| | 0110? | Lonchakov egress |
| | 0120? | Langmuir probe installed on Pirs by Fincke |
| | 0130 | Biorisk removed by Lo. |
| | 0215 | Biorisk and LP complete |
| | 0220 | Working on Zvezda |
| | | Install experiments on Zvezda |
| | 0445 | Connecting cables for Impulse |
| | | IPI-SM install? |
| | | Install Expose-R |
| | 0523 | Expose-R expt failts to activate |
| | 0548 | Remove Expose-R |
| | 0600 | Contam check prior to ingress |
| | 0612? | Lonchakov ingress |
| | 0617 | Fincke ingress |
| | 0621 | Hatch ring removed |
| | 0629 | HC |
| | 0639 | Repress begin |
| | 0639 | 10mm |
| | 0640 | 35mm - REPRESS |
| | 0641 | 110mm |
| 2009 Mar 10 | | EVA R 21A Finche, Lonchakov |
| | 1552 | Pressure = 50mm |
| | 1553 | DEPRESS |
| | 1554 | p = 15mm |
| | 1622 | HO |
| | 1634 | L egress |
| | 1635? | F egress |
| | 1640 | Cut loose Progress/Pirs straps |
| | 1720 | Translate to Expose-R site |
| | 1730 | Install Expose-R |
| | 1845 | Reorient SKK-9 container |
| | 1856 | Photography of station exterior |
| | 2058 | Yuri ingress |
| | 2100 | Fincke ingress |
| | | Time outside 4:04 |
| | 2111 | HC |
| | 2114 | Repress |
| 2009 Jun 5 | | R EVA 22 Padalka, Barratt |
| | | Wakata in SM, others in Zarya node |
| | 0704 | 450mm in depress |
| 0724 | Begin depress |
| | 0725 | 55 mm |
| | 0727 | 35mm - depress |
| | 0729 | Leak check |
| | 0736 | Leak check complete |
| | 0740 | Battery power |
| 0752 | Hatch open |
| | 0757 | Barratt egress |
| | 0800 | Padalka egress |
| | | Install MRM-1 docking equipment |
| | 1231 | Ingress |
| | 1246 | HC |
| | 1250 | Repress under way |
| 2009 Jun 10 | s | R EVA 23 Padalka, Barratt |
| | | Zvezda transfer cpt open to vacuum |
| 2010 Jan 14 | | R EVA 24 Suraev (MK4) Kotov (MK5) |
| | 1005 | HO Pirs VL-1 |
| | | Poisk outfitting |
| | 1200? | MLI bundle jettison |
| | 1410? | MLI bundle jettison |
| | | Biorisk package retrieval |
| | 1542? | Ingress |
| | 1549 | HC |
| | 1552? | Repress |
| 2010 Jul 27 | R EVA 25 Yurchikin MK-4, Kornienko MK-6 |
| | | Installation of new ATV camera |
| | 0304 | At 555 mm |
| | 0310 | Pirs/Zvezda hatch closed |
| | 0322 | Go to depress Pirs to 550 |
| | 0332 | Depress Pirs underway? |
| | 0333 | PKhO at 603 |
| | 0341 | Leak check complete? |
| | 0342 | PKhO at 760 |
| | 0345? | Begin Pirs final depress |
| | 0347 | Pirs 400 |
| | 0348 | Pirs 230 |
| | 0349 | 5 min leak check? |
| | 0350 | Pirs 170 |
| | 0350 | Pirs 130 |
| | 0351 | 90 = 120mbar = 1.7 psi |
| | 0359 | Depress completed? Final leak check |
| | 0403 | Battery power |
| | 0409 | HO prep |
| | 0411 | HO, 5mm |
| | 0422 | Misha egress |
| | 0430 | Yurch. egress |
| | 0448 | Working at Zvezda aft |
| | 0456 | Connector mated to old camera |
| | 0458? | Remove old camera |
| | 0502 | Install new camera |
| | 0508 | Preparing to leave aft |
| | 0514 | In translation to Pirs |
| | 0528? | Bring old Klest-154 video camera back to outside airlock |
| | | Rassvet cabling |
| | 0545 | Cable bundle handle floats free |
| | 0656 | Washer free |
| | 1007 Small debris object released? |
| | 1040 | Yurchikin jettison camera |
| 1042? | Ingress |
| | 1054 | HC |
| | 1058 | repress 70mm in DC1 |
| | 1058 | 100mm in DC1 |
| | 1059 | 150mm |
| | 1100 | 190mm |
| 2010 Nov 15 |
| | 1426? | Depress |
| | 1434 | 20mm |
| | 1437 | 11mm |
| | 1454 | HO |
| | 1501 | Egress Oleg S |
| | 1504? | Egress Yurch. |
| | | URM-D Workstation installed on Zvezda stbd Plane IV |
| | | Kontur robotics epxeriment removed from URM-D on Plane II |
| | | Materials experiment installed on Rassvet |
| | | Sample collection |
| | | Struts added between Rassvet and Zvezda, Zarya |
| | | Gap spanner installed on Pirs |
| | | ? Skripochka temporarily untethered and floats away |
| | | SKK 1-M2 cassette installed on Poisk |
| | | Docking camera removed from Rassvet |
| | 2035 | Failed to reinstall camera on Rassvet |
| | | Camera brought inside |
| | 2109 | EV2 ingress |
| | 2122 | HC |
| | 2126? | Repress |
| 2011 Jan 21 |
| | | Kondratev, Skripochka |
| | 1405 | depressing p = 80 |
| | 1406 | p = 50 |
| | 1409? | p=35 (guess) |
| | 1417 | Pressure check ok |
| | 1420 | Demating umbilicals |
| | 1421 | p = 39 |
| | 1425 | hatch seal opened |
| | 1429 | HO |
| | 1435? | Egress |
| | 1530? | Install SVPI unit on Zvezda MPAC-SEED frame |
| | 1653 | Cable reel jettison |
| | 1654 | Antenna cover jettison |
| | | Install camera on Rassvet |
| | 1932 | Ingress |
| | 1952 | HC |
| 2011 Feb 16 |
| | | EVA Skripocka, Kondratev |
| | 1312 | 10 psi |
| | 1330 | HO |
| | 1340? | Egress |
| | 1400? | Installation of Molniya-Gamma |
| | 1600 | Installation of RK-21-8 SVCh-Radiometria |
| | 1654 | Jettison Yakor (Ferrozond) foot restraint |
| | | Retrieve Komplast MLI panels 2 and 10 |
| | 1815? | Ingress |
| | 1821 | HC after 4:51 |
| 2011 Aug 3 | | REVA 29 Volkov, Samokutyaev |
| | 1423 | At 101 mm |
| | 1433 | Final stage depress |
| | 1435 | At 12 mm, start leak check |
| | 1447 | At 11.5mm |
| | 1450 | Pirs hatch open |
| | 1501 | Take Radioskaf outside, attached to ladder |
| | 1503 | Remove Radioskaf solar panel covers |
| | 1509 | Samok. egress |
| | | Volkov egress (by 1515?) |
| | 1515 | Radioskaf ARISSSAT activated |
| | 1520 | Prepare Radioskaf, review broken antenna |
| | 1610? | Install BTLS-N lasercom terminal on SM |
| | 1705? | Jettison lasercom MLI cover |
| | 1730? | Photography of ATV WAL6 |
| | 1843 | Deploy Radioskaf-V |
| | | Removed AO-VKA from SM |
| | | Strela-1 relocation cancelled |
| | | Biorisk-MSN carried outside |
| | | Biorisk-MSN installed on Pirs |
| | | External photography |
| | 2104 | Ingress |
| | 2113 | HC 6:23 |
| 2012 Feb 13 |
| | | DPP (debris panel package) stacks in DC1 |
| | | EVA ladder struts, Vinoslivost in DC1 |
| 2012 Feb 16 | | REVA-30 Kononenko, Shkaplerov |
| | | Pettit, Kuipers in TMA-03M |
| | | Burbank, Ivanishin in TMA-22 |
| | 1408 | 25mm Hg, depress |
| | 1412 | Pirs depress complete |
| | 1417 | On suit power |
| | 1431 | HO |
| | 1618 | Small debris object floats away |
| | 1624 | Strela-2 connected to Strela-1 |
| | 1635 | Removed foot restraint from Strela-1 and stowed |
| | 1640 | Strela-1 removed from Pirs |
| | 1644 | Strela-2 moving, taking Strela-1 away from Pirs |
| | 1710 | Strela-2 motion stopped for night pass |
| | 1733 | Resumed |
| | 1743 | Moving cover into position |
| | 1814 | Strela-1 installed on Poisk baseplate |
| | 1835 | Discussing jettison |
| | 1850 | Vinoslivost (2 panels) installed on Poisk handrails 6007 and 6015 |
| | 1904 | Jettison Strela Poisk-baseplate MLI cover |
| | 1918 | Closing up Strela-2 and equipment |
| | 1955 | At Pirs to get Test equipment for samples |
| | 2008 | On Zvezda for Test sampling |
| | 2028? | Ingress |
| | 2046 | HC, 6:15 |
| | 2049 | Repress begins |
| 2012 Aug 20 | | REVA VKD-31 Padalka MK5/BRTA-7, Malenchenko MK6/BRTA-9 |
| | 1513 | Depress Pirs, 90mm |
| | 1520 | Pirs at 10mm Hg |
| | 1537 | HO Pirs |
| | | GStM-2 crane from Pirs to Zarya |
| | | GStM-2 attached to end of GStM-1 |
| | 1632 | GStM-2 unberthed from Pirs |
| | | EVs detach GStM-2 from GStM-1 |
| | 1738 | EVs install GStM-2 on Zarya |
| | | GStM-1 attached to Pirs as translation aid |
| | | SKK cassette retrieval attempted but abandoned |
| | 1818 | Sfera and holder extracted from Pirs |
| | 1829 | 10 kg 0.53m Sfera-53 satellite deployed from Pirs |
| | 1834 | Retrieve SMDP shields from Prs |
| | 1842 | Install SMDP shields on Zvezda |
| | 1907 | Panel 28 installed |
| | 1908 | Panel 27 installed |
| | 1926 | Panel 24 installed |
| | 1935 | Panel 25 installed |
| | 1948 | Panel 26 installed |
| | 2013 | Biorisk canister retreived by Padalka |
| | 2016? | Returned to Pirs |
| | 2031 | Ladder strut 1 installation |
| | 2040 | Ladder strut 2 installation |
| | | Inventory |
| | 2053 | Sfera deployer brought inside? |
| | 2110 | Ingress Padalka |
| | 2113 | Ingress Malench. |
| | 2128 | HC |
| | 2133 | Repress |
| 2013 Apr 19 | | REVA VKD-32 Romanenko, Vinogradov |
| | 1342 | Begin depress |
| | 1403 | Hatch open Pirs |
| | 1410? | Romanenko egress |
| | 1415? | Vinogradov egress |
| | | Obst. data collection box PVK-1 installed |
| | 1527 | Obst. data collection box PVK-2 installed |
| | 1612 | Translate to Zvezda aft |
| | 1625 | New retroreflector out of tool bag |
| | 1630? | Removed old ATV reflector |
| | 1634 | Installed ATV reflector |
| | 1655 | Returned old ATV reflector to Pirs |
| | 1719 | Towels jettisoned |
| | 1719 | Obst. cable reel jettisoned |
| | 1741 | Begin to install Obst. probes on boxes |
| | 1744 | First probe installed |
| | 1840 | Second probe installed |
| | | Deploy probe booms |
| | | Fix connectors on probe 1 |
| | 1903 | Obstanovka probe container 1 jett |
| | 1906 | Obstanovka probe container 2 jett |
| | 1926 | Booms both deployed |
| | 1940? | Biorisk retrieved |
| | 2005 | Translate to Poisk |
| | 2015? | Unberth Vinoslivost panel |
| | 2016 | Vinoslivost panel lost, floats away |
| | 2028 | Ingress Pirs |
| | 2041 | HC 6:38 |
| | 2044 | Repressing at 90 mm |
| 2013 Jun 24 |
| | | REVA-33 |
| | | Yurchikin (MK5), Misurkin (MK6) |
| | 1314 | Depress |
| | 1332 | HO |
| | 1338 | Misurkin egress |
| | 1342 | Yurchikin egress |
| | 1351 | Reached Strela |
| | 1440 | Attach Kurs connectors for Nauka for test |
| | | Translate to middle of Zarya |
| | 1456 | Container open |
| | 1459 | Remove old pump |
| | 1503 | New pump out of container, installed |
| | 1508 | Old pump in container |
| | 1600 | Install Nauka cable clamps on Zarya |
| | 1700 | Small item floated away (label?) |
| | 1715 | Still working on Zarya cabling |
| | 1805 | 77KM 3572-0-01 container back inside Pirs |
| | 1817 | Heading to Poisk on Strela-1? |
| | | Strela-1 boom to Poisk to put in Kontrol experiment Indikator-MKS |
| | 1830? | Indikator truss on Poisk |
| | 1838 | Remove vinoslivost panel from Poisk |
| | 1900 | Returned to Pirs, stow panel |
| | 1910 | Move to Zvezda, install handrail gap spanners |
| | 1916 | Demating Photon-gamma connectors |
| | 1920? | Foton-Gamma unberthed |
| | 1933 | Still working on gap spanners |
| | 1940 | Wrapping up |
| | 1945? | Ingress |
| | 1952 | Both inside |
| | 2006 | HC |
| | 2009 | Repress |
| | 2019 | 261mm |
| 2013 Aug 16 | REVA 34 |
| | | Yurchikin, Misurkin |
| | 1410 | 50mm Hg |
| | 1429 | 10mm |
| | 1429 | Batt power |
| | 1436 | HO |
| | 1444 | Misurkin out |
| | 1446 | Bring out ethernet cable |
| | 1448 | egress with UECC (Universal EVA Cable Carrier) |
| | 1452 | Egress Yurchikin |
| | 1525 | Strela-1 moving |
| | 1554 | Install Vinovlivost Panel 2 on Poisk |
| | 1608 | SES-1 connector panel installed |
| | 1628 | Install connectors and gap spanners between Zarya/Poisk, Zvezda/Poisk |
| | | Routing ethernet cables for MLM |
| | 1930 | More cable installation |
| | 2138 | Strela work complete |
| | 2151 | Preparing to return to Pirs |
| | 2153? | Ingress |
| | 2201 | Remove prot cover? |
| | 2204 | Reopen hatch? |
| | 2205 | Go for close |
| | 2208 | Repress |
| 2013 Aug 22 |
| | | REVA-35 |
| | | Yurchikin MK4, Misurkin |
| | 1110? | Depress |
| | 1115 | 13mm, final leak check |
| | 1120 | '3 min on the timer' |
| | 1134 | HO |
| | 1140 | Misurkin egress |
| | 1144? | Yurchikin egress |
| | 1213 | Cover BTLS-N, preparing to remove it |
| | 1240 | BTLS-N removal? |
| | | Temp stow nearby |
| | 1315 | DPN/VRM installation abandoned, will bring in |
| | 1330? | DPN/VRM back in |
| | 1400 | Inspecting WAL covers |
| | 1420? | Retrieved DPN/VRM from Pirs |
| | 1440 | Reinstalled DPN/VRM on URM-D |
| | 1500 | Completing DPN/VRM install |
| | 1535 | Return to Zvezda aft |
| | 1540 | Tighten WAL antenna covers |
| | 1617 | Working on gap spanners |
| | 1700? | TEST samples |
| | 1715 | Completed Russian flag waving |
| | | Prep for ingress |
| | 1720 | Ingress |
| | 1730? | Ingress complete? |
| | 1732:55? | HC |
| | 1735 | 30mm |
| | 1737 | 180 |
| | | Repress |
| 2013 Nov 9 |
| | 1340 | Begin depress |
| | 1351 | Leak check PKhO |
| | 1408 | Depress |
| | 1413 | 100mm |
| | 1415 | 50mm |
| | 1416 | 40 |
| | 1417 | Depress |
| | 1418 | 25 |
| | 1434 | Equalize pressure to outside |
| | 1434 | HO |
| | 1438 | Ryaz egress |
| | 1451 | Kotov egress with Olympic torch |
| | 1514 | Torch handover ceremony |
| | 1635 | Torch and GoPro camera restowed |
| | 1730 | Removing bolts from DPN |
| | | RK-21 experiment disconnnected but not stowed |
| | 1800? | Remove Yakor platform |
| | | Fail to close up RK-21 panels |
| | | Bring Yakor inside |
| | 2009 | Ingress |
| | 2024 | HC |
| | 2027 | Repress |
| 2013 Dec 27 | | VKD37 EVA Kotov, Ryazanskiy |
| | 1238 | Begin depress |
| | 1250 | 12mm Hg |
| | 1301 | HO |
| | 1305 | Egress |
| | 1330 | Install Yakor foot restraint |
| | 1350 | Installed HRC |
| | 1400 | Removed HRC lens cover |
| | 1404 | Remove ingress aid from Yakor |
| | 1405 | Returning to Pirs w cover and ingress aid |
| | 1425? | From Pirs to SM with MRC and CL bag |
| | 1500 | Installing MRC |
| | 1515 | MRC installed |
| | 1540 | Removed MRC cover, to CLB |
| | | Cabling HRC/MRC along SM |
| | 1620 | Searching for electrical connector |
| | 1640 | Completed connectors |
| | 1646 | Jettison MRC cable reel |
| | 1700 | Oleg to AL to get Seismoprog and PR boom |
| | 1708 | Sergey working cables? |
| | | Sergey to Vsplesk |
| | 1754 | Vsplesk removed and jettisoned |
| | 1800 | Install Seismoprognoz |
| | 1811 | Complete Seismoprognoz electrical connections |
| | 1815 | Abort UrtheCast |
| | 1820 | Deploy Seismoprognoz antenna |
| | 1917 | Reconnect MRC? lens cover |
| | 1930 | Remove MRC camera? |
| | 1943 | MRC in airlock |
| | 2005 | HRC lens cover back on |
| | 2018 | Removed HRC |
| | 2026 | Back at Pirs |
| | 2050 | HRC inside |
| | 2056 | Ingress Kotov |
| | 2100? | Towel jettison? |
| | 2100? | Ingress Ryazinskiy |
| | 2107 | HC 8:06 |
| | 2109? | Repress |
| | 2110 | 110mm |
| 2014 Jan 27 | 1355? | Depress |
| | 1400 | HO | 92.91 414 x 419 x 51.65 |
| | 1405? | Ryazanskiy egress |
| | 1408 | Kotov sublimator issue, fixed |
| | 1410 | Working on foot restraint |
| | 1442 | HRC camera out of AL |
| | 1459 | Attaching HRC |
| | 1502 | HRC attach complete |
| | 1615 | Towel jettisoned |
| | 1617 | Towel jettisoned |
| | 1622 | HRC lens cover off |
| | 1628 | Lens cover back in AL |
| | 1700 | MRC attached |
| | | MRC connection issue |
| | 1755 | Working FGB PDGF WIF adapter removal |
| | 1820 | Working MRC connectors |
| | 1840 | Removing SKK-2 from Pirs |
| | 1843 | SKK-2 inside airlock |
| | 1930 | Towel jettison, Ryazanskiy |
| | 1952 | Prep for ingress |
| | 1957 | Ingress |
| | 2008 | go for HC |
| | 2008 | HC |
| | 2012 | Repress |
| 2014 Jun 19 | | VKD-38 Svkortsov, Artemev |
| | 1345 | Depress, 35mm |
| | 1354 | Batt power |
| | 1410 | HO |
| | 1645 | AFAR active phased array antenna installed on Zvezda |
| | 1720 | Working on Obstanovka |
| | 1755 | Completed moving Obstanovka PBK-2 |
| | 1758 | Checking URM-D |
| | 1908 | Install payload boom |
| | 1925 | Attach TM/TS to payload boom |
| | 1930 | Attach SVPI to boom |
| | 1935 | Working on removing carrier frame |
| | 2027 | Removed frame |
| | 2031 | Jettisoned frame |
| | 2107 | Jettisoned 2 cleaning towels |
| | 2117 | Svkortsov ingress |
| | 2121 | Artemev ingress |
| | 2133 | HC, 7:23 |
| | 2140 | Repress |
| 2014 Aug 18 | 1335 | 50mm |
| | | VKD-39 Skvortsov, Artemev |
| | 1340 | Depress 35mm |
| | 1350 | Battery power |
| | 1402 | HO |
| | 1423 | Jettison Chasqui-1 |
| | 1453 | Install EXPOSE-R2 on URM-D-II Zvezda |
| | 1542 | Install clamp on AFAR handrail |
| | 1627 | Test sample from SM window 13 |
| | 1627 | Return to Pirs |
| | 1639 | Retrieve SKK, BKDO from Pirs |
| | 1645 | Translate to Poisk |
| | 1701 | At Poisk |
| | 1720 | Remove Vinoslivost Panel 2a (installed Aug 2013) |
| | 1722 | Insall BKDO plume impingement monitor |
| | 1740 | Resecuring BKDO |
| | 1755? | Remove SKK-1-M2 |
| | 1803? | Install SKK-2-M2 |
| | 1832 | Vinoslivost and SKK inside Pirs |
| | 1836? | Skvortsov ingress |
| | 1845 | Removed Biorisk canister |
| | 1851 | Biorisk inside |
| | 1858 | Artemev ingress |
| | 1913 | HC |
| | 1916? | Repress |
| 2014 Oct 22 | | VKD-40 Suraev MK-5, Samokutyaev MK-6 |
| | | |
| | 1322 | Depress complete |
| | 1328 | HO |
| | 1330? | Samo. out |
| | 1335 | Suraev out |
| | | To URM for Radiometriya expt |
| | 1359 | Removed RK-21-8 Radiometriya |
| | 1401 | Jettison Radiom., 94 kg 1.4 x 1.9m |
| | 1410? | Remove Expose-R cover |
| | | Photos of Expose-R |
| | | Back to Pirs |
| | 1424? | Stow Expose-R cover in Pirs, retrieve TES |
| | | On Strela to MRM-2 Poisk |
| | 1500 | Working on antennas |
| | 1505 | Cut off Kurs-P antenna no. 1 on MRM-2, 0.6m |
| | 1530 | Remove Kurs-P No. 2 antenna from Poisk |
| | 1544 | Up to Strela-1 platform, jettison Kurs No 1 anten |
| | 1548 | and 2 antenna |
| | | Back to Pirs |
| | 1654? | Suraev ingress |
| | 1656? | Samo ingress |
| | 1706 | HC 3:38 |
| | 1708 | Repress |
| 2015 Aug 10 | | VKD-41 Padalka, Kornienko |
| | 1410? | Depress |
| | 1417 | HO |
| | 1500 | Cleaned SM window |
| | 1515 | Installed gap spanner handrail, Zvezda |
| | 1525 | Installed WAL1/2 cover retainers |
| | 1530? | Installed WAL3 cover retainer |
| | 1542 | Jettison cleaning towels (2) |
| | 1554 | Retrieve DP-PM PVK-1 experiment from Obstanovka |
| | 1607 | Photo doc of Expose-R |
| | 1615 | Perform TEST experiment on vents |
| | 1645? | Back to Pirs to get new WAL6 |
| | 1715 | Translating to Zvezda |
| | 1722 | Working on WAL6 |
| | | Install cabling |
| | 1825? | Remove old WAL6 |
| | 1835? | Install new WAL6 |
| | 1855 | Working near Poisk |
| | 1907 | Repositioned plume device |
| | 1925 | Stowing toolbag |
| | 1930 | Jettison old WAL6 |
| | 1943 | Ingress Padalka |
| | 1945? | Ingress Kornienko |
| | 1951 | HC |
| | 1957 | Repress |
| 2016 Feb 3 | | VKD-42 Malenchenko, Volkov (4,6) |
| | | Depress |
| | 1255 | Hatch open |
| | 1322 | Flash drive with 70th anniv. WWII videos jettisoned |
| | 1400? | Expose-R removed |
| | 1440? | Expose-R in airlock |
| | | Translate to Poisk |
| | | Remove SKK 2-M2 |
| | | Install SKK 3-M2 |
| | | Install 2 Vinoslivost panels |
| | | Install gap spanners or Zarya |
| | | Test 'Registratisya' tape-roller surface repair kit |
| | Install Restauratisya? |
| | 1730 | Ingress |
| | 1740 | HC |
| 2017 Aug 17 | | VKD-43 Yurchikin (MKS 4), Ryazanskiy (MK 6) |
| | 1416 | Pressure 130 mbar |
| | 1418 | Pressure 27 mbar |
| | 1436 | Open Pirs |
| | 1445? | Egress |
| | 1454 | Retrieve Restauratsiya plates |
| | 1454 | Rest. inside Pirs |
| | 1455? | Retrieve satellites |
| | | E+1:03 Release satellites |
| | 1510 | Deploy Tomsk |
| | 1515 | Deploy Tanushka 1 |
| | 1516 | Deploy Tanushka 2 |
| | 1521 | Deploy TNS-0 |
| | 1529 | Deploy TS-530 Zerkalo |
| | 1535 | Return deploy hardware to Pirs |
| | 1600? | Images of SKK 9 package |
| | 1652 | Install Impakt package at aft end of SM |
| | 1730? | Jettison cleaning towels |
| | | Test experiment |
| | 1800 | Working at Poisk |
| | 1855 | Rotated BKDO experiment |
| | 2020 | Installed adapter with thermal sensors |
| | 2028 | Removed adapter cover |
| | 2050 | Return hardware to Pirs |
| | | Get more Test cassettes |
| | 2115 | Test work on Pirs exterior |
| | 2151 | Both still outside |
| | 2152? | Yurchikin inside |
| | 2210 | Hatch closed |
| | 2216? | Repress |
| | 2218 | 190mm |
| 2018 Feb 2 | | VKD44 Misurkin (MKS4), Shkaplerov (MK6) |
| | 1507 | 115mm hg |
| | 1509 | 75 mm hg |
| | 1509 | 60mm |
| | 1511 | Depress |
| | 1511 | 27mm? |
| | | New ONA HF receiver box 27 kg? 0.6 x 0.4 x 0.3m |
| | 1520 | 11mm |
| | 1522 | Battery power |
| | 1534:35 | HO |
| | 1545 | Misurkin egress |
| | 1547? | Skhaplerov egress? |
| | 1700? | Rotate Lira antenna |
| | 1710 | Begin work on removing old receiver box |
| | 1756 | Removed thermal blankets |
| | 1935 | Remove old box |
| | 1941 | Jettison old box |
| | 2030 | New box installed |
| | 2054 | Complete installation of HF box |
| | | Working on LF system? |
| | | Unlock and rotate antenna back to op position |
| | 2200 | ONA rotating, snags on ATV target |
| | | ONA manually released |
| | 2220 | ONA still sticking |
| | 2240 | ONA returned to operational position |
| | 2250 | Begin return toward Pirs |
| | 2307 | 'Holding bundle' |
| | 2319 | Poisk/ISS hatch closed to isolate Acaba/Vandehei |
| | 2325 | Shkaplerov ingress |
| | 2327 | Misurkin ingress |
| | 2347 | HC |
| | 2353 | Repress |