2001-041
The Energiya SO-1, called DC1 (Docking Compartment 1) in US documents, is similar to the 316GK SO built for Mir/Kristall but includes an airlock. It is based on the Buran and Mir-2 docking unit. It would be launched with a Progress-M PAO (11F615A55 No. 301). Mass is 3676 kg. SO is mission 4R, launched with Strela. Designation is 240GK No. 1L. Shape is sphere+cylinder? 4.05l and 2.55m dia. The SO's PAO is called CVM (Cargo Vehicle Module) in English and GKM (Gruzovoy korabl'-modul') in Russian. In Russian it is the Progress M-SO1 mission. Pic NK2000-06.53
Launch mass is 7130 kg including 875 kg of fuel. M-SO1 carries 800 kg of cargo.
SO was named Pirs ("Pier") in mid-2001.
Mass breakdown:
| Component | Mass | Total |
| SO-1 Pirs (empty) | 2882 | |
| SO-1 science cargo | 78 | |
| SO-1 equipment cargo | 417 | |
| SO-1 EVA equipment | 286 | |
| Cargo for Zvezda | 13 | |
| SO-1 Pirs | 3676 | |
| PAO (empty) | 2579 | |
| PAO fuel | 875 | |
| PAO | 3454 | |
| Progress M-SO1 | 7130 | |
By Sep 2001, three Orlan-M were aboard ISS. Two flew on STS-106; one arrived on Pirs. Orlan-M empty mass is 110 kg, compared to 136 kg for a SAFER-less EMU.
EVA in Jan 2005. UWP Univ Work Platform, with ROkviss payload TOol carrier with Rokviss antenna; UWP/Rokviss installed on SM Rokviss antenna mounted on MPEC-SEEDS experiment mount. then Biorisk experiment, 3 cans in unit to outside of Pirs.
On the Mar 2005 EVA-13, the Ex10 crew carreied out a WAL antenna bundle; Install GPS antenna; Deploy nanosat. WAL antenna covers and Towels to jettison, less than 0.1 kg each Connector covers reenter after about 1 month in orbit.
In 2008 Dec, EVA-21, the crew were to install a Langmuir probe on Pirs, the EXPOSE-R and IPI-SM (Impuls) experiments on Zvezda, and retrieve Biorisk-MSN container 2 from Pirs. The astronauts were also to test out a Seiko wristwatch for a promotional venture.
In Jun 2009, Orlan-M No. 26 was stored in the TMA-14 BO while a decision was made on whether to deorbit it with M-02M. Orlan-M No. 27 was to be converted into RadioSkaf-2. But in the end both suits were discarded aboard M-02M.
VKD-41. The astronauts installed handrails on Zvezda, cleaned a Zvezda window, and installed a new WAL6 antenna to replace the old one whose cover floated off on 2013 Aug 19. New retaining straps were added to the other WAL antenna covers. The old WAL-6 antenna was jettisoned into orbit as catalog 40812; two decontamination towels were also jettisoned, and were not cataloged. The Obstanovka DP-PM PVK-1 plasma wave complex was retrieved.
VKD-42. The flash drive (fleshka) was jettisoned in a bag with towels to provide drag and wrapped in a bow. It contained commemorative materials to celebrate the 70th anniversary of Russia's Victory Day (World War II).
| Pirs | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2001 Sep 14 | 2334:55 | Launch by Soyuz-U No 677 | |
| T+1:58 Blok BVGD sep | |||
| T+2:37 GO sep | |||
| T+4:47 St 2 sep | |||
| T+5:01 KhO sep | |||
| T+8:45 Blok I MECO | |||
| 2343:44 | T+8:49 Blok-I sep | 88.0? 170 x 180 x 51.6 | |
| 2001 Sep 15 | 0320:57 | DV1A 47s 18.4m/s | |
| 0358:02 | DV1B 9.6m/s 25s | ||
| 2001 Sep 16 | 0029:47 | DV2 6.3s 2.0m/s | |
| 1153 | 89.55 239 x 265 x 51.6 | ||
| 2001 Sep 16 | 2230 | Begin auto docking sequence | |
| 2255 | DV3A Burn 26m/s | ||
| 2301 | 89.53 238 x 264 x 51.6 | ||
| 2318 | DV3B Burn 1m/s | ||
| 2341 | MC1 Burn 43 m/s | ||
| 2001 Sep 17 | 0026 | MC2 Burn 7m/s | |
| 0032 | MC3 Burn 5m/s | ||
| 0034 | MC4 Burn 1.5m/s | ||
| 2001 Sep 17 | 0038 | At 200m, begin flyaround | |
| 0045 | At 165m, stationkeep below Zvezda | ||
| 2001 Sep 17 | 0105:14 | Docked with Zvezda nadir | |
| 92.36 385 x 395 x 51.6 | |||
| HO to ISS | |||
| 2001 Sep 26 | 1536 | Progress Undock | |
| Progress sep burn | |||
| Progress at range 24 km | |||
| 2330 | Progress deorbit 609.8s 102.3m/s | ||
| 2001 Sep 27 | 0009 | Reentry over Pacific | |
| 0019 | Debris impact | ||
| 2001 Oct 8 | EVA-1 Dezhurov, Tyurin | ||
| 1410? | Batt power | ||
| 1420? | Depress Pirs and Zvezda SO | ||
| 1423 | HO | ||
| 1433 | Egress Tyurin | ||
| 1440? | Egress Dezhurov | ||
| 1600 | Strela installation on Pirs | ||
| 1710 | Jettison Pirs hatch thermal covers | ||
| Install EVA ladder | |||
| 1909 | Ingress Dezhurov | ||
| 1911 | Ingress Tyurin | ||
| 1916 | HC attempt, problem closing | ||
| 1921 | HC | ||
| 1926 | Repress | ||
| 1932? | Off power | ||
| 2001 Oct 15 | 0903 | Depress complete to 0.02bar | |
| 0916 | Opening hatch valve, full depress | ||
| 0917 | HO EVA-2 Dezhurov, Tyurin | ||
| 0922 | Hatch ring installed | ||
| 0925 | Egress Tyurin | ||
| 0929? | Egress Dezhurov | ||
| Attach Kromka contamination expt to Zvezda | |||
| 1200 | Working at SM rear | ||
| Attach MPAC-SEED capture device | |||
| Attach SEED exposure device | |||
| Replace Russian flag with Kodak sign | |||
| 1445 | Ingress | ||
| 1457 | First attempt to close hatch | ||
| 1509 | Hatch closed | ||
| 1510 | Repress | ||
| 2001 Oct 19 | |||
| 1048 | Soyuz Undock from Zarya | ||
| 1058 | Begin lateral move | ||
| 1102 | Approach | ||
| 1104 | Dock with Pirs | ||
| 2001 Nov 12 | EVA-3 Culbertson, Dezhurov | ||
| 1950 | Airlock leack check complete | ||
| 2127 | Depress to 35mm | ||
| 2135 | Battery power | ||
| 2140 | 10mm, 5mm | ||
| 2141 | HO | ||
| 2147 | Egress Culbertson EV2 | ||
| 2155? | Egress Dezhurov EV1 | ||
| Complete electrical connection to Pirs | |||
| Complete Kurs installation | |||
| Inspect Zvezda panel | |||
| 2001 Nov 13 | 0235? | Ingress | |
| 0245 | HC | ||
| 0250? | Repress | ||
| 0253 | In repress, 100mm? | ||
| 2001 Dec 2 | Fabricate hook tool to remove Progress debris | ||
| 2001 Dec 3 | EVA-4 Dezhurov, Tyurin | ||
| 1304:30 | 35mm (AK) | ||
| 1307 | At 15mm, leak check start | ||
| 1312 | At 14mm, end of leak check | ||
| 1314 | Battery power | ||
| 1319 | 10mm, prepare for HO | ||
| 1320 | HO | ||
| 1327 | Egress | ||
| 1330? | Egress Tyurin | ||
| 1440 | EV crew identify rubber seal around docking ring | ||
| 1453 | Seal removed | ||
| 1454 | Progress hard dock | ||
| 1540 | Ingress in prep; begin decontam | ||
| 1557 | Ingress EV1 Dezhurov | ||
| 1559 | Ingress EV2 Tyurin | ||
| 1606 | HC | ||
| 1608 | Prep for repress | ||
| 1609 | Repressurizing; end of EVA | ||
| 1610 | At 100mm in airlock | ||
| 1622? | Off power | ||
| 2002 Jan 14 | EX-4 EVA-1 (EVA-6) | ||
| 2041 | 110 mm depress | ||
| 2045 | 20mm depress | ||
| 2052 | Batt power | ||
| 2059 | HO | ||
| 2110? | Egress | ||
| Relocate Strela-2 from PMA-1 to Pirs | |||
| 2130 | Working on Strela-1 boom | ||
| 2002 Jan 15 | 0031 | Strela-2 installed | |
| 0200 | Installing SAREX antenna | ||
| 0245 | Returning to Pirs | ||
| 0254 | Discard Orlan gloves and wipedown towels | ||
| 0255 | Ingress | ||
| 0302 | HC | ||
| 0303? | Repress | ||
| 0304? | Above 35 mm Hg? | ||
| 0305 | p=90 | ||
| 0306 | p=150 | ||
| 0312 | Station power | ||
| 2002 Jan 25 | EX-4 EVA-2 | ||
| 1457:25 | Depress 90mm | ||
| 1502? | Adopt depress | ||
| 1502:40 | Depress 15mm | ||
| 1512 | Batt power | ||
| 1519 | HO | ||
| Retrieve Kromka 1-0 | |||
| Install Kromka 1 | |||
| Installed thruster plume deflectors on SM | |||
| Install Platan-M | |||
| 2036 | Am radio antenna open | ||
| 2043 | SKK sample exposure installed | ||
| 2053 | Jettison towel? | ||
| 2054 | Jettison towel? | ||
| 2107? | Ingress | ||
| 2118 | HC | ||
| 2120 | Repress 40mm | ||
| 2121 | Repress 70mm | ||
| 2002 Aug 16 | EVA | ||
| Whitson (Orlan-M No. 23) | |||
| Korzun (Orlan-M No. 14) | |||
| 0718 | PKhO pressure 714 | ||
| 0723 | Begin depress 530 | ||
| 0725 | At 350mm, hold | ||
| 0727 | At 150mm | ||
| 0728:02 | 100mm | ||
| 0728:40 | 80mm 107mbar | ||
| 0729:06 | 65mm 87mbar | ||
| 0729:16 | 60mm 80mbar | ||
| 0729:41 | 50mm 67mbar 1.0psi | ||
| 0730:16 | 40mm 53mbar | ||
| 0730 | 35mm 47mbar depress (JCM) | ||
| 0730:54 | 30mm 40mbar | ||
| 0732:50 | 15mm (AK) | ||
| 0733:10 | 15mm 20mbar 0.4psi | ||
| Hold pressure 5 min | |||
| 0738:40 | 16mm | ||
| 0740:30 | Battery power | ||
| 0743 | Suit O2 problem | ||
| 0753 | Repress Pirs | ||
| 0800 | Pirs still at 30mm? | ||
| 0803 | Repress Pirs at 270 | ||
| 0806 | Resume repress from 270 | ||
| 0812 | Hold pressure at 554 | ||
| Reconfig Orlan-M O2 valves | |||
| 0831 | Leak check | ||
| 0849 | 590mm begin leak check | ||
| 0859 | Resume depress | ||
| 0900 | 390mm | ||
| 0902:06 | 170mm | ||
| 0902:26 | 160mm | ||
| 0902:34 | 150mm | ||
| 0903:10 | 130mm | ||
| 0903:58 | 100mm | ||
| 0904:28 | 80mm | ||
| 0905:21 | 60mm | ||
| 0905:48 | 50mm | ||
| 0906:19 | 40mm | ||
| 0906 | Depress (JCM) | ||
| 0908:48 | 20mm, EVA mode | ||
| 0909:18 | 15mm, hold for 5 min check | ||
| 0914 | Check complete | ||
| 0915 | Battery power | ||
| 0919 | Prep to HO | ||
| 0921 | Latches open | ||
| 0923 | 4mm | ||
| 0925:35 | HO | ||
| 0931? | Egress Whitson | ||
| 0941? | Egress Korzun | ||
| Attach SMDP debris panels to Zvezda | |||
| 1335:08 | Ingress Korzun | ||
| 1338 | Ingress Whitson | ||
| 1348 | HC | ||
| 1351:40 | Begin repress | ||
| 1352 | 60mm | ||
| 2002 Aug 26 | EVA Korzun, Treshchev | ||
| Korzun (Orlan-M No. 14) | |||
| Treshchev (Orlan-M No. 12) | |||
| 0500 | 400mm | ||
| 0505 | 60mm | ||
| 0507 | Depress? 25mm | ||
| 0509 | 16mm | ||
| 0511 | Leak check | ||
| 0514 | Battery power | ||
| 0527 | HO | ||
| 0534 | Tr. Egress | ||
| 0543 | Kor. Egress | ||
| Install Zarya storage bin frame | |||
| Change out Japanese sample trays (MPAC SEED) | |||
| 0900 | Change out Kromka exposure expt trays | ||
| 0930 | Mount ARISS antennas | ||
| 1016 | Cleaning towels to wipe contam | ||
| 1019? | Jettison cleaning towels | ||
| 1039 | Ingress Pirs | ||
| 1048 | HC | ||
| 1050:21 | Repress | ||
| 1051 | 190mm | ||
| 2004 Feb 26 | R VKD-9 Orlan 14 (Foale) 23 (Kaleri) | ||
| 1330C Hatches closed to Pirs | |||
| 2004? | 1504? Depress begin | ||
| 2008 | 1508 5 min break | ||
| 2013 | 575 | ||
| 2039 | Comm checks | ||
| 2045 | Prepare to depress to 15mm | ||
| 2048 | At 350 | ||
| 2049 | At 185 | ||
| 2050 | At 130 | ||
| 2052 | At 75 | ||
| 2053 | At 55 mm | ||
| 2054:15 | At 40 mm | ||
| 2054:58 | At 30 mm | ||
| 2055? | Begin EVA (JCM criterion) | ||
| 2056:53 | 15mm | ||
| 2057 | Start 5 min timer | ||
| 2102? | Depress fully complete | ||
| 2105 | Internal suit power | ||
| 2113 | HO go; p = 5mm | ||
| 2114 | p = 3 mm | ||
| 2115 | p = 0mm; cover open | ||
| 2117:07? | HO | ||
| 2126? | Egress Foale | ||
| 2144 | Egress Kaleri | ||
| 2145? | Retrieve SKK No. 1-SO | ||
| 2145? | Install SKK No. 2-SO on Pirs | ||
| 2300? | Retreive MPAC-SEED No. 1(?) from Zvezda | ||
| 2310? | Relocate MPAC-SEED No. 2(?) | |
| 2348 | Matroshka install complete | ||
| 2357 | MPAC-SEED No. 2(?) reopened in new position | ||
| 2004 Feb 27 | 0000? | Kaleri suit sublimator problem | |
| 0040 | Decision to end early | ||
| 0052 | Ingress Kaleri | ||
| 0107 | Ingress Foale | ||
| 0109 | Off internal power | ||
| 0111 | HC per NASA voice rpt | ||
| 0113 | HC official | ||
| 0115 | Repress begin | ||
| 0115:02 | 30 mm | ||
| 0115:08 | 40 mm | ||
| 0115:32 | 80mm | ||
| 0116 | 170mm | ||
| 0117:21 | 250mm | ||
| 0125 | 270 mm | ||
| 0126 | Off internal power? (AK) | ||
| 0136 | 440 mm | ||
| 2004 Jun 24 | EVA Padalka M-25, Fincke M-26 | ||
| 2132 | Depress begin | ||
| 2156? | Depress complete | ||
| 2156 | HO | ||
| 2200? | Fincke egress | ||
| O2 pressure problem, abort EVA | |||
| 2208 | Fincke ingress | ||
| 2210 | HC after 14:22 | ||
| 2213 | Repress begins | ||
| 2213:58 | Repress at 70mm Hg | ||
| 2215:07 | At 150 mm Hg | ||
| 2236 | Off battery power | ||
| 2247 | Repress fully complete | ||
| 2004 Jun 30 | |||
| 2057 | Begin depress Pirs | ||
| 2100 | 180mm | ||
| 2103 | 60 mm | ||
| 2104 | 40 mm | ||
| 2105 | 26 mm | ||
| 2106 | Depress complete at 15mm | ||
| 2114 | Battery power | ||
| 2119 | VL-1 Hatch open | ||
| 2121 | Egress Fincke | ||
| 2124 | Egress Padalka | ||
| 2210 | Reach Unity | ||
| 2225 | Astronauts reach S0 | ||
| Open SPDA to change circuit breaker | |||
| 2004 Jul 1 | Orlan EVA-9B | ||
| 0033 | Circuit breaker changeout complete | ||
| 0114 | Back at PMA-1/FGB, to Russian protocol | ||
| 0134 | Padalka back near Pirs | ||
| 0145 | Strela retracted, Fincke at Pirs | ||
| 0200 | Attach BKDO contam monitor and handrail covers to Pirs | ||
| 0251 | Padalka ingress | ||
| 0253 | Fincke ingressing | ||
| 0259 | Hatch closed | ||
| 0300 | Repress 50 mm | ||
| 0301 | 70 mm | ||
| 0303 | 200mm | ||
| 0313 | Off battery power | ||
| 2004 Aug 3 | EVA Padalka M-25, Fincke M-26 | ||
| 0635 | Begin depress | ||
| 0637 | 280 mm | ||
| 0641:55 | 40 mm | ||
| 0642 | Depress (nominal by JCM rule) | ||
| 0642:38 | 30 mm | ||
| 0654:30 | 15 mm | ||
| 0652 | Battery power | ||
| 0658 | HO | ||
| 0704 | Fincke egress | ||
| 0706 | Padalka egress | ||
| DC1 handrail work | |||
| Replace Kromka-2 tray with Kromka-3 | |||
| Replace SKK cassette on SM | |||
| replace LRRs for ATV on SM | |||
| Install WAS-1/WAS-2 PCE and visual video target | |||
| Remove Platan-M detector | |||
| Ingress with six old LRR, Kromka-2, SKK-2, Platan-M | |||
| 1116 | Padalka ingress | ||
| 1120 | Fincke ingress | ||
| 1128 | Hatch closed | ||
| 1129:25 | Begin repress | ||
| 1129:57 | 50mm | ||
| 1133:40 | 240 mm | ||
| 1143 | Off battery power | ||
| 2004 Sep 3 | EVA-11 Padalka M-25, Fincke M-26 | ||
| 1621:25 | 25mm, Depress | ||
| 1637 | Battery power | ||
| 1643 | HO | ||
| 1647 | Fincke egress | ||
| 1651 | Padalka egress | ||
| 1729 | RRZh1 flow reg panel removed from Zarya | ||
| 1740 | New RRZh1 panel installed | ||
| Eject connector cap | |||
| Installed fairlead FGB safety tethers | |||
| 1800? | 17 min motionless test | ||
| 1838? | Stow old RRZh1 on Pirs | ||
| 1930? | Translate to Zvezda aft, inhibit thrusters | ||
| 2000? | Install WAL-1,2,3 ATV antennas | ||
| Removed 5 antenna covers | |||
| Eject WAS antenna covers (2) | |||
| 2100? | Eject WAL-1,2,3 antenna covers | ||
| Return to Zvezda forward section | |||
| 2110 | Eject cleaning towels | ||
| Return to Pirs | |||
| 2132 | Reenable thrusters | ||
| Handrail installations | |||
| 2151 | Jettison old PIG pressurized container with RRZh1 | ||
| Jettison 70 kg RRZh-1 flow regular valve panel? | |||
| 2152 | Padalka ingress | ||
| 2154 | Fincke ingress | ||
| 2204 | HC | ||
| 2206:35 | Start repress | ||
| 2206:56 | 30mm Hg | ||
| 2207:17 | 60mm Hg | ||
| 2218 | Off battery power | ||
| 2005 Jan 26 | EX10 EVA1 | ||
| 0725 | Depress to 35mm | ||
| 0734 | Batt power | ||
| 0741 | Hatch open | ||
| 0748 | Chiao egress | ||
| 0755 | Sharipov egress | ||
| Install Rokviss and Rokviss antenna | |||
| Install TM/TS box | |||
| 0817 | two covers were jettisoned | ||
| 0819 | two covers were jettisoned | ||
| 0924 | protective cover was ejected | ||
| 0944 | cover was jettisoned | ||
| 0945 | cover was jettisoned | ||
| 0947 | cover was jettisoned | ||
| 0956 | cover was jettisoned | ||
| 1041 | cover was jettisoned | ||
| 1050 | cover was jettisoned | ||
| 1051 | cover was jettisoned | ||
| 1052 | cover was jettisoned | ||
| 1057 | cover was jettisoned | ||
| Inspect Elektron vents | |||
| 1258 | Sharipov ingress | ||
| 1302 | Chiao ingress | ||
| 1311 | Hatch closed | ||
| 1313 | Repress | ||
| 1313:22 | 50 mm | ||
| 1314:04 | 100 mm | ||
| 2005 Mar 28 | Russian EVA-13 from Pirs | ||
| Sharipov EV1, Chiao EV2 | |||
| 0600 | resume depress | ||
| 0602 | 470mm | ||
| 0605 | 150mm | ||
| 0607 | 65mm | ||
| 0609 | JCM depress | ||
| 0609 | 25mm | ||
| 0610 | 20mm | ||
| 0611 | 14mm | ||
| 0612 | 5 min final leak check | ||
| 0617 | 15mm, ready for HO, batt power | ||
| 0624 | 15mm, begin HO | ||
| 0625 | 2mm | ||
| 0626 | HO | ||
| 0632? | Chiao egress | ||
| 0830 | Nanosat, 0.30m, 5 kg | ||
| Install ATV-PCE WAL4, 5, 6 antennas on Zvezda | |||
| Install ASN-M (ATV GPS) antenna | |||
| 1055 | HC | ||
| 1057 | Repress | ||
| 2005 Aug 18 | EVA Krikalyov M25, Phillips M27 | ||
| 1902? | Depress | ||
| 1902 | HO | ||
| 1930? | Retrieve Biorisk canister 1 | ||
| 2038 | Ejected Matroshka-R cover (Krikalyov) | ||
| Retrieve Matroshka inside ISS | |||
| 2350? | ingress | ||
| 2005 Aug 19 | 0000 | HC | |
| 0002 | Repress | ||
| 0003 | 90mm | ||
| 0004 | 130mm | ||
| 0010 | 253mm, repress complete | ||
| 2006 Feb 3 | EVA McArthur Tokarev | ||
| 2244 | HO | ||
| 2302 | Suitsat ejected | ||
| Relocate Strela grapple fixture from PMA1 (or FGB??) to PMA3 | |||
| 2355? | Grapple fixture off PMA1 | ||
| 2006 Feb 4 | 0010? | On PMA3 | |
| 0024 | At MT | ||
| 0050 | Problems adding safing bolt to mobile transporter TUS cable | ||
| 0145 | Back near Pirs | ||
| 0225 | Retrieve Biorisk experiment from Pirs exterior | ||
| 0300 | Photo survey of Zvezda aft | ||
| 0345 | Begin return to Pirs | ||
| 0359 | Cleaning towels jettisoned | ||
| 0406 | At Pirs hatch | ||
| 0417 | Ingress | ||
| 0427 | HC | ||
| 0430 | 20 mm? | ||
| 0434? | Repress | ||
| 0434 | 260 mm? | ||
| 2006 Jun 1 | EVA-16 Vinogradov (25), Williams (26) | ||
| 2208 | Pressure 619 | ||
| 2219 | 340mm depressing Pirs | ||
| 2223 | 5min pause? 65mm | ||
| 2225 | Depressed to 35mm | ||
| 2226:30 | 26mm? | ||
| 2228 | Depressurized 15mm, 5 min interval | ||
| 2234 | 13mm | ||
| 2236 | Battery power | ||
| 2248 | HO | ||
| 2250 | AOS, installing protective ring | ||
| 2254 | Williams Egress Pirs | ||
| 2300 | Vinogradov exit | ||
| 2006 Jun 2 | |||
| 0135 | Complete Zvezda work, V. clean suit | ||
| Uncapped Elektron vent outlet | |||
| Photography of WAL2 antenna | |||
| Removed cable slack on WAL3 antenna | |||
| Retrieved BKDO from Pirs, Kromka plate from SM, Biorisk-MSN from Pirs | |||
| BKDO is Plume Impingement and Deposit monitoring unit | |||
| 0136 | 1 cleaning towel jettison by V from Zvezda | ||
| 0238 | APFR Yakor' adapter comes loose from Strela | ||
| 0503 | V. ingress | ||
| 0507 | W. Ingress | ||
| 0519 | HC | ||
| 0521 | Repress | ||
| 0522:08 | 40mm | ||
| 0536 | Station power | ||
| 2006 Nov 22 | |||
| EVA Orlan M 25, 27 CDR L-A , FE Tyurin | |||
| Tyurin EV1, L-A EV2 | |||
| Delay with problem in Tyurin cooling line | |||
| 2340 | In depress | ||
| 2341 | 210 mm | ||
| 2342 | 140 | ||
| 2343 | 120 | ||
| 2346 | "Nearly depressurized" | ||
| 2348? | Depress less than 35mm (guess) | ||
| 2349 | Depress complete 13mm | ||
| 2006 Nov 23 | |||
| 0006 | Opening hatch | ||
| 0008 | Problem opening hatch | ||
| 0017 | HO | ||
| 0030 | L-A egress before now | ||
| 0037 | Tyurin egress before now | ||
| 0050 | Preparing for golf shot by Tyurin | ||
| 0057 | Golf shot, 3g ball | ||
| 0130 | Moving to work on Progress stuck antenna at Zvezda aft | |
| Abandoned work on Progress antenna | |||
| 0230 | Moving to work on ATV WAL2 antenna at Zvezda aft | ||
| 0320 | Complete WAL2 work | ||
| 0330? | Jettison 2 cleaning towels | ||
| 0400 | Installing BTN-M1 Neutron experiment on Zvezda PKhO | ||
| 0522 | Closing velcro flaps | ||
| 0526 | jettison BTN-M1 thermal cover | ||
| 0528 | jettison 2 more BTN-M1 thermal covers | ||
| 0537 | Tyurin ingress Pirs | ||
| 0547 | LA ingress | ||
| 0556 | HC | ||
| 0559? | Repress | ||
| 0601 | 100mm | ||
| 2007 Feb 22 | EVA-17A L-A M-25, Tyurin M-27 | ||
| EVA to release stuck Progress antenna | |||
| 1027 | HO | ||
| 1045 | LA Egress | ||
| 1049 | T egress | ||
| Tyurin suit sublimator problems | |||
| 1215 | Cutting antenna | ||
| 1245 | Antenna retracted | ||
| 1406 | Towels jettisoned | ||
| 1622 | LA ingress | ||
| 1626 | T Ingress | ||
| 1645 | HC | ||
| 1649 | Repress | ||
| 1704 | Pressure at 250mm | ||
| 2007 May 30 | |||
| 1836 | Depress in work | ||
| 1842 | Begin depress to 15mm Hg | ||
| 1853 | Pirs at 13mm Hg | ||
| 1859 | Battery power | ||
| 1905 | HO | ||
| 1913 | Yurch. egress | ||
| 1915 | Kotov out | ||
| 2015 | Kotov transfer SMDPs with Strela | ||
| 2110 | SMDP tree attached to Zvezda | ||
| Attach ATV GPS cable | ||
| 2340 | Attaching Bundle 4 (5 panels) | ||
| 2007 May 31 | |||
| 0019 | Preparing to ingress | ||
| 0022 | Ingress complete | ||
| 0030 | HC | ||
| 0034 | Repress | ||
| 2007 Jun 6 | 1423 | HO R-EVA-19 | |
| Yu, Kotov installed Biorisk | |||
| SMDP installation | |||
| 2000 | HC | ||
| 2008 Jul 10 | Pirs EVA-20A Volkov, Kononenko | ||
| 1725 | Begin depress | ||
| 1828 | 45mm | ||
| 1829 | Airlock at vac | ||
| 1830 | 25 mm | ||
| 1832 | 12.5mm | ||
| 1844 | 12.5mm | ||
| 1848 | Hatch open | ||
| 1855 | Kono. egress | ||
| 1906 | Volkov egress | ||
| 2030 | Kono. on Strela | ||
| 2040 | Kono. at Soyuz | ||
| 2100 | Kono. cutting into MLI | ||
| 2153 | Thruster covers removed | ||
| 2240 | Pyro bolt removed | ||
| 2358 | Install insulation blankets | ||
| 2008 Jul 11 | |||
| 0005 | Thruster covers jettison | ||
| Thruster cover impacts S1 radiator | |||
| 0040 | Strela stowed | ||
| 0051 | Prepare for ingress | ||
| 0056 | Ingress Volkov | ||
| 0058 | Ingress Kono. | ||
| 0104 | HC loose | ||
| 0106 | HCand latched | ||
| 0109 | Repress | ||
| 2008 Jul 15 | Pirs EVA-20 | ||
| 1640 | Begin depress | ||
| 1650? | Depress | ||
| 1653 | p=12mm Hg | ||
| 1659 | Battery power | ||
| 1708 | HO | ||
| 1718 | Kono egress | ||
| 1726 | Volkov egress | ||
| 1746 | MRM-2 docking target installed | ||
| Inspect holes for future antenna | |||
| 1833 | Foot restraint relocated | ||
| On GStM-1 Strela boom for photos of docking target | |||
| Install Vsplesk particle flux detector (MIFI/Galper) | |||
| on Zvezda | |||
| 2040 | Small debris object released | ||
| 2050 | Vsplesk installed | ||
| 2146 | MLI cover removed from Vsplesk; jettisoned? | ||
| 2230 | Biorisk retrieval | ||
| Amateur radio antenna fix | |||
| 2231 | Sergey knocks Zvezda solar array | ||
| 2245? | Volkov ingress | ||
| 2253 | Ingress Kono | ||
| 2302 | HC 5:54 | ||
| 2305 | Repress | ||
| 2307 | 230 mm | ||
| 2322 | Repress continues | ||
| 2008 Dec 23 | EVA-21 Lonchakov, Fincke | ||
| 0004 | 300mm | ||
| 0007 | 220 mm | ||
| 0009 | 110 mm | ||
| 0010 | 50mm | ||
| 0011 | DEPRESS | ||
| 0012 | 25mm | ||
| 0014 | Depress complete, 13mm | ||
| 0021 | 17mm | ||
| 0028 | 19.5mm | ||
| 0035 | 20.5mm | ||
| 0037 | 21mm | ||
| 0038 | Suit power | ||
| 0043 | 13mm | ||
| 0045 | Demate electrical umb | ||
| 0047 | 13mm | ||
| 0050 | 4mm | ||
| 0051 | HO | ||
| 0056 | Fincke egress | ||
| 0110? | Lonchakov egress | ||
| 0120? | Langmuir probe installed on Pirs by Fincke | ||
| 0130 | Biorisk removed by Lo. | ||
| 0215 | Biorisk and LP complete | ||
| 0220 | Working on Zvezda | ||
| Install experiments on Zvezda | |||
| 0445 | Connecting cables for Impulse | ||
| IPI-SM install? | |||
| Install Expose-R | |||
| 0523 | Expose-R expt failts to activate | ||
| 0548 | Remove Expose-R | ||
| 0600 | Contam check prior to ingress | ||
| 0612? | Lonchakov ingress | ||
| 0617 | Fincke ingress | ||
| 0621 | Hatch ring removed | ||
| 0629 | HC | ||
| 0639 | Repress begin | ||
| 0639 | 10mm | ||
| 0640 | 35mm - REPRESS | ||
| 0641 | 110mm | ||
| 2009 Mar 10 | EVA R 21A Finche, Lonchakov | ||
| 1552 | Pressure = 50mm | ||
| 1553 | DEPRESS | ||
| 1554 | p = 15mm | ||
| 1622 | HO | ||
| 1634 | L egress | ||
| 1635? | F egress | ||
| 1640 | Cut loose Progress/Pirs straps | ||
| 1720 | Translate to Expose-R site | ||
| 1730 | Install Expose-R | ||
| 1845 | Reorient SKK-9 container | ||
| 1856 | Photography of station exterior | ||
| 2058 | Yuri ingress | ||
| 2100 | Fincke ingress | ||
| Time outside 4:04 | |||
| 2111 | HC | ||
| 2114 | Repress | ||
| 2009 Jun 5 | R EVA 22 Padalka, Barratt | ||
| Wakata in SM, others in Zarya node | |||
| 0704 | 450mm in depress | ||
| 0724 | Begin depress | |
| 0725 | 55 mm | ||
| 0727 | 35mm - depress | ||
| 0729 | Leak check | ||
| 0736 | Leak check complete | ||
| 0740 | Battery power | ||
| 0752 | Hatch open | |
| 0757 | Barratt egress | ||
| 0800 | Padalka egress | ||
| Install MRM-1 docking equipment | |||
| 1231 | Ingress | ||
| 1246 | HC | ||
| 1250 | Repress under way | ||
| 2009 Jun 10 | s | R EVA 23 Padalka, Barratt | |
| Zvezda transfer cpt open to vacuum | |||
| 2010 Jan 14 | R EVA 24 Suraev (MK4) Kotov (MK5) | ||
| 1005 | HO Pirs VL-1 | ||
| Poisk outfitting | |||
| 1200? | MLI bundle jettison | ||
| 1410? | MLI bundle jettison | ||
| Biorisk package retrieval | |||
| 1542? | Ingress | ||
| 1549 | HC | ||
| 1552? | Repress | ||
| 2010 Jul 27 | R EVA 25 Yurchikin MK-4, Kornienko MK-6 | ||
| Installation of new ATV camera | |||
| 0304 | At 555 mm | ||
| 0310 | Pirs/Zvezda hatch closed | ||
| 0322 | Go to depress Pirs to 550 | ||
| 0332 | Depress Pirs underway? | ||
| 0333 | PKhO at 603 | ||
| 0341 | Leak check complete? | ||
| 0342 | PKhO at 760 | ||
| 0345? | Begin Pirs final depress | ||
| 0347 | Pirs 400 | ||
| 0348 | Pirs 230 | ||
| 0349 | 5 min leak check? | ||
| 0350 | Pirs 170 | ||
| 0350 | Pirs 130 | ||
| 0351 | 90 = 120mbar = 1.7 psi | ||
| 0359 | Depress completed? Final leak check | ||
| 0403 | Battery power | ||
| 0409 | HO prep | ||
| 0411 | HO, 5mm | ||
| 0422 | Misha egress | ||
| 0430 | Yurch. egress | ||
| 0448 | Working at Zvezda aft | ||
| 0456 | Connector mated to old camera | ||
| 0458? | Remove old camera | ||
| 0502 | Install new camera | ||
| 0508 | Preparing to leave aft | ||
| 0514 | In translation to Pirs | ||
| 0528? | Bring old Klest-154 video camera back to outside airlock | ||
| Rassvet cabling | |||
| 0545 | Cable bundle handle floats free | ||
| 0656 | Washer free | ||
| 1007 Small debris object released? | |||
| 1040 | Yurchikin jettison camera | ||
| 1042? | Ingress | |
| 1054 | HC | ||
| 1058 | repress 70mm in DC1 | ||
| 1058 | 100mm in DC1 | ||
| 1059 | 150mm | ||
| 1100 | 190mm | ||
| 2010 Nov 15 | |||
| 1426? | Depress | ||
| 1434 | 20mm | ||
| 1437 | 11mm | ||
| 1454 | HO | ||
| 1501 | Egress Oleg S | ||
| 1504? | Egress Yurch. | ||
| URM-D Workstation installed on Zvezda stbd Plane IV | |||
| Kontur robotics epxeriment removed from URM-D on Plane II | |||
| Materials experiment installed on Rassvet | |||
| Sample collection | |||
| Struts added between Rassvet and Zvezda, Zarya | |||
| Gap spanner installed on Pirs | |||
| ? Skripochka temporarily untethered and floats away | |||
| SKK 1-M2 cassette installed on Poisk | |||
| Docking camera removed from Rassvet | |||
| 2035 | Failed to reinstall camera on Rassvet | ||
| Camera brought inside | |||
| 2109 | EV2 ingress | ||
| 2122 | HC | ||
| 2126? | Repress | ||
| 2011 Jan 21 | |||
| Kondratev, Skripochka | |||
| 1405 | depressing p = 80 | ||
| 1406 | p = 50 | ||
| 1409? | p=35 (guess) | ||
| 1417 | Pressure check ok | ||
| 1420 | Demating umbilicals | ||
| 1421 | p = 39 | ||
| 1425 | hatch seal opened | ||
| 1429 | HO | ||
| 1435? | Egress | ||
| 1530? | Install SVPI unit on Zvezda MPAC-SEED frame | ||
| 1653 | Cable reel jettison | ||
| 1654 | Antenna cover jettison | ||
| Install camera on Rassvet | |||
| 1932 | Ingress | ||
| 1952 | HC | ||
| 2011 Feb 16 | |||
| EVA Skripocka, Kondratev | |||
| 1312 | 10 psi | ||
| 1330 | HO | ||
| 1340? | Egress | ||
| 1400? | Installation of Molniya-Gamma | ||
| 1600 | Installation of RK-21-8 SVCh-Radiometria | ||
| 1654 | Jettison Yakor (Ferrozond) foot restraint | ||
| Retrieve Komplast MLI panels 2 and 10 | |||
| 1815? | Ingress | ||
| 1821 | HC after 4:51 | ||
| 2011 Aug 3 | REVA 29 Volkov, Samokutyaev | ||
| 1423 | At 101 mm | ||
| 1433 | Final stage depress | ||
| 1435 | At 12 mm, start leak check | ||
| 1447 | At 11.5mm | ||
| 1450 | Pirs hatch open | ||
| 1501 | Take Radioskaf outside, attached to ladder | ||
| 1503 | Remove Radioskaf solar panel covers | ||
| 1509 | Samok. egress | ||
| Volkov egress (by 1515?) | |||
| 1515 | Radioskaf ARISSSAT activated | ||
| 1520 | Prepare Radioskaf, review broken antenna | ||
| 1610? | Install BTLS-N lasercom terminal on SM | ||
| 1705? | Jettison lasercom MLI cover | ||
| 1730? | Photography of ATV WAL6 | ||
| 1843 | Deploy Radioskaf-V | ||
| Removed AO-VKA from SM | |||
| Strela-1 relocation cancelled | |||
| Biorisk-MSN carried outside | |||
| Biorisk-MSN installed on Pirs | |||
| External photography | |||
| 2104 | Ingress | ||
| 2113 | HC 6:23 | ||
| 2012 Feb 13 | |||
| DPP (debris panel package) stacks in DC1 | |||
| EVA ladder struts, Vinoslivost in DC1 | |||
| 2012 Feb 16 | REVA-30 Kononenko, Shkaplerov | ||
| Pettit, Kuipers in TMA-03M | |||
| Burbank, Ivanishin in TMA-22 | |||
| 1408 | 25mm Hg, depress | ||
| 1412 | Pirs depress complete | ||
| 1417 | On suit power | ||
| 1431 | HO | ||
| 1618 | Small debris object floats away | ||
| 1624 | Strela-2 connected to Strela-1 | ||
| 1635 | Removed foot restraint from Strela-1 and stowed | ||
| 1640 | Strela-1 removed from Pirs | ||
| 1644 | Strela-2 moving, taking Strela-1 away from Pirs | ||
| 1710 | Strela-2 motion stopped for night pass | ||
| 1733 | Resumed | ||
| 1743 | Moving cover into position | ||
| 1814 | Strela-1 installed on Poisk baseplate | ||
| 1835 | Discussing jettison | ||
| 1850 | Vinoslivost (2 panels) installed on Poisk handrails 6007 and 6015 | ||
| 1904 | Jettison Strela Poisk-baseplate MLI cover | ||
| 1918 | Closing up Strela-2 and equipment | ||
| 1955 | At Pirs to get Test equipment for samples | ||
| 2008 | On Zvezda for Test sampling | ||
| 2028? | Ingress | ||
| 2046 | HC, 6:15 | ||
| 2049 | Repress begins | ||
| 2012 Aug 20 | REVA VKD-31 Padalka MK5/BRTA-7, Malenchenko MK6/BRTA-9 | ||
| 1513 | Depress Pirs, 90mm | ||
| 1520 | Pirs at 10mm Hg | ||
| 1537 | HO Pirs | ||
| GStM-2 crane from Pirs to Zarya | |||
| GStM-2 attached to end of GStM-1 | |||
| 1632 | GStM-2 unberthed from Pirs | ||
| EVs detach GStM-2 from GStM-1 | |||
| 1738 | EVs install GStM-2 on Zarya | ||
| GStM-1 attached to Pirs as translation aid | |||
| SKK cassette retrieval attempted but abandoned | |||
| 1818 | Sfera and holder extracted from Pirs | ||
| 1829 | 10 kg 0.53m Sfera-53 satellite deployed from Pirs | ||
| 1834 | Retrieve SMDP shields from Prs | ||
| 1842 | Install SMDP shields on Zvezda | ||
| 1907 | Panel 28 installed | ||
| 1908 | Panel 27 installed | ||
| 1926 | Panel 24 installed | ||
| 1935 | Panel 25 installed | ||
| 1948 | Panel 26 installed | ||
| 2013 | Biorisk canister retreived by Padalka | ||
| 2016? | Returned to Pirs | ||
| 2031 | Ladder strut 1 installation | ||
| 2040 | Ladder strut 2 installation | ||
| Inventory | |||
| 2053 | Sfera deployer brought inside? | ||
| 2110 | Ingress Padalka | ||
| 2113 | Ingress Malench. | ||
| 2128 | HC | ||
| 2133 | Repress | ||
| 2013 Apr 19 | REVA VKD-32 Romanenko, Vinogradov | ||
| 1342 | Begin depress | ||
| 1403 | Hatch open Pirs | ||
| 1410? | Romanenko egress | ||
| 1415? | Vinogradov egress | ||
| Obst. data collection box PVK-1 installed | |||
| 1527 | Obst. data collection box PVK-2 installed | ||
| 1612 | Translate to Zvezda aft | ||
| 1625 | New retroreflector out of tool bag | ||
| 1630? | Removed old ATV reflector | ||
| 1634 | Installed ATV reflector | ||
| 1655 | Returned old ATV reflector to Pirs | ||
| 1719 | Towels jettisoned | ||
| 1719 | Obst. cable reel jettisoned | ||
| 1741 | Begin to install Obst. probes on boxes | ||
| 1744 | First probe installed | ||
| 1840 | Second probe installed | ||
| Deploy probe booms | |||
| Fix connectors on probe 1 | |||
| 1903 | Obstanovka probe container 1 jett | ||
| 1906 | Obstanovka probe container 2 jett | ||
| 1926 | Booms both deployed | ||
| 1940? | Biorisk retrieved | ||
| 2005 | Translate to Poisk | ||
| 2015? | Unberth Vinoslivost panel | ||
| 2016 | Vinoslivost panel lost, floats away | ||
| 2028 | Ingress Pirs | ||
| 2041 | HC 6:38 | ||
| 2044 | Repressing at 90 mm | ||
| 2013 Jun 24 | |||
| REVA-33 | |||
| Yurchikin (MK5), Misurkin (MK6) | |||
| 1314 | Depress | ||
| 1332 | HO | ||
| 1338 | Misurkin egress | ||
| 1342 | Yurchikin egress | ||
| 1351 | Reached Strela | ||
| 1440 | Attach Kurs connectors for Nauka for test | ||
| Translate to middle of Zarya | |||
| 1456 | Container open | ||
| 1459 | Remove old pump | ||
| 1503 | New pump out of container, installed | ||
| 1508 | Old pump in container | ||
| 1600 | Install Nauka cable clamps on Zarya | ||
| 1700 | Small item floated away (label?) | ||
| 1715 | Still working on Zarya cabling | ||
| 1805 | 77KM 3572-0-01 container back inside Pirs | ||
| 1817 | Heading to Poisk on Strela-1? | ||
| Strela-1 boom to Poisk to put in Kontrol experiment Indikator-MKS | |||
| 1830? | Indikator truss on Poisk | ||
| 1838 | Remove vinoslivost panel from Poisk | ||
| 1900 | Returned to Pirs, stow panel | ||
| 1910 | Move to Zvezda, install handrail gap spanners | ||
| 1916 | Demating Photon-gamma connectors | ||
| 1920? | Foton-Gamma unberthed | ||
| 1933 | Still working on gap spanners | ||
| 1940 | Wrapping up | ||
| 1945? | Ingress | ||
| 1952 | Both inside | ||
| 2006 | HC | ||
| 2009 | Repress | ||
| 2019 | 261mm | ||
| 2013 Aug 16 | REVA 34 | ||
| Yurchikin, Misurkin | |||
| 1410 | 50mm Hg | ||
| 1429 | 10mm | ||
| 1429 | Batt power | ||
| 1436 | HO | ||
| 1444 | Misurkin out | ||
| 1446 | Bring out ethernet cable | ||
| 1448 | egress with UECC (Universal EVA Cable Carrier) | ||
| 1452 | Egress Yurchikin | ||
| 1525 | Strela-1 moving | ||
| 1554 | Install Vinovlivost Panel 2 on Poisk | ||
| 1608 | SES-1 connector panel installed | ||
| 1628 | Install connectors and gap spanners between Zarya/Poisk, Zvezda/Poisk | ||
| Routing ethernet cables for MLM | |||
| 1930 | More cable installation | ||
| 2138 | Strela work complete | ||
| 2151 | Preparing to return to Pirs | ||
| 2153? | Ingress | ||
| 2201 | Remove prot cover? | ||
| 2204 | Reopen hatch? | ||
| 2205 | Go for close | ||
| 2208 | Repress | ||
| 2013 Aug 22 | |||
| REVA-35 | |||
| Yurchikin MK4, Misurkin | |||
| 1110? | Depress | ||
| 1115 | 13mm, final leak check | ||
| 1120 | '3 min on the timer' | ||
| 1134 | HO | ||
| 1140 | Misurkin egress | ||
| 1144? | Yurchikin egress | ||
| 1213 | Cover BTLS-N, preparing to remove it | ||
| 1240 | BTLS-N removal? | ||
| Temp stow nearby | |||
| 1315 | DPN/VRM installation abandoned, will bring in | ||
| 1330? | DPN/VRM back in | ||
| 1400 | Inspecting WAL covers | ||
| 1420? | Retrieved DPN/VRM from Pirs | ||
| 1440 | Reinstalled DPN/VRM on URM-D | ||
| 1500 | Completing DPN/VRM install | ||
| 1535 | Return to Zvezda aft | ||
| 1540 | Tighten WAL antenna covers | ||
| 1617 | Working on gap spanners | ||
| 1700? | TEST samples | ||
| 1715 | Completed Russian flag waving | ||
| Prep for ingress | |||
| 1720 | Ingress | ||
| 1730? | Ingress complete? | ||
| 1732:55? | HC | ||
| 1735 | 30mm | ||
| 1737 | 180 | ||
| Repress | |||
| 2013 Nov 9 | |||
| 1340 | Begin depress | ||
| 1351 | Leak check PKhO | ||
| 1408 | Depress | ||
| 1413 | 100mm | ||
| 1415 | 50mm | ||
| 1416 | 40 | ||
| 1417 | Depress | ||
| 1418 | 25 | ||
| 1434 | Equalize pressure to outside | ||
| 1434 | HO | ||
| 1438 | Ryaz egress | ||
| 1451 | Kotov egress with Olympic torch | ||
| 1514 | Torch handover ceremony | ||
| 1635 | Torch and GoPro camera restowed | ||
| 1730 | Removing bolts from DPN | ||
| RK-21 experiment disconnnected but not stowed | |||
| 1800? | Remove Yakor platform | ||
| Fail to close up RK-21 panels | |||
| Bring Yakor inside | |||
| 2009 | Ingress | ||
| 2024 | HC | ||
| 2027 | Repress | ||
| 2013 Dec 27 | VKD37 EVA Kotov, Ryazanskiy | ||
| 1238 | Begin depress | ||
| 1250 | 12mm Hg | ||
| 1301 | HO | ||
| 1305 | Egress | ||
| 1330 | Install Yakor foot restraint | ||
| 1350 | Installed HRC | ||
| 1400 | Removed HRC lens cover | ||
| 1404 | Remove ingress aid from Yakor | ||
| 1405 | Returning to Pirs w cover and ingress aid | ||
| 1425? | From Pirs to SM with MRC and CL bag | ||
| 1500 | Installing MRC | ||
| 1515 | MRC installed | ||
| 1540 | Removed MRC cover, to CLB | ||
| Cabling HRC/MRC along SM | |||
| 1620 | Searching for electrical connector | ||
| 1640 | Completed connectors | ||
| 1646 | Jettison MRC cable reel | ||
| 1700 | Oleg to AL to get Seismoprog and PR boom | ||
| 1708 | Sergey working cables? | ||
| Sergey to Vsplesk | |||
| 1754 | Vsplesk removed and jettisoned | ||
| 1800 | Install Seismoprognoz | ||
| 1811 | Complete Seismoprognoz electrical connections | ||
| 1815 | Abort UrtheCast | ||
| 1820 | Deploy Seismoprognoz antenna | ||
| 1917 | Reconnect MRC? lens cover | ||
| 1930 | Remove MRC camera? | ||
| 1943 | MRC in airlock | ||
| 2005 | HRC lens cover back on | ||
| 2018 | Removed HRC | ||
| 2026 | Back at Pirs | ||
| 2050 | HRC inside | ||
| 2056 | Ingress Kotov | ||
| 2100? | Towel jettison? | ||
| 2100? | Ingress Ryazinskiy | ||
| 2107 | HC 8:06 | ||
| 2109? | Repress | ||
| 2110 | 110mm | ||
| 2014 Jan 27 | 1355? | Depress | |
| 1400 | HO | 92.91 414 x 419 x 51.65 | |
| 1405? | Ryazanskiy egress | ||
| 1408 | Kotov sublimator issue, fixed | ||
| 1410 | Working on foot restraint | ||
| 1442 | HRC camera out of AL | ||
| 1459 | Attaching HRC | ||
| 1502 | HRC attach complete | ||
| 1615 | Towel jettisoned | ||
| 1617 | Towel jettisoned | ||
| 1622 | HRC lens cover off | ||
| 1628 | Lens cover back in AL | ||
| 1700 | MRC attached | ||
| MRC connection issue | |||
| 1755 | Working FGB PDGF WIF adapter removal | ||
| 1820 | Working MRC connectors | ||
| 1840 | Removing SKK-2 from Pirs | ||
| 1843 | SKK-2 inside airlock | ||
| 1930 | Towel jettison, Ryazanskiy | ||
| 1952 | Prep for ingress | ||
| 1957 | Ingress | ||
| 2008 | go for HC | ||
| 2008 | HC | ||
| 2012 | Repress | ||
| 2014 Jun 19 | VKD-38 Svkortsov, Artemev | ||
| 1345 | Depress, 35mm | ||
| 1354 | Batt power | ||
| 1410 | HO | ||
| 1645 | AFAR active phased array antenna installed on Zvezda | ||
| 1720 | Working on Obstanovka | ||
| 1755 | Completed moving Obstanovka PBK-2 | ||
| 1758 | Checking URM-D | ||
| 1908 | Install payload boom | ||
| 1925 | Attach TM/TS to payload boom | ||
| 1930 | Attach SVPI to boom | ||
| 1935 | Working on removing carrier frame | ||
| 2027 | Removed frame | ||
| 2031 | Jettisoned frame | ||
| 2107 | Jettisoned 2 cleaning towels | ||
| 2117 | Svkortsov ingress | ||
| 2121 | Artemev ingress | ||
| 2133 | HC, 7:23 | ||
| 2140 | Repress | ||
| 2014 Aug 18 | 1335 | 50mm | |
| VKD-39 Skvortsov, Artemev | |||
| 1340 | Depress 35mm | ||
| 1350 | Battery power | ||
| 1402 | HO | ||
| 1423 | Jettison Chasqui-1 | ||
| 1453 | Install EXPOSE-R2 on URM-D-II Zvezda | ||
| 1542 | Install clamp on AFAR handrail | ||
| 1627 | Test sample from SM window 13 | ||
| 1627 | Return to Pirs | ||
| 1639 | Retrieve SKK, BKDO from Pirs | ||
| 1645 | Translate to Poisk | ||
| 1701 | At Poisk | ||
| 1720 | Remove Vinoslivost Panel 2a (installed Aug 2013) | ||
| 1722 | Insall BKDO plume impingement monitor | ||
| 1740 | Resecuring BKDO | ||
| 1755? | Remove SKK-1-M2 | ||
| 1803? | Install SKK-2-M2 | ||
| 1832 | Vinoslivost and SKK inside Pirs | ||
| 1836? | Skvortsov ingress | ||
| 1845 | Removed Biorisk canister | ||
| 1851 | Biorisk inside | ||
| 1858 | Artemev ingress | ||
| 1913 | HC | ||
| 1916? | Repress | ||
| 2014 Oct 22 | VKD-40 Suraev MK-5, Samokutyaev MK-6 | ||
| 1322 | Depress complete | ||
| 1328 | HO | ||
| 1330? | Samo. out | ||
| 1335 | Suraev out | ||
| To URM for Radiometriya expt | |||
| 1359 | Removed RK-21-8 Radiometriya | ||
| 1401 | Jettison Radiom., 94 kg 1.4 x 1.9m | ||
| 1410? | Remove Expose-R cover | ||
| Photos of Expose-R | |||
| Back to Pirs | |||
| 1424? | Stow Expose-R cover in Pirs, retrieve TES | ||
| On Strela to MRM-2 Poisk | |||
| 1500 | Working on antennas | ||
| 1505 | Cut off Kurs-P antenna no. 1 on MRM-2, 0.6m | ||
| 1530 | Remove Kurs-P No. 2 antenna from Poisk | ||
| 1544 | Up to Strela-1 platform, jettison Kurs No 1 anten | ||
| 1548 | and 2 antenna | ||
| Back to Pirs | |||
| 1654? | Suraev ingress | ||
| 1656? | Samo ingress | ||
| 1706 | HC 3:38 | ||
| 1708 | Repress | ||
| 2015 Aug 10 | VKD-41 Padalka, Kornienko | ||
| 1410? | Depress | ||
| 1417 | HO | ||
| 1500 | Cleaned SM window | ||
| 1515 | Installed gap spanner handrail, Zvezda | ||
| 1525 | Installed WAL1/2 cover retainers | ||
| 1530? | Installed WAL3 cover retainer | ||
| 1542 | Jettison cleaning towels (2) | ||
| 1554 | Retrieve DP-PM PVK-1 experiment from Obstanovka | ||
| 1607 | Photo doc of Expose-R | ||
| 1615 | Perform TEST experiment on vents | ||
| 1645? | Back to Pirs to get new WAL6 | ||
| 1715 | Translating to Zvezda | ||
| 1722 | Working on WAL6 | ||
| Install cabling | |||
| 1825? | Remove old WAL6 | ||
| 1835? | Install new WAL6 | ||
| 1855 | Working near Poisk | ||
| 1907 | Repositioned plume device | ||
| 1925 | Stowing toolbag | ||
| 1930 | Jettison old WAL6 | ||
| 1943 | Ingress Padalka | ||
| 1945? | Ingress Kornienko | ||
| 1951 | HC | ||
| 1957 | Repress | ||
| 2016 Feb 3 | VKD-42 Malenchenko, Volkov (4,6) | ||
| Depress | |||
| 1255 | Hatch open | ||
| 1322 | Flash drive with 70th anniv. WWII videos jettisoned | ||
| 1400? | Expose-R removed | ||
| 1440? | Expose-R in airlock | ||
| Translate to Poisk | |||
| Remove SKK 2-M2 | |||
| Install SKK 3-M2 | |||
| Install 2 Vinoslivost panels | |||
| Install gap spanners or Zarya | |||
| Test 'Registratisya' tape-roller surface repair kit | |||
| Install Restauratisya? | |||
| 1730 | Ingress | ||
| 1740 | HC | ||
| 2017 Aug 17 | VKD-43 Yurchikin (MKS 4), Ryazanskiy (MK 6) | ||
| 1416 | Pressure 130 mbar | ||
| 1418 | Pressure 27 mbar | ||
| 1436 | Open Pirs | ||
| 1445? | Egress | ||
| 1454 | Retrieve Restauratsiya plates | ||
| 1454 | Rest. inside Pirs | ||
| 1455? | Retrieve satellites | ||
| E+1:03 Release satellites | |||
| 1510 | Deploy Tomsk | ||
| 1515 | Deploy Tanushka 1 | ||
| 1516 | Deploy Tanushka 2 | ||
| 1521 | Deploy TNS-0 | ||
| 1529 | Deploy TS-530 Zerkalo | ||
| 1535 | Return deploy hardware to Pirs | ||
| 1600? | Images of SKK 9 package | ||
| 1652 | Install Impakt package at aft end of SM | ||
| 1730? | Jettison cleaning towels | ||
| Test experiment | |||
| 1800 | Working at Poisk | ||
| 1855 | Rotated BKDO experiment | ||
| 2020 | Installed adapter with thermal sensors | ||
| 2028 | Removed adapter cover | ||
| 2050 | Return hardware to Pirs | ||
| Get more Test cassettes | |||
| 2115 | Test work on Pirs exterior | ||
| 2151 | Both still outside | ||
| 2152? | Yurchikin inside | ||
| 2210 | Hatch closed | ||
| 2216? | Repress | ||
| 2218 | 190mm | ||
| 2018 Feb 2 | VKD44 Misurkin (MKS4), Shkaplerov (MK6) | ||
| 1507 | 115mm hg | ||
| 1509 | 75 mm hg | ||
| 1509 | 60mm | ||
| 1511 | Depress | ||
| 1511 | 27mm? | ||
| New ONA HF receiver box 27 kg? 0.6 x 0.4 x 0.3m | |||
| 1520 | 11mm | ||
| 1522 | Battery power | ||
| 1534:35 | HO | ||
| 1545 | Misurkin egress | ||
| 1547? | Skhaplerov egress? | ||
| 1700? | Rotate Lira antenna | ||
| 1710 | Begin work on removing old receiver box | ||
| 1756 | Removed thermal blankets | ||
| 1935 | Remove old box | ||
| 1941 | Jettison old box | ||
| 2030 | New box installed | ||
| 2054 | Complete installation of HF box | ||
| Working on LF system? | |||
| Unlock and rotate antenna back to op position | |||
| 2200 | ONA rotating, snags on ATV target | ||
| ONA manually released | |||
| 2220 | ONA still sticking | ||
| 2240 | ONA returned to operational position | ||
| 2250 | Begin return toward Pirs | ||
| 2307 | 'Holding bundle' | ||
| 2319 | Poisk/ISS hatch closed to isolate Acaba/Vandehei | ||
| 2325 | Shkaplerov ingress | ||
| 2327 | Misurkin ingress | ||
| 2347 | HC | ||
| 2353 | Repress | ||
No comments: