Friday, December 21, 1984

Peole

 1970-109A


The Peole (Preliminaire Eole) satellite was a prototype of the Eole weather satellite. The satellite carried the Eole transponders as well as a gravity gradient stabilization system, geodetic laser retroreflectors, and experimental solar cells. Peole was launched on 1970 Dec 12, but the orbit reached was lower than planned.

Mass was 57 kg (70 kg per RAE and TRW, 55 kg per SFLT).

The gravity boom deployed prematurely when the rotation speed was still too high, and the satellite ended up oriented upside down. The satellite was successfully flipped on Dec 31 and the mast used to reduce oscillation amplitude.


Peole 
 

DateTimeEventOrbit  

1970 Dec 12  1304:44 Launch by Diamant B  CSG ELD 
 1306:43  T+1:59 Amethyste MECO 
 1306:44? Stage 1 sep 
 1306:44? St 2 burn for 40s 
 1307:23? T+2:39 St 2 burnout 
 1225? St 2 sep 
 1311? T+6:53? St 3 burn 46s 
 1311? T+7:39? St 3 burnout at 741 km? 
 1312? Peole sep 97.2 517 x 747 x 15.0 
 1315? Yo-yo despin 
1980 Jun 16   Reentered 

Payload:

  • Gravity gradient stabilization system with 10m long mast, 3 kg end mass

  • Eole transmitters

  • Laser reflectors (44)

Thursday, December 20, 1984

Corona 92

1965-013A


KH-4A Mission 1017 (CORONA 92) carried scientific experiments in addition to the J-1 camera system. It was launched on 1965 Feb 25. Both SRVs were recovered, and transmissions from the experiments continued to Mar 10.


KH-4A Mission 1017 
 

DateTimeEventOrbit  

1965 Feb 25  2144:55 Launch by Thor SLV-2A Agena D  V Complex PALC-1 Pad 1 
 2145:55  Castor sep (T+1:00) 
 2147:25  Thor MECO (T+2:30) 
 2147:33  Thor VECO (T+2:38) 
 2147:41  Thor sep (T+2:46) 
 2147:45 Agena burn (T+2:50) 
 2151:48 Agena MECO (T+6:53)  90.07 182 x 378 x 75.08 (VCR) 
1965 Feb 26  0142   90.02 178 x 372 x 75.08 
1965 Feb 26  0230   90.07 177 x 377 x 75.08 (RAE) 
 1813   89.99 174 x 373 x 75.1 
1965 Feb 28  0913   89.94 177 x 365 x 75.1 
1965 Feb 28    89.9 179 x 352 x 75.1 (SSR) 
1965 Mar 2  2311?  SRV-1 ejected rev 81 
1965 Mar 2  2350 SRV-1 recovered midair 
  22 57N 156 01W 
1965 Mar 5  2105   89.78 176 x 350 x 75.1 
1965 Mar 6  2301? SRV-2 ejected rev 145 
1965 Mar 6  2343  SRV-2 recovered midair 
  23 30N 166 22W 
1965 Mar 7  2358   89.72 166 x 354 x 75.1 
1965 Mar 10   End of transmissions 
1965 Mar 12  1901   89.37 179 x 307 x 75.1 
1965 Mar 15    89.6 180 x 328 x 75.1 (SSR) 
1965 Mar 18  1955?  Reentered 

Ariel 2

 1964-015A


UK 2 (NASA S-52, UK-C) was similar to UK 1. The NCSR and GSFC managed the program. Mass was 68 kg. Size 0.58m dia 0.90m long with a 40m dipole antenna normal to the spin axis.


Ariel 2 
 

DateTimeEventOrbit  

1964 Mar 27  1725:23  Launch by Scout X-3  WI LA3 
  T+1:15 St 1 burnout 
  T+1:34 St 2 burn 
  T+2:16 St 2 burnout 
  T+2:44 Fairing sep 
  T+2:45 St 3 burn, St 2 sep 
  T+3:23 St 3 burnout 
 1732:36 T+7:13 St 3 sep 
 1732:40 T+7:17 St 4 burn,  
 1733:17 T+7:54 St 4 burnout 
 1747:36 T+22:13 Yo weights deploy 
 1748:36 T+23:13 Inertia booms 
 1749:36 T+24:13 Solar panels deploy 
 1750:36 T+25:13 St 4 sep 
   285 x 1362 x 51.6 
1964 Sep   End of ops
1967 Nov 18  1620? Reentered over Ethiopia 

Payload:

  • Galactic radio noise (MRAO/FGSmith) 40m dipole antenna 650kHz-3.5MHz

Kosmos 117

  1966-037A


Zenit-2 No. 39 flew a standard 8-day, 65 degree mission in May 1966.


Kosmos-117 
 

DateTimeEventOrbit  

1966 May 6  1058  Launch by Vostok 8A92  KB 
 1103? Blok-E burn 
 1108? Blok-E sep   
   89.5 207 x 308 x 65 (TASS) 
 2130   89.6 205 x 298 x 64.9 (RAE) 
1966 May 6    89.54 205 x 297 x 64.9 
1966 May 10    89.48 203 x 294 x 65.0 
1966 May 14  0805?  Retrofire
 0815?  PO sep 
 0825? Landed 

Tuesday, December 18, 1984

Aeros 2

 1974-055A


The Aeros 2 satellite (Aeros B to NASA prior to launch) was DFVLR's second atmospheric study satellite. It was launched in Jul 1974 to carry on the work done by Aeros A, and operated until its reentry in Sep 1975. Mass was 127 kg.

AEROS-B is under the aegis of the BMFT. The satellite is built by GfW (Gesellschaft fur Weltraumforschung mbh).


Aeros 2 
 

DateTimeEventOrbit  

1974 Jul 16  1151:01  Launch by Scout D-1 S-186C  V SLC5 
 1152:23  Algol burnout T+1:22 
 1152:29  Castor burn T+1:28 
 1153:07  Castor burnout T+2:06 
 1154:06  Fairing sep T+3:05 
 1154:08  Antares burn T+3:07 
 1154:42  Antares burnout T+3:41 
 1154:49  Coast 
 1157:09  Altair burn T+6:09 
 1157:42  Altair burnout T+6:41 
 1202:05  T+11:04 Altair sep 
 1202:07  T+11:06 Yo-yo sep 
   95.6 224 x 869 x 97.5 
1974 Jul 23   Experiment covers open 
1975 Feb 25    90.61 195 x 413 x 97.4 
1975 Feb 25   Orbit raise  91.45 280 x 410 x 97.4 
1975 Sep 25   Reentered

Payload:

  • IP Impedance Probe for electron density (ApW-Freiburg/Neske)

  • MS Mass spectrometer (MPIK/Krankowsky)

  • RPA Retarding Potential Analyser (ApW-Freiburg/Spenner)

  • EUV Solar and atmospheric EUV spectrometer 120-1070A (ApW-Freiburg/Schmidtke)

Sunday, December 16, 1984

Kosmos 988

 1978-015A



Kosmos-988 
 

DateTimeEventOrbit  

1978 Feb 8  1215 Launch by Soyuz  Plesetsk 
 1219  Blok-I burn 
 1223  Blok-I sep 
1978 Feb 8    89.89 200 x 337 x 72.8 
1978 Feb 8   B 193x320, d Feb 17 
1978 Feb 8   C 125x339, d Mar 5 
1978 Feb 20   D 177x254, d Feb 22 
1978 Feb 20   E 187x502, d Mar 2 
1978 Feb 20   F 203x271, d Mar 11 (Engine) 
1978 Feb 20   G 198x403, d Feb 24 
1978 Feb 20    89.70 196 x 321 x 72.8 
1978 Feb 21  
 0652?  Deorbit 
 0702?  PO sep 
 0707? Entry 
 0725? Landed 

October 1,2026

  https://planet4589.org/space/jsr/back/news.860.txt