Wednesday, July 3, 2013

TDRS-9

 2002-011A


BSS-601 TDRS I by Atlas IIA AC-143 from CC 2002 Mar. 3190 kg. BOL mass is 1781 kg. Size is 3.4 x 3.4 x 8.4m with 21m span, 13m antenna span.


 
 

DateTimeEventOrbit  

2002 Mar 8  2259  Launch by Atlas IIA AC-143  CC SLC36A 
  T+2:45 BECO 
  T+2:48 Booster sep 
  T+3:38 Fairing 
  T+4:35 SECO 
  T+4:37 Atlas sep 
  T+4:54 MES-1 
 2308 T+9:52 MECO-1  167 x 578 x 28?  
  T+24:29 MES-2 
  T+25:50 MECO-2 
 2328 T+29:37 Centaur sep  507.28 247 x 29135 x 27.1 
2002 Mar 11   LAM-1 31m/s 32 kg? 510.85 433 x 29146 x 26.4 
2002 Mar 13   LAM-2 perigee 132m/s 132 kg? 635.80 429 x 35800 x 26.31 
2002 Mar 19  0010? LAM-3 313 m/s 291 kg? 696.73 3521 x 35789 x 21.4 
2002 Mar 20    697.07 3521 x 35806 x 21.4 
2002 Mar 26   LAM-4  797.02 8383 x 35811 x 17.4 
2002 Mar 29    797.05 8384 x 35811 x 17.4 
2002 Apr 27   LAM-5  796.89 8391 x 35797 x 17.3 
2002 Jun 12  1600? LAM-6  818.34 9392 x 35813 x 16.6 
2002 Jun 16  1530? LAM-7  829.56 9918 x 35815 x 16.3 
2002 Jul 13  1100? LAM-8  859.03 11286 x 35824 x 15.7 
2002 Aug 5   LAM-9  870.48 11819 x 35823 x 14.9 
2002 Aug 15   LAM-10  903.04 13323 x 35815 x 14.8 
2002 Sep 10   6min burn  
2002 Sep 13    976.74 16667 x 35795 x 13.8 
2002 Sep 24    1279.88 29507 x 35833 x 10.0 
2002 Sep 30   Reaches GEO 
2002 Oct 6  0615?  1436.56 35778 x 35813 x 8.5 
2002 Oct 28    1436.21 35769 x 35807 x 8.4 GEO 149.8W+0.03W 
2003 Jan 4    1436.11 35752 x 35821 x 8.2 GEO 149.5W 
2003 Oct   Drift off course 
2003 Dec 19   Move out of GEO from 152W 
2004 Jan 24   Move into GEO at 171W 
2004 Apr 10    1436.01 35766 x 35803 x 7.1 GEO 170.8W 
2004 Sep 19    1436.00 35765 x 35803 x 6.7 GEO 170.9W 
2004 Oct   Relocate out of GEO 
2005 Jan 22    1433.20 35711 x 35748 x 6.3  
2005 Feb 23   Move into GEO at 62.5W 
2005 Mar 13    1436.06 35767 x 35804 x 6.2 GEO 62.2W 
2006 Aug 8    1436.26 35772 x 35807 x 4.9 GEO 62.6W 
2011 May 31    1436.17 35699 x 35877 x 1.4 GEO 62.4W 
2011 Aug 4   move out 
2011 Sep 9   Move in at 41W  1435.99 35722 x 35847 x 1.4 GEO 41.0W 
2013 Apr 29    1435.99 35718 x 35850 x 2.2 GEO 41.0W 

Us Weekly: March 25,2013

 https://welib.org/md5/323b79f296688b8643fbda67e1662ca8

Tuesday, July 2, 2013

Nanosail-D

 2010-062L


NS-D is a solar sail deployed from a P-POD built into FASTSAT. 10 sq m sail.

First deploy attempt waved off on Nov 27. Deploy attempt Dec 6 at 0631 UTC; the P-POD door opened but the satellite was not tracked and did not communicate with the ground; it had become stuck in the deployer.

Deployed unexpectedly Jan 18 0300 UTC (confirmed Jan 19 1630 UTC.). The sail was confirmed to have deployed around Jan 20. Last transmission Jan 21.


S26 
 

DateTimeEventOrbit  

2010 Nov 20  0125:00  Launch by Minotaur IV  V SLC8 
  T+0:57 St 1 sep 25 km 
  T+1:56 St 2 burnout 88 km 
  T+1:56 St 2 sep 106 km 
  T+1:56? SR120 burn 106 km 
 0127 T+2:20 92-in Fairing sep 133 km 
  T+3:08 St 3 burnout 192 km? 
 0138 T+13:21 St 3 sep 
 0138 T+13:32 St 4 burn  
 0139 T+14:39 St 4 burnout 
  B+0:00 Stage 4 burnout  641 x 652 x 72.0 
 0141 B+2:00 T+16:39 STPSat-2 sep  
 0142 B+3:00 T+17:39 RAX sep from PPOD-1 
 0143 B+4:00 T+18:39 O/OREOS sep from PPOD-2 
  B+5:00 Rotate stage 180 deg 
 0146 B+7:00 T+21:39 FASTSAT sep 
2010 Dec 6  0631  NS-D/PPOD sep commanded, failed 
2011 Jan 18  0300  NS-D separate from FASTSAT 
2011 Jan 20  0300? Sail deploy 
2011 Jan 21  1354 Last transmission 
2011 Feb 22    97.36 615 x 648 x 72.0 
2011 Sep 17   Reentered 

Monday, July 1, 2013

Aqua

 2002-022A


EOS PM-1 Earth Observing System: TRW T330 (AB1200) Odyssey class graphite-epoxy bus. Launch is Apr 2002 by Delta 7920. orbit 690 x 705 x 98.2. Launch to A-Train constellation at 1:30pm position.

Launch mass 2934 kg (web page and press kit; but AWST said 3078 kg) incl 102 kg hydrazine.

Size 2.7 x 2.5 x 6.7m with 14m solar panel. 16.7m total span.

Mission is climate studies, with cloud, snow and ice cover measurements.


Aqua 
 

DateTimeEventOrbit  

2002 May 4  0954:58  Launch by Delta 7920-10L 
  T+1:26 SRM 1-6 sep 
  T+2:11 SRM 7-9 sep 
  T+4:23 MECO 
  T+4:31 St 1 sep 
  T+4:37 SES-1 
  T+4:43 Fairing sep-4200? x 150? x 98.1  
 1006:09 T+11:11 SECO-1  185 x 707 x 98.14 
 1047:39 T+53:41 SES-2 
 1048:58 T+54:00 SECO-2  676 x 687 x 98.17 
 1054:28 T+59:30 St 2 sep 
  T+1:21:30 SES-3 
 1116 T+1:21:54 SECO-3 
 1140  Solar arrays deployed 
2002 May 10    98.32 673 x 682 x 98.18 
2002 Jun 1    98.35 673 x 686 x 98.17  
2002 Jun 9   orbit raise  98.55 681 x 697 x 98.18  
2002 Jun 15   orbit raise  98.75 693 x 703 x 98.17 
2002 Jun 22  orbit raise  98.82 698 x 705 x 98.17  
2002 Jul 13   98.83 698 x 706 x 98.17 
2002 Aug 4    98.82 699 x 704 x 98.19 
2002 Nov 30   98.83 701 x 703 x 98.19 
2003 Feb   HSB failed 
2011 Oct   AMSR failed 

Payload:

  • 8 x 4.4N hydrazine thrusters

  • CERES Clouds and the Earth's Radiant Energy System

  • MODIS-N Moderate Res Imaging Spectrometer

  • AIRS/E Atmospheric IR Sounder/EOS

  • AMSU-A Adv Microwave Sounding Units (2)

  • AMSR-E Multifreq Imaging Microwave radiometer (Japan)

  • HSB Microwave Humidity Sounder (Brazil)

November 20,2006

  https://en.wikipedia.org/wiki/Association_football