Saturday, June 11, 2016

USA-210

 2009-057A


DMSP 18 Launch by Atlas V 401 AV-017. Processed at LMSC/Sunnyvale. Will replace F-16.

AV-017 was used to test long duration Centaur ops and then disposed into a heliocentric orbit with C3 = 37.47 km2/s2. 5400 kg of extra LOX/LH2 was available after DMSP delivery.


DMSP 18 
 

DateTimeEventOrbit  

2009 Oct 18  1612:01 Launch by Atlas V 401  V SLC3E 
  T+4:07 BECO 
  T+4:13 Stage 1 sep 
  T+4:23 MES-1 
  T+4:31 Fairing sep
 1627:21 T+15:20 MECO-1  
 1630 T+18:09, Centaur sep, MECO1+2:49  857 x 857 x 99 
  102.8 850 x 857 x 98.8 (UN) 
 1646? T+35:00? sep+16:40 Begin Centaur demo  
  AV-017 Hydrazine burn to settle prop at reduced duty cycle 
  Single-direction roll coast test 
  Controlled GO2 venting test 
  LH2 pulsed chilldown test 
 1910 T+2:58:07 Centaur MES2, disposal, 841 km 
  Test of GO2 venting during engine burn  
  Enhanced MRS (continue until significant thrust decrease) 
 1913 T+3:01:47 Centaur MECO2, escape traj, 917 km 
  T+3:05:14 Begin blowdown 
  T+3:28:24 Blowdown complete 
  T+3:41:04 N2H4 depletion 
 1957 T+3:45:04 Centaur EOM 
  T+3:55:04 get Orbital Param Message 
2009 Oct 19  0108  Centaur pass EL1:4 
2009 Oct 21  1400? Centaur depart Earth L1 sphere 
2016 Mar   Primary sat at 0710 LT 

STS-127 (Endeavour)

 2009-038A


On OV-105, 3003 for Wolf and 3018 for Cassidy. No rotation with ISS EMUs.

On ISS: EMU 3005 Kopra,Marshburn with 3011 as backup. 3006 not used.

Launch mass 119939 kg and landing mass 97389 kg.

The ODS carries the DTO 701B DragonEye LIDAR nav sensor for SpaceX on the TCS mount.

On EVA-4 the astronauts removed thermal covers from the ELF-ES and then went out to the P6 IEA to replace batteries there. Only two out of a planned four were swapped out when the spacewalk was cut short as CO2 levels rose in Cassidy's suit; the LiOH canister was unable to keep up with his rapid exertions early in the EVA.

Landing mass expected 97623 kg. MD to ISS 987 kg plus 582 kg consumables, ISS to MD 898 kg. Total transfer 11176 up, 4753 down (including 1020 kg BORUs). PLB to 10189 kg up, 3855 kg down; 'Real time additions' 66 up 75 down. Down cargo includes old P6 BORUs.

After docking:

  • JEM-EF is installed on JEM-PM with SSRMS.

  • ICC-VLD is installed on POA (Payload ORU Accomodation) on ISS using SRMS and SSRMS.

  • ICC-VLD is moved to P6 by SSRMS/SPDM for battery install/replace; then back to POA.

  • PM-2, LDU, SGANT installed on ESP-3 from ICC-VLD using SSRMS, EVA.

  • ICC-VLD reberthed in bay.

  • ELM-ES installed on JEM-EF by SRMS/SSRMS

  • SEDA,MAXI and ICS transferred from ELM-ES to JEM-EF using JEM-RMS

  • ELM-ES returned to PLB using SSRMS,SRMS.

The Bay 5 ECSH contains JEM-EF LTA cable stowage The Bay 13 ECSH supports ICC-VLD LTA cable stowage

PPSU 1 (Payload power switching unit) gives power to ELM-ES; PPSU 2 gives power to ICC-VLD. The SPDU gives power to the OBSS laser sensor, and the ROEU powers the ELM-ES heaters.

The flight includes two experiments using Orbiter engine burns: MAUI (Maui analysis of upper atmospheric injections) and SEITE (Shuttle Engine Ion Turbulence Experiment).

The EVAs will generate some debris; EVA-1 will jettison the EFBM Contam Cover; EVA-2 may jettison two Vision Equipment Camera covers (if not bagged); EVA-3 will jettison three ICS-EF thermal covers.

 


STS-127 
 

DateTimeEventOrbit  

2009 Apr 10   Roll to VAB 
2009 Jun 13  0426  T- 7h Scrub due to GUCP gas leak during tanking 
2009 Jul 15  2203:10 Launch  
 2205:13  SRB sep 
 2205:24  OMS Ass 
 2206:35  OMS ASS CO 
 2211:34  T+8:30 MECO 
 2211:56  ET-131 sep  58 x 230 x 51.6 
 2241:40 T+38:30 OMS-2 30.1m/s 1:06? 158? x 229 x 51.6 
 2242:43  OMS-2 CO 
 2335:25  PLBD open  88.38 155 x 232 x 51.6 
2009 Jul 16  
 0147:38  OMS-3 NC1  
 0147:59  OMS-3 CO 
 0600  88.70 180 x 240 x 51.6 
 1454:09  OMS-4 R NC2  88.75 177 x 247 x 51.6 
 1454:19  OMS-4 CO 
 1550? OBSS unberth 
 2200   88.78 187 x 241 x 51.6 
2009 Jul 17   Rendezvous 
 0400   88.80 186 x 243 x 51.6 
 1300:17 OMS-5 NH 113924 kg 46 m/s   
 1301:54 OMS-5 CO 
 1345:32  OMS-6 NC4 27m/s 112226 kg 
 1346:28 OMS-6 CO 
 1420  NCC 
 1517:26  OMS-7 L TI burn 12s 3m/s 111248 kg 
 1517:38  OMS-7 CO 
 1538  MC1 
 1611  MC2 
 1629  MC3 
 1638  MC4  
 1650  210m on Rbar nadir 
 1656  Begin RPM 
 1704  RPM complete 
 1717  On +Vbar 
 1737  Adjust alignment 
 1739  Final approach from 10m 
 1747:06  Docking  341 x 351 x 51.6 
 1948  HO 
 2122  Kopra joins EX20 
2009 Jul 18 0035  15-min orbit boost, avoid object 84180 

 EVA-1 Wolf, Kopra 
 1320  RMS in motion 
 1505?  SSRMS grappled JEM EF 
 1553  Depress in progress 
 1605  Resume at 5psi 
 1606  2.1 psi 
 1613  0.7 psi 
 1618  HO  91.49 344 x 351 x 51.6 
 1619  Battery power 
 1626  Egress Kopra 
 1630  Wolf still in AL 
 1635  Egress Wolf 
 1715  Active berthing mechanism MLI cover removed from JEM Kibo by Wolf 
 1724  EF thermal cover removed for temp store in toolbox 
 1742  JPM ABM MLI thermal cover jettisoned by Wolf  
 1759  SSRMS unberth EF 
 1810? Kopra removes MAXI cover 
 1830  SRMS grapples EF 
 1837  MAXI cover stowed in AL? 
 1846  SSRMS ungrapple EF 
 1955  Wolf releasing P3 UCCAS  
 1955  EF in handoff position 
 2005  UCCAS released 
 ?  MT translate from WS6 to WS7 
 2010  SSRMS walk off: grapple MBS, based on Harmony 
  SSRMS ungrapple Harmony, based on MBS 
 2030  SSRMS in motion  
 2058  SSRMS grapple EF 
 2107  SRMS ungrapple EF 
 2130  Wolf ingress 
 2133?  Kopra ingress 
 2142 TC close 
 2142  EF close to Kibo 
 2148  HC 
 2151  Repress NASA: 5:32 
 2215?  EF mated to Kibo 
 2228  EF latched 
 2247  EF fully latched 
 2334  EF installation complete 
2009 Jul 19  1347  RMS grapple ICC-VLD 
 1402  RMS unberth ICC-VLD 
 1501  SSRMS ready to grapple 
 1515?  SSRMS grapple ICC 
 1527? RMS ungrapple ICC 
 1605  ICC near MBS POA 
 1658  ICC berthed on MBS POA 
 1710  SSRMS ungrapple ICC 
2009 Jul 20   EVA-2 Wolf, Marshburn 

 

1457  At 5 psi 
 1508  Depress? 
 1524  HO 
 1527  Battery power 
 1542?  Egress Marshburn 
 1545  Egress Wolf 
 1730  SGANT unberthed from ICC-VLD 
 1820  SGANT installed on ESP 
 1920  Pump module installed on ESP 
 2030  MT spare LDU drive installed on ESP 
 2145?  TC open 
 2205? Ingress 
 2207  TC closed 
 2215  HC  
 2220  Repress 
2009 Jul 21    
 1229  SRMS grapple JLE 
 1245? SRMS unberth JLE 
 1330  SSRMS grapple JLE ("Jelly") 
 1333? SRMS ungrapple JLE 
 1426  JEL soft dock with EF 
 1435  SSRMS dock ELM-ES (JLE) with EF 
 1535  SSRMS ungrapple JLE? 
  SSRMS grapple ICC 
 1650?  SSRMS unberth ICC from MBS 
 1830? MT translation to near P6 
2009 Jul 22   EVA-3 Cassidy, Wolf 
 1402  Begin depress 
 1424  1 psi  
 1428? Depress 
 1430  0.5 psi 
 1431  HO 
 1432  Battery power 
 1439  Go for egress 
 1442  Cassidy egress 
 1445  Wolf egress 
 1446  TC closed 
 1507  JEF Thermal cover 1 jettison by Cassidy 
 1516  Thermal cover 2 jettison 
 1520  Thermal cover 3 jettison 
 1537  Thermal cover 4 removed for return 
  Translate to P6 truss 
 1640  Old Bat A removed from P6 
 1645? Old Bat A stowed on temp area in P6 
 1711  New Bat A removed from ICC 
 1726  New Bat A installed on P6 
 1734  Old Bat B removed from P6 
 1755  Old Bat B installed on ICC 
 1821  New Bat B removed from ICC 
 1836  New Bat B installed on P6 
 1852  Old Bat C removed from P6 
 1926  Old Bat C on ICC 
 2005  Cassidy LiOH/CO2 problem, EVA called off 
 2018  Ingress Wolf 
 2021  Ingress Cassidy 
 2027  HC  
 2031  Repress (NASA 5:59) 
2009 Jul 23  
 1255  JEM-RMS grapple MAXI (on JLE) 
  EF vibrations due to hard grapple 
 1320? Ungrapple MAXI 
 1410? Regrapple MAXI 
 1420  JEM-RMS unberth MAXI 
 1525  MAXI installed on EF 
 1540?  JEM RMS ungrapple MAXI  
 1622  JRMS grapple IOCS 
 1726  JEM RMS unberth IOCS from JLE 
 1848  IOCS berthing on EF 
 1858  IOCS installed on EF 
 1858  JRMS ungrapple IOCS 
 1940? JRMS grapple SEDA 
 2045  SEDA-AP removed from JLE by JEM RMS 
 2120  SEDA-AP installed on EF 
2009 Jul 24   EVA-4 Cassidy, Marshburn 
 1319  Depress underway 
 1339 Resume depress  
 1345 Depress 0.7 psi 
 1347 0.6 psi 
 1353 0.5 psi  
 1353  HO  
 1354  Battery power 
 1401  Egress Marshburn 
 1408  Egress Cassidy 
  Battery replacements at P6 
 1435  Cassidy and Marshburn arrive at P6 
 1458  New battery C removed from ICC 
 1519  New battery C installed on P6 
 1530  Old battery D removed from P6 
 1612  Old battery D on ICC 
 1645  New battery D removed from ICC 
 1719  New battery D installed on P6 
 1740  Old battery E removed from P6 
 1810  Old battery E installed on ICC 
 1833  New battery E removed from ICC 
 1853  New battery E installed on P6 
 1908  Old battery F removed from P6 
 1924  Old battery F installed on ICC 
 1942  New battery F removed from ICC 
 1950  New battery F installed 
 2003  Old battery A moved from P6 temp to ICC 
 2025  SSRMS moving ICC away from P6 
 2052  Cassidy ingress 
 2055  Marshburn ingress 
 2102  HC 
 2107  Repress NASA 7:12 
 2133  SSRMS hand ICC to SRMS 
 2220  ICC being berthed by RMS in bay 
 2250  ICC berthed and latched 
 2258  SRMS ungrapple  
2009 Jul 26  
 0850? MT move WS8 to WS4 
 1150  JLE grappled by SSRMS  
 1218  JLE being moved away from EF 
 1257  SMRS grapple JLE 
 1305  SSRMS ungrapple JLE 
 1345  JLE latched in bay  
 1349  SRMS ungrapple JLE 
2009 Jul 27   EVA-5 Cassidy, Marshburn 
 1128  1 psi 
 1130? Depress 
 1132  HO 
 1133  Battery power 
 1142?  Egress Cassidy 
 1146?  Egress Marshburn 
 1220 Cassidy work on Z1 elec cables 
 1230 Marshburn fix Dextre thermal covers 
  Cassidy and Marshburn to EF 

 

1330  TV camera install on EF 
 1500  TV cameras install on Kibo 
 1608?  Marshburn ingress 
 1616  Cassidy ingress 
 1617  TC closed 
 1623  HC 
 1627  Repress (NASA 4:54) 
  SSRMS relocate to Node 2 
2009 Jul 28  
 1508  Hatch closed to ISS 
 1725:56  Undocking 
 1726:06 RCS ISS Sep  
 1730  8m sep 
 1753:04  Begin flyaround on +Vbar at 130m 
 1806  On R-bar zenith 
 1810  Range 188m 
 1817  On -Vbar 
 1828  On R-bar nadir 187m 
 1840  On +Vbar 
 1840:40  Sep-1 6s 0.5m/s 
 1908:40  Sep-2 42s 3m/s 
2009 Jul 29  
 1502  SRMS berth/ungrapple OBSS 
 1728:43  OMS 8 both, 10s SEITE-1 burn  328 x 353 
 1728:53  OMS 8 CO 
 2012:09  OMS 9 L, Sep-3 11.8s Orbit adjust 3m/s 328 x 342 
 2012:22  OMS 9 CO 
2009 Jul 30  
 1103:49  OMS-10 both, SEITE-2 burn 9.9s 5.0m/s  323 x 347  
 1103:59  OMS-10 CO 
 1124:09 RCS OA burn 21.7s 1.6m/s  323 x 341  
 1234:30  Dragonsat deploy (MET 15:14:31:20) 
 1234:35  Dragonsat Bevo/Aggiesat failed to sep 
 1723:02  ANDE-2 deploy (MET 19:19:52) 
 1723:39  ANDE-2 upper can sep from center 
 1723:39  ANDE Passive ? sep from upper can 
 1723:56  ANDE Center disk separate from lower can 
 1723:56  ANDE Active sep from lower can 
 1748s  SEP-4 RCS burn 2s 
2009 Jul 31 
 1101:41 PLBD closed  327 x 336 x 51.6 
 1341:10  OMS DO 92.4m/s 2:51 
 1344:01  OMS DO CO  17 x 335 x 51.6 
 1416:31  EI 
 1448:10  MGTD KSC RW15 
 1448:21  NGTD 
 1449:13  Wheels stop 

1926OPF Bay 2 

Tuesday, June 7, 2016

BEAM

 2016-024


BEAM, Bigelow Expandable Activity Module, 1413 or 1578 kg, 3.7m l 3.2m dia; 1.75m high 2.36m dia packed. Delivered to ISS aboard Dragon CRS-8 and installed on Node 3 aft.


BEAM 
 

DateTimeEventOrbit  

2016 Apr 16  0500?  SSRMS grapple BEAM 
 0600? SSRMS unberth BEAM 
 0620  BEAM out of CRS-8 trunk 
 0900  BEAM next to N3 
 0921  Ready to latch 
 0937  Berthed on N3 aft (Stage 2 capture) 
2016 May 25   N3 HO to BEAM vestibule opening 
2016 May 26   Expand attempt, small motion 96 in to 111 in 
2016 May 28  1305  113in Introduce 22s air 
 1313  8s air 
 1338  3s air 
 1352  1s air 
 1443  1s air 
 1510  5s air 
 1525  3s air 
 1620  1s? air, 32 in long 118 dia  
 1644  2s air 
 1652  2s air (try 13, 54s total), 34 x 118  
 1712  1s air, 35 x 119  
 1724  1s air, 37 x 119 
 1748  1s air 38 x 120 
 1808  1s air 39 x 120 
 1825  1s air 40 x 120 
 1853  2s air 41 x 120  
 1918  42 x 120  
 1936  8s air 56 x 123 
 1943  10s air (try 21) 59 x 125  
 1946  14s air 63 x 127  
 1950  15s air 66 x 127  
 1955  30s air 66.5 x 127 
 2003  9s air 67 x 127 
 2010  Manual expansion declared complete 
 2034  Begin pressurization 
 2044  Pressurization complete 
2016 Jun 6  0847  Williams and Skripochka entry 