Saturday, March 21, 2015

Crazy Rich Asians (Crazy Rich Asians Trilogy)

 https://welib.org/md5/745f3db89af16cb3aabae386813c7f07

Aviation Week: September 8,2014

 https://welib.org/md5/019c30c5a6ad1afae2f2584641c3c572

Frankfort Country Club: one hundred years of history and tradition, 1913-2013

 https://welib.org/md5/7c7f1c5bb7eb3b2486fa541e87d8beb0

The Big Bang Theory and Philosophy : Rock, Paper, Scissors, Aristotle, Locke

 https://welib.org/md5/2b5ed0269532460e83014dc97a10d5dd

USA-240

 2012-071A


Flight vehicle 1 made its second flight as OTV-3.


X-37B 
 

DateTimeEventOrbit  

2012 Dec 11  1803 Launch by Atlas V 501 AV-034  CC SLC40 
  T+3:36 Fairing sep 
  T+3:42 CFLR sep 
  T+4:23 Atlas BECO 
  T+4:29 Atlas sep 
  T+4:39 Centaur MES-1 
 1820 T+17:35 MECO 
  AV-034 sep  343 x 360 x 43.5 
 1843?  T+40? AV-034 deorbit  -1500? x 350? 
 1900?  AV-034 impact IOR W of Australia 
2014 Oct 17  1540?Deorbit 
 1624  Landed RW12 VAFB 

Spaceflight: September 2014

 https://welib.org/md5/55e6aee71ccfed3bcbb59efb0d674dea

The Jump : my journey from public to private high school education

 https://welib.org/md5/ccc7feb246651428303289251fddb6c8

Friday, March 20, 2015

Prom Ever After: Haute Date\Save the Last Dance\Prom and Circumstance

 https://welib.org/md5/d7f033cd2613ec48f4b50f588dde9184

June 19,2006

 https://en.wikipedia.org/wiki/Western_Front_(World_War_I)

It’s Late!

https://broomheadz.com/2015/03/04/alexa-pappadopoulos-fashion-1-11/










BSat-3C

 2011-041B


Broadcast Satellite Systems corp and Sky Perfect JSat Corp. will launch a LMCSS/Newton A2100A in 2011 on Ari 5ECA.

At 110E.

Mass 2910 kg. 5.3 x 2.0 x 1.9m,, 18.9m span.

Following a regulatory change which allowed Japanese operators to fly a broadcasting and communications payload on the same satellite, JSAT and B-SAT procured a joint satellite, JCSAT-110R. The JSAT side would backup JCSAT-110. B-SAT would operate the satellite in orbit as B-SAT 3c.


BSAT3C 
 

DateTimeEventOrbit  

2011 Aug 6  2252:37 Launch by Ariane 5 L560 
  T+2:14 SRB sep 
  T+3:05 Fairing sep
 2301:22 T+8:45 EPC MECO  -1029 x 188 x 6.79 
 2301:28 T+8:51 EPC sep 
 2301:32 T+8:55 ESC-A burn 
2011 Aug 7 
 0017:30 T+24:53 ESC-A MECO   
 0019:42  T+27:05 Astra 1N sep 
 0029:15 T+36:38 Sylda sep 
 0030:41 T+38:04 BSAT sep 
  T+49:34 End of mission 
2011 Aug 8    630.88 264 x 35712 x 1.97 
2011 Aug 16    1435.88 35768 x 35796 x 0.0 GEO 109.9E 
2011 Oct 4    1436.12 35784 x 35789 x 0.0 GEO 110.0E 

Wednesday, March 18, 2015

IXV

 2015-U01


ESA Intermediate Experimental Vehicle (IXV). Launch by Vega to 180 x 307 km x 70 deg from CSG. or 470 km 1 orbit, deorbit burn using Vega AVUM upper stage over -90 -40 Pacific, reentry over -70 +35 at 7.70 km/s, -1.19 deg, 120 km (earth-relative; azimuth unknown) with recovery after splashdown. AVUM reached orbit, deorbited on 2nd pass over Kourou, probably with entry over the Indian Ocean.


IXV 
 

DateTimeEventOrbit  

2015 Feb 11 1340 Launch by Vega VV04  CSG ELV 
  T+1:52 P80 sep 
  T+3:35 Z23 sep 
  T+3:59 Z9 burn  
  T+4:02 Fairing sep 
 1346 T+6:39 Z9 sep 171 km 7.15km/s  
 1348 T+8:00 AVUM burn 1 
  Z9 impact 68.75E 2.75S +- 7 deg E 
 1353 T+13:49 AVUM MECO-1 332 km 7.656 km/s 76 x 416 x 5.4 
 1357 T+17:59 IXV sep 
 1411 T+31:14 AVUM MES-2 
 1411 T+31:30 AVUM MECO-2  220 x 430 x 5.4 
 1427? Z9 entry in IO 
 1444 IXV reentry 
  Parachute panel ejection 
  Drogue para 
 1509  Para deploy 
 1515?  Flotation device panels ejected 
 1518?  IXV splash 123W 3N 
 1529 T+1:49:31 AVUM MES-3 
  T+1:50:30 AVUM MECO-3 
 1610? AVUM reentry 86.25E 4.5S 
  Recovery ship Nos Aries 

Monday, March 16, 2015

STPSat-2

 2010-062A


Space Test Program Standard Interface Vehicle. Ball/AeroAstro generic bus based on AeroAstro STPSat-1

STP-SIV 1. Box + panels, attaches to ESPA ring.

Launch by Minotaur 4 from Kodiak on mission STP S26 which includes MSFC FastSat and three other sats: FASTRAC A/B

Size 0.6 x 1.0m, mass 135 kg.

The GCA contains the Ori 38 motor.

The HAPS stage contains the HAPS engine and the MPA (Multi Payload Adapter).

GCA stage is 2.34m dia 2.2m long Orion motor inside is 1.4long 1.0dia HAPS is a trunc cone 0.8l 1.0 dia; HAPS stage is 1.8m long 1.0m main diameter, with MPA at front 1.5m dia and truss at back possibly 2.1m dia.

68 mm = 2.34 0.0344/mmm

We have no data on the mass of the HAPS stage or the ballast. Guessing wildly we have 270-370 kg full, HAPS prop is 73 kg and thrust is 0.67 kN, Ve = 2314 m/s so mdot is 0.29 kg/s. Total HAPS burn time is 316s, implies 92 kg prop total, 40 kg in burn 1 and 52 kg in burn 2.

Low end mass: 270 kg to 230 kg to 178 kg, dV = 371 and 593 m/s. High end mass: 370 kg to 330 kg to 278 kg, dV = 265 and 397 m/s. Actual required dV to get to 635 x 1200: 142; then to 1201 x 1202: 145 m/s.

2314 ln m2/m3 = 145 so m2/m3 = 1.065; m1 = 1.134m3 and m1=m3+92 implies 0.134m3 = 92 so m3=686 kg. True mass of HAPS stage is much larger because of MPA and stage structure. Guess stage+MPA = 386 kg dry, ballast = 300 kg. HAPS stage full = 478 kg.

Total payload mass 509 kg; ballast+HAPS 778 kg. GCA stage 500 empty? GCA propellant 770 kg. Gives Orion 38 burn

of 1787 / 2557 for dV of 1008 m/s.

The UN registration confirms that the ballast payloads were in a 1200 x 1204 km x 72.0 deg orbit.


S26 
 

DateTimeEventOrbit  

2010 Nov 20  0125:00  Launch by Minotaur IV  V SLC8 
  T+0:57 St 1 sep 25 km 
  T+1:56 St 2 burnout 88 km 
  T+1:56 St 2 sep 106 km 
  T+1:56? SR120 burn 106 km 
 0127 T+2:20 92-in Fairing sep 133 km 
  T+3:08 St 3 burnout 192 km? 
 0138 T+13:21 St 3 sep  -2773? x 651 x 72.0  
 0138 T+13:32 St 4 burn  
 0139 T+14:39 St 4 burnout 
  B+0:00 Stage 4 burnout  641 x 652 x 72.0 
 0141 B+2:00 T+16:39 STPSat-2 sep  
 0142 B+3:00 T+17:39 RAX sep from PPOD-1 
 0143 B+4:00 T+18:39 O/OREOS sep from PPOD-2 
  B+5:00 Rotate stage 180 deg 
 0146 B+7:00 T+21:39 FASTSAT sep 
  B+8:00 Rotate stage 150 deg 
 0151 B+12:00 T+26:39 FS-5 sep 
 0156 B+17:00 T+31:39 FASTRAC1/2 sep from stage 
  B+17:30 Reorient to vel vector 
 0159 B+20:00 T+34:39 Stage 4 GCA sep from HAPS 
 0200 T+35:39 HAPS burn 1 136s over 102W 54S? 
 0202 T+37:55 HAPS cutoff 1 
 0251 T+1:27:00 HAPS burn 2 180s 
 0255 T+1:30:00 cutoff 2  1201 x 1202 x 72 
 0258 T+1:33:00 Ballast mass 1 and 2 sep from HAPS 
 0305 T+1:40:00 HAPS depletion 
 0309 T+1:44:00 RCS depletion 
  FASTRAC1/2 sep from each other 
  NS-D separate from FASTSAT 
2012 Apr   Mission extended to Feb 2013 

Payload:

  • Space Phenomenology Experiment (sensor test)

  • SCP SCP-2 Satellite Comms Payload, Data-X Data exfiltration experiment (ONR/Praxis/), IP based buoy comms with ODTML Ocean Data Telemetry Microsat Link (ONR/)

November 20,2006

  https://en.wikipedia.org/wiki/Association_football