Friday, September 8, 1989

Ariel 1

  1962-015A


The UK 1 satellite was built by NASA-GSFC for the British National Committee on Space Research and the Dept. of Science and Industrial Research. The spacecraft structure was made by Washington Technical Associates. NASA designated the payload S-51. It was named Ariel after launch from Cape Canaveral in Apr 1962 and was billed as the first international satellite.


Ariel 1 
 

DateTimeEventOrbit  

1962 Apr 26  1800:16 Launch by Delta DM19  CC LC17A 
 1802:55  Thor MECO 
 1802:55  Thor sep 
 1803:00 Delta 2018 SES 1:37 
 1803:29  Fairing 
 1804:38 Delta SECO  -3234 x 392 x 35? 
 1810:55  Spin 
 1811:10 Delta sep 
 1811:10 Altair X-248-A5 burn 
 1811:52  Altair burnout 
 1812:54  Despin 1 (yo-yo) 
 1814:14  Despin 2
 1828:30 Altair sep 389 x 1214 x 53.9 
1962 Jul 9    393 x 1209 x 54 
1962 Jul 12   ops intermittent 
1964 Jul 1   ops suspended 
1964 Aug 26   ops resumed 
1964 Nov 9  End of operations 
1976 May 24  2130  Reentered 

Tuesday, September 5, 1989

Intelsat 307

  1970-032A


The F-7 satellite was Atlantic Primary for two years, but failed in 1972. It appears to have been relocated to 3W in mid-1971. The orbit was low after the third stage burn and after apogee firing the altitude was made up with RCS burns. One transponder failed after 22 months in orbit.It seems that the first stage underperformed, but that the launch was still counted a success. D. Baker says that Intelsat quarterly operations reports show it still active to circa 1986.


Intelsat III F-7 
 

DateTimeEventOrbit  

1970 Apr 23  0046:12  Launch by Delta M  CK LC17A 
  SRM 1-3 burn 
 0049:48  T+3:36 MECO 
 0049:54? St 1 sep 
 0049:54? SES-1 6:25 
 0056:19? SECO-1 
 0110? St 2 sep 
 0111? TES 
 0111? TECO 
 0113? St 3 sep  261 x 31932 x 27.1 
1970 Apr 23  0530?  Apo 1 105E 
 1500?  Apo 2 37W 
1970 Apr 24  0030?  Apo 3 174W 
 0930? Apo 4 45E 
 1900? Apo 5 97W 
  RCS burns raise apogee 
1970 Apr 24  2019  SVM-2 burn  31935 x 35604 x 2.0 
  RCS burns raise perigee 
1970 May 1   AOR Primary, replaced III F-2  GEO 19W 
1970 May 4    1436.17 35770 x 35805 x 0.2 GEO 19.2W 
1970 Jul 7    1436.18 35759 x 35817 x 0.1 GEO 19.4W 
1970 Jul 20    1436.10 35773 x 35800 x 0.1 GEO 21.4W 
1971 Mar 1    1436.13 35772 x 35801 x 0.1 GEO 20.6W 
1971 Apr 12   mv out  1434.56 35722 x 35791 x 0.7 GEO 18.5W+0.4 
1971 May 25   mv in  1435.98 35776 x 35792 x 0.9 GEO 2.7W+0.02 
1972 Mar   Inactive?
1972 May   Replaced by IV F-3 
1972 May   Moved to IOR backup? 
1986? End of transmissions? 

May 13,2026

  https://planet4589.org/space/jsr/back/news.855.txt