Saturday, May 30, 1998

Gambit 11

  1964-058A


KH-7 11 (SV 962) was launched on 1964 Sep 23 by Atlas SLV-3 Agena D from Vandenberg. The SRV was recovered on Sep 27, with out-of-focus pictures. SV 962's OCV reentered on Sep 28.


KH-7 11 
 

DateTimeEventOrbit  

1964 Sep 23  2006? Launch by Atlas Agena D  
  T+2:18? BECO 
  T+4:37? SECO 
  T+4:54? VECO 
  T+4:59? Atlas sep 
  T+5:51? Agena MES 
 2015? T+9:50? Agena MECO 
1964 Sep 23   Agena D 4809 sep from OCV 
1964 Sep 24    88.95 145 x 303 x 92.9 
1964 Sep 24  2046   88.66 176 x 240 x 92.9 
1964 Sep 25  0535   88.04 121 x 233 x 92.9 
1964 Sep 27   Rev 65 last image 
1964 Sep 27  2240?  SRV deorbit  
1964 Sep 27  2315?  RV recovered on rev 67 
1964 Sep 28  1450?  Reentered after 4.78d 

Wednesday, May 27, 1998

Kosmos 1511

 1983-117A


The final Oktan flight was in Nov 1983 to Jan 1984. On Jan 5 the spacecraft apogee was raised to 448 km, much higher than typical. Kosmos-1511 returned to the normal altitude regime a day later.


Kosmos-1511 
 

DateTimeEventOrbit  

1983 Nov 30  1345 Launch by Soyuz  Plesetsk 
 1353  Blok-I sep 
1983 Nov 30    89.66 171 x 343 x 67.1 
1983 Dec 6    89.29 166 x 312 x 67.1 
1983 Dec 7   Orbit raise  89.70 168 x 349 x 67.1 
1983 Dec 14    89.06 159 x 296 x 67.1 
1983 Dec 14   Orbit raise  89.73 172 x 348 x 67.1 
1983 Dec 16   SpK-1 fid 
1983 Dec 24    89.09 163 x 295 x 67.1 
1983 Dec 25   Orbit raise  89.97 178 x 367 x 67.1 
1983 Dec 30    89.73 176 x 346 x 67.1 
1983 Dec 30   Lower peri  89.56 167 x 338 x 67.1 
1984 Jan 2   SpK-2 fid 
1984 Jan 3    89.23 163 x 309 x 67.1 
1984 Jan 5
 Orbit raise  90.65 164 x 448 x 67.1 
1984 Jan 6    90.52 163 x 435 x 67.1 
1984 Jan 6   Orbit lower  89.32 162 x 319 x 67.1 
1984 Jan 9    89.02 160 x 291 x 67.1 
1984 Jan 9   Orbit raise  89.32 170 x 311 x 67.1 
1984 Jan 13    89.02 166 x 285 x 67.1 
1984 Jan 15  
 2109?  Deorbit 
 2122? Entry 
 2135?  Landed 

Monday, May 25, 1998

Skylab 2

  1973-032A


Apollo CSM 116 (the Skylab SL-2 spaceship) was launched at 1300 on 1973 May 25 by Saturn IB from Kennedy Space Center. A `milkstool' pedestal had been placed on the LC39B platform to accomodate the shorter IB instead of the huge Saturn V.

The launch vehicle then went back to the VAB and rolled out again with the flight CSM 116. Adapter SLA-6, with hinges, was used after a decision to deorbit the S-4B stage; originally a separating adapter had been planned.

The flight was officially designated SL-2 (SL-1 was the space station itself) but in press releases the first piloted mission was often referred to as `Skylab 1' since it was thought that this would cause less confusion (!).


    Skylab SL-2 Crew

  • Commander Capt. Charles Conrad, Jr., USN

  • Science Pilot Cdr. Dr. Joseph Kerwin, USN, M.D.

  • Pilot Capt. Paul J. Weitz, USN

The Saturn IB delivered SL-2 to a 155 x 352 km x 50.0 deg orbit at 1310. from Apollo at 1316. The rendezvous burns began at 1523. The TPF braking burn at 2037:28 left CSM 116 in a 433 x 442 km orbit approaching Skylab. Soft dock with the axial port of the MDA ]came at 2156 on May 25. The CSM undocked again at 2245 and flew around the station to the SAS 1 array. At 2346 the CSM was depressurized and the hatch was opened for an EVA. Weitz stood in the open hatch and tried to free the SAS wing while Conrad stationkept with the lab. The wing remained stubbornly stuck, and Weitz returned to the cabin. The hatch was closed at 0023 and the cabin was repressurized at 0101 after an 01h 15m EVA. The crew now made 7 failed attempts to redock with the MDA, without managing to get the docking latches to lock. At around 0200 on May 26, the cabin was depressurized to rewire the docking probe. (Since the main hatch was not opened, most records do not count this as an EVA, although with the docking probe removed the cabin was open to space.) The CM was repressurized at around 0320. Finally at 0352 the spaceship successfully redocked with the axial MDA port and the crew could get a night's sleep. At 1630 on May 26 the hatch to the MDA was opened and the crew transferred to Skylab.

The CM was powered up at 0130 on 1973 Jun 22. The crew came aboard and undocked from Skylab at 0858 on Jun 22. After flying around the station to inspect it, they made an RCS separation burn at 0940, followed by an SPS burn at 1005 to lower the perigee to 167 km. The SPS deorbit burn was made at 1310. CM-116 splashed down in the Pacific at 1349:48 at 24 46N 127 4W. The spaceship was recovered by the aircraft carrier USS Ticonderoga.


Skylab 2
 

DateTimeEventOrbit  

1973 May 25  1300 Launch 
1973 May 25  1302:22 S-IB separation 59km  -6133 x 108 x 44.1 
 1302:23  J2 MES 
  Two M-415 covers sep? 
1973 May 25  1302:23? Interstage separation 
 1302:35  Ullage case jettison 70 km (97 kg tot) -6126 x 112 x 45.3 
  Two M-415 covers sep? 
1973 May 25  1302:45? (MSFC-MAN) LES separation 79 km -6107 x 116 x 45.5  
1973 May 25  1303:30 LES separation   
 1308:55  S-IB impact at 31.55N 76.76W 
1973 May 25  1309:49 S-IVB MECO 
1973 May 25  1310 Orbit insertion 155 x 352 km x 50.04 deg 
   150 x 352 x 50.03 (MPR) 
1973 May 25  1316 S-IVB separation 
1973 May 25  1523:30 NC1 13994 kg 9s, 359 x 372 km 
1973 May 25  1741:19 NC2 16s, 9m/s  370 x 406 km 
  13648 kg 
1973 May 25  1827:26 NCC (CCM) 11m/s 403 x 417 km 
1973 May 25  1904:26 NSR Coelliptic  415 x 425 km 
1973 May 25  2003:50 TPI (Terminal phase initiation) 5m/s 422 x 435 km 
 2031  Tallyho 
1973 May 25 2037:28 TPF (Braking), 433 x 442 km 
1973 May 25 2040  Rendezvous with Skylab 
1973 May 25 2125? Docked with MDA  

 

2345  Cabin down to 7.5psi 
1973 May 25 2345 Undocked from MDA 
 2350 Stationkeep near SAS 
1973 May 25 2352 Depress for SEVA, attempted SAS repair till 0101 
 2357? HO 
1973 May 26 0000  PLT SEVA from hatch 
 0012  Egress? 
 0020  Working on strap with pick tool 
 0022? HC 
 0023? Repress 
 0030? Docking with MDA, failed 
 0035? Docking with MDA, failed 
 0036  At 4 psi 
 0100  Docking with MDA, failed 
 0102:29 Docking with MDA, failed 
 0124:56  Docking with MDA, failed 
 0144  Stationkeeping 
1973 May 26 0220?  Docking with MDA, failed 
1973 May 26 0252 Depress for probe repairs 
 0259? Probe dismantled 
 0307  Repress 1 psi 
 0310  Repress 3 psi 
1973 May 26 0352 Docking with MDA, mass 13113 kg 
1973 May 26 1630 Hatch open to MDA, crew enter SL-1 
1973 May 29  0107  Orbit trim 0.6 km/s 
1973 Jun 17  1330  Orbit trim 0.9 km/s 
1973 Jun 22 0130 CSM power up 
1973 Jun 22  Crew entry 
1973 Jun 22 0855 Undocking from MDA 
1973 Jun 22 0858 Undocking from MDA 
1973 Jun 22  Flyaround of Skylab  425 x 440 x 50.0  
1973 Jun 22 0940:00 Sep (RCS) 1.5m/s  419 x 440 x 50.0  
1973 Jun 22 1005:29 Lower perigee (SPS), 10.9s,  167 x 426 x 50.0 km 
 1005:40 Cutoff, (-78.0,0.0,19.9) 
1973 Jun 22 1310:45 SPS deorbit (-56.2, 0.0, 13.9) 
 1311:54 Deorbit cutoff  -16 x 422 x 50.0  
1973 Jun 22 1315:50 SM-116 separation 
1973 Jun 22 1332:47 Entry interface
1973 Jun 22 1349:48 Splashdown in Pacific. 
1973 Jun 22 1430  Recovered by USS Ticonderoga 

May 13,2026

  https://planet4589.org/space/jsr/back/news.855.txt