Friday, December 15, 2017

Alcomsat 1

 2017-078A


ASAL comms satellite using CAST DFH4 bus. Control from Medea and Ouargla. Called Algeria yi hao tongxin weixing (Algeria No. 1 Communications Satellite) by China.


Alcomsat-1 
 

DateTimeEventOrbit  

2017 Dec 10  1641  Launch by CZ-3B  XSC  
  T+2:07 Booster sep 
  T+2:27 St 1 sep 
  T+3:52 Fairing 
  T+5:32 St 2 sep 
  T+5:32 St 3 MES-1 
 1651? T+10:31? MECO-1  160? x 450? x 28.5? 
 1702? T+21:21? MES-2 
 1705? T+24:20? MECO-2  200 x 41991 x 26.4 
 1707?  St 3 sep 

Sunday, December 10, 2017

LKW-1

 2017-077A


Land Survey Satellite 1. Launched 2017 Dec 3 to 1030 LTDN SSO. Rumoured to be a CAST-developed high resolution imaging spy satellite.


LKW 
 

DateTimeEventOrbit  

2017 Dec 3  0410 Launch by CZ-2D  JQ 
 0420? Stage 2 sep  489 x 502 x 97.5 
 0428?  Stage 2 deorbit 
 0454? Stage 2 impact Antarctic? 

AGILE

 2007-013A


AGILE (Astrorivelatore Gamma ad Imagini Leggero, Light Gamma-Ray Imaging Astronomical Detector) was developed for ASI using Carlo Gavazzi Space Spa/Milano MITA bus and CGS project management. PSLV to 550 x 550 x 6 deg, mass 352 kg. Perigee was a little low (523 km instead of 550 km).

PSLV modified to carry light payload; no PSOM and 400 kg of prop offloaded from the PS4 stage.

Sensitivity less than EGRET on-axis, but much better off-axis performance. 2.5 sr FOV. GRID has 5' to 20' resolution. The GRID MC (MiniCalorimeter) will also detect bursts in the 0.3-200 MeV range and Super-AGILE will give simultaneous hard X-ray data.

The AGILE (Light Imager for Gamma Astrophysics)

Launched with PSLV Advanced Avionics Module (180 kg) inside the Dual Launch Adapter.

SUPER AGILE 4 x 1D coded masks bibcode NIM-A 581, 728F Feroci et al 2007 45 sources seen to date, mostly XBs, some AGN, 2 GRB

In 2009 the reaction wheel malfunctioned, ending AGILE's ability to point at targets. Following this, AGILE was spun around the sun-pointing axis at 1 degree per second, surveying 70 percent of the sky each day.


AGILE 
 

DateTimeEventOrbit  

2007 Apr 23  1000 Launch by PSLV C-8  SDSC SLP 
  T+0:53 Sep PS1 50 km 1.737 km/s  -6240 x 70? x 6 
  T+0:53 PS2 burn 50 km 1.736 km/s 
  T+3:23 Fairing sep 116 km 2.95 km/s  -5900? x 130? x 6 
  T+4:23 PS2 sep 147 km 4.743 km/s 
  T+4:24 HPS3 burn 148 km 4.7842 km/s  -4900? x 150? x 6 
 1008 T+8:38 HPS3 burnout 283 km 7.581 km/s  -450? x 510 x 6 
 1017 T+17:13 PS4 burn 508 km 7.317 km/s  -450? x 510 x 6 
 1022 T+22:11 PS4 burnout 550 km 7.583 km/s 
 1022 T+22:53 PS4 sep from Agile 
2007 Apr 24    95.40 523 x 552 x 2.5  
2009 Oct 18   Reaction wheel failed 
2009 Nov 4   Spinning mode 
2014 Mar 14   Mission restarted 

Payload:

  • GRID Gamma-ray Imaging Detector 30 MeV-50 GeV detector using a Si/W tracker, CsI mini-calorimeter (GRID-MC) and anticoincidence system.

  • GRID-MC CsI mini-calorimeter 0.3-200 MeV

  • Super-AGILE Hard X-ray detector 15-45 keV, FOV 0.8sr, 3' res

May 13,2026

  https://planet4589.org/space/jsr/back/news.855.txt