Friday, January 30, 2015

SJ-11-06

 2014-014A


Shi Jian shiyi hao 06 xing was launched on 2014 Mar 31 into an 0902LTDN SSO.


SJ11-06 
 

DateTimeEventOrbit  

2014 Mar 31  0258  Launch by CZ-2C  JQ 
 0308?  Stage 2 sep  98.60 680 x 702 x 98.3  
2014 Jul 19    98.68 687 x 703 x 98.3 

Wednesday, January 28, 2015

Gonets 2013

 2013-048A


Planned launch of 'Blok no. 12' (Gonets-D1M Block 372AS71 No. 12) with satellites 372AS11 No. 14, 16, 17 using Rokot 14A05 No. 4926391838 and Briz-M 72519.


Gonets-M 
 

DateTimeEventOrbit  

2013 Sep 11  2323:04 Launch by Rokot  PL LC133/3 
 2325:06  Stage 1 MECO 
 2325:54  Fairing sep 
 2328?  Stage 2 MECO 
 2328:09  Stage 2 sep 
 2328:15  MES-1 
 2337:44  MECO-1  100? x 1500 x 82.6 
2013 Sep 12  0037:24  MES-2 
 0038:17  MECO-2 
 0107:13  Spacecraft sep 
2013 Sep 13    116.04 1495 x 1510 x 82.5 

Himawari 8

 2014-060A


The geostationary meteorological satellite Himawari 8 was built by MELCO for JMA, as a successor to the MTSAT series. Size 8 m high. Box + dish + 1 pan Mass 3500 kg launch 1300 kg dry. Launch by MHI on H-IIA 202 F25 with 4S fairing on 96 deg azimuth.


GMS8 
 

DateTimeEventOrbit  

2014 Oct 7 0516:00  Launch by H-IIA F25  TNSC 
  T+1:36 SRM out  
  T+1:48 SRB sep 
  T+4:05 Fairing sep
 0522 T+6:36 Stage 1 MECO 
 0522 T+6:44 Stage 1 sep 222 km, 5.3 km/s 
  T+6:50 SES-1 
 0528 T+12:12 SECO-1 271 km, 7.7 km/s  250? x 300? x 30? 
 0539 T+23:50 SES-2 264 km, 7.7 km/s 
 0543 T+27:07 SECO-2 
 0543 T+27:57 separation 
2014 Oct 8    795.22 8227 x 35882 x 8.8 
2014 Oct 9   1335.44 31745 x 35839 x 0.4 
2014 Oct 15    1436.01 35756 x 35813 x 0.1 GEO 140.8E 
2014 Nov 25    1436.14 35784 x 35791 x 0.0 GEO 140.8E 

Payload:

  • AHI Advanced Himawari Imager: 3 vis at 0.5-1km, 3 NIR 1-2 km res., 10 IR bands; 10 minute cadence

Monday, January 26, 2015

WGS-6

 2013-041A


Third Block II WGS satellite supporting 2.4-3.6 Gbps data transfer in X and Ka band. Funded by Australia. Control from 3SOPS/Schreiver.

Mass 6100 kg.


WGS 6 
 

DateTimeEventOrbit  

2013 Aug 8  0029 Launch by Delta 4M+(5,4)  CC SLC37B 
  T+1:31 SRM 1-2 burnout  
  T+1:33 SRM 3-4 burnout  
  T+1:40 SRM 1-2 sep 
  T+1:42 SRM 3-4 sep 
  T+3:27 Fairing sep
  T+4:07 MECO 
  T+4:14 St 1 sep 
  T+4:27 DCSS SES-1 
 0049 T+20:32 DCSS SECO-1  185 x 6880 x 25.6 
  T+28:22 DCSS SES-2 
 0100 T+31:31 SECO-2  439 x 66900 x 24.0  
 0109 T+40:38 DCSS sep from WGS 
 0120? CCAM 
 0156?End DCSS depletion 

Sunday, January 25, 2015

Eutelsat 3B

 2014-030A


Astrium Eurostar 3000 satellite, 51 transponders for Africa, Mideast, Central Asia and S America. 5967 kg. Size 7.5m high 31m span, 12 kW power.


Eut3B 
 

DateTimeEventOrbit  

2014 May 26  2109:59  Launch by Zenit-3SL  SL Odyssey 
  T-0:03.5 Go Inertial 
  T+2:27 St 1 sep 
  T+3:48 Fairing sep 118 km  
  T+7:12? St 2 shutdown 
  T+8:28 St 2 sep  -2239 x 185 x0  
 2118:36 T+8:38 DM-SL MES-1 
 2123:12 T+13:17 DM-SL MECO-1 180 x 407 x 0  
 2153:45 T+43:47 DM-SL MES-2 
 2200:38 T+50:44 DM-SL MECO-2 532 km  381 x 35799 x 0 
 2210:28 T+1:00:34 SC Sep 
  T+6:02:55 Apo-1  385 x 35646 x 0  
2014 May 27    630.70 368 x 35599 x 0.0  
2014 May 28    734.98 5580 x 35619 x 0.0 
2014 May 29    957.35 15980 x 35616 x 0.1 
2014 Jun 2    1153.65 24494 x 35623 x 0.0 
2014 Jun 5    1428.57 35625 x 35653 x 0.0 
2014 Jul 19    1436.08 35779 x 35793 x 0.1 GEO 3.1E 

Intelsat 601

 

1991-075A


The satellite was a spin stabilized 5.4 m high, 3.6m diameter cylinder with an extendable solar array skirt (deployed height was 11.8m). The 1908 kg dry mass of the satellite was increased to 4260 kg when fuelled (BOL mass was 2560 kg). The masses of the various components of the Ariane 44L launch vehicle are tabulated below:

 

Ariane mass budget 

Element  Dry mass  Fuel  Total  
PAL (4)    17991 
L220  18254  387244  405498  
St 2  3696  35479  39175 
H10  1279  10586  11865  
Case a equipement 723   723  
Adapter70   70 
Intelsat 601  1908  2352  4260 
Fairing815   815 

Ariane total    480397 


Intelsat VI~F-1 
 

DateTimeEventOrbit  

1991 Oct 29  2308:08  Launch by Ariane 44L (V47)  CSG ELA2 
 2309  PAL1 and 2 sep (T+2:29)   
 2309  PAL3 and 4 sep (T+2:30) 
 2310  Stage 1 sep (T+3:33) 
 2310  Stage 2 MES (T+3:36) 
 2311  Fairing sep (T+4:19) 
 2312  Stage 2 sep (T+5:45) 
 2312  Stage 3 MES (T+5:50) 
 2326:00 Stage 3 MECO (T+17:52) 
 2330:45  Stage 3 sep (T+22:37) 
 2331:39  Stage 3 sep burn (T+23:31) 
1991 Oct 30  0430? R4D test burn  634.83 280 x 35899 x 7.1 
1991 Oct 31  0137s LAM-1 R4D main burn 1  
1991 Oct 31  1200   715.97 4532 x 35733 x 4.44  
1991 Nov 1  0200? LAM-2  1087.51 21572 x 35732 x 0.89  
1991 Nov 2  1400? LAM-3 
1991 Nov 3    1436.01 35772 x 35797 x 0.0 GEO 38.0W 
1991 Oct   Tests  GEO 38W 
1991 Nov 14    1436.12 35673x35900x0.05 GEO 37.00W-0.01/d 
1991 Nov  Spot beam malfunction discovered 
1992 Jan 27    1436.15 35682 x 35892 x 0.1 GEO 37.2W+0.02W 
1992 Feb 16   drifting 
1992 Mar  Spot beam repaired 
1992 Mar 27  In service 
1992 Apr 4   mv in  1436.05 35773 x 35798 x 0.1 GEO 27.6W 
1994 Feb 26    1436.12 35783 x 35790 x 0.0 GEO 27.5W 
1996 Dec 27    1436.13 35777 x 35796 x 0.0 GEO 27.5W 
1997 Oct 8   mv out  GEO 28W 
1997 Oct 20   mv in  GEO 34W 
1997 Oct 25    1436.04 35777 x 35793 x 0.0 GEO 34.5W 
1999 Jun 15    1436.10 35784 x 35789 x 0.0 GEO 34.5W 
2002 Jun 28   Move to 32E and then 64E 
2002 Jul 11   mv in  1436.13 35783 x 35790 x 0.0 GEO 32.9E 
2002 Sep 29   mv out 1436.06 35781 x 35789 x 0.0 GEO 33.0E 
2002 Nov 1   mv in  1435.80 35754 x 35806 x 0.0 GEO 64.3E 
2003 Sep 2    1436.09 35778 x 35794 x 0.0 GEO 64.3E 
2006 Aug 3    1436.01 35780 x 35793 x 1.8 GEO 64.3E 
2007 Oct 2   mv out from 63E 
2007 Nov 4   Move in 47E 
2011 Oct 14    1436.06 35784 x 35787 x 6.5 GEO 47.4E 

The rich : from slaves to super-yachts : a 2,000-year history

 https://welib.org/md5/0944b6332f30373dccd4eb915da93732

October 1,2026

  https://planet4589.org/space/jsr/back/news.860.txt