Friday, December 6, 2019
SJ-15
2013-037C
“Shijian shiwu hao", Shi Jian 15, a SAST satellite, was launched on 2013 Jul 19 as part of a triple satellite launch with the Shiyan 4 and Chuangxin 3
Also known as Tansuo-5.
Launched into 06:42LTDN SSO.
| SW7 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2013 Jul 19 | 2337 | Launch by CZ-4C | TYSC |
| T+156 T+2:36 St 1 sep | |||
| St 2 burn | |||
| T+210 T+3:30? Fairing sep | |||
| T+6:48? Stage 2 MECO | |||
| T+6:49? St 2 sep | |||
| T+10:22? Stage 3 burn 1 | |||
| 2349? | T+12? Stage 3 MECO | ||
| 2356? | T+19:32 SJ-15 sep | ||
| Adapter sep | |||
| 2357? | T+20:52? CX3 sep | ||
| 2359? | T+22:29 SY-4 sep | ||
| 2013 Jul 20 | 98.12 663 x 673 x 98.1 | ||
| 2013 Jul 31 | 98.12 664 x 672 x 98.1 | ||
| 2013 Aug 1 | Raise orbit | 98.17 669 x 672 x 98.1 | |
| 2013 Aug 2 | Raise orbit | 98.20 670 x 675 x 98.1 | |
| 2013 Aug 6 | 1815 | Passed CX-3 at 3 km distance, 5m/s | |
| 2013 Aug 8 | 98.21 670 x 675 x 98.1 | ||
| 2013 Aug 8 | Lower orbit | 97.77 651 x 652 x 98.1 | |
| 2013 Aug 9 | 0000 | Raise orbit | 98.16 663 x 677 x 98.1 |
| 0800 | burn | 98.14 667 x 671 x 98.1 | |
| 1815 | In formation with TS-3/CX-3 at 10 km range | ||
| 2013 Aug 10 | 98.12 665 x 673 x 98.1 | ||
| 0040? | Passed 3 km from CX-3 at 3m/s | ||
| 2013 Aug 12 | 98.13 665 x 673 x 98.1 | ||
| 2013 Aug 16 | Lower orbit | 94.74 501 x 510 x 98.1 | |
| 2013 Aug 17 | 96.43 564 x 610 x 97.7 | ||
| 2013 Aug 18 | 96.43 564 x 610 x 97.7 | ||
| 0230 | Rendezvous with SJ-7/TS-2 at 1.5 km | ||
| 2013 Aug 19 | 0400 | Stationkeep 2 km from SJ-7 (per R Christy) | |
| Move to 4 km sep | |||
| 2013 Aug 20 | 0015 | Lower orbit, leave SJ-7 | |
| 2014 Apr 12 | Raise orbit to begin new rendezvous | ||
| 2014 Apr 14 | Orbit raise | ||
| 2014 May 8 | Orbit lower | ||
| 2014 May 12 | Orbit lower, approach and pass SJ-7 | ||
| 2014 May 13 | Lower 0.8 km | ||
| 2014 May 14 | Lower 0.4 km, 250 km behind | ||
| 2014 May 16 | Matched target height, follow by 120 km | ||
| 2016 May 1 | 96.74 584 x 621 x 98.0 | ||
| 2016 May 4 | Orbit raise | 98.08 663 x 671 x 98.0 | |
| 2016 May 26 | 98.08 665 x 670 x 98.0 | ||
| 2016 May 31 | Orbit raise | 98.09 665 x 670 x 98.0 | |
| 2016 Jun | Close to 37B | ||
| 2016 Jul 22 | 98.09 663 x 672 x 98.0 | ||
| 2016 Jul 24 | Orbit raise | 98.09 663 x 672 x 98.0 | |
| 2016 Oct 9 | 98.09 665 x 670 x 98.0 | ||
| 2016 Oct 10 | Orbit raise | 98.10 665 x 671 x 98.0 | |
| 2017 Aug 15 | 98.10 665 x 670 x 98.0 | ||
| 2017 Aug 17 | Orbit raise | 98.10 666 x 670 x 98.0 | |
| 2018 Mar 23 | 98.10 665 x 671 x 98.0 | ||
Thursday, December 5, 2019
Orion EFT-1
2014-076A
Exploration Flight Test of Orion on Delta 4, two orbits. SV is assembled at Michoud, outfitted at LM/OCF-KSC and then tested at LM/Denver. The flight is operated by LM Space Systems/Denver, rather than by NASA.
Flight capsule, dummy SM and test fairings. SM fairings provide structural strength during stage 1 burn and are jettisoned during the stage 2 burn to save mass.
Mass is 21000 kg including SM and LAS; 8600 kg CM at landing. CM+LAS at lanch 17000 kg. LAS motor is 3464 kg, with 1780 kN thrust. LAS ACS motor is 760 kg. LAS jettison motor is 410 kg, giving a lower limit of 4650 kg to LAS and upper limit of 12350 kg to the CM; infer service module is about 2650 kg. Orion to stage adapter connects to DCSS. Fairings 450 kg x 3.
| CM | 9400? | |
| SM | 2650? | |
| LAS | 7650? | |
| Panels | 1383 | |
| Total | 21083 | |
| OSA | 510 | |
| EFT1 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2014 Dec 5 | 1205 | Launch by Delta 4H | CC SLC37 |
| T+3:58 Side CBC MECO, sep | |||
| T+5:31 CBC Core MECO | |||
| 1210 | T+5:38 Stage 1 sep | ||
| 1210 | T+5:51 Stage 2 MES | ||
| 1211 | T+6:16 SM fairings sep | ||
| 1211 | T+6:20 LAS sep | ||
| 1222 | T+17:17 Stage 2 MECO-1 | 185 x 888 x 28.8 | |
| 1400 | T+1:55:20 Rev 2 Stage 2 MES-2 4:45 | ||
| T+2:00:11 MECO-2 | -37 x 5807 km x 28.8 | ||
| 1510 | T+3:05 Apogee 5807 km | ||
| 1528 | T+3:23:36 Stage 2 sep from CM -8.36 113.67 5275 km | ||
| 1550 | Stage 2 burn 3, 1 min | ||
| 1602 | T+3:57:11 RCS burn 10s, translation | ||
| 1616 | T+4:11:05 Stage 2 reentry over Pacific | ||
| 1618 | T+4:13:35 Orion reentry interface 8.9 km/s | ||
| T+4:19:29 Forward bay cover sep, para deploy | |||
| 1629 | T+4:23:29 Splashdown off Baja | ||
| 23.60N 116.46W | |||
| Recovery by USS Anchorage | |||
October 1,2026
https://planet4589.org/space/jsr/back/news.860.txt
-
Mirroring from AO3: Planned works in this series Chapter Text 7th grade 1. There’s A New Name In School (August 12-September 18,2005) 2. Gl...
-
✅ Mercury-Thor 3. Friendship 7. March 25,1961. John Glenn. First manned spaceflight . Suborbital test of Mercury mission profile. Vostok...
-
The Degrassi Quarternarians: Overview The Quarternarians are a Canadian Cadets unit of exactly 25 Degrassi Junior High / High stude...