| Quest |
| |
|
| Date | Time | Event | Orbit |
|---|
|
| 2002 Feb 20 | | US EVA-1 |
| | | Walz EV-1, Bursch EV-2 |
| | | Safer 5, 4 |
| | 1035 | Begin depress |
| | 1128 | At 1 psi |
| | 1134? | Depress |
| | 1135? | HO |
| | 1138 | Battery power |
| | 1144 | TC open |
| | 1147 | Egress Walz |
| | 1154 | Egress Bursch |
| | | Cables from Z1 to Destiny |
| | | Remove thermal covers from Z1, store inside Z1 |
| | | Retrieve tools from Z1 |
| | | Inspect MISSE |
| | | Carry EVARM radiation sensors |
| | | Remove Strela base |
| | | Secure latches on O2N2 tanks |
| | 1703 | EV2 ingress |
| | 1710 | EV1 ingress |
| | 1713 | TC closed |
| | 1719 | HC |
| | 1725 | Repress |
| 2002 Oct 10 | | STS-112 EVA-1 Wolf, Sellers |
| | 1433 | Quest depress begin |
| | 1443 | At 5psi |
| | 1458 | Resume depress |
| | 1502 | 2.5psi |
| | 1504 | 1.6psi |
| | 1509 | 1psi |
| | 1511 | 0.8psi |
| | 1514 | Adopted depress mark |
| | 1514 | 0.6 psi |
| | 1518? | HO |
| | 1518 | TC open |
| | 1519 | Depress complete |
| | 1521 | Battery power |
| | 1531? | Egress Sellers |
| | 1534? | Egress Wolf |
| | 1630 | Connect S0/S1 power/data/fluid |
| | 1730 | Release radiator launch locks |
| | 1830 | SASA install on S1 |
| | 1930 | CETA launch locks |
| | 2109? | SSRMS close to Shuttle PLB (less than 10 cm?) |
| | 2130 | S1 nadir camera install, problem with SSRMS |
| | 2200 | CETA couple to MBS |
| | 2210? | Ingress Wolf |
| | 2210 | Ingress Sellers? |
| | 2212 | TC closed |
| | 2218? | HC (out of comm) |
| | 2222:08 | Repress begin NASA 07:01 |
| 2002 Oct 12 | | STS-112 EVA-2 Wolf, Sellers |
| | 1407 | 5psi |
| | 1414 | Resume depress |
| | 1417 | 2.0psi, pump off |
| | 1425 | 0.6psi Adopted depress time |
| | 1428 | 0.5psi |
| | 1429 | Hatch open |
| | 1431 | Battery power |
| | 1440? | Sellers egress |
| | 1444 | Wolf egress |
| | | Install SPD on Z1/P6 |
| | | Install Z1-Lab loop A |
| | 1630 | Connect ATA umbilical on S1 |
| | 1645 | Lab ETVCG from AL |
| | 1710 | Lab ETVCG attached to second S1 VSSA |
| | 1714 | CETA launch locks |
| | 1720? | ETVCG and VSSA removed from S1 |
| | 1730 | ETVCG/VSSA attached to Lab |
| | 1800 | S1/S0 SPD installs on NH3 quick disconnects |
| | 1930 | Radiator launch locks |
| | 2020? | Ingress Wolf |
| | 2024? | Ingress Sellers |
| | 2028 | TC closed |
| | 2030 | Hatch closed |
| | 2035 | Repress (NASA 6:04) |
| 2002 Oct 14 | | STS-112 EVA-3 Wolf, Sellers |
| | 1330 | Begin depress |
| | 1404? | Vacuum |
| | 1408? | HO |
| | 1411 | Battery |
| | 1430 | IUA (Interface Umbilical Assy) repair on MT |
| | 1715 | Fluid line connect |
| | 1830 | Keel pin removal |
| | 2035? | Ingress |
| | 2042? | HC |
| | 2047 | Repress NASA 6:36 |
| 2003 Jan 15 | 0755 | MT from WS7 to WS4 |
| | 0821 | MT at WS4 |
| | | EVA Pettit, Bowersox |
| | 1131 | Begin depress |
| | 1138 | At 6 psi |
| | 1140 | At 5 psi |
| | 1157 | Resume depress |
| | 1201 | 2.2psi |
| | 1208 | Tone? |
| | 1214 | At vac |
| | 1216 | Rotating hatch handle, dp=0.5 |
| | 1230 | 0.2psi |
| | 1233 | Problem opening hatch |
| | 1246 | Hatch open |
| | 1250 | Batt power |
| | 1308 | Recycle Bowersox suit power |
| | 1314? | Egress Bowersox |
| | 1322 | Egress Pettit |
| | 1452 | P1 central radiator deploy |
| | 1502 | P1 radiator deploy done |
| | 1911 | Ingress |
| | 1928 | TC closed |
| | 1938? | HC |
| | 1941 | Repress |
| 2003 Apr 8 | | EVA Bowersox, Pettit |
| | | Power cable reconnection |
| | | CMG reserve power supply |
| | | Thermal cover on QDs |
| | | Release stanchion on CETA |
| 2003 Apr 8 | 1221 | Resume depress at 5psi |
| | 1229 | Almost at vacuum |
| | 1233 | (Almost at 0.5 psi) |
| | 1236? | Depress (JCM) |
| | 1237 | At 0.6 psi |
| | 1238 | At 0.5psi, go for HO |
| | 1239 | TC open |
| | 1239 | HO |
| | 1240 | Battery power |
| | 1248 | Egress Bowersox |
| | 1255 | Egress Pettit |
| | 1300 | Move CETA 1/2 away from MT |
| | | P1/S0/S1 connectors reconfigured |
| | | CMG power cables reconfigured |
| | | Freed lightning pole stanchion on CETA |
| | 1855? | Ingress |
| | 1901? | HC |
| | 1906 | Repress |
| 2005 Nov 7 | | EX12 EVA-1 McArthur Tokarev |
| | 1410 | Begin depress |
| | 1419 | 5 psi check |
| | 1425 | Resume depress |
| | 1429 | 3.3 psi |
| | 1430 | 2.9 psi |
| | 1434 | 2.0 psi, end of stage 2 |
| | 1436 | Stage 3 venting fails, valve wrong |
| | 1448 | Repressing; quick rise above 3.5 psi |
| | 1448 | 19 min below 3.5 psi |
| | 1453 | 14.3psi; reopen CL |
| | 1455 | Open MTE valve |
| | 1459 | Close CL |
| | 1500 | Begin depress again |
| | 1510 | 5psi check |
| | 1513 | Resume depress |
| | 1515 | 3.2 psi |
| | 1518 | 2.0 psi, stage 3 venting |
| | 1522 | 1.0 psi |
| | 1527 | 0.6 psi |
| | 1529 | Hatch open |
| | 1532 | Battery power |
| | 1544 | McArthur egress |
| | 1550 | Tokarev egress |
| | 1600 | Tokarev to ESP2 |
| | 1610 | Retrieve VSSA stanchion |
| | 1621 | Get camera from AL |
| | 1640 | Arrive at P1 camera worksite |
| | 1657 | Attach cam to VSSA |
| | 1719 | Cam/VSSA installed on P1 as CP9 |
| | 1750 | Tether swap after VSSA install |
| | 1800 | Head for S1 Bay 13 RJMC (rotary joint motor contrller) |
| | 1808 | At RJMC |
| | 1814 | Failed RJMC removed |
| | 1824 | Leave S1 Heading for airlock |
| | 1828 | Back at AL, stowing RJMC etc |
| | 1831 | Pick up Jettison Stowage Bag (JSB) at AL |
| | 1833 | McA gets PFR from CETA |
| | 1836 | McA leaves CETA for P6 |
| | 1853 | Approaching FPP |
| | 1856 | Arrive at FPP worksite |
| | 1904 | 27 kg FPP removed from station by McA |
| | 1920 | FPP hand jettison by McA |
| | 1920? | Small washer drifts away |
| | | Inspect P6 MISSE |
| | 1936 | FPP stanchion stowed in AL |
| | | APFR stowed on WIF12 on AL-EL |
| | 2012 | Replace MT circuit breaker power module, completed |
| | 2025 | Tokarev ingress |
| | 2027 | JSB returned to AL |
| | 2035 | McArthur ingress |
| | 2036 | TC closed |
| | 2046 | HC |
| | 2054 | Repress |
| | 2107 | Repress complete, CL open |
| |
| 2006 Aug 3 | | EVA Williams (EV1), Reiter (EV2) |
| | 1329 | Depress to 5psi |
| | 1350 | Depress 35 mm |
| | 1354 | HO |
| | 1400 | HO completely, stowed |
| | 1404 | Battery power |
| | 1420? | Egress Williams |
| | 1425 | Egress Reiter |
| | 1515 | Install FPMU floating point measurement unit on S1 |
| | 1606 | MISSE-3 and 4 installed near Quest |
| | 1701 | Install RJMC (Rotary Joint Motor Controller) on S1 |
| | | Thermal Radiator MDM on S1 |
| | 1737 | Install CETA floodlight on S1 |
| | 1835 | Install vent valve on Destiny |
| | 1902 | Install foot restraint on S0 truss |
| | 1945? | Ingress Reiter |
| | 1948? | Ingress Williams |
| | 1950? | HC |
| | 1958 | Repress US:5:54 |
| 2007 Jan 31 |
| | | US EVA-6 |
| | 1510? | Depress 0.7psi |
| | 1511 | At 0.5 psi |
| | 1513 | HO |
| | 1514 | Battery power |
| | 1529 | Egress LA |
| | 1535? | Egress Williams |
| | | Ammonia system reconfigured |
| | 1921 | P6 Stbd Radiator retract |
| | 2200 | Preps for ingress |
| | 2225? | Inside airlock |
| | | Bakeout |
| | 2247 | Go for TC close |
| | 2250 | HC |
| | 2309 | Repress |
| | 2310 | Hold at 5 psi for decontam |
| |
| 2007 Feb 4 | | US EVA-7 |
| | 1334? | Depress |
| | 1337? | HO |
| | 1338 | Battery power |
| | 1350? | Egress LA, Williams |
| | | Loop B reconfigured |
| | 1545 | Config recomplete |
| | | LA to base of P6 for EAS work |
| | 1623 | P6 aft radiator retract |
| | | P6 solar array mast inspection |
| | 1820 | SSPTS cable install on Destiny |
| | | MDM Sunshade to be retrieved |
| | 2005 | At airlock, cleanup |
| | 2010 | Williams ingress |
| | 2025 | LA ingress |
| | 2027 | TC closed? |
| | 2033 | HC |
| | | Pause for bakeout |
| | 2049 | Repress |
| | 2053 | Halt at 5 psi |
| | 2109 | Resume repress |
| | 2113 | Repress complete |
| 2007 Feb 8 | | EVA |
| | | LA, Williams |
| | 1322 | AL depress 0.7 psi |
| | 1324 | HO, TC open |
| | 1326 | Battery power |
| | 1331 | Go for egress |
| | 1332 | Williams egress |
| | 1340 | LA egress |
| | | To CETA carts |
| | | Translate to P3 |
| | 1404 | Zenith RJMC shroud removal |
| | 1500 | First shroud packed and secured |
| | 1536 | Shroud jettison by LA |
| | 1542 | Shroud jettison by LA |
| | 1600 | Work on P3 zenith UCCAS deploy |
| | 1730 | Work on P5 launch locks |
| | 1815 | Translate back on CETA |
| | 1830 | SSPTS cable install |
| | 1946 | Ingress LA |
| | 1953 | Ingress Williams |
| | 1957 | TC closed |
| | 2002 | HC |
| | 2006 | Comm hardline |
| | 2006 | Repress |
2007 Jul 23 | | EVA-9 |
| | 1024 | Batt power |
| | 1035? | Anderson egress |
| | 1044? | Yu egress |
| | 1105? | VSSA retrieved from ESP-2 |
| | 1130? | VSSA installed at CP7 on S0/P1 |
| | | VSSA FSE/FRAM retrieved from ESP-2 |
| | 1321 | VSSA FSE/FRAM jettison |
| | 1437 | EAS jettison |
| | | Replace RPCM S04B-F on S0 |
| | | Return failed RPCM to Quest |
| | 1520 | Clean CBM on Unity nadir |
| | | Remove GPS Antenna No. 4 |
| | 1805 | Repress NASA 7:41 |
| 2007 Nov 9 | | STS-120 EVA-5 (Whitson, Malenchenko) |
| | 0952? | Depress |
| | 0953 | HO |
| | 0954 | Battery power |
| | | Egress |
| | | Prepare PMA-3 for unberthing |
| | | Harmony PDGF activated |
| | 1628? | Ingress |
| | 1646 | HC |
| | 1649 | Repress |
| 2007 Nov 20 | | US EVA-11 (Tani, Whitson) |
| | 1007 | Depress |
| | 1008 | HO |
| | 1010 | Battery power |
| | 1017 | Egress Whitson |
| | 1019 | Egress Tani |
| | | Cooling loop A connected to Destiny |
| | | Harmony/Destiny connections |
| | 1703 | Ingress |
| | | HC |
| | 1726 | Repress |
| 2007 Nov 24 | | US EVA-12 (Whitson, Tani) |
| | 0940? | Depress |
| | 0949? | HO |
| | 0950 | Battery power |
| | 0955 | Egress Whitson |
| | 0958 | Egress Tani |
| | 1218 | Loop B umbilical tray connected to Destiny |
| | 1330 | Ammonia flowing to Harmony |
| | 1412 | Tani removing thermal cover from SARJ |
| | 1635 | Tani prep for ingress |
| | 1645 | Whitson ingress |
| | 1652 | HC |
| | 1654 | Repress |
| 2007 Dec 18 | | US EVA-13 (Whitson, Tani) |
| | 0948? | Depress |
| | 0949? | HO |
| | 0950 | Battery power |
| | | EMU 3006 Tani, EMU 1005 Whitson |
| | | Inspect 1A BGA and BMRMM |
| | | Inspect SARJ |
| | | Remove SARJ TBA-5 Trundle Bearing Assy. |
| | 1630? | Ingress |
| | 1642? | HC |
| | 1646:20 | Repress (NASA 6:56) |
| 2008 Jan 30 | | USOS EVA-14 (Whitson, Tani) |
| | 0950? | Depress |
| | 0955? | HO |
| | 0956 | Battery power |
| | | BMRRM repair |
| | 1208 | old S4-1A BMRRM removed |
| | 1214 | new BMRRM installed |
| | 1440 | SARJ inspection |
| | 1645 | Ingress |
| | 1705 | HC |
| | 1706 | Repress |
2010 Aug 7 | s | USOS EVA-15 |
| | | EV-1 Wheelock - 3005. EV-2 Caldwell Dyson - 3009. |
| | 1107 | 1.5 psi |
| | 1110 | 1.0 psi |
| | 1114 | 0.7 psi DEPRESS |
| | 1116 | 0.5 psi |
| | 1117 | HO |
| | 1119 | Battery power |
| | 1125? | Egress Wheelock |
| | 1130? | Egress C-D |
| | 1132 | TC closed |
| | 1148 | Astros at PM location on S1 |
| | 1723 | QDs removed on old PM |
| | 1802 | Cleaning up worksite |
| | 1824 | Return to vicinity of AL |
| | | NH3 decontam |
| | 1833 | Go to ingress |
| | 1841 | Ingress complete |
| | | NH3 bakeout in open hatch |
| | 1911 | Closing hatch |
| | 1911? | HC |
| | 1922 | Starting repress (NASA 8:03) |
| | 1923 | Crack open hatch handle for decontam |
| | 1924 | Resume repress |
| | 1926 | Hold at 5 psi? |
| | | NH3 checking |
| | 1943 | Continue repress |
| 2010 Aug 11 | | EVA-16 Wheelock, Caldwell-Dyson |
| | 1209 | Resume 5psi depress |
| | 1213 | At 2psi |
| | 1217 | At 1 psi |
| | 1221 | 0.7 psi DEPRESS |
| | 1225 | 0.6 psi |
| | 1226 | HO |
| | 1227 | BP, NASA start |
| | 1233? | Wheelock egress |
| | 1240? | C-D egress |
| | 1245 | TC closed |
| | | Translate to S1 to work on QDs |
| | 1320 | C-D at CETA cart |
| | 1330 | Adjusting QDs on DDCU |
| | 1400 | C-D moved Ceta cart |
| | 1423 | M3 connector finally freed |
| | 1539 | Wheelock on SSRMS to ESP-2 to get AGB |
| | 1638 | Final bolt undone on old pump |
| | 1718 | Adjustable grapple bar on old pump |
| | 1729 | Wheelock extracts old pump |
| | 1740 | C-D working at ESP2 on new pump |
| | 1755 | Old PM on MT POA |
| | 1900 | New pump prepped |
| | 1923 | TC open, prepare to ingress |
| | 1932 | Ingress complete, TC closed |
| | 1936? | HC |
| | 1954 | Repress |
| 2010 Aug 16 | | EVA 17 Wheelock, C-D |
| | 1017? | Depress |
| | 1019 | HO |
| | 1020 | BP |
| | 1040 | Egress |
| | 1203 | PM SN4 removed from ESP2 |
| | 1246 | PM SN4 placed in truss |
| | 1300 | Bolted in place |
| | 1322 | PM tests OK |
| | 1500 | PM valves open |
| | | CETA cart relocation |
| | 1727 | CD ingress |
| | 1731 | Wheelock ingress |
| | 1737 | HC |
| | 1740 | Repress |
| 2012 Aug 30 | | US EVA-18 Williams, Hoshide, 3011, 3015 |
| | | EMU3011/SAFER-1003 and EMU3015/SAFER-1005 |
| | 1157 | 5psi |
| | 1205 | Depress near complete |
| | 1214 | HO |
| | 1216 | BP |
| | 1500 | Hoshide: MBSU-1 removed from S0 |
| | 1520 | Hoshide taking old MBSU to ESP2 on arm |
| | 1533 | Temp mount old MBSU on ESP2 |
| | 1600? | Unberth new MBSU from ESP2 |
| | | Hoshide and new MBSU moved to S0 by SSRMS |
| | | Suni install cables for MRM |
| | 1621 | Old MBSU stowed on ESP2 FRAM FSE, soft dock |
| | 1635 | Old MBSU stow complete, secured on ESP2 |
| | 1700? | Begin to install new MBSU on S0 |
| | | Installation not completed; ISS power on 6 of 8 arrays |
| | 1750 | Applying more torque to MBSU |
| | 1807 | Remove new MBSU again |
| | 1820 | Cleaning coldplate with nitrogen |
| | 1835 | Reinstall MBSU in S0 |
| | | Fail to bolt down MBSU again |
| | 1924 | Final attempt failed |
| | | Array 1A and 1B out of the ISS loop |
| | 1955 | Suni ingress |
| | 2018 | Ingress Hoshide |
| | 2028? | HC |
| | 2033 | Repress after 8:17 |
| 2012 Sep 5 | | EVA-19 Williams, Hoshide |
| | 1101 | Depress |
| | 1105 | TC open |
| | 1105 | Hatch open |
| | 1106 | Power to Bat |
| | 1113 | Williams egress |
| | 1118 | Hoshide egress |
| | 1125 | Aki at S0 |
| | 1200 | Aki on SSRMS moved to MBSU |
| | 1245 | MBSU unbolted from partial install on S0 |
| | 1314 | MBSU stowed on flexible arm, MUT ballstack |
| | 1400 | Cleaning out shavings from bolt |
| | 1420 | ACME bolt test |
| | 1500 | ACME bolt removed |
| | 1513 | Suni hands MBSU to Aku on SSRMS |
| | 1514 | Disconnected from MUT |
| | 1522 | Installing MBSU |
| | 1540 | H2 bolt locked |
| | 1550 | H1 bolt locked? |
| | 1600 | Tool inventory |
| | | SSRMS CLPA camera replacement |
| | 1708? | Suni ingress |
| | 1720 | Aki ingress |
| | 1724 | TC closed |
| | 1730 | HC |
| | 1734 | Repress NASA 6:28 |
| | 1735 | 35 mm Hg |
| | 1737 | 104 mm Hg |
| | 1739 | 3psi |
| | 1742 | 4.5 psi |
| | 1744 | Pause at 5psi |
| | 1748 | Resume repress |
| | 1751 | 9.5 psi |
| 2012 Nov 1 |
| | | US EVA-20 (Ex33EVA1) Williams, Hoshide |
| | | 2B PVTCS radiator bypass |
| | | P6 cooling loop reconfigure to isolate PVR |
| | 1154 | CL/EL IV hatch closed |
| | 1207 | Pause depress at 5psi |
| | 1215 | 89 mm |
| | 1216 | 83 mm |
| | 1219 | 58mm |
| | 1220 | 51 mm |
| | 1221 | 46 mm |
| | 1223:01 | 36 mm 0.7 psi |
| | 1224 | 32 mm |
| | 1225 | 27mm |
| | 1226 | 23 mm, less than 0.5 psi |
| | 1228 | HO |
| | | TC open |
| | 1229 | 1.3mm |
| | 1229 | Battery power |
| | 1236 | Williams egress |
| | 1239 | Hoshide egress |
| | 1241 | Williams towards P1 |
| | 1249 | Hoshide towards Z1 toolbox |
| | 1255 | Williams at P6 |
| | | Hoshide to P6 |
| | | EAS jumper reconfig |
| | | Remove shroud to fluid QDs |
| | 1419 | FQDC cover reinstalled |
| | | Suni continue QD jumper work |
| | | Replace shroud |
| | | Demate FH01 jumper |
| | 1440 | vent N2 , install jumper in new loc |
| | | Hoshide translate to aft of P6 |
| | | Remove shroud to P6 trailing TCR (Hoshide) |
| | 1451 | Hoshide working on shroud |
| | 1452 | Suni done with 3 of 4 jumper moves |
| | 1500 | Ammonia flowing |
| | 1511 | Shroud being folded up |
| | 1545 | Suni working fix to SPDs with wire ties |
| | 1547 | Securing shroud |
| | 1635 | Completed jumper work |
| | | Release radiator cinches |
| | | Ground deploy P6 trailing ETCS radiator (stowed on Ex14 Feb 4 2007) |
| | | Back to P1, retrieve tethers |
| | 1730 | Radiator prep complete |
| | 1733 | Go for TCR deploy |
| | 1734 | TCR deploy begin |
| | 1740 | TCR deploy complete |
| | | Back to EAS jumpers, for work on SPDs |
| | 1815 | Complete P6 work |
| | 1833 | Begin return |
| | 1845 | TC open, Aki at AL |
| | 1845 | Suni at P1 |
| | 1850 | Aki go for ingress |
| | 1854 | Aki ingresss |
| | 1855? | SCU locked |
| | 1857 | Suni ingress |
| | 1859 | Suni SCU locked |
| | 1903 | HC 6:35 |
| | 1907 | Repress NASA 6:38, d/r 6:44 |
| | 1908 | 44 mm |
| | 1909 | 75 mm |
| | 1910 | 135 mm |
| | 1912 | 258 mm 5 psi |
| | 1913 | 268 mm holding |
| | 1916 | Resume press |
| 2013 May 11 | | US EVA-21 |
| | | Cassidy, Marshburn |
| | | Contingency EVA to replace PFCS on P6, ammonia leak |
| | 1241 | Depress 35 mm |
| | 1243 | HO |
| | 1244 | Batt |
| | 1250 | TC open |
| | 1251 | Egress Cassidy |
| | 1253 | Egress Marshburn? |
| | 1315 | Arrive P6 truss |
| | 1332 | Begin PFCS unbolt |
| | 1349 | Fluid connectors unbolted |
| | 1412 | PFCS removed, stow on bracket |
| | 1430 | Spare pump cover removal |
| | 1505 | New pump unberthed |
| | 1516 | installing - soft dock |
| | 1530? | New pump installed |
| | 1545 | Old pump in storage slot |
| | 1631 | New PFCS activated |
| | | Watching for leaks |
| | 1720 | begin Return from P6 |
| | 1734 | Marshburn in AL vicinity |
| | 1734? | Marshburn in? |
| | 1744? | Cassidy in |
| | 1747 | TC closed |
| | 1756 | EV off batt |
| | 1757 | HC |
| | | 15 min vac hold |
| | 1812 | O2 to press |
| | 1814 | repress |
| | 1833 | repress complete |
| 2013 Jul 9 | | US EVA-22 |
| | | Cassidy 3010, Parmitano 3011 |
| | 1150 | Depress resume |
| | 1151 | 112 mm |
| | 1152 | 96 mm |
| | 1153 | 86mm |
| | 1154 | 81mm |
| | 1156 | 58 mm |
| | 1159 | 40mm |
| | 1159 | 37mm |
| | 1200 | 1mm |
| | 1201 | HO |
| | 1202 | Batt power |
| | 1208? | Cassidy out |
| | 1211? | Parmitano out |
| | 1212? | TC closed |
| | 1223 | Unbolting SGTRC |
| | 1230 | Old SGTRC off |
| | 1231 | Installing new SGTRC |
| | 1243 | Ormate cover on |
| | 1244 | Ormate retrieve |
| | 1247 | MISSE 8 retrieve |
| | 1304 | SGTRC declared in (after bolt doubts) |
| | 1310 | Luca back to AL with MISSE |
| | 1312 | Chris heading back to AL |
| | 1315 | Stow in AL |
| | 1325 | Cabling |
| | 1414 | Unberth RGB1 |
| | 1419 | Remove FSE |
| | 1434 | Install RGB1 on stbd TRRJ |
| | 1440 | Bolted |
| | 1501 | CLPA released |
| | 1515 | RGB2 unberthed, on way to P1 |
| | 1526 | Chris carries PMA2 cover to PMA2 |
| | 1537 | PMA2 cover staged at PMA2 |
| | 1539 | RGB2 handed to Chris at P1 |
| | 1543 | RGB2 bolted |
| | 1551 | Y jumper cable install |
| | 1623 | APFR install |
| | 1638 | Luca at PMA2 |
| | 1648 | PMA2 cover being installed |
| | 1700? | PMA2 cover complete |
| | 1756 | Luca ingress? |
| | 1758 | Cassidy ingress |
| | 1800 | TC closed |
| | 1805 | HC |
| | 1806 | Power to SCU |
| | 1809 | Repress |
| | | Luca water problems noted |
| 2013 Jul 16 |
| | | EVA 23 Cassidy, Parmitano |
| | 1145 | 2.0 psi |
| | 1154? | Depress |
| | 1155? | 0.5 psi |
| | 1156 | HO |
| | 1157:00 | Batt power |
| | 1201 | Parmitano out |
| | 1204 | Cassidy out |
| | 1220 | Y-bypass jumper work |
| | 1230 | MLM 1553 cable work |
| | 1235 | EV2 CO sensor offscale |
| | 1240 | Chris to P1 for V-guide work |
| | 1240 | MLM eth cable work at Node 3 |
| | 1241 | Luca reports water in comm cap |
| | 1242 | Chris opens RPCM MLI flap |
| | 1254 | Troubleshooting loose water in helmet |
| | 1302 | EV2 report water at back of head |
| | 1305 | Call to terminate EVA |
| | 1306 | Luca toward AL |
| | 1308 | Chris cleanup, Luca to AL, comm problems |
| | 1312 | Luca ingress |
| | 1315 | Chris retrieving bags |
| | | V-Guide bag is in |
| | | MBSU bag |
| | 1321? | Chris inside |
| | 1325 | Two minute timer up |
| | 1325 | Closing hatch |
| | 1326 | HC |
| | 1329 | Airlock repress 1:32 (NASA) |
| | 1335 | Internal hatch open |
| | 1338 | Luca's helmet off |
| 2013 Dec 21 |
| | | EVA Mastracchio Hopkins 3010, 3011 |
| | 1133 | 12.1psi |
| | 1148 | 2psi |
| | 1150 | 75mm |
| | 1152 | 62mm |
| | 1153 | 56mm |
| | 1154 | 48mm |
| | 1155 | 41mm |
| | 1156 | 39mm |
| | 1157 | 35mm depress |
| | 1158 | 30mm |
| | 1159 | 27mm |
| | 1159 | HO 2mm |
| | 1200 | 1.3mm |
| | 1201 | Battery power |
| | 1206 | Go for egress |
| | 1206 | Egress Mas. |
| | 1210? | Egress Hopkins |
| | 1457 | Completed PM disconnections |
| | | Head to ESP2 |
| | 1527 | Get adjustable grapple bar (AGB) from ESP-2 FHRC |
| | 1610? | Partly remove PM |
| | 1620 | Attach AGB to PM |
| | 1625? | Removed PM from truss |
| | 1646 | Install PM on MBS POA |
| | 1713 | Back at AL |
| | 1717 | Hopkins ingress | |
| | 1720 | Rick ingress |
| | 1723 | TC closed |
| | 1724 | HC |
| | 1729 | Repress 5:28:11 |
| 2013 Dec 24 | | EVA-25 Hopkins, Mast. |
| | 1124 | Begin depress |
| | 1128 | 440mm |
| | 1130 | 373mm |
| | 1133 | 280mm |
| | 1139 | 120mm |
| | 1140 | 110mm |
| | 1141 | 95mm |
| | 1142 | 80mm |
| | 1143 | 75mm, pause? |
| | 1144 | 66mm |
| | 1145 | 58mm |
| | 1146 | 52mm |
| | 1147 | 45mm |
| | 1148 | 40mm |
| | 1149:00 | 35mm Depress |
| | 1150 | 32mm |
| | 1151 | 29mm |
| | 1152 | 26mm |
| | 1152 | HO, 2mm |
| | 1153 | Battery power |
| | 1157 | Egress Hopkins |
| | 1204 | Egress Mastrach. |
| | 1230 | At ESP-3 |
| | | Hopkins on RMS |
| | 1308 | Hopkins arrives ESP-3 |
| | 1408 | Unbolted PM SN0006 |
| | 1410 | Removed from ESP3 |
| | 1450 | Installing in S1 |
| | 1456 | Installed but not bolted |
| | 1508 | PM bolted to S1 |
| | 1515 | Mating QD fluid connectors |
| | 1525 | PM vented (remove N2) |
| | | NH3 flakes loose, on suits |
| | 1716 | NH3 lines connected |
| | 1746 | Cables connected |
| | 1800 | PM confirmed working |
| | 1836 | In cleanup |
| | 1854 | Ingress Mastr. |
| | 1855? | Ingress Hopkins |
| | 1857? | TC closed |
| | 1901 | Off batt power |
| | 1902 | Go for HC |
| | 1904 | HC |
| | | Begin 15 min hold for NH3 decontam |
| | 1923 | Repress |
| | | 30mm |
| 1927 | 192 mm |
| 1928 | 5psi, holding |
| 1935 | Doing NH3 sampling |
| 1943 | Resume repress from 5psi |
| 1945 | Hold repress at 12psi |
| 1948 | Resume repress |
| 1952 | Repress almost complete |
| 1954 | IV hatch open |
| 2014 Apr 23 | | EVA-26 Mastracchio, Swanson |
| | 1340 | p = 90 mm |
| | 1345 | TDRS LOS, 74mm |
| | 1346 | 65mm |
| | 1347 | 54 mm |
| | 1349 | 45 mm |
| | 1351 | 35 mm |
| | 1354 | 25mm, 0.5psi |
| | | HO |
| | 1356 | Batt power |
| | 1400 | Egress Mas. |
| | 1404 | Egress Swanson |
| | 1409 | At S0 inspecting site |
| | 1427 | Old MDM out |
| | 1440 | New MDM installed |
| | 1450 | Free stuck SPDA door |
| | 1500 | Cut lanyard on other SPDA door |
| | 1520 | Ingress SS |
| | 1522 | Ingress RM |
| | 1529 | HC |
| | 1532 | Repress |
| | 1546 | 636mm |
| 2014 Jul 31 | | Get ETVCG from PMA2 for EVA27 |
| 2014 Aug 1 | | Get SSU from Z1 dome for EVA27 |
| 2014 Oct 7 | | EVA-27 Wiseman 3003, Gerst 3010 |
| | 1210 | 5psi leak check |
| | 1216 | 2 psi |
| | 1222 | 1 psi |
| | 1225? | Depress |
| | 1229? | HO |
| | 1230 | Bat power |
| | 1237 | Wiseman egress |
| | 1246 | Gerst egress |
| | 1246? | MTRA from AL |
| | 1358 | PM remove from POA |
| | | PM transfer by Gerst on RMS |
| | 1447 | PM install on PM FSE on ESP2 |
| | 1510? | PM bolted on ESP2 |
| | 1530 | PM cleanup, AGB stowage |
| | 1557 | ETVC CP-13 CLPA repair; light removed |
| | 1610 | New light installed |
| | 1634 | MTRA soft docked |
| | 1646 | APFR stowed |
| | 1650 | Broken light stowed in AL |
| | 1700 | Working on MTRA |
| | 1730 | Cabling for MTRA |
| | 1826 | Gerst ingress |
| | 1830? | Wiseman ingress |
| | 1837 | HC |
| | 1843 | Repress |
| 2014 Oct 15 | | EVA-28 Wiseman, Wilmore |
| | 1201? | Resume Depress from 5 psi |
| | 1215? | HO |
| | 1216 | Batt power |
| | 1300 | At S4 truss to work on SSU 3A |
| | 1357? | Old SSU 3A removed from S4 |
| | 1402 | new SSU 3A on truss |
| | 1412 | SSU 3A bolted in place |
| | 1430 | Remove tool stanchion, PFR from P1 |
| | 1506 | Install tool stanchion, PFR on S0 |
| | 1549 | Removed broken EVTCG from P1 CP7 |
| | 1600? | Removed WETA VSSA stanchion from P1 nadir CP8 |
| | 1652 | Bolted VSSA stanchion to Node 2 zenith CP11 |
| | 1710? | Return broken port truss camera to AL |
| | 1721 | Attached WETA to Node 2 stanchion |
| | 1750? | Install new EVTCG camera P1 on CP8 |
| | 1831 | Go for Ingress |
| | 1836? | Ingress EV1 |
| | 1839? | HC |
| | 1850 | Repress after 6:34 |
| 2015 Feb 21 | | EVA-29 Wilmore EV1, Virts EV2 |
| | 1216 | Depressing, at 600 mmHG |
| | 1221 | 415 mm |
| | 1222 | 313 mm |
| | 1223 | 267 mm, 5 psi halt |
| | 1228 | 234 mm depressing |
| | 1229 | 187mmm |
| | 1230 | 149mm |
| | 1231 | 120mm |
| | 1232 | 100mm |
| | 1233 | 89mm, pump off |
| | 1234 | 78mm | |
| | 1235 | 69mm |
| | 1236 | 61mm |
| | 1237 | 53 |
| | 1238 | 47 |
| | 1239 | 42 |
| | 1240 | 37, depress Quest (JCM) |
| | 1241 | 33 |
| | 1242 | 2 (Hatch opened) |
| | 1245 | BP, EVA |
| | 1252 | Wilmore egress |
| | 1254? | IDA bag A (Port) handed to Wilmore |
| | 1257 | Virts egress with IDA Bag B (Stbd) |
| | 1308 | TC closed |
| | 1315? | Bag A on Node 2 |
| | 1320 | Bag B installed on Node 2 |
| | 1350 | Installing wire ties on NOD2, PMA2 |
| | | PMA-2 umbilical removed to clear C2-02 |
| | 1429 | Port MMOD shield NOD2/C2-02 removed |
| | | Cable 1 (Blue-white) to P853 connector |
| | 1505 | Cable 2 (Blue) installed to P852 |
| | | Cable 3 (Green-yellow) to P851 |
| | | Cable 4 (Red-white) to P850 |
| | 1515 | 4 port cables installed |
| | 1543 | Harmony port MMOD shield reinstalled |
| | 1550? | Stbd MMOD shield NOD2/C2-05 removed |
| | 1559 | Cable 5 (Red) installed to P864 |
| | 1610 | 4 stbd connections complete |
| | 1610 | Harmony stbd MMOD shield reinstalled |
| | | Deploy cables along side of Harmony to Destiny |
| | | Purple cable W2258 routed to P102A/P106A on LAB |
| | | Purple cable W2258 routed to HR343 awaiting install of PMA-3 and IDA-2 |
| | | Purple cable W2258 IDA-1 leg routed to PMA2 |
| | | W2254 Red-White from port bag routed to PMA-2 |
| | | W2256 Blue cable routed to PMA-2 |
| | | W2254 Red-White second leg to PMA-2 nadir |
| | | W2256 Blue cable IDA-1 leg routed to PMA-2 zenith |
| | | W2262 Blue-White P103 and P1 installed |
| | | W2252 Stbd bag Yellow-Green routed to PMA-2 nadir |
| | | W2256 Blue cable for IDA-2 routed to HR357 |
| | | W2254 Red-white P204 routed to HR318 |
| | | W2272 Stbd Bag Red cable routined PMA-2 zenith and N2 HR317 for IDA-2 |
| | | Remove SSPTS power cables |
| | 1909 | Virts ingress |
| | 1911 | Willmore ingress |
| | 1913 | TC closed |
| | 1918? | HC |
| | 1926 | Repress; 104 m of cable installed |
| | 1934 | 434mm |
| | 1937 | CL repressed at 750 mm |
| 2015 Feb 25 | | EVA-30 Wilmore, Virts |
| | 1142? | Depress |
| | 1146 | TC open |
| | 1148? | HO |
| | 1151 | Battery power |
| | 1225 | Removing PMA-2 cover |
| | 1230 | Cover removed and in bag |
| | 1240 | Working on cable routing |
| | 1330? | Cable routing complete |
| | 1348 | PMA-2 cover bag in airlock |
| | 1420 | Wilmore remove NPV vent from Node 3 |
| | 1530 | Wilmore to release Node 3 CBM launch locks |
| | 1530 | Virts lubricating SSRMS LEE-A |
| | 1610 | Returning avionics bag from Node 1 exterior to AL |
| | | Deploying wire ties at S1 and P1 for C2V2 cabling |
| | 1815 | Back at airlock |
| | 1819? | Ingress Wilmore |
| | 1823 | Ingress Virts? |
| | 1826 | Wilmore out again struggling with TC |
| | 1828 | TC closed |
| | 1829 | HC |
| | 1834 | Repress |
| | 1835:30 | 100 mm |
| | 1835:45 | 161 mm |
| | 1836:00 | 210 mm |
| 2015 Mar 1 | | EVA-31 Virts, Wilmore |
| | 1141 | Under 2 psi |
| | 1145? | Depress |
| | 1150? | HO |
| | 1152 | Battery power |
| | 1159 | Virts egress |
| | 1208? | Wilmore egress |
| | 1229 | Wilmore install S3 boom |
| | 1233 | Two S3 antennas installed |
| | 1240? | Virts install P3 boom |
| | 1246 | Virts install P3 antennas |
| | 1250 | Virts install P3 antennas |
| | 1330 | Routing C2V2 cables |
| | 1720? | Ingress |
| | 1727? | HC |
| | 1730 | Repress |
| 2015 Oct 28 | | EVA-32 Kelly, Lindgren (3003, 3010) |
| | 1200? | Depress |
| | 1201 | HO |
| | 1203 | BP |
| | 1205? | Egress Kelly |
| | 1210? | Egress Lindgren |
| | 1330? | Adding large MLI blanket to AMS |
| | 1350? | Remove MLI from failed MBSU |
| | 1407 | MBSU task complete |
| | | Add small MLI blanket to AMS |
| | 1430 | Blanket on AMS complete |
| | 1530 | Working on IDA wiring |
| | 1540 | LEE-B lubing at ESP-2 |
| | 1630 | IDA cable installation |
| | 1818 | End of LEE lubing (one part incomplete) |
| | 1850? | Ingress |
| | 1859 | TC closed |
| | 1911? | HC |
| | 1919 | Repress 7:19 |
| 2015 Nov 6 | | EVA-33 Kelly, Lindgren (3003, 3010) |
| | 1120? | Depress |
| | 1120? | HO |
| | 1122 | Battery power |
| | 1415 | P6 Ammonia system refill |
| | 1518 | TTCR retracted by Lindgren |
| | 1556 | P5/P4 strut tightening |
| | 1728 | TTCR re-deployed due to lack of time |
| | 1837? | Ingress Kelly |
| | 1848? | Ingress Lindgren |
| | 1904 | HC |
| | 1910 | Repress |
| 2015 Dec 21 | | EVA-34 Kelly, Kopra (3010, 3011) |
| | 1213 | Begin depress |
| | 1225 | Manual pressure valve |
| | 1233 | 1 psi |
| | 1238? | Depress |
| | 1239 | 0.6 psi |
| | 1243 | HO |
| | 1245 | Battery |
| | 1254 | Egress Kelly |
| | 1300? | Kopra egress |
| | | Translate to WS4 to free CETA brake |
| | 1309 | Free brake handle |
| | 1321 | MT back at WS4 |
| | 1400 | Kopra ethernet cable routing to MLM |
| | 1400 | Kelly routing IDA cables |
| | 1449 | Kopra at AL |
| | 1502 | Kopra retreive EVA bag from Lab exterior |
| | 1540? | Kopra ingress |
| | 1543? | Kelly ingress |
| | 1554? | HC |
| | 1601 | Repress, PET 3:16 |
| 2016 Jan 15 | | US EVA-35 |
| | | EVA35 EV1 Kopra 3011, EV2 Peake 3008 |
| | 1243? | Depress |
| | 1247? | HO |
| | 1248 | BP |
| | 1300? | Kopra egress |
| | 1304? | Peake egress |
| | 1348 | At S6 for SSU work |
| | 1440 | Remove S6 SSU-1B S/N 0012 |
| | 1446 | Install replacement SSU |
| | 1532 | Old SSU stowed in AL |
| | 1600 | Peake working IDA cabling |
| | 1610 | Kopra N3 NPV vent relocate |
| | 1645 | NPV vent reinstalled |
| | 1657 | Korpa reports water in helmet |
| | 1657 | Terminate EVA |
| | 1713 | Kopra ingress |
| | 1717 | Peake ingress |
| | 1726 | TC close |
| | 1727 | HC |
| | 1731 | Repress PET 4:43 |
| 2016 Aug 19 | | US EVA-36 |
| | | IDA 0.6m from PMA |
| | 1016 | Dextre touch IDA to PMA |
| | 1154 | 1psi |
| | 1158 | Depress |
| | 1203 | HO |
| | 1204 | BP (EVA, NASA) |
| | 1209 | Williams EV-1 egress |
| | 1216 | Rubins EV-2 egress |
| | 1219 | Wiliams at EVA-2 |
| | 1231 | Rubins gets APFR |
| | 1300 | Attaching tethers between IDA-1, PMA-2 |
| | 1316 | Dextre release IDA |
| | 1318 | Dextre/SSRMS in motion away from IDA |
| | 1320 | Cinched tethers on IDA |
| | 1325 | IDA confirmed soft docked |
| | 1330 | Initial electrical connections |
| | 1350 | Struggling with one connection |
| | 1400 | Cable connection ok |
| | 1430 | First set of hooks closed |
| | 1440 | All hooks closed |
| | 1440 | IDA-2 hard mate to PMA-2 |
| | | Cover on grapple fixture |
| | 1500 | Cabling |
| | 1512 | Power to IDA |
| | 1520 | IDA cover removed |
| | 1530 | Williams install new reflectors |
| | 1530 | IDA cover stuffed in ORU bag |
| | 1600 | IDA-2 work complete |
| | 1700 | Cable cleanup |
| | 1724 | Williams lost audio in right ear |
| | 1726 | EV1 with CL bag heading to AL |
| | 1731 | Comm issues, EVA terminated |
| | 1731 | EV2 with ORU bag near AL |
| | 1737 | EV2 ingress with ORU bag |
| | 1743? | EV1 Ingress |
| | 1744 | TC closed |
| | 1751 | SCUs locked |
| | 1757 | HC |
| | 1802 | Repress, EVA PET 5:58 |
| 2016 Sep 1 | | US EVA-37 |
| | 1146 | Depress |
| | 1150 | HO |
| | 1153 | BP |
| | 1159 | Egress williams |
| | 1202 | Egress Rubins |
| | 1238 | TTCR retract |
| | 1248 | TTCR retract complete |
| | 1300 | Installing cinches |
| | 1326 | Cinches done |
| | 1400 | TTCR cover on |
| | 1450 | P1 CP9 light replacement |
| | 1520 | Light replaced, start HDTV install |
| | 1620 | Second HDTV install at CP8 |
| | 1824? | Ingress |
| | | HC |
| | 1841 | Repress |
| 2017 Jan 6 | | EVA-38 Kimbrough, Whitson |
| | 1220? | Depress |
| | 1222? | HO |
| | 1223 | BP |
| | 1230? | Egress |
| | 1239 | Egress Whitson |
| | 1350 | Loosen bolts |
| | 1400 | Whitson has adap plate |
| | | K connects data cable |
| | | K installs adapter plate in slot 6 |
| | 1430 | K working on NiH Slot 4 0039 |
| | 1435 | NiH 4 moved to Slot 6 on plate |
| | | Remove plate from B to slot 4 |
| | 1447 | Install AP B on slot 4 |
| | 1515 | Moving NiH from slot 2 to slot 4 |
| | 1530 | Installing in slot 4 |
| | 1556 | AP C removed from EP |
| | 1615 | Move AP C to empty slot 2 |
| | 1700 | Working at CETA cart to get failed CLPA light |
| | 1745 | CETA light removed, for brining it inside |
| | 1800 | Node 3 ACBM bundle installed |
| | | Z1 rat's nest internet cable |
| | 1838 | TC open |
| | 1839 | Whitson ingress |
| | 1842 | Kimbrough ingress |
| | 1843 | TC closed |
| | 1852 | HC |
| | 1855 | Repress |
| 2017 Jan 13 | | | EVA-39 Kimbrough, Pesquet |
| | 1120? | Depress |
| | 1120? | HO |
| | 1122 | Battery power |
| | 1123 | TC open |
| | 1130? | Kimbrough egress |
| | 1135? | Pesquet out |
| | 1140 | Secure N3ACBM bundle to Quest handrail 0153 |
| | 1225? | AP F off EP, on Pesquet |
| | 1235 | AP E off EP, on Kimb? |
| | 1252 | AP F in slot 6 |
| | 1311 | NiH2 bat 0080 moved from slot 4 to AP F /slot 6 |
| | 1324 | AP E on slot 4 |
| | 1350 | Removing AP D from EP |
| | 1358 | AP D at IEA |
| | 1412 | AP D installed slot 2? |
| | 1449 | Pesquet retrieve CLPA from airlock |
| | | CLPA replace put on MTRA for later SSRMS add |
| | 1512 | Removed old CLPA |
| | 1520 | New CLPA on |
| | 1530 | Working on SSRMS LEE WIF |
| | 1558 | Stow medium ORU bag in AL |
| | 1600 | Photo survey of rat's nest avionics tray at Z1/S0 |
| | 1620 | Removing handrails from Destiny |
| | 1640 | Stow handrails in AL |
| | | Move shield bundles to Node 3 |
| | 1658 | Bundles on Node 3 |
| | 1705 | Begin return to AL |
| | 1705 | Pesquet ingress |
| | 1709 | Kimbrough ingress |
| | 1716 | HC |
| | 1720 | Repress 5:58 (NASA) |
| 2017 Mar 24 | | EVA-40 Kimbrough, Pesquet |
| | 1116 | 50mm |
| | 1118 | 39mm |
| | 1118:50 | 35mm |
| | 1122 | 2mm, HO |
| | 1124 | BP |
| | 1131 | Pesquet out |
| | 1139? | Kimbrough out |
| | 1203 | Old EXT-2 MDM removed |
| | 1210 | New EXT-2 MDM installed |
| | 1326 | P RBVM imaging for leak search |
| | 1328 | K begin disconnecting PMA-3 cables |
| | 1354 | K completed PMA-3 work |
| | 1505 | K gets 2 EF cameras from AL |
| | 1500 | Pesquet lubing SPDM LEE |
| | 1515 | K replacing JEM EF cameras |
| | 1550 | Kimbrough stowing 2 old EF cameras |
| | 1600? | Kimbrough at AL |
| | 1622 | K depart AL with replacement CETA light |
| | 1655 | S1 CETA light replace |
| | 1706 | Heading back to airlock |
| | 1716 | K into AL |
| | | P into AL |
| | 1753 | HC |
| | 1758 | Repress |
| 2017 Mar 30 | | EVA-41 Kimbrough, Whitson |
| | 1122 | Depress |
| 1128 | HO |
| | 1129 | BP |
| | 1136 | Whitson egress |
| | 1139 | Hand empty PMA cover bag out |
| | 1144 | Kimbrough egress with MDM ORU bag |
| | 1155 | Removing MDM-16E-0103 |
| | 1217 | Removed MDM |
| | 1223 | Installed new MDM |
| | 1230 | Whitson removed PMA-3 cover |
| | 1257 | Kimbrough at PMA3 to help stuff into bag |
| | 1307 | In cover bag at last |
| | 1319 | Bag in airlock |
| | 1319 | Old MDM in airlock |
| | 1328 | N3 axial shields move from outside AL |
| | 1348 | Bundles at N3 |
| | | 4 shields, 2 per bundle |
| | 1354? | S1/S2 sep |
| | 1357? | Shield 1 floats away |
| | 1359 | Loss of shield 1 discovered |
| | 1406 | Shield 2 installed |
| | 1412 | Working on bundle 2 |
| | 1444 | Shield 3 and 4 separated |
| | 1455 | Shields 3 and 4 installed |
| | 1502 | Wrap up shields work |
| | 1525 | Back at AL |
| | 1529 | PMA-3 cover out of AL |
| | 1540 | Back at N3 with cover bag |
| | 1549 | Removing cover from bag |
| | 1615 | PMA3 cover attach to N3 complete |
| | 1630 | Back at AL |
| | 1634? | Retrieve cummerbund bag |
| | 1646 | At PMA3, working with bag |
| | 1650 | P and S cummerbunds (PMA3 Shield) out of bag, 1 each |
| | 1705 | Cummerbunds installed on PMA3 |
| | 1730 | SSRMS translate |
| | 1730 | Cummerbunds installed |
| | 1810 | K ingress |
| | 1815? | W ingress |
| | 1826? | HC |
| | 1833 | Repress |
| 2017 May 12 | | EVA-42 Whitson, Fischer |
| | | One airlock SCU failed |
| | | EV1 and 2 swap other SCU back and forth |
| | 1200? | SCU to Peggy? |
| | 1222? | SCU to Fischer, Peggy on battery |
| | 1229? | CL/EL closed |
| | 1230 | Ready for depress |
| | 1300 | Airlock just above 1 psi |
| 1303 | Depress 0.7? |
| | 1303 | Almost 0.5 psi |
| | 1305 | 0.5 psi, go for HO |
| | 1306 | TC open |
| | 1306 | HO |
| | 1308 | hatch stow confirmed |
| | 1308 | Fischer power to batt |
| | 1315 | Whitson out |
| | 1321 | Fischer out |
| | 1322 | New ExPCA out |
| | 1341 | Temp stow new ExPCA |
| | 1423 | Old ExPCA out |
| | 1427? | Old ExPCA temp stow |
| | 1435 | New ExPCA in, soft docked |
| | 1500 | New ExPCA operational |
| | 1530 | Cable terminator work at AMS2 |
| | 1545 | Fischer ties down JEM RMS insulation |
| | 1627 | PMA-3 forward shield installed |
| | 1639 | PMA-3 forward shield install complete |
| | 1640 | ExPCA and EV1 back at AL, stow outside |
| | | Relocate PFR from COF to PMA3 |
| | 1654 | ExPCA into AL? |
| | 1700 | Fischer ingress |
| | 1703 | Fischer back on SCU |
| | 1710 | Whitson ingress |
| | 1714 | HC |
| | 1721 | Repress |
| 2017 May 23 | | EVA-43 Whitson, Fischer |
| | 1118? | Depress |
| | 1119 | HO |
| | 1120 | BP |
| | 1128 | Whitson egress |
| | 1132 | Fischer egress |
| | 1140 | EV1 on S0, EV2 on Lab |
| | 1153 | EV2 installed STBD EWC antenna on Lab HR 261A |
| | 1158 | Old 16E-0102 MDM removed |
| | 1215 | EV2 installed PORT EWC antenna on Lab HR 262A |
| | 1205 | Failed MDM back in bag |
| | 1207 | New MDM in |
| | 1226 7 Removed new MDM again to realign |
| | 1250 | Clean MDM area |
| | 1257 | New MDM reinserted |
| | 1320 | Tightening bolts |
| | 1352? | EV1 in |
| | 1355 | EV2 in |
| | 1402 | HC |
| | 1406 | Repress |
| 2017 Oct 5 | | EVA-44 Bresnik, Vande Hei |
| | 1146 | 2 psi |
| | 1200? | Depress |
| | 1203 | HO |
| | 1205 | BP |
| | 1214? | Egress Bresnik |
| | 1220? | Egress Vande Hei |
| | 1326 | Remove LEE-A SN 202 from SSRMS |
| | 1335 | Stow LEE 202 on port CETA cart |
| | 1414 | POA LEE SN 203 removed from MBS |
| | 1442 | Attach LEE 203 to SSRMS |
| | 1500? | LEE 203 attach completed |
| | 1530? | Remove LEE 202 from CETA |
| | 1600? | Stow LEE 202 on POA |
| | 1700? | Begin getahead tasks |
| | 1837 | VDH ingress |
| | 1843? | Bresnik in |
| | 1844? | TC closed |
| | 1854 | HC |
| | 1900 | Repress |
| 2017 Oct 10 | | EVA-45 Bresnik, Vande Hei |
| | 1123 | Begin depress |
| | 1136 | Resume depress |
| | 1149 | Depress 0.7 |
| | 1155 | HO |
| | 1155:55 | BP |
| | 1200 | Egress Bresnik |
| | 1202 | Egress Vande Hei |
| | 1243 | Rotate PFCS spare |
| | 1310 | EV1 get ETVCG bag from Quest |
| | | Replace ETVCG CP9 at P1 nadir |
| | 1340 | HD cam removed from CP9 |
| | 1402 | Old TVCG removed |
| | 1415 New TVCG installed |
| | 1430 | HD cam reinstalled |
| | 1510 | Replace MBS camera lens cover |
| | 1527 | Loose bolt floats away? |
| | 1550 | Lube LEE ball joint |
| | 1648 | Remove Node 3 handrails |
| | 1700 | Completed lubing |
| | 1730 | Remove MLI from ELC-1 BCDU |
| | 1800? | Ingress EV2? |
| | 1810 | Ingress EV1 |
| | 1810 | TC closed |
| | 1817 | HC |
| | 1822 | Repress 6:26(NASA) |
| 2017 Oct 20 | | US EVA46 Bresnik Acaba |
| | 1132 | Resume depress |
| | 1144? | Depress |
| | 1146 | HO |
| | 1147 | BP |
| | 1154 | Bresnik out |
| | 1158? | Acaba out |
| | 1215 | SPDM EOTP fuse replaced |
| | 1330 | Working at CP3 |
| | 1330 | MSBU spare remove MLI at ESP1 |
| | 1345 | Installing HDTV at CP3 S1 |
| | 1430 | Replacing CLA on new LEE-A |
| | 1530 | New CLA installed |
| | | Remove insulation on spares |
| | 1707 | Acaba SAFER arm broken, return to AL |
| | 1805? | Ingress EV2 |
| | 1812? | Ingress EV1 |
| | 1821 | TC closed |
| | | HC |
| | 1836 | Repress NASA 6:49 |
| 2018 Jan 23 | | EVA-47 Vande Hei, Tingle |
| | 1128 | Resume 5psi depress |
| | 1145? | Depress |
| | 1147? | HO |
| | 1149 | BP |
| | 1205 | TC open |
| | 1213 | Egressed |
| | 1400 | Working on releasing old LEE |
| | 1457 | LEE 201 removed from SSRMS |
| | 1515 | LEE 201 soft dock on ESP2 |
| | 1554 | Remove CLPA from 201 |
| | 1558 | Install CLPA on 204 |
| | 1624 | LEE 204 off ESP2 |
| | 1640 | LEE 204 soft dock on SSMRS as LEE B |
| | 1654 | LEE 204 installation complete |
| | 1809 | SSRMS move away from ESP2 |
| | 1847 | Release piece of rubber from AL region at 1 m/s |
| | 1847 | TC open |
| | 1850 | EV2 ingress |
| | 1856 | EV1 ingress |
| | 1858 | TC closed |
| | 1907? | HC |
| | 1913 | Repress |
| 2018 Feb 16 | | EVA-48 Vande Hei, Kanai |
| | 1156? | Depress, About 0.7? |
| | 1158 | Depress 0.6psi |
| | 1159 | HO |
| | 1200 | BP |
| | 1206 | Egress EV1 |
| | 1210 | Egress EV2 |
| | 1230 | Remove CLA cam from LEE 202 on POA |
| | 1306 | Remove LEE 202 from POA |
| | 1325 | LEE 202 in Quest |
| | 1345 | LEE 201 removed from ESP2 |
| | 1359? | LEE201 soft dock on POA |
| | 1420? | LEE 201 work done |
| | 1431 | Reinstall CLA on LEE 201 |
| | 1520 | Lube LEE-A |
| | 1610 | Install RMCT tool on SPDM on Lab pdgf |
| | 1645 | Lube complete |
| | 1720 | Adjust position of FHRC strut on ESP2 |
| | 1732 | Kanai ingress |
| | 1737 | VDH preparing to ingress - ingress? |
| | 1745 | TC closed |
| | 1750 | HC |
| | 1757 | Repress |
| 2018 Mar 29 | | EVA49 Arnold 3003, Feustel 3006/13 |
| | 1315 | AL at 1.0psi? |
| | 1318 | p is 65? |
| | 1323 | p is 40 |
| | 1325? | Depress AL |
| | 1327 | p is 26 mmHg |
| | 1328 | p is 22 mmHg |
| | 1329 | HO |
| | 1333 | BP |
| | 1340 | EV1 out |
| | 1345 | EV2 out Arnold |
| | 1500 | EV1 Zenith wireless antenna installation on N2 |
| | 1505 | P1 RVBM jumpers removed |
| | 1520? | Nadir wireless antenna installation on N2 |
| | 1540 | EV1 back to AL to switch tool bags |
| | 1600 | EV1 inspect PFCS |
| | 1630 | Working on P1 CP8 ETVCG replacement |
| | 1640? | Old ETVCG back in AL |
| | 1700? | New ETVCG on |
| | 1740 | old HD cam back from AL |
| | 1920 | EV1 in |
| | 1928? | EV2 in |
| | 1935 | on SCU |
| | 1938 | HC |
| | 1943 | Repress |
| 2018 May 16 | | EVA-50, Feustel and Arnold |
| | 1118 | 6 psi |
| | 1122 | Resume depress |
| | 1124 | 2.5 psi |
| | 1128 | 1.5 psi |
| | 1133 | 0.75psi, Airlock depress |
| | 1137 | 0.5 psi |
| | 1138 | HO |
| | 1139 | BP |
| | 1149 | Egress Feustel |
| | 1153? | Egress Arnold |
| | 1302 | PFCS Leaky off EOTP |
| | 1315? | Leaky on MUTT |
| | 1320 | PFCS Frosty off ESP |
| | 1343 | Frosty on EOTP |
| | 1401 | Leaky on ESP |
| | 1505? | Remove old CP13 camera |
| | 1530 | Install CP13 replacement ETVCG |
| | 1550 | EV1 replace SGTRC box on Z1 |
| | 1620 | Primary tasks done |
| | 1642 | MLI removal on ELC2 DCSU |
| | 1702 | RGB T-handles installed |
| | | FHRC work |
| | 1748 | Back at AL, ingress EV2 |
| | 1757 | EV1 ingress |
| | 1800 | TC closed |
| | 1808 | HC |
| | 1810 | Repress |
| 2018 Jun 14 | | EVA-51 |
| | 1201 | Depress 0.7 psi |
| | 1205 | HO |
| | 1206 | Batt, EVA-51 |
| | 1212 | Arnold egress with CL bag/eth cable |
| | 1215? | Feustel egress |
| | | CL bag att to N2 next to Lab |
| | 1350 | Route cables along N2 to PMA2 |
| | 1420 | Back to AL to get boom + HDcams |
| | 1447 | Install EWC/HD cam boom 1 on WIF 16 at N2 front |
| | 1451 | Install EWC/HD cam boom 2 on WIF 17 at N2 front |
| | 1620 | Replace CP3 luminaire |
| | 1633 | Close CATS cover |
| | 1650 | Remove old HD cam on CP3 |
| | 1655 | Install new HD cam EDHC S/N 1002 |
| | 1730 | Move adjustable grapple bar from FHRC on ESP2 to ELC4 |
| | 1800 | AGB transfer complete |
| | 1814 | Feustel - Wire tie to secure S4 solar array blanket box |
| | 1815 | Wire tie floats off nadir fwd |
| | 1836 | Ingress Arnold |
| | 1838 | Arnold out again |
| | 1840 | Arnold ingress |
| | 1843 | Feustel ingress |
| | | Closing TC |
| | 1851 | HC |
| | 1855 | Repress |