BEAM, Bigelow Expandable Activity Module, 1413 or 1578 kg, 3.7m l 3.2m dia; 1.75m high 2.36m dia packed. Delivered to ISS aboard Dragon CRS-8 and installed on Node 3 aft.
| BEAM | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2016 Apr 16 | 0500? | SSRMS grapple BEAM | |
| 0600? | SSRMS unberth BEAM | ||
| 0620 | BEAM out of CRS-8 trunk | ||
| 0900 | BEAM next to N3 | ||
| 0921 | Ready to latch | ||
| 0937 | Berthed on N3 aft (Stage 2 capture) | ||
| 2016 May 25 | N3 HO to BEAM vestibule opening | ||
| 2016 May 26 | Expand attempt, small motion 96 in to 111 in | ||
| 2016 May 28 | 1305 | 113in Introduce 22s air | |
| 1313 | 8s air | ||
| 1338 | 3s air | ||
| 1352 | 1s air | ||
| 1443 | 1s air | ||
| 1510 | 5s air | ||
| 1525 | 3s air | ||
| 1620 | 1s? air, 32 in long 118 dia | ||
| 1644 | 2s air | ||
| 1652 | 2s air (try 13, 54s total), 34 x 118 | ||
| 1712 | 1s air, 35 x 119 | ||
| 1724 | 1s air, 37 x 119 | ||
| 1748 | 1s air 38 x 120 | ||
| 1808 | 1s air 39 x 120 | ||
| 1825 | 1s air 40 x 120 | ||
| 1853 | 2s air 41 x 120 | ||
| 1918 | 42 x 120 | ||
| 1936 | 8s air 56 x 123 | ||
| 1943 | 10s air (try 21) 59 x 125 | ||
| 1946 | 14s air 63 x 127 | ||
| 1950 | 15s air 66 x 127 | ||
| 1955 | 30s air 66.5 x 127 | ||
| 2003 | 9s air 67 x 127 | ||
| 2010 | Manual expansion declared complete | ||
| 2034 | Begin pressurization | ||
| 2044 | Pressurization complete | ||
| 2016 Jun 6 | 0847 | Williams and Skripochka entry | |