Tuesday, June 20, 1995

Explorer 49

  1973-039A


Because of the problem of terrestrial radio interference, the second RAE, RAE B, was designed to make its observations in lunar orbit, shielded from Earth while it skimmed above the lunar farside. The spacecraft had a velocity control thruster to refine the lunar orbit.

RAE 2 (Explorer 49) was launched at 1413 on 1973 Jun 10 by a Delta 1913 from Cape Kennedy. The Delta stage ignited at 1417:30 and cut off at 1422:30 to place the combination in parking orbit. At 1425 the Delta reignited for 29s to enter a 107.8 min, 182 x 2074 km x 29.3 deg orbit. At 1428 the Star 37D third stage ignited for the 44s translunar injection burn, entering a 182 x 390244 km x 29.1 deg orbit. RAE 2 separated from the Star 37D at 1430. The VCS was used to make a midcourse correction at 1528 on Jun 11. The TE-M-479 (Star 17) solid motor fired at 0721 on Jun 15 to insert RAE 2 in a 241 min, 1123 x 1334 km x 38.3 deg lunar orbit. The Star 17 was jettisoned on Jun 18, and the same day the VCS fired to lower the orbit to 221.2 min, 1053 x 1064 km x 38.7 deg. The 37m dipole antenna was extended on Jun 20.

Another object was cataloged in lunar orbit, probably implying the VCS was also ejected after use.

It was reported in Jun 1973 that on Jul 4 the dipole would be retracted, the VCS used to adjust the orbit, and the two main V antennas would be deployed first to 183m, and then a week later to 229m. Total span is 400m. RAE also has a 190m stabilization boom.

RAE 2 operated in lunar orbit until 1977 Apr 30. After that, engineers performed end-of-life tests retracting and extending the antennas. It probably impacted the lunar surface later in 1977. Orbit according to an internal document was 1058 x 1070 km x 59 deg with a 222 min period; this is presumably the first orbit after VCS sep.

 


Explorer 49 
 

DateTimeEventOrbit  

1973 Jun 10  1413:00  Launch by Delta 1913  CK LC17B 
  T+0:38 SRM 4-9 burnout 
  T+0:39 SRM 1-3 on 
  T+1:17 SRM 1-3 out 
  T+1:25 SRM 1-9 sep 
  T+4:29 MECO 
  T+4:33 VECO 
  T+4:36 St 1 sep 
 1417:41  T+4:41 SES-1  
  T+4:55 Fairing sep
 1422:31  T+9:31 SECO-1 
 1425:57  T+13:57 SES-2 29s 
 1426:28  T+14:28 SECO-2  182 x 2074 x 29.3 
  T+15:02 Spinup 
 1428:05  T+15:05 Stage 2 sep 
 1428:19  T+15:17.9 Star 37D burn 44s 
 1429:03  T+16:02.7 Star 37D burnout 
 1430:43  T+17:43 Star 37D separation  182 x 390244 x 29.1  
 1430:45  T+17:45 Star 37D release yo weight  
1973 Jun 11  0600? Pass EL1:4 
1973 Jun 11  1528  VCPS TCM 
1973 Jun 13  0600? Enter lunar sphere 
1973 Jun 15  0721  Star 17 burn 22s LOI  241.0 1123 x 1334 x 61.4 
1973 Jun 18  0725? Star 17 sep 
  Despin to 12 rpm (ACS) 
  VCPS lower orbit to avoid LIM  221.2 1053 x 1064 x 61.4 
1973 Jun 20   37m dipole extended 
1973 Jul 4   Retract dipole? 
1973 Jul 9   Final orbit trim 
1973 Jul 9?   VCPS separated 
1973 Jul   Deploy libration damper 
1973 Jul 12  Deploy to 183m 
  Experiment turn on 
1973 Jul 29   Begin first lunar shadow period 
1973 Oct 26   End first shadow period 
1973 Nov 8   Upper V extension to 200m 
1973 Nov 14   Upper V deploy to 229m 
1974 Jan 3   Begin second lunar shadow period 
1974 Jan 31    222.0 1059 x 1071 x 62.0  
1974 Mar 22   End second shadow period 
1974 Jun 10   Begin third shadow period 
1974 Aug 28   End third shadow period 
1974 Oct 11   One lower-V boom extended to 229m 
1974 Nov 6   Second lower-V boom extended to 229m 
1974 Nov 17   Fourth shadow period 
1975 Feb 1   End shadow period 4 
1975 Apr 21   Shadow period 5 
1975 Jul 1   Begin new-moon-intensive 50-percent data coverage 
1975 Jul 9   End shadow period 5 
1975 Dec 24   Resume full time coverage 
1976 Apr 17   Reduce to 50 percent coverage again 
1976 Oct 19   Resume full time coverage 
1977 Apr 30   End of ops 

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...