Saturday, April 12, 2003

Viking 1

  1975-075A


The Viking A (Lander 2/Orbiter 2) payload was hurriedly replaced by Viking B (Lander 1/Orbiter 1) on the pad at Cape Canaveral in Aug 1975 because of a battery problem, after an initial countdown scrub on Aug 14.

The Titan Centaur took off on 1975 Aug 20 at 2122 and inserted Viking 1 into solar orbit. TC-4's insertion predicted closest Mars approach at 1976 Jun 20 2319 UTC at a distance of 32227 km (T=164486, R=-277133). After blowdown

A mid course correction on 1975 Aug 28 set course for Mars. Approach burns AMC1 and AMC2 were made on 1976 Jun 10 and Jun 15, with Mars orbit insertion on Jun 19. The MOI-1 burn on Jun 21 refined the orbit to 24.66h, 1513 x 32625 km x 37.9 deg, with periapsis at 23.2 deg latitude. MOT5 trim burn on Jul 9 and MOT6 on Jul 14 synchronized the orbit over the landing site. The lander was separated on Jul 20. The bioshield base was jettisoned into Martian orbit.

A trim burn on Aug 3 was followed by MOT7 on Sep 11, starting a drift orbit 21.88h, 1491 x 29510 km x 38.1 deg, with periapsis at 30.8 deg. On Sep 20 the orbit was synchronized again over the VL2 site. MOT 9 on Sep 24 trimmed the orbit.

The Viking Extended Mission began on 1976 Dec 14. Viking Orbiter 1 (VO-1) was used to study the Martian moon Phobos. MOT10 on 1977 Jan 22 put VO-1 on a Phobos approach orbit. On Feb 4 and 12 the MOT11, MOT12 burns synchronized the orbit with that of Phobos. On Feb 20, VO1 made a flyby of Phobos at a distance of 88 km.

Further MOT burns were made over the next few months including MOT15 to avoid Phobos and MOT16 to perform a radio occultation experiment. A series of experiments flying through the shadow of Phobos were carried out on Sep 20, 23 and 27.

The Viking Continuation Mission began on 1978 May 31 and lasted until 1979 Feb 26 when the Deep Space Network was required for the Voyager encounters. MOT17 on 1978 Dec 2 put VO1 in a slow walk, at 24.85h 260 x 34088 km x 39.9 deg, with a periapsis at 38.5 deg south latitude. VO1 reached its lowest periapsis of 234 km on 1979 Jan 22.

The Viking Survey Mission began on 1979 Jul 19, and was replaced by the Mapping Completion Mission on Nov 6. The MOT20 burn on 1979 Nov 6 moved the periapsis latitude to -4.7 deg. The Survey II mission lasted from 1980 Apr 23 to 1980 Jul 14, and on Jul 15 VO1 began the Termination Phase. Test burns on Jul 15-18 were followed by a propellant depletion burn on Jul 31. The last images were taken on 1980 Aug 5 and VO-1 was turned off on command at 2000 on 1980 Aug 7.

 


VO1 
 

DateTimeEventOrbit  

1975 Aug 20  2122:00  Launch by Titan IIIE 
 2123:40  Heat shield jettison 
 2123:51  Stage 1 burn 
 2124:01  SRM sep 
 2126:19  Stage 1 MECO 
 2126:20  Stage 1 sep 
 2126:20  Stage 2 burn 
 2126:32  CSS fairing sep 
 2129:40  Stage 2 MECO 
 2129:54  Stage 2 sep 
 2130:06 Centaur MES 1 
 2132:11 Centaur MECO 1, 19 min coast  158 x 165 x 29.21  
 2147:33 Centaur MES 2 
 2152:48 Centaur MECO 2 
1975 Aug 20  2156:31 Centaur sep  183 x -50629 x 29.3  
 2158:42  Solar panels deploy 
 2210:41  Centaur retro 
 2214:52  Centaur retro cutoff 
1975 Aug 20  2329:00  Bioshield cap sep 
1975 Aug 21  0505? Leave EL1:4 
1975 Aug 21  0549? Centaur leave EL1:4 
1975 Aug 24 1220? Leave Earth sphere 
1975 Aug 24  1457? Centaur leave Earth sphere 
1975 Aug 27    1.00120 x 1.66788 x 4.48 
1975 Aug 27  1830:11 MC1 targeting 4.6m/s 12s 6kg  1.00121 x 1.66898 x 4.48 
1975 Sep 6  2010  Post MC1 periapsis  
1975 Sep 6  2039  Pre MC1 periapsis  
1976 Sep 17   Mass 3464 kg 
1976 Jun 9   He leak discovered 
1976 Jun 10   Approach  1773 x -20117 x 36.44 
1976 Jun 10  1100  AMC1 3464 kg, 60 kg used, 50.5m/s 122.4s 
1976 Jun 10   Approach  2113 x -20918 x 38.44 
1976 Jun 15  1400 AMC2 3404 kg, 70 kg used, 60.0 m/s 143s 
1976 Jun 15   Approach  2164 x -21518 x 38.01 
1976 Jun 17  1130  In Mars SOI  
1976 Jun 19  2220:43  MOI 37:49 1.097 km/s  
1976 Jun 19  2258:32  MOI cutoff  42.4h 1514 x 50300 x 37.7  
1976 Jun 21  1726:21  MOT1 80.0m/s 24.66h 1513 x 32625 x 37.9 23.2 
1976 Jul 9  0040:00  MOT5 25.7m/s 41s out of sync  
1976 Jul 14  0712:00 MOT6 2.7m/ssync over 47W  
1976 Jul 20  0832:15 Sep from VO1 
1976 Jul   Bioshield base sep 
1976 Aug 3  0300:00  SKT-2 burn 2.2m/s, stationkeep with VL1 
1976 Sep 11  1903:54  MOT7 21.3m/s 21.88h 1491 x 29510 x 38.1 30.8 
1976 Sep 20  2215:29  MOT8 3.7m/s  
1976 Sep 24  1510:00 MOT9 22.9m/s  
1976 Dec 14   Viking Extended Mission 
1977 Jan 22   MOT10 Phobos sync 23.05h 1480 x 30856 x 39.1 38.1 
1977 Feb 4   MOT11 Phobos trim 23.05h 
1977 Feb 12   MOT12 Phobos trim 23.05h 
1977 Feb 13   P236 Phobos-1 174 km 
1977 Feb 14   P237 Phobos-2 159 km 
1977 Feb 15   P238 Phobos-3 153 km 
1977 Feb 16   P239 Phobos-4 157 km 
1977 Feb 17   P240 Phobos-5 153 km 
1977 Feb 18   P241 Phobos-6 127 km  
1977 Feb 19   P242 Phobos-7 103 km 
1977 Feb 20   P243, Phobos-8 flyby 89 km 
1977 Feb 21   P244 Phobos-9 104 km  
1977 Feb 22   P245 Phobos-10 137 km 
1977 Feb 22   P246 Phobos-11 174 km  
1977 Feb 23   P247 Phobos-12 194 km 
1977 Feb 24   P248 Phobos-13 204 km  
1977 Feb 25   P249 Phobos-14 213 km  
1977 Feb 26   P250 Phobos-15 225 km? 
1977 Feb 27   P251 Phobos-16 255 km? 
1977 Feb 28   P252 Phobos-17 290 km? 
1977 Mar 11   MOT13 21.92 299 x 30750 x 39.2  
1977 Mar 24   MOT14 23.50 303 x 32540 x 39.3  
1977 May 15   MOT15 Phobos avoidance 23.50h 323 x 32520 x 39.2 36.8 
1977 Jul 1   MOT16  23.97h 321 x 33050 x 39.2 32.7 
1977 Sep 20   Phobos shadow pass 
1977 Sep 23   Phobos shadow pass 
1977 Sep 27   Phobos shadow pass 
1978 May 31   Viking Continuation Mission 
1978 Oct 19   Possible Phobos pass, 612 km 
1978 Dec 2   MOT17  24.85h 260 x 34088 x 39.9 -38.5 
1979 Feb 26   DSN to Voyager 
1979 May 19   MOT18  24.99 329 x 34148 x 39.9 -29 
1979 Jul 19   MOT19  24.79h 357 x 33925 x 39.9 -20.0 
1979 Jul 19   Viking Survey Mission 
1979 Nov 6   MOT20  23.95h 351 x 32997 x 38.0 -4.7 
1979 Nov 6   Mapping Completion Mission 
1980 Apr 19?  MOT-21 951 kg 15 m/s  24.52h 369 x ? x 38.9  
1980 Apr 23   Survey II Mission 
1980 Jul 15   Termination Phase 
1980 Jul 15   Test  36.36h 373 x 47857 x 37.7 31.9 
1980 Jul 17   Test  41.82h 375 x 51038 x 37.5 31.8 
1980 Jul 18   Test  47.56h 351 x 56273 x 36.9 31.2 
1980 Jul 31   Depletion 47.63h 411 x 56275 x 37.9 31.7 
1980 Aug 7  2000 Turned off 

Payload:

  • Vidicon cameras (0.48m telescopes)

  • IR radiometer 0.05m telescope A, 18-24 mu; 0.05m telescope B 9.8-12.5mu; 0.05m telescope C 6-15mu; 0.025m telescope D with 0.3-3mu bandpass.

  • IR spectrometer


1975-075C

VL-1 (Viking Lander 1) landed on Mars on 1976 Jul 20. The VL has both deorbit engines and braking engines, built by RRC. The Aeroshell Base contains the four RCS deorbit engines, with two fuel tanks mounted on the aeroshell itself; the engines are monopropellant hydrazine with Isp = 160s. The three terminal descent (TD) engines on the lander are 2.7 kN thrust each. An upper atmospheric mass spectrometer is mounted on the aeroshell and returns data from 7000 to 100 km altitude.

On 1981 Jan 7 Viking Lander 1 was renamed the Thomas A. Mutch Memorial Station in honor of a member of the VL-1 team (1931-1980) who had been killed in a climbing accident. It returned its last image on Sol 2238, 1982 Nov 5, and stopped transmitting on 1982 Nov 13.


VL1 
 

DateTimeEventOrbit  

1976 Jul 20  0832:15 Sep from VO1 
 0839:16 S+7:01 Deorbit 23 min burn 156m/s 
 0901:35 S+29:20 Deorbit complete 
 1135:08 Orient for entry  
 1144 Alt 245 km  -100 x 30828 x 37.9  
 1144:08 S+3:11:53 Entry 243.8km 4.6098 km/s -16.99 deg 
 1151:06 S+3:19:02 Parachute deploy 5.9 km  
 1151:13 Aeroshell base sep 5.0 km 
 1151:25  Legs deployed 
 1151:25? Aeroshell top sep 
 1152:19 Terminal descent 1.5 km 
 1153:05 Touchdown LT=19min 
 1159  Biology PDA lid deploy  
1976 Jul 22  0719  Arm cover eject 
1976 Jul 23  1138  GMCS lid deploy 
1976 Dec 14   Viking Extended Mission 
1980 Aug 7   Lander Monitor Mission 
1981 Jan 7   Renamed Mutch Memorial Station 
1982 Nov 13   End of transmissions? 
1982 Nov 20   End of operations
1983 Jun   Mission ended

Payload:

  • SNAP-19 RTG

  • Itek facsimile cameras

  • TRW biology unit

  • XRFS X-ray flourescence spectrometer

  • GCMS Gas Chromatograph Mass Spectrometer

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...