Friday, March 12, 1999

Kosmos 1676

 1985-072A



Kosmos-1676 
 

DateTimeEventOrbit  

1985 Aug 16  1510 Launch by Soyuz  PL 
 1514  Blok-A sep 
 1518  Blok-I sep 
1985 Aug 16    89.63 165 x 346 x 67.16 
1985 Aug 22    89.29 162 x 315 x 67.2 
1985 Aug 23   
89.62 164 x 346 x 67.2 
1985 Aug 28    89.25 160 x 314 x 67.2 
1985 Aug 29   
89.30 162 x 317 x 67.2 
1985 Sep 3    88.84 157 x 276 x 67.15 
1985 Sep 3   
89.78 176 x 351 x 67.16 
1985 Sep 5   SpK-1 fiducial 
 0715? Deorbit 
 0725?  Entry 
 0737? Land 
1985 Sep 14    89.29 170 x 308 x 67.1 
1985 Sep 14   
89.97 176 x 369 x 67.15 
1985 Sep 25   SpK-2 fiducial 
 0059  Deorbit 
 0109  Entry 
 0121? Land 
1985 Sep 30    89.18 170 x 297 x 67.2 
1985 Oct 1   
89.49 179 x 319 x 67.1 
1985 Oct 10    89.04 175 x 278 x 67.2 
1985 Oct 10   
89.64 177 x 336 x 67.1 
1985 Oct 13  2011   89.50 176 x 322 x 67.2 
1985 Oct 14   
 1832?  Deorbit  -175? x 281  
 1847?  Entry 
 1859?  Land 


Monday, March 8, 1999

Westar 5

 1982-058A


Western Union Spacecom's Westar V HS-376 class satellite was launched in 1982 to replace the aged Westar II. The first stage burn was short by 91 m/s, but the second stage overburned to compensate.


Westar 5 
 

DateTimeEventOrbit  

1982 Jun 9  0024  Launch by Delta 3910  CC LC17 
  T+0:57 SRM 1-6 off 
  T+1:02 SRM 6-9 on 
  T+1:10 SRM 1-3 sep 
  T+1:11 SRM 4-6 sep 
  T+1:59 SRM 6-9 off 
  T+2:05 SRM 6-9 sep 
  T+3:44 MECO 
  T+3:52 St 1 sep 
  T+3:57 SES-1 5:04 
 0028 T+4:00 Fairing 
 0033 T+9:01 SECO-1  -750? x 300? x 27.4 
 0043 T+19:33 spin 
 0043 T+19:35 St 2 sep 
 0044 T+20:13 TES 85s 
 0045 T+21:38 TECO 
 0105 T+41m Stage 3 sep 633.74 206 x 35917 x 26.9 
1982 Jun 11  2120  AKM burn  
1982 Jun 11    1418.51 34970 x 35912 x 0.3 GEO 145.8W+4.4E 
1982 Jun 12    1424.36 35255 x 35857 x 0.0 GEO 142.5E+3.0E 
1982 Jun 17    1436.17 35720 x 35855 x 0.1 GEO 139.1W 
1982 Jul 2   mv out 1436.05 35721 x 35849 x 0.1 GEO 139.2W 
1982 Jul 14    1428.79 35566 x 35720 x 0.1 GEO 129.9W+1.8E 
1982 Jul 18   mv in 1436.08 35783 x 35789 x 0.0 GEO 123.4W 
1982 Jul 30    1436.13 35786 x 35788 x 0.1 GEO 123.1W 
1984 Dec 28    1436.11 35783 x 35790 x 0.0 GEO 123.1W 
1987 Mar 1    1436.10 35780 x 35792 x 0.0 GEO 122.6W 
1989 Mar 5    1436.05 35778 x 35792 x 0.0 GEO 123.1W 
1992 Mar 3    1436.04 35778 x 35792 x 0.1 GEO 122.5W 
1992 May 1    1436.03 35773 x 35797 x 0.2 GEO 122.4W 
1992 May 4   mv out  1438.91 35824 x 35859 x 0.2 GEO 124.6W+0.7W 
1992 May 25   orbit raise 1451.31 36007 x 36159 x 0.3  
1992 Oct 8    1451.36 36009 x 36160 x 0.6 
1996 Apr 27    1451.43 36027 x 36144 x 5.5

Wednesday, March 3, 1999

Saturn S-IVB-504N

  1969-018B


SA-504 was launched at 1600:00 on 1969 Mar 3. The S-IVB entered earth orbit at 1611:15, and Apollo 9 separated from it at 2018. The S-IVB restarted at 2045:47, entering a 207 x 3087 km x 32.6 deg orbit. A third burn at 2207:19 sent the stage on an escape trajectory to solar orbit. The burn involved an experimental extended preburn fuel supply, and several anomalies were reported; pressurization was lost in the engine system, losing about 2 km/s of velocity. At MECO-3 the velocity was 9.628 km/s at an altitude of 2283 km, and C3 was 824712 m2/s2. The S-IVB reached a 325.8d, 128.561 x 148.678 Mkm x 24.39 deg solar orbit instead of the planned 240d, 76.808 x 149.340 Mkm x 22.27 deg orbit.


S-4B-504 
 

DateTimeEventOrbit  

1969 Mar 3  1600:00  Launch by Saturn V (SA-504)  KSC LC39A 
 1602:14  S-IC CECO 
 1602:43  S-IC OECO 
 1602:43  S-IC sep 
 1602:44  S-II ignition 
 1603:13  Interstage sep 
 1603:19  LES sep 
 1608:57  S-II ECO, sep 
 1608:57  S-IVB ignition 
 1609:09  Ullage case jettison 
 1611:04  S-IVB cutoff 
 1611:15  Earth orbit insertion  189 x 191 x 32.6 
   184 x 186 x 32.55 
 1612:03  CVS vent on 
 1622   88.31 184 x 197 x 32.6 
 1841:16  Sep from S-IVB/SLA, SLA panels sep 
  Transposition and docking maneuver 
 1902:07  Docked with LM 3 (Spider)/S-IVB 
 2008:06  CSM/LM undocked from S-IVB 
 2045:47  Burn 2 
 2046:57  MECO-2  196 x 3096 x 32.30 
 2206:27  Burn 3, solar orbit 
 2211:21  MECO-3  2280 x Inf x 33.82 
 2212:51  LOX NPV vent 
 2224:11  LH2 vent 
 2334:05  APS depletion burn 9.7m/s 
 2341:53  APS depletion complete 

Apollo 9 (Gumdrop)

  1969-018A


The Command and Service Module for the Apollo 9 mission was CSM 104, named Gumdrop for its shape. On Mar 8 Gumdrop lowered its perigee to improve conditions for multispectral photography of the Earth.

Gumdrop (CSM 104) 
 

DateTimeEventOrbit  

1969 Mar 3  1600:00  Launch by Saturn V (SA-504)  KSC LC39A 
 1602:14  S-IC CECO 
 1602:43  S-IC OECO 
 1602:43  S-IC sep  -6000 x 110 x 32.1 
 1602:44  S-II ignition 
 1603:13  Interstage sep 
 1603:19  LES sep 
 1608:57  S-II OECO, sep -2070 x 189 x 32.7 
 1608:57  S-IVB ignition 
 1609:09  Ullage cases 1 and 2 jettison 
 1611:04  S-IVB cutoff 
 1611:15  Earth orbit insertion  189 x 191 x 32.6 
 1622   88.31 184 x 197 x 32.6 
 1845  Sep from S-IVB/SLA, SLA panels sep 
 1850Transposition and docking maneuver 
 1902:08  Docked with LM 3 (Spider)/S-IVB 
 2008:06  CSM/LM undocked from S-IVB  194 x 212 x 32.6 (FER) 
 2159:01  SPS 1 docked burn  201 x 233 x 32.6 
 2159:06  SPS 1 cutoff  201 x 250 x 32.6 (MR) 
1969 Mar 4  0055   88.84 217 x 217 x 32.6 
 0500   88.90 202 x 237 x 32.6 
 0634   88.69 201 x 218 x 32.6 
 1200   88.82 203 x 228 x 32.6 
1969 Mar 4  1412:03  SPS 2 orbit shaping  199 x 250 x 32.7 (MR) 
 1413:54  SPS 2 cutoff  199 x 351 x 32.6 
   199 x 370 x 32.6 (MR) 
 1717:38  SPS 3 propellant utilization test  201 x 372 x 33.6 (MR) 
 1722:19  SPS 3 cutoff  205 x 524 x 34.0 (MR) 
   202 x 503 x 33.8 
 1800   91.58 295 x 498 x 33.8 
 2024:40  SPS 4 test burn  205 x 528 x 34.0 (MR) 
 2025:09  SPS 4 cutoff  204 x 524 x 34.0 (MR) 
 2145   91.63 198 x 510 x 33.8 
1969 Mar 5  0920   91.57 204 x 498 x 33.8 
1969 Mar 5  1741:33  Docked DPS burn  202 x 499 x 32.6 
   203 x 520 x 34.0 (MR) 
 1747:46  DPS 1 cutoff  203 x 523 x 34.1 (MR) 
 2226:11  SPS 5 reshaping  203 x 519 x 34.1 (MR) 
 2226:56  SPS 5 cutoff  239 x 250 x 33.8 (MR) 
   229 x 239 x 32.6 
 2317   89.24 227 x 246 x 33.6 
1969 Mar 6  0515   89.23 225 x 247 x 33.6 
 1155   89.21 233 x 237 x 33.6 
1969 Mar 6   CDR and LMP to LM 
 1401   89.15 223 x 241 x 33.6 
 1653  Depress for SEVA by CMP  
 1659  Fully depressed 
 1701  Hatch open 
 1749:25  Hatch closed 
 1754  Repress (1:01) 
  CDR and LMP to CSM 
1969 Mar 7   CDR and LMP to LM 
 0621   89.12 231 x 231 x 33.6 
 1239:30  LM Undocked 
 1240  CSM flyaround inspection of LM 
 1302:53  RCS sep burn  233 x 242 x 33.7 (MR) 
   235 x 225 x 32.6 
 1303:03  RCS cutoff  234 x 242 x 33.7 (MR) 
  Rendezvous by LM 
 1826   89.10 213 x 246 x 33.6 
 1859  LM docked with CSM 
  CDR and LMP transfer to CSM 
 2122:45  LM undocked 
 2132:44  CSM sep burn  224 x 235 x 32.6 
1969 Mar 8  0710   89.14 231 x 231 x 33.6 
 1212   89.05 226 x 228 x 33.7 
 1302   89.15 226 x 238 x 33.6 
1969 Mar 8  1925:06  SPS 6 burn  195 x 222 
 1925:08  SPS 6 cutoff 
 2145   88.74 191 x 232 x 33.6 
1969 Mar 9  1155   88.67 194 x 222 x 33.6 
 1911   88.52 192 x 209 x 33.6 
1969 Mar 10  1738:59  SPS 7 burn 
 1739:25  SPS 7 cutoff  183 x 484 x 33.7 (MR) 
 1820   90.94 181 x 459 x 33.5 
1969 Mar 11  1021   90.92 176 x 462 x 33.5 
1969 Mar 12  0605   90.95 189 x 452 x 33.5 
 1136   90.84 181 x 449 x 33.5 
 1338   90.89 176 x 459 x 33.5 
1969 Mar 13  0413   90.80 182 x 444 x 33.5 
1969 Mar 13  1631:14  SPS 8 deorbit burn 11.8s  186 x 456 x 33.6 (MR) 
 1631:25  SPS 8 cutoff  -7 x 444 x 33.5 (MR) 
   3 x 446 x 33.6 (MR) 
 1636:03 SM-104 sep 
 1644:10 Entry interface 0 x 452 x 34.6 (MR) 
 1700:54  Splashdown in Atlantic 
 1750Recovered by USS Guadalcanal 

Apollo 9 (Spider)

  1969-018C


LM 3 was the first piloted test flight of an LM, carried out in Earth orbit.

On Mar 6 the first spacewalk of the Apollo program was carried out. With Scott in the CSM, and McDivitt and Schweickart in the LM, the LM hatch was opened. Schweickart went out onto the LM porch. The spacecraft was repressurized after 1h 7min.

On Mar 7, Spider undocked and carried out tests of the DPS engine. After two burns of the DPS, the Descent Stage was jettisioned; it reentered on Mar 22. The APS was then put through its paces, with a successful rendezvous and docking. After the crew returned to the CSM, Spider was jettisoned and the APS burned again to leave the ship in an elliptical orbit.


Spider (LM3) 
 

DateTimeEventOrbit  

1969 Mar 3  1600:00  Launch by SA-504  KSC LC39 
 2018  Removed from S-4B-504 by CSM 104 
1969 Mar 5  1000?  Crew entry, power up 
1969 Mar 5   RCS test, legs deployed 
   202 x 503 x 33 
 1741:33  Docked DPS burn  202 x 499 x 33 
1969 Mar 6  1644  LM depressurized 
 1646?  HO? 
1969 Mar 6   EVA by LMP  
 1707:37  Egress LMP 
 1745  Ingress 
 1749:57  Hatch closed 
 1751  LM repress 
1969 Mar 7   Transfer hatch closed 
 1239:20  Undocked from CSM 104  229 x 239 x 33 
   224 x 252 x 33.7 (MR) 
 1347:34  DPS phasing burn  207 x 253 x 33 
 1347:54  DPS cutoff  210 x 265 x 33.7 (MR) 
 1539:07  DPS insertion burn  248 x 257 x 33 
 1539:30  DPS cutoff 
 1616:04  LM3 DS separation  89.3 242 x 246 x 33.6 (DS) 
 1616:06  RCS 30s CSI burn  208 x 255 x 33 
 1616:36  RCS cutoff 
 1658:14  APS constant DH burn, 3s  207 x 215 x 33 
 1658:17  APS cutoff 
 1757:59  TPI burn 7m/s LM RCS 208 x 233 x 33 
 1758:36  TPI burn off 
 1827  2 km, at 10m/s 
 1830  170m 
 1830:51  TPF burn  224 x 234 x 33 
 1834  Rendezvous with CSM 104 at 30m 
 1859  Docked with CSM-104 
 1940  Transfer hatch open, crew transfer to CSM 
 2045? Transfer hatch closed 
 2122:45  Undocked from CSM-104  225 x 234 x 33 ? 
 2132  CSM leaves LM vicinity 
 2153:20  APS depletion burn 5:42 
 2159:10  APS burn ends  164.7 230 x 6939 x 28.91 
1969 Mar 8  0358   164.96 234 x 6936 x 28.9 
1970 Oct 9    156.63 230 x 6263 x 29.0 
1981 Jun 6    99.66 198 x 1285 x 28.8 
1981 Oct 23  1500?Reentered 

Tuesday, March 2, 1999

Kosmos 1348

 1982-029A



Kosmos-1348 
 

DateTimeEventOrbit  

1982 Apr 7  1342 Launch by 8K78M  Plesetsk 
  BVGD sep 
  GO sep 
  T+4:46 Blok A sep 
  T+4:56 KhO sep 
  T+8:46 Blok-I MECO 
 1350 T+8:50 Blok-I sep 
  T+1:00? BOZ burn 
 1442?  T+1:00? BOZ sep 
  2BL burn 
  2BL MECO 
 1445?  T+1:03 2BL sep  
1982 Apr 7    708.8 593x39316x62.8 
1982 Apr 24   717.7 607x39745x62.9

Kosmos 469

 1971-117A


A US-A satellite was launched in Dec 1971 from Baikonur,reached orbit and was named Kosmos-469. It operated in the low orbit for ten days before the reactor section was separated and boosted to a higher orbit. One solution for the orbit change is with burns at 0637, 0729 UTC on Jan 4; this is consistent with the claimed time of orbit change in the RAE tables. However, a pair of elsets for the separate reactor and propulsion sections for epoch around 0300 UTC suggests that separation took place before that time. I therefore adopt another solution with burns at 2013 and 2105 UTC on Jan 3.


Kosmos-469 
 

DateTimeEventOrbit  

1971 Dec 25  1130  Launch by 11K69  KB  
 1132  Stage 2 burn  
 1134  Stage 2 sep  
 1144?  DU burn  
  DU cutoff, orbit  
 1154? Stage 2 entry 
 1549   89.63 244 x 267 x 64.9 
1971 Dec 26  0000   89.60 249 x 262 x 64.94 (RAE) 
1972 Jan 3  2013? DU and radar section sep  
1972 Jan 3  2013? DV1 
 2105? DV2 
1972 Jan 4  0255   89.48 242 x 254 x 65.0 
1972 Jan 5  0754  Reactor section  104.72 946 x 1015 x 64.5 
1972 Jan 7  1521?  DU reentered 
1972 Jan 15  1430  Reactor section  104.74 941 x 1023 x 64.50  
1972 Feb 9  0155?  Radar section reentered 

Monday, March 1, 1999

ADEOS-1

 1996-046A


The ADEOS satellite was launched in Aug 1996. NASDA's ADEOS Advanced Earth Observing Satellite was built by Mitsubishi Electric of Tokyo. The 3200 kg satellite has a 4m x 4m x 5m bus with a 3 x 13 m solar array. It carries a payload to study the ozone layer and the greenhouse effect, as well as an inter-satellite communications experiment. The satellite was named Midori (`green') on reaching orbit, but the ADEOS name was almost always used.

The main 20N thrusters malfunctioned, and initial orbit adjust was made by the small 1-N thrusters. In June 1997 the solar panels failed structurally and the spacecraft was lost.


ADEOS 
 

DateTimeEventOrbit  

1996 Aug 17  0153  Launch by H-II (4F)  TNSC  
 0154  SRB burnout (T+1:33) and sep (T+1:40) 44km 
 0156  Fairing sep (T+3:50), 151 km 
 0158  T+5:45 Stage 1 cutoff 
 0158  T+5:55 Stage 1 sep, 321 km 
 0159  Stage 2 burn T+6:01 
 0207  Stage 2 cutoff T+14:57), 802 km 
 0208  ADEOS sep from Stage 2 (T+15:47) 
 0234? Stage 2 burn 2 
 0234? Stage 2 cutoff 2 
 0234?  JAS sep from Stage 2 
 0315? Stage 2 depletion? 
1996 Aug 24   Orbit raise begin 
1996 Sep 8   In op orbit 
1996 Sep 11   OCTS radiation cover deployed 
1997 Jun 23   Solar panel problems 
1997 Jun 27   Power decrease begins 
1997 Jun 30   Battery power only, safemode 

0520  (1620JST) loss of signal 
1997 Jul 2 end of ops

Payload:

  • OCTS Japanese NASDA Ocean Color /Temp Scanner

  • AVNIR Japanese NASDA Adv Vis/Near IR Radiometer

  • IMGG Japanese MITI Interferometric Monitor for Greenhouse Gases (Greenhouse effect)

  • ILAS Japanese Envir. Agency Improved Limb Atmospheric Spectrometer (spectrometer)

  • Japanese Retroreflector (laser as atmospheric probe)

  • NSCAT NASA Scatterometer (wind speed) NSCAT (Earth Probe)

  • TOMS NASA Ozone Mapping Spectrometer TOMS

Sunday, February 21, 1999

DSP 10

 1982-019A


DSP 10 was launched in Mar 1982 on the last Titan IIIC. 


DSP 10
 

DateTimeEventOrbit  

1982 Mar 6  1925  Launch by Titan IIIC  CC 
 1927  SRM sep 
 1929?  Stage 1 sep 
 1930?  Fairing 
 1932?  Stage 2 MECO  90.0? 150 x 280 x 28.5? 
 1933? Stage 2 sep 
 2033? Transtage MES-1  630.0 280? x 35500 
 2035? MECO-1 
1982 Mar 7 0200?  MES-2 
 0202?  MECO-2 
 0210?  Transtage sep 1424.6 35521 x 35600 x 1.98 GEO 92W+3E/d 
1982 Mar 8?  Cover sep 
1982 Mar 13   1435.2 35733 x 35803 x 0 GEO 73.3W+0.25E/d 
1982 Mar 31   mv  
1982 Apr 6    1436.1 35760 x 35813 x 0 GEO 68W 
1982 Oct    GEO 68W (?) 
1983 Jan 1    GEO 35W 
1988 Mar 10   mv out  GEO 35W 
1988 May 15   mv in  GEO 165W 
1989 Sep 20   mv out  GEO 165W 
1989 Nov 25   mv in GEO 35W 

Saturday, February 20, 1999

Kosmos 899

 1977-022A



Kosmos-899 
 

DateTimeEventOrbit  

1977 Mar 24  2211 Launch by 11K65M  Plesetsk 
 2213  S3 burn 
 2219? T+8m? S3 MECO-1 
 2244? T+33m? S3 MES-2 
 2244? S3 sep 
1977 Mar 24   95.2 503x547x74.1 
1980 Oct 19   reentered 

Kosmos 174

  1967-082A


In Aug 1967 the Korolev bureau launched a Molniya-1Yu (Yustirovochnaya, calibration) satellite. The satellite may have been used for testing the N-1/L-3 lunar mission tracking and communications network.


Kosmos-174 
 

DateTimeEventOrbit  

1967 Aug 31  0800:03  Launch by Molniya 8K78M  KB 
 0804  Blok-I burn 
 0809  Blok-I sep  91.06 199 x 454 x 64.8 (RAE) 
 0904?  Blok-L burn  
 0905?  Blok-L cutoff  
 0906?  Blok-L sep  715.0 430 x 39796 x 64.9 (RAE) 
1967 Sep 6    715.14 423 x 39800 x 64.9 
1968 Apr?   End of ops
1968 Aug 25    709.17 185 x 39743 x 65.1 
1968 Oct 15    681.26 127 x 38409 x 65.2 
1968 Dec 8    493.19 117 x 28482 x 65.1 
1968 Dec 28    147.36 125 x 5601 x 65.3 
1968 Dec 30   Reentered 

Kosmos 2305

 1994-088A



Kosmos-2305 
 

DateTimeEventOrbit  

1994 Dec 29  1130:00  Launch by Soyuz-U2  KB 
 1138  Blok-I sep 
1994 Dec 29  1424  89.14 180 x 283 x 64.9 
1994 Dec 30   Orbit raise 
1994 Dec 30  0336  89.85 244 x 289 x 65.0 
 0643   89.89 240 x 297 x 64.91 
1995 Jan 9  1940   89.78 236 x 290 x 64.90 
1995 Jan 13  0433   89.74 235 x 287 x 64.90 
1995 Jan 25    89.58 229 x 277 x 64.9 
1995 Jan 25   Orbit raise 90.02 240 x 309 x 64.9 
1995 Jan 27  2121   90.00 240 x 308 x 64.90 
1995 Feb 24  0643   89.63 229 x 283 x 64.90 
1995 Feb 26   Orbit raise  90.10 241 x 317 x 64.9 
 
1995 Mar 3  0502   90.04 239 x 313 x 64.90 
1995 Mar 30  2038   89.65 228 x 286 x 64.90 
1995 Apr 1   Orbit raise 89.92 239 x 301 x 64.9 
1995 Apr 5  2150   89.88 238 x 297 x 64.90 
1995 Apr 20  2107   89.66 232 x 283 x 64.90 
1995 Apr 26   Orbit raise  89.88 241 x 295 x 64.9 
1995 Apr 28  1857   89.85 240 x 293 x 64.90 
1995 May 19  1257   89.59 232 x 275 x 64.89 
1995 May 24   Orbit raise 
1995 May 25  0448   89.82 239 x 291 x 64.89 
1995 Jun 15  2233   89.56 232 x 273 x 64.89 
1995 Jun 21   Orbit raise 
1995 Jun 23  0350   89.92 241 x 299 x 64.89 
1995 Jul 19  2150   89.65 234 x 280 x 64.89 
1995 Aug 3   Orbit raise 
1995 Aug 4  1243   89.91 240 x 300 x 64.89 
1995 Aug 25  1019   89.70 234 x 285 x 64.89 
1995 Aug 29   Orbit raise 
1995 Sep 1  0516   89.96 239 x 305 x 64.89 
1995 Sep 29  0224   89.62 229 x 281 x 64.88 
1995 Sep 29   Orbit raise  89.98 241 x 304 x 64.9 
1995 Oct 8  1716   89.87 238 x 297 x 64.89 
1995 Oct 27  0531   89.59 229 x 279 x 64.88 
1995 Nov 2    89.49 225 x 272 x 64.9 
1995 Nov 2   Orbit raise  89.93 240 x 302 x 64.9 
1995 Nov 29    89.59 277 x 280 x 64.9 
1995 Nov 30   Orbit raise  89.95 244 x 299 x 64.9 
1995 Dec 18  2147? Two debris objects (C,D) ejected 
 2150   89.77 239 x 286 x 64.9 
 2212  Groundtrack pass over Baikonur 
 2225? Deorbit 
 2250  Groundtrack pass over SE Pacific 
 2255? Entry? 

Spaceflight: September 1998

 https://welib.org/md5/4797085928b9877e9b7a5576bec113a9

Thursday, February 18, 1999

Kosmos 1074

 1979-008A


Kosmos-1074 (7K-ST No. 5L) spent 60 days in space to simulate a long duration Soyuz T mission. The mission had been planned for 90 days, but it was cut short because of a control system failure.

A post reentry TLE set is probably for the orbital module, which is probably cataloged as 11315 (79-008C). Its first assigned elsets are at 1343 UTC on Mar 31, a day before reentry - it is possible that the BO was ejected early as a test or that a planned recovery on Mar 31 was aborted


Kosmos-1074 
 

DateTimeEventOrbit  

1979 Jan 31  0900:00 Launch by Soyuz  KB 
 0902  Blok BVGD sep 
 0904  Blok A sep 
 0908  Blok I MECO 
 0908  Blok I sep 
1979 Jan 31   88.87 197x240x51.60 
1979 Feb 1    88.87 195x242x51.60 
1979 Feb 2    90.03 255x297x51.67 from 194x237 
1979 Feb 3    90.15 264x306x51.66 
1979 Feb 3    90.83 308x323x51.66 
1979 Feb 4    90.82 310x320x51.66 
1979 Feb 7    92.09 352x402x51.6 from 278x357 
1979 Feb 7    92.02 363x384 
1979 Mar 31    91.55 347x360x51.66 
1979 Mar 31  1200? BO sep 
 1340? Retrofire possibly cancelled? 
1979 Apr 1  
 0925? DO 
 0929? DO CO  
 0940? PAO sep 
 0950? Entry  

1011:00 Landed

Monday, February 15, 1999

IRS-P3

 1996-017A


IRS-P3 was launched by PSLV in Mar 1996. Mass of the satellite was 922 kg. As well as the remote sensing instruments, it carried an X-ray astronomy payload. Three proportional counters studied variable X-ray sources in the 2-18 keV band. The first reported results  were measurements of the X-ray pulsar GX1+4 and the superluminal transient GRS 1915+105.


IRS-P3 
 

DateTimeEventOrbit  

1996 Mar 21  0453  Launch by PSLV (D3)  SHAR 
  T+00:30 PSOM 5-6 ignite 
  T+00:54 PSOM 1-4 cutoff 
  T+01:18 PSOM 1-4 sep 
  T+01:19 PSOM 5-6 cutoff 
  T+01:30 PSOM 5-6 sep 
 0454  T+01:43 PS-1 cutoff and sep 
 0454  T+1:44? PS2 burn 2:29 
 0457  T+4:13? PS2 burnout 
 0457  PS2 sep 
 0457  T+4:15? PS3 burn 78s 
 0458  T+5:33? PS3 burnout 
 0458? PS-4 burn 
 0500? PS-4 sep 802 x 848 x 98.8 

November 20,2006

  https://en.wikipedia.org/wiki/Association_football