Thursday, September 10, 1998

Aviation Week: April 27,1998

 https://welib.org/md5/b037019033c6aba67ff5b66d852f81dd

Meteor 120

  1974-099A


Meteor F20 was launched in Dec 1974 and operated for at least a year.


Meteor F20 
 

DateTimeEventOrbit  

1974 Dec 17  1145 Launch by Vostok 8A92M PL 
 1149?  Blok E burn 
 1155?  Blok E sep 
   102.4 842 x 897 x 81.2 
1976? End of ops 

Monday, September 7, 1998

Kosmos 146

  1967-021A


L-1 No. 2P ('P' for simplified) was launched on 1967 Mar 10 aboard a Proton-K with the first 11S824 Blok-D upper stage and the first 8D49-powered Proton third stage. The 7K-L1 11F91 No. 2P spacecraft was given the code name Kosmos-146; it was boosted to a 'simulated Moon', i.e. an elliptical orbit with apogee at lunar distance. The flight caused some statistical confusion, since it was included in Soviet totals of flights which reached the `second cosmic velocity' (Earth escape speed). The spacecraft was not recovered; some reports suggested attitude control may have failed on reentry, but Kamanin's diaries suggest that recovery was not intended and that the flight was a test of the Blok-D second burn, not a reentry test. Chertok's memoirs describe it as a test of 'acceleration to lunar reentry velocity'.

The Blok-D second burn was about 24h after launch and occurred over the USSR, simulating the wait for rendezvous and docking by another Soyuz. The flight appears to have lasted at least 42 hours; the RDM-3 radio beacon lasted that long even though it was meant to switch off after the second burn.

A nominal apogee of 400000 km would lead to an entry on Mar 22, but small differences in velocity could lead to entry as early as Mar 17 or as late as mid-April, or indeed to escape into solar orbit.


Kosmos-146 
 

DateTimeEventOrbit  

1967 Mar 10  1130:32  Launch by Proton-K  KB 
 1136Stage 3 burn  
 1140? Stage 3 cutoff  -1400? x 200 x 51.5 
  Adapter sep 
 1141? Blok-D burn 1:49 
 1143? Blok-D cutoff, orbit insertion 
 
SOK cone sep 
  SOZ sep  89.25 180 x 294 x 51.44 (A) 
 1843   89.24 184 x 290 x 51.51 
1967 Mar 11  1235   89.22 184 x 287 x 51.5 
1967 Mar 11  1255:30  Blok-D burn to high apogee  200? x 400000? 

1967 Mar 17? 

 Apogee 
1967 Mar 17  2300? Entry (apo = 258k) 
1967 Mar 22  0800?  Reentered? 
 ?  Entry (apo = 400k) 
1967 Apr 18   Entry ( apo = 871k) 

Kosmos 2262

 1993-057A




Kosmos-2262 
 

DateTimeEventOrbit  

1993 Sep 7  1325:00  Launch by Soyuz  KB 
 1329Blok-I burn 
 1333  Blok-I sep 
1993 Sep 8    89.13 172x290x64.9 
1993 Sep 9    89.81 207x323x64.9 
1993 Sep 17   89.58 202 x 304 x 64.9 
1993 Sep 18   Orbit raise 89.81 213 x 316 x 64.9 
1993 Sep 28    89.52 207 x 293 x 64.9 
1993 Sep 28   Orbit raise  89.86 212 x 322 x 64.9 
1993 Oct 11   89.47 204 x 291 x 64.9 
1993 Oct 11   Orbit raise  89.84 209 x 323 x 64.9 
1993 Oct 21    89.54 203 x 300 x 64.9 
1993 Oct 23   Orbit raise  89.82 212 x 318 x 64.9 
1993 Oct 27   89.68 209 x 307 x 64.9 
1993 Oct 30   Orbit raise  89.84 214 x 318 x 64.9 
1993 Nov 12    89.45 206 x 288 x 64.9 
1993 Nov 13   Tweak  89.53 209 x 293 x 64.9 
1993 Nov 22    89.85 227 x 305 x 64.9 
1993 Nov 24   Orbit raise  89.96 208 x 336 x 64.9 
1993 Dec 17    89.03 187 x 265 x 64.9

Sunday, September 6, 1998

Lacrosse 2

 1991-017A


The second LACROSSE, USA 69, was launched on 1991 Mar 8 by a Titan 4 from Vandenberg and was soon picked up by visual observers in a 414 x 664 km x 68.0 deg orbit. The Titan rocket stage was observed on Jul 12 in a similar orbit, 95.34 min 412 x 657 km x 68.0 deg. Meanwhile on Mar 28 the payload was seen to have moved to a new orbit, raising its perigee to circularize at 680 km.


LACROSSE 2 
 

DateTimeEventOrbit  

1991 Mar 8  1203  Launch by Titan4  V SLC4E 
  Stage 1 burn T+1:57 
 1208 Stage 2 burn T+5:02 
 1208 Stage 1 sep T+5:03 
 1211 Stage 2 MECO T+8:38 
 1212 Orbit insertion T+8:58 
 1212 Titan stage 2 sep 95.43 414 x 664 x 68.0 (CSS) 
1991 Mar    95.5 420 x 662 x 68.0 (UN) 
1991 Mar 28    683 x 683 x 68 (CSS) 
1991 May 17    98.23 672 x 676 x 68.0 (CSS) 
1991 Jun 29    98.23 669 x 677 x 68.0 (CSS) 

Navstar 17

 1989-097A


Navstar 17 (USA 49, SVN 17/PRN 17) was launched on 1989 Dec 11 into plane D. It was the 5th Block II launch.


Navstar 17 
 

DateTimeEventOrbit  

1989 Dec 11  1810:01  Launch by Delta II 6925  CC LC17 
  T+0:56 SRM 1-3,7-9 out  
  T+1:01 SRM 4-6 on 
  T+1:02 SRM 1-3 sep 
  T+1:03 SRM 7-9 sep 
  T+1:57 SRM 4-6 off 
  T+2:02 SRM 4-6 sep 
  T+4:25 MECO 
  T+4:31 VECO  
  T+4:33 Stage 1 sep 
 1814  Stage 2 TIG (T+4:38) 
 1814  Fairing sep (T+4:50) 
 1821  SECO-1 (T+11:37)  180 x 500? x 35.66? 
  T+20:55 spinup 
 1830  T+20:58 Delta sep 
 1831  T+21:35 TES 
 1833 T+23:02 TECO  
 1834 T+24:55 Stage 3 sep   
 1834 T+24:57 despin weights
 1915? T+1:05:00? SES-2 depletion  
 1916?  T+1:06:20? SECO-2 depletion   
 1935? T+1:25 St 2 perigee  99.55 497 x 976 x 35.6 
   353.04 156 x 20180 x 37.6 
1989 Dec 13  1500? Star 37XFP burn 
1989 Dec 13  1400   726.21 20209 x 20560 x 54.95 
1989 Dec 18  1700   726.02 20208 x 20552 x 54.94 
1989 Dec 25  1700   726.02 20207 x 20552 x 54.94 
1989 Dec 30  1700   718.10 20011 x 20359 x 54.92 
1990 Jan 4  0230   718.03 20009 x 20357 x 54.94 
1990 Jan 6   In service 
1997 Feb 2   Operating at slot D3 

Saturday, September 5, 1998

Skylab 1

  1973-027A


The Skylab Orbital Workshop (Skylab OWS), Skylab A was launched at 1730 on 1973 May 14 by the two-stage Saturn V SA-513 from pad 39A at Cape Kennedy. The launch was designated Skylab SL-1. At 1731:13 the meteoroid shield was torn away from the side of the OWS by the vibration of the launch and the SAS-2 boom came free. Meteoroid shield debris impacted near 80.52W 28.66N. At 1732 the S-IC-513 first stage separated, but at 1733:10 the S-IC interstage ring failed to separate (probably due to damage from the shield debris). The second stage, S-II-513, ignited successfully. At 1739:49 the S-II shut down, entering a 93.2 min, 427 x 439 km x 50.0 deg orbit. It separated from the OWS at 1739:52, becoming satellite 1973-27B; it reentered on 1975 Jan 11. The SAS-2 array was completely torn away at 1739 when the S-II retro plume hit it.

The Skylab OWS pitched over and the refrigeration system radiator cover was jettisoned off the rear of the OWS at 1740. At 1745:20 the four nose fairing panels were ejected. Skylab reached solar intertial attitude at 1745:59.

At 1746:39 the ATM began to rotate into position, and was locked in place at 1750. Its solar panels deployed at 1754:52. At 1822 the SAS arrays were commanded to unfold, but SAS-1 was fouled by a piece of the meteoroid shield and only opened a crack. SAS-2 had already floated away into a separate orbit! Parts of the SAS arrays (1973-27J,K,L,M) were tracked later that day. The launch of the first crew was delayed from May 15 to May 25. Meanwhile, because of the lack of the thermal coating that had covered the meteoroid shield, temperatures in the OWS began to rise.

Skylab SL-2 docked at the axial port on the MDA (this was the only port ever used) before 2156 on May 25. It undocked at 2245 and flew around the station. A standup EVA attempt to free the SAS 1 wing was a failure. After some problems, SL-2 was back at the docking port and hard docked by 0352 on May 26.

The first crew entered the MDA at 1635 on May 26. At 1800 the pilot entered the AM and OWS to check conditions, and at 2000 on May 26 the crew entered the OWS.


    First Skylab Crew (1973 May 26-Jun 22)

  • CDR Commander: Charles Conrad, Jr.

  • PLT Pilot: Paul J. Weitz

  • SPLT Science Pilot: Joseph Kerwin, MD.

At 2100 on May 26 the crew deployed the JSC Parasol sunshade through the SAL (Scientific Airlock) in the OWS. The operation was complete by 0100 on May 27. Later on May 27 the ATM was activated. Skylab had begun operations. The space station's orbit was adjusted using the Apollo RCS thrusters at 0108 on May 29.

At 1517 on Jun 7, the CDR and SPLT conducted the first Skylab EVA, in which the SAS 1 array was freed. (see Skylab AM for details). The orbit was again adjusted at 2059 on Jun 17. The second EVA, by Conrad and Weitz, was carried out on Jun 19. Jun 20 was devoted to deactivation and cargo stowage. A particle collection experiment was placed in the SAL on Jun 21. The crew returned to Skylab SL-2 and undocked at 0855 on Jun 22.

The Skylab SL-3 spaceship docked at 2003 on 1973 Jul 28. The crew entered the lab at 2115.


    Second Skylab Crew (1973 Jul 28-Sep 22)

  • CDR Commander: Alan Bean

  • PLT Pilot: Jack R. Lousma

  • SPLT Science Pilot: Dr. Owen K. Garriott

The lab was reactivated by Aug 2. On Aug 4, the S-063 camera was jettisoned after being stuck in the SAL. It was tracked as 1973-27V and reentered after 27 days. The new crew's first EVA was on Aug 6 and saw the installation of a new A-frame sunshade.

Bean and Lousma got to testfly the ASMU (Automatically Stabilized Maneuvering Unit), a precursor of the MMU built by Martin Marietta, on Aug 13 and 15. The second and third EVAs were carried out on Aug 24 and Sep 22. On Sep 20 the CSM was checked out in preparation for the return. At 1430 on Sep 25 the crew transferred to the Apollo spaceship; Skylab SL-3 undocked at 1950 on Sep 25.

Skylab SL-4 docked at 2202 on Nov 16. The new crew entered at 1430 on Nov 17.


    Third Skylab Crew (1973 Nov 17-1974 Feb 8)

  • CDR Commander: Gerald Carr

  • PLT Pilot: William Pogue

  • SPLT Science Pilot: Dr. Edward Gibson

The first EVA was on Nov 22. On Nov 23 the CMG1 gyro overheated and had to be shut down. CSM trim burns were made on Nov 25 at 0222 and Dec 12. Two more EVAs, to observe Comet Kohoutek, were made on Dec 25 and 29. Flight tests of the M509 AMU maneuvering unit were made on 1974 Jan 20. The AMU was a project left over from the Gemini program. A CSM RCS trim burn was made at 1312 on Jan 21. On Jan 27, Skylab flew within 6 km of the OV3-2 satellite. Preparations for the final return to Earth began on Feb 2 with a checkout of the CSM. The final EVA was on Feb 3; equipment stowage took up Feb 5. At 2048 on Feb 6 the orbit was altered from 431 x 444 km to 433 x 455 km using the CSM thrusters. The crew transferred to the CSM at 0620 on Feb 8 and the MDA hatch was closed. After an RCS test burn at 0815, the Skylab SL-4 spaceship undocked at 1034 on 1974 Feb 8. Some engineering tests were carried out on Feb 8-9, then the station was powered down and put in gravity gradient mode. Telemetry was commanded off at 2009:05 on Feb 9.

It was initially intended that the Shuttle should dock with Skylab and raise its orbit, but unexpectedly rapid orbital decay associated with the 1980 solar maximum and delays to the Shuttle program made this untenable. In 1978 NASA began a series of measures to prolong the life of the station by changing its orientation in orbit. Telemetry was commanded on on 1978 Mar 7. Attitude control maneuvers were made between June and November. By Nov 3 it was in minimum drag configuration in a 364 x 377 km x 50.0 deg. On 1979 Jan 25 it was changed to solar inertial attitude; the orbit was 358 x 358 km x 50.0 deg. The attitude was changed on 1979 Jun 20 to the torque equilibrium attitude. At 0745 on Jul 11 Skylab was sent into a tumble in its last active maneuver. At 128 km altitude, Jul 11 at 1632, the solar panels broke off and telemetry from the station ceased. At 1637 on 1979 Jul 11 Skylab reentered over the Indian Ocean; some of the debris impacted in Australia and was recovered.


Skylab 1
 

DateTimeEventOrbit  

1973 May 14  1730  Launch by Saturn V 
 1731:13 T+63s OWS meteoroid shield fails, 8.7 km 0.30km/s 
  SAS-2 partial deploy 
  Shield impact at 80.52W 28.66N? 
 1732:20  OECO 
 1732:38  IECO 
 1732:40  S-IC sep  -6055 x 206  
 1732:43  S-II burn 
 1733:10 S-IC interstage failed to sep 
 1735:14  S-II CECO  38.82 -5513 x 353 x 50.0 
 1739:49  S-II OECO  93.2 427 x 439 x 50.0 
 1739:51  S-II Sep at 18.5m/s 
 1739:53  T+9:53 SAS-2 array torn off 
 1740  Radiator cover sep 
 1743:25  S-II LOX safing 
 1745:20 Fairing sep
 1745:59  Solar inertial attitude obtained
 1746:39  ATM rotation begins 
 1747  Discone antenna booms deploy 
 1755  ATM locked in place 
 1754:52  ATM solar panels out 
 1822  SAS fails to deploy 
 1930? S-II venting complete 
1973 May 25  2125? SL-2 docked between 2120 and 2145? 
 2156  SL-2 already docked 
 2245  SL-2 undocked 
  SL-2 flyaround 
  SL-2 SEVA, SAS-1 work 
  SL-2 failed to dock 
1973 May 26  0352  SL-2 docked 
1973 May 26  1635  Crew entry MDA 
 1800  PLT enter AM 
 2000  Crew enter OWS 
 2100  Deploy parasol begins 
1973 May 27  0100  Parasol deploy completed 
  ATM operational 
1973 May 29  0108  CSM orbit trim 
1973 Jun 7  1518  SL-2 EVA-1 
 1518:27  2.0psi 
 1520:02  0.8psi depress 
 1521:16  0.5psi depress 
 1522:44  0.2psi depress 
 1523:16  HO 
 1525  CDR egress 
 1526  SPT egress 
 1755  SAS 1 array freed 
 1846  SPT in 
 1847  CDR in 
 1847:44  HC 
 1848:12  Initial repress 
 1850:36  Fast Repress 0.4 to 3.5 psi 
1973 Jun 17  2059  Orbit trim 
1973 Jun 19   SL-2 EVA-2 
 1050:31  Start depress 
 1051:04  3 psi 
 1052:00  1.0 psi 
 1052:34  0.5 psi 
 1054:07  0.2 psi 
 1057:20  HO 
 1058:10  EV-1 (PLT) egress 
 1105:42  CDR egress 
 1112  Activate ATM battery with hammer 
 1231?  Ingress 
 1233  HC 
 1233  Start repress 
 1235:49  Fast repress 0.5 to 4 psi 
1973 Jun 20   Deactivation 
1973 Jun 21   Particle coll. expt in SAL 
1973 Jun 22?  Crew to CSM 
1973 Jun 22  0855  SL-2 Undocked 
1973 Jul 9   27Q-U, 64-74D,E tracked 
1973 Jul 28  2003  SL-3 docked 
 2115  Crew entry 
1973 Aug 2   OWS reactivated 
1973 Aug 4   S-063 camera jettison (27V) 
1973 Aug 6   SL-3 EVA-1, A-frame (27W-Z) 
  (Bean in AL?) 
 1724  In depress 
 1726  0.7psi 
 1728  0.2psi 
 1732:23  HO 
 1733  Egress  
 2352  PLT (EV2) ingress 
 2359  SPT (EV1) ingress 
1973 Aug 7  0000  HC 
 0003  Repress 
1973 Aug 13   ASMU test 
1973 Aug 15   ASMU test 
1973 Aug 24   SL-3 EVA-2 
  EV1 PLT (PCU 13, Umb 13) SPT (PCU 010, Umb 009) 
 1618  Depressing 
 1620:50  0.5psi 
 1624:08  HO 
 1625  SPLT out 
 1626  PLT out 
 2053  SPLT and PLT? in 
 2054:21  HC 
 2057:07  0.5psi  
 2057:16  Fast repress 
1973 Sep 20   CSM checkout 
1973 Sep 22   SL-3 EVA-3 
  EV1 SPT, Umb 7, PCU 13 
  EV2 CDR Umb 12, PCU 10 
 1110:50  in Depress 
 1112:28  2.5 psi 
 1114:20  1.3 psi 
 1115:41  0.7 psi 
 1117:50  0.2 psi 
 1118:34  HO 
 1120  SPT egress 
 1129  CDR egress 
 1357  Ingress 
 1359:16  HC 
 1400:55  Repress 0.2 to 4 psi 
 1402:30  Repress complete 
1973 Sep 25  1430  Crew transfer to CSM 
 1950  SL-3 undocked 
1973 Nov 16  2202  SL-4 docked 
1973 Nov 17  1430  Crew entry 
1973 Nov 22   SL-4 EVA-1; EV1 SPT, EV2 PLT 
 1739  In depress 
 1739  2 psi 
 1741:26  1 psi 
 1742:51  0.3 psi 
 1743:48  HO 
 1747  SPT egress 
 1754? PLT egress 
1973 Nov 23  0015  Ingress 
 0017:18  HC 
 0018:45  Repress 
1973 Nov 23   CMG-1 gyro shutdown 
1973 Nov 25  0222:30  CSM trim 1.8m/s 88s 
1973 Dec 12  1704:54  CSM trim 0.3m/s 17s 
1973 Dec 25   EVA-2, Kohoutek 
  PLT, CDR 
 1647  2.8psi 
 1651  1 psi 
 1652  0.4 psi 
 1654:52  HO 
 1700  PLT Egress 
 1737  CDR Egress 
 2338?  CDR ingress 
 2347  PLT ingress 
 2348:00  HC 
 2350:59  0.5 psi 
 2351 Repress 0.7 to 1.5 
 2353  3.2 psi 
 2354  4.8 psi 
1973 Dec 29   EVA-3, Kohoutek 
  SPT PCU 10, UMB 9; CDR Um 16, PCU 16 
 1722  3.5psi 
 1726  1 psi 
 1727:35  0.5psi 
 1728  0.3psi 
 1729  HO 
 1732  EV1 out 
 1734? EV2 out 
 2055? Ingress 
 2057:54  HC 
 2100  0.2psi 
 2101  Repress 
1974 Jan 9    93.24 421 x 444 x 50.0 
1974 Jan 20   M509 tests 
1974 Jan 21  1312:00  CSM RCS trim 0.2m/s 10s 
1974 Feb 3   SL-4 EVA-4, retrieval  
  SPT, CDR 
 1514  2.5psi 
 1515  1.6psi 
 1518  0.4psi 
 1519  0.25psi 
 1519  HO 
 1521  SPT egress 
 1528  CDR out 
 2019  CDR in 
 2037  SPT in 
 2038  HC 
 2041  0.5psi 
 2041  Repress 
1974 Feb 6  0641   93.24 421 x 444 x 50.0 
1974 Feb 6  2048:00  Orbit raise 3.7m/s 180s  93.37 427 x 451 x 50.0 
1974 Feb 8  0620  Hatch closed 
 0815  RCS test 
 1034  Undocked 
1974 Feb 9   Orbital life tests
1974 Feb 9  2009:25  end of tx 
1975 Jan 3    93.21 420 x 442 x 50.0 
1975 Jan 11  0800? S-II-13 reenters over 34N 19W  
1976 Oct 8    92.97 410 x 430 x 50.0 
1977 Dec 20    92.68 398 x 413 x 50.0 
1978 Mar 7   Telemetry on  92.55 391 x 407 x 50.0 
1978 Jun 9   Attitude adjust  92.27 378 x 392 x 50.0 
1978 Jul 10   Attitude adjust  92.22 376 x 390 x 50.0 
1978 Jul 19   Attitude adjust  92.19 375 x 388 x 50.0 
1978 Jul 25   Attitude adjust  92.18 374 x 387 x 50.0 
1978 Nov 3   Attitude adjust, min drag  92.02 366 x 380 x 50.0 
1979 Jan 25    91.81 358 x 368 x 50.0 
1979 Mar 2    91.50 342 x 354 x 50.0 
1979 May 31    90.20 278 x 290 x 50.0 
1979 Jun 20   Torque equalization
1979 Jul 4    88.98 220 x 227 x 50.0 
1979 Jul 11  0745  Sent into tumble 
 1544  Begin entry 
 1611  Breakup begins over Ascension 
 1632  Solar panels off 
 1637  Reentry 31.8S 124.4E 
 1645?Impact in Western Australia 

Kosmos 1153

 1980-007A




Kosmos-1153 
 

DateTimeEventOrbit  

1980 Jan 25  2036 Launch by 11K65M  Plesetsk 
  T+2:10 St 1 MECO 
  T+2:12 St 1 sep 
  T+2:12 St 2 burn 59km 
  T+2:27 Fairing sep 76km 
 2044?  T+8:03 St 2 MECO 150 km  150 x 1003? x 83 
  T+1:02:19 St 2 MES2 
  T+1:02:30 St 2 MECO2 
 2139?  T+1:02:50 St 2 sep 

  105.0 967x1020x82.9 

Kosmos 1258

 1981-024A


The second intercept of Kosmos-1241 came in March with a similar profile to the first.


Kosmos-1258 
 

DateTimeEventOrbit  

1981 Mar 14  1655 Launch by 11K69  KB 
 1657  Stage 2 burn 
 1700  Stage 2 sep 89 125x256x66 

1747? Maneuver97.87 289 x 1023 x 65.8 
   97.98 300 x 1023 x 65.83  

2008Intercepted K1241 at 15 km range? 

2030? deorbited 
 2057? Reentered over Pacific 

Monday, August 31, 1998

DSP 13

 1987-097A


The refurbished satellite DSP 5R was launched on 1987 Nov 29 by Titan 34D/Transtage to become DSP Flight 13, the last Block II satellite. It also received the designation USA 28.


DSP 5R 
 

DateTimeEventOrbit  

1987 Nov 29  0327:20  Launch by Titan 34D/Transtage  CC LC40 
  T+1:48 Stage 1 ignition 
 0329  T+1:56 SRM sep 
 0331:49  T+4:29 Stage 1 sep 
 0332:00  T+4:40 Fairing 
 0335:53  T+8:33 Stage 2 MECO 
 0336? Stage 2 sep  
 0336:03 T+8:43 Transtage MES-0 152 km 36s 
 0336:39 T+9:19 MECO-0 
 0352? MES-1 
 0357?  MECO-1 
 0925?  MES-2 
 0927?  MECO-2 
 0930?  Transtage sep 
1987 Nov 28?  Cover sep 
1988 Mar   drift  GEO 60W dr 
1988 Mar 20   mv in GEO 35W 
1989 Feb 20   mv out  GEO 35W 
1989 Mar 10    GEO 15E 
1990 Jun    GEO 10E 
1992 Feb 15   mv out  GEO 10E 
1992 Mar 25    GEO 35W 
1993 May 8   mv out  GEO 35W  
1993 Jun 15    GEO 105E 
1996 Jan    GEO 165W 

Tuesday, August 25, 1998

Kosmos 1591

 1984-092A


On the day that spacecraft no. 50 landed, 17F41 No. 51 (Kosmos-1591) was launched to replace it. It entered an unusually low parking orbit before its perigee was raised.


Kosmos-1591 
 

DateTimeEventOrbit  

1984 Aug 30  1015Launch by Soyuz-U  PL LC43/4 
 1023Blok-I sep  209 x 272 x 82.3 
1984 Aug 31  185 x 343 x 82.3 
1984 Sep 3 
260 x 271 x 82.3 
1984 Sep 5  267 x 273 x 82.3 
1984 Sep 11  266 x 272 x 82.3 
1984 Sep 12 
 0623?  Deorbit 
 0635?  PO sep 
 0642?  Entry 
 0658?  Landed 

Kosmos 1494

 1983-091A


25 objects were cataloged with Kosmos-1494. Since all the other Romb missions seem to have deployed at most 24 objects, I suggest one of the objects was a double cataloging of another object. I arbitrarily suspect D and H of being the same (same RCS, same decay date) but have not inspected the TLEs.


Kosmos-1494 
 

DateTimeEventOrbit  

1983 Aug 31 0630  Launch by 11K65M  KY 
 0638? Stage 2 MECO-2 
 0700?  Stage 2 sep 
1983 Aug 31   93.5 345x552x50.7 
1985 Sep 26  reentered

No  Object  RCS  Release (approx)  Decay  

 Kosmos-1494  24.1   1985 May 24 
 S3 rocket  21.2  1985 Sep 26 
1  0.31  1984 Feb 8  1984 Apr 7 
d  0.26  1984 Feb 8  1984 Apr 6 
2  E  0.22 1984 Feb 8  1984 Apr 5 
3  F  0.29 1984 Feb 8  1984 Apr 9 
4  G  0.25 1984 Feb 8  1984 Apr 7 
5  H  0.26 1984 Feb 8  1984 Apr 6 
6  J  0.30 1984 Feb 8  1984 Apr 8 
7  K  0.25 1984 Feb 8  1984 Apr 9 
8  L  0.28 1984 Feb 8  1984 Apr 5 
M  0.31 1984 Feb 8  1984 Apr 6 
10 N  0.43 1984 Feb 8  1984 Apr 8 
11  P  0.40 1984 Feb 8  1984 Apr 6 
12 Q  0.31 1984 Feb 8  1984 Apr 1 
13  R  0.24 1984 Feb 16  1984 Apr 4 
14  S  0.26 1984 Feb 16  1984 Apr 2 
15  T  0.31 1984 Feb 16  1984 Apr 4 
16  0.37 1984 Feb 16  1984 Apr 5 
17  0.36 1984 Feb 16  1984 Apr 10 
18  0.21 1984 Feb 16  1984 Apr 6 
19  X  0.31 1984 Feb 16  1984 Apr 5 
20  0.22 1984 Feb 16  1984 Apr 6 
21  0.21 1984 Feb 16  1984 Apr 9 
22  AA 0.22 1984 Feb 16  1984 Apr 8 
23  AB  0.31 1984 Feb 16  1984 Apr 11 
24  AC  0.26 1984 Feb 16  1984 Apr 10 

November 20,2006

  https://en.wikipedia.org/wiki/Association_football