1971-063B
SA-510 was launched on 1971 Jul 26 at 1334. The S-IVB-510 stage impacted the lunar surface at 2058:42 on Jul 29 at 2.577 km/s and an impact angle of 27.8 deg to the vertical. The location of the impact was 0.9970S 11.8719W.
| S-4B-510 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1971 Jul 26 | 1334:00 | Launch by Saturn V | |
| S-IVB MES-1 2:21 | -1958 x 176 x ? | ||
| S-IVB MECO-1 | 166 x 170 x 29.68 | ||
| 1624:03 | S-IVB TLI burn 5:50 | ||
| 1629:53 | S-IVB cutoff | ||
| 1629:54 | 10.853 km/s | ||
| 1630:03 | Translunar injection | 208 x 517232 x 29.685 | |
| 208 x 547691 x 29.69 | |||
| 208 x 561873 x 29.69 | ||
| 1656:24 | CSM sep from S-IVB/SLA | ||
| 1706:50 | CSM soft docked with LM | ||
| 1707:50 | CSM hard docked with LM | ||
| 1729:54 | S-IVB non propulsive venting | ||
| 1745 | Venting complete | ||
| 1752:00 | CSM/LM sep from S-IVB | ||
| 1814:02 | APS ullage burn 3.0m/s | ||
| 1830:42 | CVS vent 0.4m/s | ||
| 1835:20 | LOX dump 9.1m/s | ||
| 1836:08 | End LOX dump | ||
| 1840:17 | LH2 venting | ||
| 1920:01 | APS-1 241s 9.9m/s | ||
| 2334:01 | APS-2 71s 2.1m/s | 127 x 503764 x 29.7? | |
| 1971 Jul 27 | 0701 | Pass EL1:4 | |
| 1971 Jul 29 | 0527 | Enter lunar SOI | |
| 1971 Jul 29 | 2058:42 | Impact | -1310 x -12024 x 173.4 |
No comments:
Post a Comment