Thursday, August 10, 1995

Gambit-3 36

 1972-068A


KH-8 36 (GAMBIT 4336) was launched by Titan 23B Agena D from Vandenberg on 1972 Sep 1. The flight lasted 27 days (primary mission) with 1 further day of SCS solo operations; all systems operated well.


KH-8 36 
 

DateTimeEventOrbit  

1972 Sep 1  1736 Launch by Titan 23B Agena D  V SLC4W 
 1738  Titan stage 1 sep 
 1741 Titan stage 2 sep 
 1741  Agena burn 
 1746? Agena MECO 
 1836   89.62 127 x 383 x 110.5 
1972 Sep 2  0634   89.77 142 x 383 x 110.4 
  Raise apogee 
1972 Sep 3  2128   89.80 143 x 386 x 110.4 
1972 Sep 4  1056   89.77 143 x 382 x 110.4 
1972 Sep 5  2121   89.80 146 x 383 x 110.4 
1972 Sep 6  2118   89.79 144 x 382 x 110.4 
  Perigee raise 
1972 Sep 8  0015   89.84 150 x 382 x 110.4 
1972 Sep 10  0308   89.71 145 x 374 x 110.4 
  Raise apogee 
1972 Sep 10  2105   89.80 142 x 386 x 110.4 
1972 Sep 12  0900   89.70 141 x 377 x 110.4 
  Raise apogee 
 2357   89.77 142 x 383 x 110.4 
1972 Sep 15  0120   89.70 140 x 379 x 110.4 
  Raise orbit 
1972 Sep 16  0115   89.85 150 x 383 x 110.4 
  Lower perigee 
 2343   89.79 141 x 387 x 110.4 
1972 Sep 18  1307   89.67 139 x 376 x 110.5 
 2240? SRV-1 notional eject 
  Raise orbit 
 2035  
90.53 172 x 427 x 110.4 
 2335   89.82 145 x 385 x 110.4 
1972 Sep 19  1004   89.77 146 x 379 x 110.4 
1972 Sep 21  1256   89.65 143 x 371 x 110.4 
  Orbit riase 
 2324   89.85 154 x 379 x 110.4 
1972 Sep 23  2018   89.72 142 x 378 x 110.4 
  Raise apogee 
1972 Sep 24  0048   89.85 143 x 389 x 110.4 
1972 Sep 28  2130   89.61 147 x 362 x 110.4 
  Orbit lower 
 2332?  SRV-2 deorbit after 27 days 
 2337?  Entry 
1972 Sep 29  0002?  Recovered 
1972 Sep 29  0457   89.30 133 x 346 x 110.3 
 2248   89.01 130 x 320 x 110.2

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...