Saturday, May 25, 2002

Soyuz 26 (Taimyr)

 1977-113A


Yuriy Romanenko and Georgiy Grechko stepped in to replace the Soyuz-25 crew as Salyut-6's first residents. Their spacecraft, 7K-T No. 43 (11F615A8 No. 43) was launched on 1977 Dec 10 and became Soyuz-26. It docked with the rear port of DOS 5 on 1977 Dec 11.

On 1978 Jan 16, the EP-1 crew launched on Soyuz-27, Vladimir Dzhanibekov and Oleg Makarov, entered the spacecraft. They undocked later that day and landed in Kazakhstan.


Soyuz-26 
 

DateTimeEventOrbit  

1977 Dec 10  0118:40  Launch by Soyuz-U  KB 
 0120 Blok BVGD sep 
 0123  Blok A sep 
 0127  Blok I MECO 
 0127  Blok I sep 
   88.7 195 x 235 x 51.6 
   205 x 245 x 51.6 
   90.2 251 x 321 x 51.6 
 0900  262 x 337 x 51.6 
1977 Dec 11  0302  Docked with Salyut-6 
  EO crew to Salyut-6 
1978 Jan 15   Test burn 
1978 Jan 16   EP crew from Salyut-6 
 0805?  Undocked 
 1039?  Retrofire 
 1042?  DO CO 
 1055?  Modules sep 
 1100?  Entry 
 1124:58  Landed

Friday, May 24, 2002

Kosmos 2360

 1998-045A



Kosmos-2360 
 

DateTimeEventOrbit  

1998 Jul 28  0915:00 Launch by Zenit-2  KB 
 0917  T+2:23 St 1 MECO 
 0917  T+2:25 Stage 1 sep 
 0917  T+2:25 Stage 2 burn 
 0917  T+2:40 GO sep 
 0921  T+6:42 Stage 2 MECO 150? x 850? x 71.0 
  Sep motor cover perigee  
 0928? T+13m? Stage 2 VECO 
 0928?  Stage 2 sep motor covers 
 0928?  T+13m? Stage 2 sep 
1998 Aug 3    101.95 847 x 854 x 71.0 

People: March 11,2002

 https://welib.org/md5/0374d1fd8b977042bb1857c75113be6e

Wednesday, May 22, 2002

Daily Variety: December 6,2001

 https://welib.org/md5/1356fe3cda9f0abd93a8cb3429843e32

Kosmos 2335

 1996-069A


Kosmos-2335 was launched a year after its predecessor, in Dec 1996. RCS was 24m2.


Kosmos-2335 
 

DateTimeEventOrbit  

1996 Dec 11  1200  Launch by 11K69  KB LC90 
 1202  Stage 1 sep 
 1202  Stage 2 burn 
 1204  Stage 2 sep  
  AKM burn  
 1244? Orbit insertion  403 x 418 x 65.0 
1998 Dec 6   Lower perigee
1998 Dec 23    204 x 324  
1999 Jan 1  0433  Reentered over S China sea 


The Cambridge Dictionary of Space Technology

 https://welib.org/md5/e82d088095db9e46cae0f4de3f47cd56

Tuesday, May 21, 2002

Rocsat 1

 1999-002A


The Republic of China (Taiwan) NSPO National Space Program Office contracted TRW to built the ROCSAT (Republic of China Satellite) experimental satellite. Taiwan Aerospace/Taichung and ITRI/Hsinchu, as well as the NSPO/Hsinchu integration facility were involved in building the satellite. Rocsat has a mass of 403 kg and will be launched into a 600 x 600 x 35 orbit. The OCI will determine plankton levels for fisheries management. Size is 1.1 x 1.1 x 2.0 m with two 1.1 x 2.5 m solar arrays. The Rocsat bus will also be used for some EOS missions.

In some contexts ROCSAT is referred to in Chinese by the word whose Wade-Giles transliteration is Chunghua (meaning China). Taiwan at this time used Wade-Giles rather than Pinyin. However more generally the name Formosat-1 (

\uni{ 福爾摩沙衛星一號}{ }
Fuermosha weixing yi hao) is used.

The Athena has a Castor 120 stage 1 and an Orbus 21D ESBM (Equipment Section Boost Motor).

On 2004 Jun 16 the satellite lost Sun sensor capabilities and the spacecraft was unable to keep its solar panels oriented, losing power.

ESBM was 10810 kg full 1030 em, thrust 189.2 kN, 296s Isp. 2903 m/s. mdot 65.2 kg/s.

m1/m2 = 11213 / 1433 so dV = 5972 m/s


ROCSAT 1 
 

DateTimeEventOrbit  

1999 Jan 27 0034 Launch by Athena-1  SPFL SLC46 
  T+1:34 St 1 burnout 
  T+3:09 Model 92 Fairing sep 
  T+3:14 St 1 sep 
 0037 T+3:16 ESBM burn 149s  -6194? x 222 x 35.0 
  T+5:45 ESBM burnout 
 0039 T+5:45 ESBM sep  89.25 208 x 265 x 35.0 (ILAM) 
  T+5:50 OAM burn 121s 
 0041 T+7:51 OAM MECO  92.79 209 x 612 x 35.0 (ILAM) 
 0125 T+51:55 OAM burn 2 164s 
 0128 T+54:39 OAM MECO-2 
 0139  T+1:05:08 OAM sep  96.74 596 x 608 x 35.0 (ILAM) 
 0144 T+1:10:08 OAM CCAM burn 
 0146 T+1:12:24 OAM CCAM cutoff 91.99 146 x 597 x 34.7 (ILAM)

Sunday, May 19, 2002

Insat 2C

 1995-067B


The third in the Insat 2 series carried the C and S band transponders, but the meteo package was replaced by Ku-band transponders for television broadcast. Mass of Insat 2C was 2050 kg at launch, 980 kg dry. The bus was 2.3 x 2.5 x 2.7 m in size, with 14.6m solar panel span. It was stationed at 93.5E until 2002, colocated with Insat 2B; this was ISRO's first colocation of geostationary satellites.


Insat 2C 
 

DateTimeEventOrbit  

1995 Dec 6  2323  Launch by Ariane  
 2326  Stage 1 sep 
 2326  Stage 2 on 
 2327 Fairing 01 sep 
 2328  Stage 2 off (T+5:42) 
 2328  Stage 3 on (T+5:48) 
 2340  H-10-III cutoff (T+17:06) 
 2344  Telecom 2C sep from Mini-Spelda (T+21:18)  630.1 224 x 35712 x 6.8 
 2347  Mini-Spelda sep (T+24:18) 
 2349  Insat 2C sep (T+26:18) 
 2349  Stage 3 avoidance burn 
1995 Dec 7    630.23 224 x 35719 x 7.0 
1995 Dec   LAM burn 
1995 Dec   LAM burn 
1995 Dec 19    1435.30 35723 x 35818 x 0.1 GEO 92.5E 
1996 Jan 24    1435.81 35756 x 35805 x 0.0 GEO 93.6E 
1999 Oct 15    1436.10 35764 x 35808 x 0.1 GEO 93.5E 
2002 Mar 4    1436.15 35779 x 35795 x 0.4 GEO 93.5E

Thursday, May 16, 2002

Soyuz T-5 (Elbrus)

 1982-042A


7K-ST No. 11L was launched in May 1982 as Soyuz T-5, carrying the first DOS 6 crew (D-6-1, DOS 6 EO-1) to the new Salyut-7 (DOS 6) orbital station. Commander was Anatoliy Berezovoy and flight engineer was Valentin Lebedev. On Aug 27, the visiting crew of Leonid Popov, Aleksandr Serebrov and Svetlana Savitsakaya used Soyuz T-5 to return to Earth.


Soyuz T-5, Flight 1 
 

DateTimeEventOrbit  

1982 May 13  0958:05  Launch by Soyuz-U  KB 
 1000  Blok BVGD sep 
 1002  Blok A sep 
 1006  Blok I MECO 
 1006  Blok I sep 
1982 May 14  1100:35  Docked with Salyut-7 -X 
  EO-1 crew to Salyut 


Soyuz T-5, Flight 2 
 

DateTimeEventOrbit  

1982 Aug 27   Popov crew to Soyuz 
 1145  Undocked -X 
 1245?  BO sep 
 1418?  DO 
 1422? DO CO  -75? x 298  
 1430?  PAO sep 
 1441?  Entry 
 1504:16  Landed 70 km NE of Arkalyk 

Tuesday, May 14, 2002

USA-141

 1998-058A


Atlas flight AC-130 placed the UHF F/O F9 satellite in orbit  using a Lockheed Martin Astronautics Atlas IIA with a 14-ft fairing. It took off from Cape Canaveral's Space Launch Complex 36A. The Atlas IIA first stage main (sustainer) engine is the Boeing Rocketdyne RS-56SA, based on the RS-27 used in Delta. Wrapped around the main engine section is a booster section with two very similar RS-56BA engines. The booster engine cutoff (BECO) was at T+2:45 (i.e. 2min 45s after launch), followed 3s later by separation of the heavy booster package with its two engines. The sustainer engine cutoff (SECO) was at T+4:35.

After separation of the Atlas stage at T+4:37, the Centaur II second stage takes over. Centaur is a liquid hydrogen fuelled stage using two Pratt and Whitney RL10A-4-1 engines. At T+9:53 the Centaur shut down putting the vehicle in a 168 x 1090 km x 28.9 deg elliptical parking orbit. After coasting around the orbit, Centaur reignited at T+22:23 for about one minute until its fuel was almost depleted. and then at T+27:03 separated from the payload. Target orbit was at least a 286 x 26733 km x 27.0 deg orbit, with an apogee 10000 km below geostationary. This shortfall is to be made up by the Marquardt R-4D bipropellant liquid apogee motor on the Hughes HS-601 satellite payload.

The payload is UHF F/O F9, a Block III UHF Follow-On comsat for the US Naval Space Command. Earlier UHF F/O satellites were launched by Atlas II, which has now been retired. The satellite carries UHF and EHF transponders for naval communications, and a Ka-band Global Broadcast Service video relay package. Launch mass is 3200 kg, dropping to around 1550 kg once geostationary orbit is reached. Dry mass of the satellite is probably around 1200-1300 kg, but I haven't seen a figure on this. UHF F/O F9 was checked out in a slightly elliptical synchronous orbit over 170-175W and then in Jan 1999 placed over the Atlantic Ocean for operational service.

Although operated by the Navy, the payload is considered a joint Dept. of Defense asset with support for all services. UHF satellites were operated by US Space Command 3 SOPS/Schriever AFB until 1999 Jun 15, when control passed to NAVSOC/Pt Mugu.


UHF 9 
 

DateTimeEventOrbit  

1998 Oct 20  0719 Launch by Atlas II AC-130  SLC 36A 
  T+2:45 BECO
  T+2:48 Booster sep
  T+04:34 SECO 
  T+04:36 Atlas sep 
  T+04:53 MES 1  
 0728 T+09:53 MECO1  168 x 1090 28.9 
 0741 T+22:23 MES2 
 0742 T+23:36 MECO2  465.2 286 x 26733 x 27.0  
 0746 T+27:03 Centaur sep  465.1 287 x 26726 x 27.0  
  T+1:07:44 Depletion burn461.0 279 x 26499 x 27.0  
1998 Oct 20    448.35 272 x 25780 x 27.0 
1998 Oct 21  1340? LAM-1
1998 Oct 22    533.47 269 x 30552 x 26.9 
1998 Oct 23  2340? LAM-2 
1998 Oct 23    790.82 7126 x 36772 x 14.8 
1998 Oct 27  0430? LAM-3 
1998 Oct 27    1428.51 34478 x 36798 x 6.3 GEO 175.3W+1.9E 
1998 Oct 28    1436.55 34808 x 36782 x 6.1 GEO 173.8W+0.1W 
1998 Nov 5    1436.18 34810 x 36769 x 6.0 GEO 172.8W+0.03W 
1998 Dec 3    1436.04 34815 x 36754 x 6.0 GEO 170.6W 
1998 Dec 18    1435.95 34815 x 36751 x 6.0 GEO 172.2W 
1998 Dec   Move out 
1999 Jan   In service at 22W 
1999 Jan 19    1436.09 35774 x 35798 x 5.9 GEO 22.5W 
1999 Jul 26    1436.05 35768 x 35803 x 5.6 GEO 22.5W 

Friday, April 26, 2002

Geosat

 1985-021A


APL's Geosat obtained altimetry data for Trident missile targeting between Mar 1985 and Oct 1986, completing mapping of the marine geoid begun by Seasat. It achieved a spatial resolution of 15 km. It then altered its orbit to begin the Seasat Exact Repeat Mission, which involved having 17-day repeating groundtracks, suitable for oceanography.


Geosat 1 
 

DateTimeEventOrbit  

1985 Mar 13  0200  Launch by Atlas E (41E)  
  T+2:01? BECO 
  T+2:04? Booster sep 
  T+2:24? Fairing 
  T+5:24? SECO 
  T+5:49? Atlas sep  -2270? x 800 ? x 108?  
 0211?? T+11 min? Star 27 burn 
 0211?? Star 27 sep  100.64 760 x 817 x 108.05 
 0215? Restraining cable release 
  Despin cable release 
  Deploy solar panels 
  Deploy boom 1m 
1985 Mar 14   Deply boom fully 
1985 Mar   Geodetic mission (GM) begins  
1985 May 5    100.63 759 x 817 x 108.07 
1986 Sep 22    100.63 762 x 814 x 108.04 
1986 Oct 1   End of GM   
  2 test burns  
1986 Oct 3   Calibration burn 
1986 Oct 7   Calibration burn 
1986 Oct 10-11   30 burns to alter e and arg. peri. 
1986 Oct 14    100.63 762 x 814 x 108.04 
1986 Oct 14-23   157 burns to alter e and arg. peri. 
1986 Oct 23    100.62 772 x 802 x 108.02 
1986 Oct 23   Start 48 burns to alter semimajor axis 
1986 Oct 27    100.59 783 x 789 x 108.03 
1986 Nov 7   End of 48 burns 
1986 Nov 7   Secondary mission begins: Seasat ERM (Exact Repeat Mission) 
1986 Nov 8    100.59 785 x 788 x 108.03 
1986 Dec 1?  Alter period by 22ms 
1987   Adjust orbit by 20ms every 30d 
1988 Nov 23    100.59 784 x 788 x 108.04 
1989 Oct 3   Tape recorders failed 
1990 Jan 5   end of tx 
1990 Oct 21    100.56 783 x 786 x 108.05 
1996 Mar 4    100.44 775 x 781 x 108.05 
2002 Mar 20    100.26 768 x 773 x 108.05

November 20,2006

  https://en.wikipedia.org/wiki/Association_football