1966-072A
KH-4A Mission 1036 (CORONA 111) saw the introduction of a new launch vehicle, the Long Tank Thrust Augmented Thor Agena D. The LTTAT, also known as Thorad, was delivered by McDonnell Douglas to USAF in June of 1966, and took off from Vandenberg on Aug 9, placing the KH-4A payload into a retrograde 100 degree inclination orbit. The KH-4A mission had an unusually long duration, with SRV-1 recovered after 7 days and and SRV-2 operating for a further 6 days before recovery. This mission may be the first J-2 model,although the J-2 designation was not used in most documents. The J-2 proposal, reportedly not approved, used Thorad/Agena, had a 14 day lifetime, and could incorporate the OAS orbit adjust system kit. All of these enhancements apply to the later J-1 missions.
| KH-4A Mission 1036 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1966 Aug 9 | 2046:03 | Launch by Thorad Agena D | V SLC1W |
| 2047:45 | Castor II SRMs sep (T+1:42) | ||
| 2049:40 | Thor MECO (T+3:37) | ||
| 2049:49 | Thor VECO (T+3:46) | ||
| 2049:55 | Thor sep (T+3:52) | ||
| 2050:01 | Agena burn (T+3:58) | ||
| 2054:03 | Agena MECO (T+8:00) | 89.46 193 x 305 x 100.11 (VCR) | |
| 1966 Aug 10 | 0212 | 89.38 191 x 296 x 100.1 | |
| 1966 Aug 11 | 0501 | 89.32 188 x 294 x 100.1 | |
| 1966 Aug 12 | 0451 | 89.30 188 x 291 x 100.1 | |
| 1966 Aug 13 | 2232 | 89.25 187 x 286 x 100.1 | |
| 1966 Aug 15 | 89.4 193 x 239 x 100.12 (SSR) | ||
| 1966 Aug 15 | 0230 | 89.35 194 x 287 x 100.12 (RAE) | |
| 1966 Aug 15 | 0249 | 89.21 188 x 282 x 100.12 | |
| 1966 Aug 16 | 2157 | 89.16 189 x 276 x 100.11 | |
| 1966 Aug 17 | 2357? | SRV-1 ejected rev 115 | |
| 1966 Aug 17 | 0034 | SRV-1 recovered midair | |
| 22 46N 168 02 W | |||
| 1966 Aug 21 | Rev 211 film supply depleted | ||
| 1966 Aug 22 | 0003? | SRV-2 ejected rev 212 | |
| 1966 Aug 23 | 0015 | SRV-2 recovered midair | |
| 22 31.0 N 165 58W | |||
| 1966 Aug 31 | 89.0 185 x 246 x 100.1 (SSR) | ||
| 1966 Sep 12 | CORONA/Agena reentered | ||
No comments:
Post a Comment