1983-086A
———————————
FSW No. 6 (PRC 11) was launched in Aug 1983 and carried out a 5 day flight.
| FSW | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1983 Aug 19 | 0600 | Launch by CZ2 | JQ |
| 0602 | T+2:10 MECO | ||
| 0602 | Stage 2 burn | ||
| 0604? | T+4:02? Stage 2 MECO | ||
| 0607? | Stage 2 VECO | ||
| 0607? | CZ-2C sep | 90.1 173 x 389 x 63.3 | |
| 1983 Aug 20 | 90.10 171 x 386 x 63.31 | ||
| 1983 Aug 23 | 89.97 172 x 373 x 63.3 | ||
| 1983 Aug 24 | 0433? | Capsule sep | |
| 1983 Aug 24 | 0443 | Capsule landed | |
| 1983 Aug 24 | 1002 | 89.92 171 x 368 x 63.31 | |
| 1983 Sep 1 | 88.48 156 x 242 x 63.30 | ||
| 1983 Sep 3 | Reentered | ||
No comments:
Post a Comment