1989-021A
STS-29R deployed the TDRS 4 satellite. The SHARE heat pipe experiment failed to operate because of gas bubbles in the system.
| STS-29R | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1989 Jan 23 | Tow to VAB | ||
| 1989 Feb 3 | Rollout | LC39B | |
| 1989 Mar 13 | 1457:02 | Launch from LC39B | |
| 1459:06 | SRB sep | ||
| 1500:39 | 80 km alt | ||
| 1505:30 | MECO 110 km | 88.03 65 x 289 x 28.5 (PK) | |
| 1505:48 | ET sep | 88.18 72 x 296 x 28.5 (OMS dV) | |
| 1536:58 | OMS-2 2:21 68m/s | ||
| 1539:19 | OMS-2 CO | ||
| 1617 | PLBD open | 90.51 296 x 303 x 28.46 | |
| 1927 | ASE tilt | ||
| 2110:12 | TDRS/IUS-9 deploy | ||
| 2110? | RCS sep | ||
| 2124:47 | OMS-3 sep 17s 9m/s | 90.87 302 x 332 x 28.5 | |
| 1989 Mar 14 | 90.86 301 x 333 x 28.5 | ||
| 1989 Mar 15 | 90.87 302 x 333 x 28.5 | ||
| 1989 Mar 16 | 90.87 301 x 333 x 28.5 | ||
| 1989 Mar 17 | 90.90 302 x 335 x 28.5 | ||
| 1989 Mar 18 | 1100 | PLBD closed | 90.91 302 x 335 x 28.5 |
| 1200 | 90.91 303 x 336 x28.5 | ||
| 1335:15 | OMS DO (2:42) 95m/s | ||
| 1337:57 | OMS DO CO | ||
| 1405:11 | Entry | ||
| 1435:48 | Landed RW22 EAFB | ||
| 1436:00 | NGTD | ||
| 1436:41 | Wheels stop | ||
| 1989 Mar 23 | 1901 | SCA takeoff | EAFB |
| 2210 | SCA landing | Kelly AFB TX | |
| 1989 Mar 24 | 0855 | SCA takeoff | Kelly AFB |
| 1132 | SCA landing | KSC SLF | |
| 1500 | Tow to OPF/2 | ||
Payload:
- TDRS 4/IUS
- SHARE
- OASIS-1
- Middeck Cabin: CHROMEX/PGU Plant Growth Unit; PCG-III-1 Protein Crystal Growth; SSIP SE83-9 Chicken Embryo; SSIP SE82-8 AEM with 4 rats; IMAX
No comments:
Post a Comment