Tuesday, September 30, 1997

STS-61-B (Atlantis)

 1985-109A


The second flight of Atlantis was one of the most ambitious of the 1985 missions. Three PAM-D satellite deployments were followed by a pair of spacewalks to study on-orbit assembly. A single GAS can carried experiments by Canadian high school students. The Continuous Flow Electrophoresis System and a 3M experiment for Diffuse Mixing in Organic Solids (DMOS) flew on the middeck.

After launch on 1985 Nov 27, the Mexican Morelos communications satellite was deployed only 5 hours after payload bay door opening. Morelos was a standard American-built Hughes HS-376 model spinning comsat, but because of its presence the Mexican government had been invited to send along a payload specialist, Dr. Rodolfo Neri Vela. Dr. Neri carried out a series of mid-deck experiments under the MPSE (Morelos Payload Specialist Experiments) program, mostly life sciences related.

The following day, the Aussat satellite and the Satcom K-2 satellite were deployed.

Nov 29 saw the first spacewalk of the mission. Sherwood `Woody' Spring and Jerry Ross entered the payload bay and practiced assembling and disassembling two large structures mounted on a payload bay MPESS carried. ACCESS consisted of a truss structure made of many small components, while the rival EASE was a tetrahedron consisting of a few large tubes joined by special nodes. During the EVA, Spring carried out a small device called OET from the airlock, and jettisoned it into space by hand. The OET (OEX Target, Orbiter Experiments Target) was a radar target to allow Atlantis to perform rendezvous experiments.

After a day of rest, Spring and Ross returned to the bay for EVA-2. This EVA continued the work of the first, with the EASE and ACCESS structures being reassembled and disassembled.

Atlantis returned to Earth on Dec 3, landing at Edwards AFB.


STS 61-B 
 

DateTimeEventOrbit  

1985 Nov 8   Tow to VAB  VAB/3 
1985 Nov 8   ET mate 
1985 Nov 12   Rollout  LC39A 
1985 Nov 27  0029:00  Launch from LC39A 
 0031:03  SRB sep at 44.7 km 
 0037:31  MECO at 109.9 km  88.63 63 x 350 x 28.5  
 0037:49  ET sep at 112.1 km  88.72 69 x 353 x 28.5  
 0109:24  OMS-2 (3:00) 85m/s   
 0112:25  OMS-2 CO  91.66 353 x 359 x 28.5 
 0202  PLBD open  
 0746:50  Morelos deploy 
 0802  OMS-3 (RH 13s) 3m/s  91.78 356 x 366 x 28.5 
1985 Nov 28  0120:33  Aussat deploy 
 0135  OMS-4 (RH 13s) 3m/s  91.90 364 x 370 x 28.5 
 2157:31  Satcom deploy 
 2213?  OMS-5 (LH 16s) 4m/s 92.04 368 x 381 x 28.5 
1985 Nov 29    
 2143  EVA-1 depress? 
1985 Nov 29  2145  EVA-1 (05:32)  
 2147  Hatch open  
  Spring, Ross egress 
 2200?  Begin ACCESS experiment 
 2245?  ACCESS assembled bays 1-10 
  Disassemble ACCESS 
 2311  Stow ACCESS 
 2316  at PSA 
1985 Nov 29  2330?  EASE experiment 
  Assemble/disassemble 6 times 
 2335?  Cycle 1 
 2350?  Cycle 2 
1985 Nov 30  0010?  Cycle 3 
 0030?  Cycle 4 
 0050? Cycle 5 
 0115?  Cycle 6 
 0130?  Cycle 7 
 0155?  Cycle 8 
 0215?  Stow EASE 
 0224 In airlock  
 0225  Obtain AAPS target (OET) 
1985 Nov 30  0230  OET deployed by Spring  92.06 368 x 382 x 28.5 
 0240  Moving RMS for OEX deploy obs
 0255Target stable 
 0310  Ingress procedures 
 0317  End EVA-1 
 0323  Repress 
 0816?  Stationkeep with OET (DAP test) at 10m 
 1130End OET test  92.08 368 x 383 x 28.5 
1985 Dec 1  0140?  OMS-6 (RH 49s) 15m/s  91.60 322 x 383 x 28.5 
 2022  Depress? 
 2023  Hatch open? 
1985 Dec 1  2030  EVA-2 (06:38)  
 2030?  Spring, Ross egress 
 2037  Working with MFR 
 2050?  MFR grapple 
 2100?  ACCESS configured, built 1-9 
 2129? Getting in MFR 
 2130?  EV-1 in MFR, built bay 10 
 2230?  EV-1 manipulate ACCESS from MFR 
 2240?  EV-1 off MFR 
 2245?  EV-2 on MFR 
 2250? Disassemble bay 10 
  Task work on bay 8 
 2330?  Rebuild bay 10 
 2340?  EV-2 on MFR manipulate ACCESS 
 2350?  Disassemble ACCESS 
1985 Dec 2  0000?  EV-2 off MFR 
 0010?  Stow ACCESS, unstow EASE 
 0015? EV2 on MFR 
 0030? Work with heat pipe assembly 
 0045? Build EASE 
 0100? EV2 manipulate EASE 
 0110? EV2 off MFR, EV1 on 
 0115? EV1 manipulate EASE 
 0145? EV1 in MFR disassemble EASE 
 0155? EV1 build heat pipe 
 0215?  EV1 egress MFR 
 0225?Stow EASE 
 0230?  Stow MFR 
 0230  Cleanup 
   332 x 382 x 28.5 
 0256? Ingress 
 0258  HC 
1985 Dec 2  0308  End EVA-2 

1985 Dec 3  

1716  PLBD close  91.62 322 x 384 x 28.5 
1985 Dec 3  2026:45  OMS DO (169s) 96 m/s  
 2029:34  OMS DO CO 
 2103:17  Entry  
 2133:49  Landed at RW22 EAFB 
 2134:00  NGTD 
 2135:07  Wheels stop 
1985 Dec 7  1430  SCA takeoff  EAFB 
 1750SCA landing  Kelly AFB TX 
 1932SCA takeoff 
 2215  SCA landing  KSC SLF 
1985 Dec 8  0330Tow to OPF 

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...