Wednesday, June 10, 1998

STS-8 (Challenger)

 1983-089A


STS-8 was launched on 1983 Aug 30. The TDRS-B satellite was removed from the manifest some months before launch, and replaced by the PFTA and a stack of postal service first day covers. STS-8 also saw tests of the TDRS system using TDRS-1.

On Sep 1 the RMS was used to carry out tests with the Payload Flight Test Article, a large, heavy dummy satellite, as part of DTO 503 for PDRS testing. PFTA was developed by JSC. On Sep 2, the orbit was lowered for investigations of oxygen interaction effects.


STS-8 
 

DateTimeEventOrbit  

1983 Jun 30    OPF Bay 1 
1983 Jul 27    VAB3 
1983 Aug 2    LC39A 
1983 Aug 30  0632:00  Launch  LC39A 
 0634:05  SRB sep, 46.4 km 
 0640:42  MECO, 110.0 km 
 0641:00  T+8:57 ET sep, 111.5 km  -4 x 156 x 28.5 
   86.12 1 x 162 x 28.5 
 0642:42  T+10:42 OMS 1 (2:19) 69.2m/s  95 x 296  
 0645:00  OMS-1 CO  88.44 98 x 296 x 28.5 
 0656  ET apogee 
 0716:52  T+44:52 OMS 2 (1:55) 60.0m/s 
 0718:47  OMS-2 CO 
 0719  ET breakup 28.4S 81.5E 
 0800  PLBD open  90.51 295 x 302 x 28.46 
  RMS testing 
 1300  RMS checkout complete 
 1947   90.49 294 x 303 x 28.46 
1983 Aug 31  0748:54  T+1:01:16:54 Insat 1 deploy (burn 0834) 
 0803:54  OMS 3 sep (6s) 3m/s  90.61 298 x 310 x 28.5 
   Mass 99610 kg 
1983 Sep 1  0645? RMS grapple PFTA 
 0655?  RMS unberth PFTA  90.61 298 x 310 x 28.5 
  RCS loading tests 
 1033  Preparing to berth 
 1045? RMS berth PFTA 
 1130? RMS unberth PFTA (direct drive test) 
 1350? RMS berth PFTA 
1983 Sep 2  0428:28  OMS 4 98701 kg RECIRC1 (38s) 20m/s  224 x 308 x 28.5  
 0513:25  OMS 5 98050 kg RECIRC 2 (47s) 25m/s 89.04 223 x 230 x 28.5 
 0905?  RMS unberth PFTA 
 1330? RMS berth PFTA 
 1350? Berth RMS 
 1821   88.99 220 x 228 x 28.5 
1983 Sep 3  0935?  Grapple PFTA 
 0940  Unberth PFTA 
 0957  Preparing to reberth 
 1026  Reberth PFTA 
  Problems reberthing 
 1100? Reberth PFTA completed 
 1104  Ungrapple PFTA 
  Unloaded RMS testing 
 1200? Reberth RMS 
1983 Sep 4  1613   88.92 215 x 225 x 28.5 
1983 Sep 5  0325  PLBD closed  88.89 213 x 224 x 28.5 
 0647:30  OMS DO (151s) 84.9m/s 
 0650:01  OMS DO CO 
 0710:23  Entry  86.32 -35 x 218 x 28.5 
 0740:43  Landed  RW22 EAFB 145:08:42 
 0740:50  NGTD 
 0741:33  Wheels stop 
1983 Sep 9  1322  SCA 905  EAFB 
 1745SCA 905  Sheppard AFB TX 
 2300  SCA 905  KSC SLF 

No comments:

Post a Comment

May 13,2026

  https://planet4589.org/space/jsr/back/news.855.txt