Saturday, June 2, 2001

The World Spaceflight News video catalog

STS-65 IML-2 MISSION / JULY 1994 / 12 hours / TWO CASSETTES

STS-64 LITE - SAFER EVA / SEPT. 1994 / 12 hours / TWO CASSETTES

STS-68 SRL-2 MISSION / SEPT. 1994 / 12 hours / TWO CASSETTES

STS-66 ATLAS-3 / NOVEMBER 1994 / 12 hours / TWO CASSETTES

STS-63 MIR RENDEZVOUS / EVA / FEBRUARY 1995 / 24 hours / 4 CASSETTES

STS-67 ASTRO-2; MIR-18 THAGARD / MARCH 1995 / 18 hours / 3 CASSETTES

STS-71 FIRST MIR DOCKING / JUNE 1995 / 30 hours / FIVE CASSETTES

STS-70 TDRS-G MISSION / JULY 1995 / 12 hours / TWO CASSETTES

STS-69 WSF-2, SPARTAN, EVA / SEPT. 1995 / 18 hours / THREE CASSETTES

STS-73 USML-2 MISSION / October 1995 / 12 hours / TWO CASSETTES

STS-74 SECOND MIR DOCKING / NOV. 1995 / 18 hours / THREE CASSETTES

STS-72 SFU RETRIEVAL, 2 EVAS / JAN. 1996 / 24 hours / FOUR CASSETTES

STS-75 TSS-1R includes break / FEBRUARY 1996 / 18 hours / THREE CASSETTES

STS-76 THIRD MIR DOCKING, EVA / MARCH 1996 / 18 hours / 3 CASSETTES

STS-77 SPACEHAB-04 / MAY 1996 / 12 hours / TWO CASSETTES

STS-78 LMS / JUNE 1996 / includes in-cockpit launch-landing video / 12 hours / THREE CASSETTES

STS-79 FOURTH MIR DOCKING / SEPT. 1996 / 6 hours / ONE CASSETTE

STS-80 WSF-3, ORFEUS / NOVEMBER 1996 / 18 hours / THREE CASSETTES

STS-81 FIFTH MIR DOCKING / JANUARY 1997 / 12 hours / TWO CASSETTES

STS-82 SECOND HST SERVICING / FEBRUARY 1997 / 42 hours / SEVEN CASSETTES

STS-83 MSL-1 / APRIL 1997 / 12 hours / TWO CASSETTES

STS-84 SIXTH MIR DOCKING / MAY 1997 / 12 hours / TWO CASSETTES

STS-94 MSL-1R / JULY 1997 / in-cabin ascent and landing / 12 hours / TWO CASSETTES

STS-85 Orfeus-Spas/MFD / AUGUST 1997 / in-cabin crew entry and strap-in / 12 hours / TWO CASSETTES

STS-86 7th MIR DOCKING, EVA / SEPTEMBER 1997 / 18 hours / THREE CASSETTES

STS-87 USMP-4, SPARTAN, 2 EVAS / NOVEMBER 1997 / 30 hours / FIVE CASSETTES

STS-89 8th MIR DOCKING / January 1998 / 12 hours / TWO CASSETTES

STS-90 NEUROLAB / APRIL 1998 / 12 hours / TWO CASSETTES

STS-91 9th and final MIR DOCKING / June 1998 / TWO CASSETTES

STS-95 "John Glenn flight" / October - November 1998 / THREE CASSETTES

STS-88 Historic first assembly flight of the International Space Station / December 1998 / / EIGHT CASSETTES

STS-96 Second ISS Shuttle Mission / May 1999 / FOUR CASSETTES

STS-93 Chandra Deployment Flight / July 1999 / TWO CASSETTES

STS-103 * HST SERVICING MISSION / DECEMBER 1999 / SEVEN TAPES

STS-99 * SHUTTLE RADAR TOPOGRAPHY MISSION (SRTM) / ENDEAVOUR / FEBRUARY 2000 / THREE CASSETTES

—————

1995

VOLUME #1 CONTENTS: STS-67 landing; PEGASUS launch attempt (great views of carrier aircraft); MIR 17/18 crew news conference 3/20; Mars spacecraft; Aerogel; Installation of SSME; HST: MARS and VENUS (motion views); SEMINAR The Universe: Now and Beyond; docking adapter / Spacelab installation; Thagard tour of MIR.

VOLUME #2 CONTENTS: STS-67 Post-flight conference; Hubble: storms on Jupiter; MIR 18 MISSION UPDATES; Hubble: Supernova; Apollo 13; MIR 18 NEWS CONFERENCE (includes Progress approach) 4/12; Columbia mods; STS-1; Mt Pinatubo SRL; El Nino; NEPTUNE AND VESTA (rotation images) (1 hour);Thagard 4/19/95.

VOLUME #3 CONTENTS: MIR 18 MISSION UPDATE: 4/21; 4/28; 5/05; 5/12/95; 1960'S historic film first stratospheric manned flights by Picard; ATLANTIS ROLLOUT 4/28; bucket ejection from Mir; MATING TO SRBs; DISCOVERY ROLLS OUT TO LAUNCH PAD; SPACE WELDING TOOL; STS-70 BRIEFINGS 5/15: BLOCK I SSME included

VOLUME #4 CONTENTS: CONTINUATION OF STS-70 BRIEFINGS FROM MAY 15: DOD SECONDARY PAYLOADS; FLIGHT DIRECTOR OVERVIEW OF MISSION; CREW PRESS CONFERENCE; NEW MISSION CONTROL; SECOND MIR EVA 5/17; AC-77 / NOAA GOES-J NEWS CONFERENCE, including new photos from GOES-8

VOLUME #5 CONTENTS: STS-70 crew at KSC; GOES-J briefings (includes material missing from earlier magazine volume); 5/19 Mir 18 Mission Update; AC-77/GOES-J first launch attempt (includes unique views of rain and wind battering rocket on launch pad); AC-77/GOES-J successful launch attempt, early countdown period.

VOLUME #6 CONTENTS: AC-77/GOES-J launch; 5/26 Mir 18 Update Spektr Proton launch;Russian zero-gravity plane; Energia; Spektr docking; Music video on 100th US flight; In-cabin launch video; Woodpecker drilling External Tank; STS-71 briefings: Docking System; Thagard endurance record; Skylab; damage to ET by woodpeckers.

VOLUME # 7 CONTENTS: STS-71 BRIEFINGS / CREW PREFLIGHT PRESS CONFERENCE. 6/02 Mir 18 Mission Update; Phase One Overview Briefing; Hubble star images; Saturn ring plane; HST: Stars Under Construction;Skylab; Sprites; aircraft simulation; Russian docking module; 6/09 Mir 18 Mission Update; Anniversary of B-52

VOLUME #8 CONTENTS: Gamma ray animation; Kuiper comets animation; Mars Pathfinder testing, designer interviews; Night launch Soyuz ; Mir 18 Status Report; Woodpecker preventive measures; STS-70 rollout; Ulysses; footage of Soyuz prep for ASTP; STS-71 crew simulates docking; Mir station animation; STS-71 crew training

VOLUME #9 CONTENTS: STS-71 & Mir-18 Post-Flight Crew News Conference, spectacular footage from the Mir of docking; Russian spacewalk material; HST sky survey; Cassini / Huygens animation; Galileo probe deployment/deflection maneuver; SRM O-ring anomaly Briefing; HST photo of new moons of Saturn; unique views of pad structure; STS-71 IMAX footage of Mir docking

VOLUME #10 CONTENTS: STS-71 Crew Post-landing conference; SRM O-ring anomaly Briefings (2); HST finds complex structures in galaxies; STS-69 roll; KSC wildlife (birds, turtles, more); Nozzle joint repair; preview of USML-2 / STS-73 science; STS-70 Crew Post-flight Presentation; 1995 International Space Station Status Report - great views of hardware and new construction animation

VOLUME #11 CONTENTS: STS-69 PREFLIGHT BRIEFINGS: Mission Overview, EVA, WSF, Spartan 201, Goddard Payloads, GAS, Crew Conference

VOLUME #12 CONTENTS: APOLLO 9 & 10 film; STS-69 pre-launch briefing; STS-69 Countdown Status Briefing; APOLLO 14 film; "Leap of Faith: Flight of Gordon Cooper"; GOES-9 photos, Hurricane Luis: first "live" 1 minute interval photos; last moments of STS-69 EVA including post-EVA activities, with unique television views inside of airlock.

VOLUME #13 CONTENTS: STS-69 post-landing video (one and a half hours) orbiter walkaround, post-landing press conference; STS-73 PREFLIGHT BRIEFINGS: Flight Director, USML-2 scientists; flight crew; World's largest balloon in VAB; Ting discusses Station experiments; Ocean currents; booster insulation; STS-73 crew arrival

VOLUME #14 CONTENTS: Station / Russian components; astronauts test station underwater; STS-73 crew ; completed Station modules; STS-73 L-1 news conference with mission managers; 9/28 Launch Postponement; 73 Countdown Briefings; Launch Postponement 10/06; collection of new HST photos, including Jupiter and satellites

VOLUME #15 CONTENTS: STS-73 LAUNCH ATTEMPT on 10/7/95 - crew entry, MEC problem and subsequent tense half-hour decision making on scrub; crew exit

VOLUME #16 CONTENTS: STS-73 ATTEMPT 10/15/95 - rain, crew entry. STS-73 LAUNCH DAY on October 20, 1995 - with early portion of countdown

VOLUME #17 CONTENTS: STS-74 PREFLIGHT BRIEFINGS - October 1995, details of second Mir docking mission, with flight director, experiments, docking module

VOLUME #18 CONTENTS: SOHO prelaunch briefing; HST photos of nebula, pillars of gas; RADARSAT prelaunch news conference; RADARSAT launch on November 4, 1995 with post-launch news conference; X-31 crash (interesting!), SurfSAT, SIR-C radar images Run time 4 hours 42 minutes

VOLUME #19 CONTENTS: STS-73 / USML-2 landing coverage November 5; STS-74 crew interviews, arrival; Seminar Series: "Probing the Primordial Constituents of the Solar System"; Space Station News Conference; Pre-launch STS-74 News Conference full 6 hours

VOLUME #20 CONTENTS: Galileo JPL pre-arrival conference (2 hours); HST - Young stars; edge-on disk; Orion Nebula fly-through; SOHO briefing; SOHO ATLAS Launch - December 2, 1995 - countdown, ascent, and post-launch video 6 hours 8 minutes

VOLUME #21 CONTENTS: Remaining SOHO coverage / orbital insertion; MAX Q band; GALILEO ARRIVES AT JUPITER ON DECEMBER 7, 1995: full coverage from JPL conference,Galileo movies asteroid images/animation; post-insertion conference, interview Carl Sagan; live control room scenes - historic probe entry & orbit insertion

VOLUME #22 CONTENTS: Conclusion 12/7/95 Galileo conference; post-landing views of STS-72 mission; GALILEO PROBE SCIENCE RESULTS BRIEFING JANUARY 22, 1996; POST-FLIGHT STS-73 and STS-74 CREW PRESENTATIONS WITH UNIQUE STILL PHOTOS AND VIDEO Total run time 6 hours 9 minutes

VOLUME #23 CONTENTS: Delta XTE LAUNCH ATTEMPT - ON-PAD ABORT (vernier LOX valve failure) 12/18/95; STS-72 COUNTDOWN EVENTS on January 11, 1996

1996

VOLUME #24 CONTENTS: STS-72 PRE-FLIGHT BRIEFINGS; X-33 animations, STS-72 crew interviews Total run time: 6 hours 9 minutes

VOLUME #25 CONTENTS: Space Station discussion show (one hour); Cassini construction; MIR 21 crew news conference; NEAR press conference and preview; POLAR press conference and preview - good animation with both conferences; STS-75 L-1 day press conference; POLAR L-1 day press conference 5 hours 50 minutes

VOLUME #26 CONTENTS: STS-75 (Tethered Satellite) preflight briefings, including crew press conference; Magnetic Storm news conference from JPL (2/15/96)

VOLUME #27 CONTENTS: NEAR countdown and launch; POLAR launch attempt; POLAR countdown and launch Total run time 6 hours 8 minutes

VOLUME #28 CONTENTS: Bursting pulsar news conference, pictures, and animation; STS-75 mission material; STS-76 at Cape; HST Pluto science update with unique photos and animation; STS-76 last-second entry wave-off decision (March 30); STS-76 postlanding material: replays, news conference, pictures of orbiter damage.

VOLUME #29 CONTENTS: STS-76 post wave-off payload bay door latch "crisis" (March 30); Weekly MIR status reports (Lucid mission); Marshall SRB film; "New Light on Solar Mysteries"; 5/03 Mission Update and station solar arrays

VOLUME #30 CONTENTS: STS-76 pre-flight briefings including full crew news conference; DCX rollout; Supersonic flight tests; new Galileo results; STS-76 crew interviews; FY 1997 NASA Budget Briefing (March 1996) Total run time 5 hours 57 minutes

VOLUME #31 CONTENTS: STS-77 pre-flight briefings - Overview; Crew; BETSCHE, GAS, Spacehab, Spartan-207 Inflatable Antenna Experiment; Hitchhiker; TEAMS

VOLUME #32 CONTENTS: ARIANE 501 LAUNCH EXPLOSION COVERAGE:two hours 30 minutes of the Ariane 5 launch June 4, 1996 including extensive views of the launch complex, computer graphics of the rocket, factory tours and assembly footage, main engine/SRB tests, control center details, a review of the weather situation in Kourou, followed by the launch, accident, and aftermath; Mir 21 conference; STS-77 post-landing events and replays; TSS-1R INVESTIGATION BOARD news conference with video simulation of tether breakage events

VOLUME #33 CONTENTS: Remaining TSS briefing; more ARIANE 501 explosion coverage, including a different camera angle of the explosion; June 7th Mission Update about Mir 21; DC-XA Second flight ; STS-78 mission pre-launch briefings

VOLUME #34 CONTENTS: MIR EVA, Station truss testing; STS-78 pre-launch briefings, news conference 6/17/96; new X-33 animations; JSC closed-loop life support system experiment; Al Gore X-33 announcement at JPL; X-33 news conference; STS-78 entry Pilot's Point of View camera video, including "fireball" scenes not on primary mission tapes; Theseus second flight; Earth views; July 10 RSRM Status Briefing with Holloway

VOLUME #35 CONTENTS: STS-78 Post-launch briefing at KSC June 20; STS-78 mission briefings, science briefings, crew on-orbit video (various flight days); MIR-22 crew pre-launch press conference; JSC life science experiment participant interview

VOLUME #36 CONTENTS: July 10 RSRM briefing conclusion; Ganymede Galileo photo briefing July 1996, includes 3-D flyover animation; July 12 RSRM briefing (announcement of launch delay for STS-79); STS-77 Crew Presentation to NASA Employees (great on-orbit photography); Mission Updates; Lucid press conference; Live from Mars Virtual Conference July 20.

VOLUME #37 CONTENTS: HISTORIC AUGUST 7, 1996 LIFE ON MARS NEWS CONFERENCE; Mission update 7/26/96; Clipper Graham DC-XA landing accident; Atlantis booster stacking; half-hour APOLLO-SOYUZ history film

VOLUME #38 CONTENTS: STS-79 pre-flight crew conference; station node pressure tests; Lucid interview; Mir mission updates, STS-79 post-landing video material

VOLUME #39 CONTENTS: Atlantis rollout; Europa Galileo flyby news conference; Mir mission update; FAST/Pegasus briefing; FAST launch; NASDA ADEOS launch (brief interruption in tape) – unique camera on H-2 rocket provides view looking back at launch pad; STS-79 pre-flight briefings

VOLUME #40 CONTENTS: Shuttle/Mir crew event; Lucid interview; Mars Pathfinder animation, payload processing, NASA Vision for Mars Exploration; Pathfinder and Mars Global Surveyor news briefings; Blaha event; Lucid post-flight news conference; Hurricane video

VOLUME #41 CONTENTS: STS-80 preflight briefings: Orfeus-SPAS, WSF, Flight Director, Medical experiments, EVA, crew news conference. Russian rover testing, Pegasus launch, tracking stations for Galileo

VOLUME #42 CONTENTS: Mars Global Surveyor launch attempt coverage November 6, 1996, launch 11/7; post-launch news conference, Blaha report from Mir

VOLUME #43 CONTENTS: Mars Pathfinder first and second launch attempts; includes launch; STS-80 rendezvous material; Pathfinder post-launch conference

VOLUME #44 CONTENTS: STS-80 Post-launch news conference; HST Update: Quasars; STS-80 mission material; status briefings, science and WSF briefings; Blaha interviews; Pathfinder pre-launch news conference

VOLUME #45 CONTENTS: STS-79 postlanding VOLUME with replays, Holloway news conference; Dan Goldin post-landing statement; United Space Alliance contract signing ceremony and news conference; Blaha interview; Cassini assembly; STS-79 crew presentation

VOLUME #46 CONTENTS: STS-80 postlanding VOLUME, Holloway and crew news conference; Nile radar, Mir news conference with Christmas tree; STS-81 crew news conference, mission overview, Spacehab, KidSat; cracks on MLP

VOLUME #47 CONTENTS: Mir mission update 12/96; STS-81 phase one interview, Blaha interview; STS-81 countdown status briefings; STS-81 countdown for night launch with in-cabin crew strap-in

1997

VOLUME #48 CONTENTS: Galileo science update EUROPA unveiled; STS-81 crew postlanding conference 1/22/97; Blaha interview; Highlights of 1970; SOHO observations and photos; STS-82 animation; STS-82 Mission Overview Briefings; Crew Interview clips; Goldin budget briefing; STS-82 countdown status briefings, crew arrival

VOLUME #49 CONTENTS: STS-82 postlanding VOLUME, crew news conference; Lunar Prospector; Hale-Bopp; STS-83 pre-flight briefings – flight director overview, crew news conference, mission science; Earth science mission announcement briefing; Mars life debate at JSC March 1997 (first part)

VOLUME #50 CONTENTS: Conclusion of Mars life debate at JSC; Linenger letters from Mir; AP interview includes fire discussion; HST Mars images; interviews with Dr. Alan Hale; History tapes: Biology and space; Skylab first four days; Comets and Asteroids; Atlas Mission to Earth; Hyper X vehicle; STS-82 post-flight presentation

VOLUME #51 CONTENTS: STS-82 post-flight presentation (conclusion); STS-83 countdown status, experiment preview, pre-flight briefings; Post-landing KSC runway coverage, including STS-83 crew postlanding news conference, Linenger interview

VOLUME #52 CONTENTS: Galileo update – new understanding of Europa, April 1997; SOHO observes solar eruption, X-33 wind tunnel tests; SOFIA airborne observatory; SSME testing; Project Mercury summation; History reports from 1960s: Apollo 1 pre-flight; 1966 highlights; Mir updates; Cassini heads for KSC; STS-84 crew at KSC; new X-33 animation, STS-84 countdown status briefing

VOLUME #53 CONTENTS: GOES-K AC-79 night launch, good views of satellite preparation April 1997; extensive coverage of Mir 23 EVA with Jerry Linenger April 29, 1997; first HST results after servicing mission, including new instrument photos; STS-84 prelaunch news conference May 13

VOLUME #54 CONTENTS: Mars: Dynamic View of Red Planet with new HST high-resolution pictures; News conference with First Space Station Crew (May 21, 1997); STS-84 post-landing runway video, news conference, Jerry Linenger interview

VOLUME #55 CONTENTS: STS-84 preflight briefings – crew, flight director, Mir/Russians, Spacehab, Phase One Overview; Space Station Status conference May 1997; discovery of comet snowballs; El Nino photographs

VOLUME #56 CONTENTS: Linenger June 13 conference; 51-G Crew Presentation; STS-94 Science briefing; STS-94 Mission Overview and Crew Conference; ISS Node 1 for shipment (extensive hardware views); NEAR encounter with Mathilde asteroid, pre-encounter briefing; breaking news of MIR collision and damage to Spektr; two Mir briefings with Frank Culbertson. 6 hrs 9 min

VOLUME #57 CONTENTS: Late June 1997: video feeds astronaut Bill Readdy; Node 1 News Conference with Cabana, Brinkley (6/26), four Mir status briefings Frank Culbertson (6/26, 27, 28, 29); first TV from Mir crew after accident; STS-94 countdown briefing.

VOLUME #58 CONTENTS: Mir Briefings Frank Culbertson 6/30 and 7/01; STS-94 countdown status; STS-94 Pre-launch Conference June 30; NEAR briefing on Mathilde encounter, first photos of asteroid; MARS PATHFINDER Preview briefings

VOLUME #59 CONTENTS: MARS PATHFINDER July 2 briefing; July 3 Mars Symposium with Administrator Dan Goldin; July 3 Mars Pathfinder briefing; July 5th 10 am EDT MARS PATHFINDER briefing; Mir status briefing with Frank Culbertson on July 5

VOLUME #60 CONTENTS: MARS PATHFINDER - HISTORIC JULY 4TH COVERAGE OF LIVE COMMENTARY FROM JPL AS THE LANDING TOOK PLACE - begins at 11:30 AM EDT from the JPL Mission Operations Center through late afternoon 6 hours

VOLUME #61 CONTENTS: MARS PATHFINDER - First post-landing briefing at 5:30 PM EDT includes Gore phone call to Goldin at JPL; another briefing at 6:30 PM; LIVE COVERAGE OF FIRST PHOTOS, followed by briefing with first color views of MARS

VOLUME #62 CONTENTS: MARS PATHFINDER - more photos through the evening of July 4 - 5; briefing at 2 AM EDT July 5th; resumed coverage 5 PM EDT July 5 with live downlink leading to Rover ramp deployment; Briefing at 8 PM EDT; photos of ramp deployment, followed by the excitement of the first photos of the ROVER on MARS!

VOLUME #63 CONTENTS: MARS PATHFINDER - BRIEFINGS - July 6 - 1 PM; July 7 at 1 PM; July 9 at 4 PM; July 10 and July 11

VOLUME #64 CONTENTS: Mars Pathfinder briefings: July 15 / 21/ 31. Mir Status Briefings: July 17, July 18, July 21

VOLUME #65 CONTENTS: STS-85 Pre-flight Briefings: Crew News Conference, Mission Overview, CRISTA-SPAS; Foale interview; Mir Status Briefing July 31; MIR 24 Soyuz launch video from Baikonur Cosmodrome

VOLUME #66 CONTENTS: STS-85 Prelaunch News Conference 8/6; Soyuz Mir 24 Docking to Mir; Mars Pathfinder briefing 8/8; STS-85 Japanese arm activities; Mir briefing 8/12; ACE prelaunch science briefing 8/12

VOLUME #67 CONTENTS: STS-85 Post-flight briefing, post-landing activities, crew post-flight conference; Mir internal spacewalk preview briefing, STS-84 Post-flight Presentation (great pictures); ACE countdown for scrubbed launch attempt 8/24/97

VOLUME #68 CONTENTS: Mir 24 Internal EVA to reconnect solar array power cables in Spektr module (complete)

VOLUME #69 CONTENTS: ACE launch coverage (8/25 includes spectacular view from first stage camera showing ascent, SRB sep!), Mars Pathfinder 8/27; Mars Global Suveyor orbit insertion briefings Sept. 9, 10, 11; STS-82 Post-Flight presentation; partial STS-47 post-flight video.

VOLUME #70 CONTENTS: Mir 24 EVA (with Foale) - Spektr module inspection and array repositioning September 5 (complete)

VOLUME #71 CONTENTS: Cassini Preview Briefing: Mission Overview, Hardware (RTGs), Science; Mir 24 Pre-EVA Briefing; NASA post-EVA briefing (August 6), Post-EVA video downlink of activities

VOLUME #72 CONTENTS: Mars Global Surveyor orbit insertion events and news conferences (several hours); STS-86 Pre-flight Briefings: Culbertson Phase One, Mission Overview, Spacehab.

VOLUME #73 CONTENTS: STS-86 Preflight Briefings continued: EVA, crew news conference; Foale status report; Wolf training for Mir stay; Mars Global Surveyor finds magnetic field around Mars

VOLUME #74 CONTENTS: Mars Global Surveyor science results briefing 10/2/97; STS-86 post-landing KSC video, including crew briefing; Mike Foale; Mars Pathfinder status briefing early October; JSC Moon-Mars Life Support System project briefing and interviews; El Nino graphics

VOLUME #75 CONTENTS: First CASSINI countdown / launch attempt 10/13/97; Successful CASSINI countdown and launch 10/14/97 - includes unique ground preparation footage of Titan IV launch vehicle, along with Cassini spacecraft

VOLUME #76 CONTENTS: Mir mission update 10/16/97; Hubble Space Telescope science briefing: Colliding Galaxies; Mike Foale post-flight news conference; Dave Wolf interview from Mir; X-33 engine test flights on SR-71; Mir 24 EVA Sputnik Replica Deployment; Mars Pathfinder "final" news briefing November 4

VOLUME #77 CONTENTS: SOHO briefing about discovery of Sun's magnetic carpet; news briefing on Tropical Rainfall Measuring Mission (TRMM); Mars Global Surveyor briefing; STS-87 pre-flight briefings

VOLUME #78 CONTENTS: STS-87 pre-flight briefings

VOLUME #79 CONTENTS: Lunar Prospector prelaunch mission science briefing 12/4/97; STS-87 landing replays and post-landing KSC ground processing coverage; post-landing crew news conference; Mir 24 crew news conference; Galileo update (end of primary mission at Jupiter) 12/16/97.

1998

VOLUME #80 CONTENTS: HST Update: Final Blaze of Glory; Mir "Inspector" European flying camera video; "Stars of Wonder" Holiday Music Video with HST images; Europa images; Mission Update 12/19; Lunar Prospector prelaunch conference; Lunar Prospector launch 1/6/98; Galileo lecture by Project Manager.

VOLUME #81 CONTENTS: STS-89 Crew at KSC; Mission Update 1/9/98; STS-69 post-flight presentation (history tape); STS-89 Preflight Briefings: Mission Overview, Phase One Status; Mir 24/Wolf EVA briefing; Astroculture; Crew Press Conference.

VOLUME #82 CONTENTS: Dave Wolf's Mir EVA on January 14; NASA news conference announcing John Glenn's Shuttle flight assignment; Mission Update January 16; International Space Station FGB Delivery Ceremony and news conference in Russia, January 17 (start).

VOLUME #83 CONTENTS: ISS FGB module ceremony in Russia January 1998; STS-89 countdown status reports; STS-89 Pre-launch Press Conference; Wolf from Mir; STS-89 crew training and interviews; NEAR Earth and Moon photo; STS-89 post-landing video including landing replays, post-landing conference, and Dave Wolf interview

VOLUME #84 CONTENTS: NASA FY'99 Budget Briefing with our one-and-only Dan Goldin; Dave Wolf post flight News Conference; ISS Teleconference: Countdown to Launch; Mission Update for 2/20/98; John Glenn in centrifuge; Mir 24 return to earth; STS-95 Crew News Conference with John Glenn; Glenn media interviews; Mir 25 Crew News Conference with Andy Thomas

VOLUME #85 CONTENTS: LUNAR PROSPECTOR WATER ON THE MOON BRIEFING 3/5/98; Mission Update for 3//6; Laser Mapping; Collins becomes first Female CDR; Glenn begins Shuttle training; Collins interviews; X-38 First Free flight with extensive post-landing "recovery" views 3/12/98

VOLUME #86 CONTENTS: STS-90 coverage: countdown status briefings; Pre-launch press conference; extensive material from countdown (crew module entry); post-launch press conference

VOLUME #87 CONTENTS: Andy Thomas from Mir; STS-90 pre-flight briefings: Mission Overview, Neurolab overview; Neurolab science briefing; Crew press conference; more Andy Thomas, Mission Update

VOLUME #88 CONTENTS: Science Astronomy Update: Massive Gamma-ray Explosion; STS-91 pre-flight briefings: Mission Overview, Phase One Overview; Spacehab; Alpha Magnetic Spectrometer, Crew news conference

VOLUME #89 CONTENTS: INTERNATIONAL SPACE STATION BACKGROUND AND STATUS BRIEFINGS - MAY 12, 1998: Overview, Research, First Elements Status, Assembly

VOLUME #90 CONTENTS: ISS Flight Control briefing; NOAA-K TITAN II Prelaunch Briefing from Vandenberg AFB May 12; NOAA-K launch May 13

VOLUME #91 CONTENTS: John Glenn training at JSC, TRACE/photos of Sun, STS-91 countdown status report, Phase One Lessons Learned press conference, STS-91 Pre-launch press conference with mission management and Russians, Mexican fires, SLWT manufacturing; STS-91 crew training, interviews, MORE

VOLUME #92 CONTENTS: STS-91 Countdown events, including in-cabin video of crew entry and strap-in, post-launch KSC press conference, Mars Pathfinder One-year Press Briefing June 29, 1998

VOLUME #93 CONTENTS: STS-91 postlanding runway video, Post-landing management press conference, Andy Thomas post-flight press conference July 8, 1998; Alan Shepard memorial video footage

VOLUME #94: Discovery rollout highlights (including meatball logo), Jupiter’s rings; October 1, 1998 “Happy Birthday NASA” ceremony; Hubble: Distant Galaxies conference; TCDT Q&A at launch pad

VOLUME #95: STS-95 pre-flight briefings (including crew, Glenn)

VOLUME #96: STS-95 Terminal Countdown Demonstration Test ; Deep Space 1 pre-launch briefing

VOLUME #97: Deep Space 1 countdown and launch 10/24/98; STS-95 countdown status reports, more

VOLUME #98: STS-95 pre-launch briefings and countdown events; Station news and training video

VOLUME #99 - STS-95 final pre-launch briefing, new Mars photos, ISS program briefing, Goldin host Houston event with Walter Cronkite; STS-95 post-landing coverage, including landing replays

VOLUME #100 - STS-95 post landing crew briefing (with Glenn); STS-95 crew return to JSC

VOLUME #101 - STS-88 and ISS briefings 11/13/98, including mission overview, Zarya and Unity, Mars 98 missions, Skylab 25th anniversary, and crew news conference

VOLUME #102 - INTERNATIONAL SPACE STATION: ZARYA LAUNCH - complete coverage of the historic November 20, 1998 liftoff of the first Station module, including post-launch briefings

VOLUME #103 - STS-88 First Launch Attempt Countdown on December 3, 1998, including late-count scrub because of unexplained master alarm and post-scrub events with crew exit; STS-88 Launch Postponement Press Conference; STS-88 Mission Status Briefing; remainder of Top 10 Mars Global Surveyor briefing; STS-88 pre-EVA prep video; Flight Day 7 video; STS-95 Post Flight Presentation with John Glenn

VOLUME #104 - STS-88 Countdown for launch December 4, 1998

VOLUME #105 - Mars Orbiter Launch 12/11/98; Mars Polar Lander pre-launch news conference; Mars Polar Lander launch 1/3/99

1999

VOLUME #106—Mars Polar Lander events; Stardust press briefing; NASA FY 2000 Budget Briefing; X-38 drop test and post-test briefing; Mars Flyer Animation; Stardust launch attempt coverage 2/06/99

VOLUME #107—Stardust launch with fantastic launch views from Delta rocket; mapping ice in Greenland; X-38 free flight; X-33 launch site dedication; WIRE launch; Space Science briefing: Forecasting Solar Eruptions

VOLUME #108—Deep Space 1 update briefing 4/6/99; Space Interferometry Mission; Landsat 7 launch coverage; STS-96 countdown status briefings; Space science update: HST, Hubble’s Yardstick of the Universe

VOLUME #109— ISS Program Status Briefing; STS-96 Pre-flight Briefings—Flight Director, EVA, Starshine. STS-96 in-flight material

VOLUME #110— STS-96 Prelaunch News Conference, Crew Interviews; Countdown Status Briefings; First Global 3D View of Mars; STS-96 In-flight Material; STS-93 Chandra Mission Overview Briefing July 1999

VOLUME #111– STS-96 Countdown

VOLUME #112— STS-96 post-landing and crew conference; FUSE briefing; STS-93 (Chandra) crew, science briefings

VOLUME #113—QuikScat Titan II launch June 19, 1999; Pete Conrad career highlights; Apollo 11 anniversary special

VOLUME #114 CONTENTS – STS-93 Countdown briefings, countdown

VOLUME #115 CONTENTS – STS-93 countdown through scrub, July 20; Apollo 11 Crew Interview

VOLUME #116 CONTENTS – STS-93 second launch attempt countdown; Feb. 2000 budget briefing

VOLUME #117 CONTENTS – STS-93 countdown and scrub July 21, postponement briefing

VOLUME #118 CONTENTS – STS-93 SSME nozzle damage views after touchdown; postlanding crew conference and ceremony

VOLUME #119 CONTENTS – August 1999 x-vehicle briefings; Mars landing site briefing; Mars, An Active Planet? Shuttle wiring damage briefing

VOLUME #120 CONTENTS – X-33 Aerospike engine brieing; STS-93 post-flight presentation; Mars Climate Orbiter Orbit Insertion Failure

VOLUME #121 CONTENTS – STS-103 briefings, Mars Climate Orbiter investigation board briefing

VOLUME #122 CONTENTS - STS-95 post-flight presentation; Mars Polar Lander (MPL) briefings and Mars Background Briefings (search for water)

VOLUME #123 CONTENTS – MPL entry, descent and landing day December 3, 1999 – live coverage

VOLUME #124 CONTENTS – MPL early communications listening sessions, briefings through December 4

VOLUME #125 CONTENTS – MPL communications listening sessions, STS-103 countdown briefings

VOLUME #126 CONTENTS – Terra spacecraft briefings; first and second Terra launch attempts Dec. 1999

VOLUME #127 CONTENTS – STS-103 launch countdown and scrub 12/17/99

2000

VOLUME #128 CONTENTS – STS-99 SRTM pre-flight briefings Jan. 2000, pre-launch status briefings

VOLUME #129 CONTENTS – STS-99 launch countdown and scrub 1/31/00

VOLUME #130 CONTENTS – STS-99 first scrub (conclusion), STS-99 status briefings and countdown

VOLUME #131 CONTENTS – Terra spacecraft launch 12/99; STS-99 countdown and briefings

VOLUME #132 CONTENTS – NEAR EARTH ASTEROID RENDEZVOUS (NEAR) EROS ASTEROID ORBITAL INSERTION ON FEBRUARY 14, 2000; POST-INSERTION FIRST IMAGES AND NEWS BRIEFING; MORE

VOLUME #132 CONTENTS – NEAR encounter with asteroid EROS; Compton GRO deorbit plan briefing; IMAGE prelaunch briefing; X-34 drop

VOLUME #133 CONTENTS – IMAGE launch; ISS briefing;MARS REVIEW TEAM (Polar Lander failure) Report News Briefings; Planet Finding briefing

VOLUME #134 CONTENTS – STS-101 preflight briefings: Mission Overview, EVA, Orbiter Upgrades, Crew (March 27, 2000)

VOLUME #135 CONTENTS – STS-101 first (unsuccessful) Countdown—Launch Attempt; STS-101 second (unsuccessful) Countdown-Launch Attempt

VOLUME #136 CONTENTS – STS-101 third (unsuccessful) Countdown—Launch Attempt

VOLUME #137 CONTENTS – NOAA GOES satellite launch (May 2000); STS-101 preflight briefings

VOLUME #138 CONTENTS – STS-101 fourth (successful) Countdown—Launch attempt

VOLUME #139 CONTENTS – Terra video and Terra First Results Briefing; STS-101 preflight material

VOLUME #140 CONTENTS - Compton Gamma Ray Observatory controlled entry June 4, 2000

VOLUME #141 CONTENTS – TDRS-H Conference, ISS Service Module Briefing, TDRS-H Launch, STS-106 status

VOLUME #142 CONTENTS – Zvezda Service Module preflight footage, Faget tribute, ASTP films, educational programs

VOLUME #143 CONTENTS – Zvezda Service Module launch July 2000, “Time of Apollo” documentary, astronomy

VOLUME #144 CONTENTS – STS-106 Preflight Briefings, Progress docking - August 2000

VOLUME #145 CONTENTS – STS-92 Preflight Briefings, various video files, more

VOLUME #146 CONTENTS – ISS Expedition One prelaunch and launch coverage October 2000, more

VOLUME #147 CONTENTS – STS-92 Status/Postponement, Expedition 1 briefing, Mars Exploration Plans 10/00

VOLUME #148 CONTENTS – STS-97 Preflight briefings EVA, crew, more

VOLUME #149 CONTENTS - ISS Expedition 1 First Crew docking and ceremonies, X-33 test, Shuttle ferry flight, STS-97 preflight briefings - November 2000

VOLUME #150 CONTENTS - Progress docking to ISS, Delta/EO-1 launch from Vandenberg AFB November 21, ISS crew video, STS-97 Countdown status, Progress redocking December 26, 2000

No comments:

Post a Comment

May 13,2026

  https://planet4589.org/space/jsr/back/news.855.txt