Friday, April 19, 2002

Pioneer Venus Orbiter

 1978-051A


The Pioneer Venus Orbiter was launched at 1313 on 1978 May 20 by Atlas Centaur from Cape Canaveral. The Atlas stage separated at 1317:16 and the Centaur ignited at T+4:26. Centaur MECO at 1322 (T+9:36) left PVO in a 170 km parking orbit. At 1331 the Centaur reignited for a 2 min 17 s solar orbit insertion burn. When it separated at 1336, PVO was on a Type 2 Venus transfer trajectory with an aphelion of 1.08 AU. Control was transferred to the PMOCC at Ames on May 22. Correction burns TCM1 and TCM2 were made on Jun 1 and Nov 2.

The onboard solid insertion motor fired at 1558:05 on 1978 Dec 4 and placed PVO in a 23h 11m, 378 x 66900 km x 105.6 deg orbit around Venus. At 0527 Dec 6 it lowered periapsis to 233 km, and on Dec 9 the periapsis was lowered further to 180 km. By Dec 20 the orbit was synchronized to the Earth day, 1436 min 150 x 66900 km x 105 deg, when the last of 7 trim burns was made.

In 1979 Jan-Feb the periapsis was varied from 142 km to 175 km. On Feb 14 the OIR instrument failed. In August the PVO was turned off temporarily while the Deep Space Network supported the Pioneer Saturn encounter. The nominal mission was over on 1979 Aug 4, and was followed by EM1, the Pioneer Venus Extended Mission. By 1979 Sep periapsis had risen to 253 km and was lowered to 142 km. Extended Mission 2 ran from 1980 Apr 3 to Dec 2. In 1980 Jul the RCS gas ran low; the periapsis was allowed to rise. The period remains constant as the inclination, now at 17 degrees, would drift to 0 degrees by 1986, and back up to 17 deg in 1992. In 1981 the periapsis was too high for the ORM and it was turned off.

The Approach Phase began in 1991 Jan when periapsis began to drop from 1000 to 200 km. This was followed by the Entry Phase, starting in 1992 Jun. A periapsis raising burn (the 6th) was carried out on 1992 Oct 2, raising closest approach from 132.9 km to 141.7 km. On Oct 3 the propellant ran dry and the satellite had to be spun up on Oct 5. A final orbit raise of 1 km was made at 0525 on Oct 8 (apoapsis). After the next periapsis passage, 128 km at 1922 on Oct 8, no further transmissions were heard from PVO and the end of mission was declared.


PVO 
 

DateTimeEventOrbit  

1978 May 20  1313:00  Launch by Atlas Centaur 
  T+2:19 BECO 57 km  
  T+2:22 Booster sep 61 km 
  T+3:04 Insulation panels sep 98 km 
 1316:44  T+3:44 Fairing sep 
  T+4:14 SECO
 1317:16  T+4:16 Atlas sep 
 1317:26  T+4:25 Centaur MES-1 
 1322:36  T+9:35 Centaur MECO-1  166 x 170 x  
 1332  Centaur MES-2 2:17 
 1334  Centaur MECO-2 
 1337:46  T+24:46 Centaur sep (MECO2+2:15)  0.72 x 1.08 AU 
 1337:49 T+24:49 Spinup to 6.5 rpm 
 1650:30  MAG deploy 
 2056?  Pass EL1:4 
1978 May 21  1700?  HGA despin 
1978 May 24  0544  Exit Earth sphere (L1)  0.72 x 1.08 AU 
1978 Jun 1 1001  TCM-1 axial 0.5m/s  
 1916  TCM-1 radial-1 1.6m/s 
 2146  Spin rate trim 
1978 Jun 2  0006  TCM1 radial-2 1.6m/s  
1978 Nov 2 TCM-2 
1978 Dec 1  1900?  Enter Venus sphere/L1 
1978 Dec 4  1558:17  VOI burn 1108.7 m/s 
  VOI burnout  1391.43 378.7 x 66900 x 105.0210 
  HGA spinup 30 rpm 
  SC bus despin to 15 rpm 
  Inversion, spin axis to NEP at apo 1 
  HGA despin 
  ORAD antenna released 
  ONMS cap jettison (VOI+36h?) 
  OETP radial sensor deploy 
1978 Dec 5   OTM-1  248 x 66900? x 105.6 
1978 Dec 6   OTM-2  233 x 66900? x 105.6 
1978 Dec 9   OTM-3  180 x 66900? x 105.6 
1978 Dec 20   OTM-7? 1436.0 150 x 66900 x 105 
  Spacecraft despin to 5 rpm  
1979 Jan-Feb   Periapsis (km) 142-175 
1979 Mar-Apr    150-170 
1979 May-Jul    150-190 
1979 Aug 4   End primary mission 
1979 Aug 4   Start Extended Mission 1 
1979 Sep    253 
1979 Sep   Orbit lower  170 
1979 Oct    142 
1979 Oct    160 
1979 Nov    145-160 
1979 Dec    150-185 
1980 Jan    150-185 
1980 Feb-Mar    150-175 
1980 Apr 3   Start Extended Mission 2 
1980 Apr-Jun    150-180 
1980 Jul   end of orbit maintenance 
1980 Dec 2  End EM2 
1981    400-800  
1982    800-1500 
1983    1500-1800 
1984    1800-2000 
1985    2000-2100 
1986 Jun 30    2270 
1987    2000-2100 
1988    1600-2000 
1989    1200-1600 
1990    1000-1200 
1991 Jan   Approach Phase 
1991 Mar 3    1000  
1991 Dec    200 ?  
1992 Jun   Entry Phase 
1992 Oct    132.9  
1992 Oct 2   PRM-6  141.7 
1992 Oct 3   Fuel low 
1992 Oct 5   spinup 
1992 Oct 6    130.8 (orbit 5054) 
1992 Oct 7    128.9 (orbit 5055) 
1992 Oct 8  0525 PRM-7? 1km 128  
1992 Oct 8  1922 Perapsis  128 x  
  End of transmissions 
1992 Oct   Entry 

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...