Discovery was launched in Feb 1997 on the second HST Servicing Mission. Reaching almost 600 km in altitude, OV-103 closed in on Hubble over a couple of days. Steve Hawley, who had released the observatory using RMS 301 on Discovery in 1990, captured the satellite with the same RMS arm on Feb 13. Hawley quickly installed HST on its mounting point on the Flight Support System in the aft cargo bay.

On Feb 14 Mark Lee and Steven Smith entered the external airlock for the first EVA. This was the first time an ODS airlock had been carried at the front of the cargo bay and the first time a spacewalk was made from the ODS hatch. The ODS has two hatches, one on top used to go through the docking system, and one at the rear which on Mir missions leads to the Spacehab module. The rear hatch was used on this mission.

As the ODS was depressurized from 10 psi to 5, the +V2 solar array on HST was observed to suddenly slew 40 degrees. It was later realized that escaping air from the airlock had hit the panel; a density spike on the FOS instrument was recorded at the same time. The airlock was held at 5 psi while the situation was discussed. One orbit later the depress was resumed; the astronauts had been ahead of schedule so the delay was not serious.

Once in the payload bay, Lee and Smith spent some time setting up equipment, and then removed the GHRS instrument from Hubble's aft compartment, replacing it with the new STIS imaging spectrograph. GHRS was stowed in STIS's container on the ORUC Spacelab pallet. Next, the NICMOS infrared camera/spectrograph, carried up in the SAC carrier, replaced the old FOS ultraviolet spectrograph, giving HST an infrared capability for the first time.

The second EVA, on Feb 15, featured installation of the replacement Fine Guidance Sensor used to guide HST accurately. A tape recorder, ESTR-2, was also replaced in equipment bay 8. EV crew member Tanner used Smith's spacesuit, the first time such sharing had been done (leg and arm components had to be switched).

The third EVA was on Feb 16. After depress, hatch opening was delayed briefly while problems with Lee's suit were resolved. The astronauts entered the bay; this time Lee went on the RMS. He removed a DIU interface box and replaced it. Then Smith came onto the RMS and installed a new solid state data recorder in equipment bay 5. Finally, a reaction wheel gyro assembly was replaced. The astronauts inspected damaged multi-layer insulation (MLI) and found that it could not be easily repaired with Kapton tape. The orbit was again raised.

The fourth EVA saw replacement of solar array drive electronics, add protective covers over the magnetometers near Hubble's aperture, and install MLI blankets on damaged areas at the aperture end. The spacewalkers were Harbaugh and Tanner.

The fifth and final EVA was devoted to further repairs on the insulation. Lee and Smith completed the job in two and a half hours, but then HST engineers noticed a possible problem in a reaction wheel assembly which could have required the astronauts to replace it. The spacewalkers were told to return to the airlock and remain there while the problem was analysed. Eventually it was decided not to decide that day, retaining the option for a spacewalk the following day (an option which was not used). Lee and Smith returned to the payload bay briefly to stow the Manipulator Foot Restraint which had spent the week attached to the remote manipulator system, and complete their payload bay cleanup; they then went back to the airlock and repressurized, completing the repair activities for the mission. A final orbital reboost soon followed.


STS-82 
 

DateTimeEventOrbit  

1997 Feb 11  0855:17  Launch STS-82  KSC LC39A 
 0857:20  SRB sep 
 0903:46  MECO 
 0903:56  ET sep  57 x 572 x 28.5 
 0939:50  OMS-2 2:52 83.9m/s 350 x 579 x 28.5 
 0942:43  OMS-2 CO 
 1015?  PLBD checkout partial open/close 
 1037  PLBD open 
 1422:34  OMS-3 1:14 36 m/s  480 x 579 x 28.5 
 1423:48  OMS 3 CO 
1997 Feb 12   RMS checkout 
 1231:38  OMS-4 NSR 56s 29m/s  576 x 584 x 28.5 
 1232:35  OMS 4 CO 
 1357:17  NC2 RCS 13s 1m/s 
1997 Feb 13  0201:21 OMS-5 NH burn 8s 4m/s 
 0201:03  OMS-5 CO 
 0248:17  NC3 burn RCS 1m/s 14s 96.51 589 x 593 x 28.5  
 0355:41  NPC-2 RCS 0.2m/s 2s 
 0503:03  NCC RCS 0.4m/s 1s 
 0524  RMS power up 
 0528  Range to HST 20 km 
 0531  RMS uncradle 
 0603:09  TI burn, 1m/s 12s mass = 105917 kg  96.57 589 x 598 x 28.5 
 0629  MCC 1 
 0658  MCC 2 6s, 6 km range 
 0707  MCC 3, 3s 
 0717  MCC 4, 1.2 km range 
 0722  On HST -R-bar  589 x 598 x 28.5 
 0833:53  RMS grapple HST 
 0904 Berthed and latched on FSS 
 0912:13  Berthing complete 
 0914 RMS ungrapple 
 0920  RMS survey of HST  96.57 589 x 598 x 28.5 
  RMS extended park position 
1997 Feb 14   EVA-1  
 0244  Airlock in depress to 5 psi 
 0245 HST Solar array moves due to depress air; EVA postponed. 
 0415 Resume depress 
 0429  Depressurized, EVA begins (JCM)  96.56 590 x 597 x 28.5 
 0429:53  AL depress complete (NASA) 
 0434  EVA begins (NASA)  
 0435  Slew +V2 array back to horizontal 
 0440? Hatch open; Lee egress  
 0445  Smith egress to bay 
 0454  RMS grapple MFR 
 0507  Smith on RMS 
 0548  Open HST compartment 
 0619  GHRS removed from HST 
 0633  GHRS parked on ORUC 
 0640  STIS removed from ORUC SIPE 
 0724  STIS installed in HST 
 0750  GHRS placed in ORUC SIPE 
 0810? FOS removed from HST 
 0826  FOS parked on ORUC 
 0830  NICMOS removed from SAC SIPE 
 0900  NICMOS installed in HST 
  Install cryo vent line on NICMOS 
 0940  HST aft shroud closed 
 1016  HST aft shroud latched 
 1050  FOS placed in SAC SIPE 
 1116  Hatch closed  
 1116:32  Repress 
1997 Feb 15   EVA-2 Harbaugh, Tanner 
 0250  Begin depress 
 0321  EVA depress (JCM) 
 0323:11  AL depress complete (MR) 
 0325  EVA begins (NASA) 
 0332  Egress  
 0400  Tanner on RMS 
 0500  FGS-1 removed 
 0510  FGS-1 on ORUC fixture 
 0522  FGS-1R removed from FSIPE 
 0541  FGS-1R installed 
 0650  FGS-1 in FSIPE 
  ESTR-2 removed 
 0740  ESTR-2R removed from contained 
 0800  ESTR-2R installed 
  Survey of solar array damage 
 0850  Harbaugh on RMS 
 0900  OCE-EK installation, Bay C 
  Orbit raise 22 min 
 1044  Hatch closed 
 1051  End of EVA (NASA) 7:26 
 1053:01  Repress, end of EVA 7:30 
 1502:19  VRCS reboost, avoid 94-029 debris. 10 min 
1997 Feb 16   EVA-3 Lee, Smith 
 0250:56 AL depress complete 
 0251? Depress  
 0253  EVA begins (NASA)  96.56 589 x 597 x 28.5  
  Lee on RMS 
 0430  DIU removed 
 0550  new DIU installed 
 0640?  SSR work 
 0745?  SSR installed 
 0800?  RWA installed 
 0850?  RWA complete 
  MLI damage inspection  
  Hatch closed 
 1003:37  Repress 7:13  
 1010:16 VRCS reboost 2  
 1030:03 RCS complete 
 1200   86.76 597 x 608 x 28.5 
1997 Feb 17  0340  EVA-4 Harbaugh, Tanner 
 0343:24  Depress complete  
 0345  EVA start, NASA 
 0351  Hatch open 
 0410  Harbaugh on RMS 
 0420  begin SADE repair 
 0645  Done SADE repair 
 0757  MSS cover repair complete 
 0805  Begin insulation repairs at top of HST 
 0920  Insulation repairs complete 
 0937  Harbaugh off RMS 
 1014  Hatch closed  96.75 597 x 608 x 28.5 
 1019:32  Repress, end of EVA  
1997 Feb 18   EVA-5 Lee, Smith 
 0305  Depress  96.75 597 x 608 x 28.5 
 0312:42  Depress complete (MR) 
 0315  NASA EVA start 
 0320  Hatch open 
 0330  Lee on RMS 
 0336  MLI insulation repairs 
 0545  Repairs complete 
 0627  Ingress, hatch closed 
 0733  Hatch open, egress 
 0749  Remove MFR from RMS 
 0823  Ingress, Thermal cover closed 
 0827  Hatch closed 
 0829  O2 to press 
 0831:28  Repress 
 1028  Reboost VRCS 32 min 
 1100  Reboost-3 complete 
 1245   96.88 598 x 619 x 28.5 
1997 Feb 19  0321:09  RMS grapple HST  
 0502:56  RMS unberth HST 
 0557  Open HST aperture door 
 0641:21  Release HST 
 0642:06 SEP1 0.4m/s 5s 
 0717  SEP2, 0.4m/s 5s 300m range 
 0758  SEP-2A 0.4m/s 5s 
 1059   96.86 598 x 618 x 28.5 
 2200   96.86 598 x 617 x 28.5 
1997 Feb 20  0841  RCS perigee lower, 4m/s 52s  96.70 583 x 617 x 28.5 
1997 Feb 21  0308  Close PLBD  
 0721:54  OMS DO 4:59 153.8m/s  52 x 611 x 28.5 
 0726:53 OMS cutoff  57 x 616 x 28.5 (TLE) 
 0801  Entry interface 122 km  
 0832:26 Landed RW15 KSC 
 0832:37  NGTD 
 0833:24Wheels stop 