STS-98 (Atlantis)

 2001-006A


Launch mass of STS-98 is 115527 kg; landing mass 90223 kg. Destiny is to be connected to Unity.

At the end of the docked phase, orbiter mass is 95242 kg and Station mass is 104690 kg for a total mass of 199932 kg. Deployed mass is 14637 kg, retrieved 396 kg. IVA cargo 1377 kg (inc 130? kg EMU and 450 kg CWC), Lab 13547, other EVA 167 (SASA 103, PDGF 35, unknown 31) total 15091 - discrepancy of 454 kg, may be the CWCs.

Adopted RevL Other Destiny 13547 13691 14056 PDGF 33 + 45 = 78 34 + 37 = 71 SASA 103 + 120 = 223 103 + 163 = 266 Other 69 Middeck 1377 781-539

EVA-1 will see move of PMA-2,

Ivins grappled the PMA-2; then electrically controlled bolts were released, the external cabling having been removed on STS-97, making PMA-2 ready for undocking (with the crew playing the song 'Please Release Me' down to the ground).

Destiny contam cover removal, PMA-2 storage on Z1, Destiny unberth and docking, and connecting umbilicals between Destiny and Z1. EVA-2 will move PMA-2 to Destiny's ACBM. Thermal covers on Destiny trunnions. Slidewire installation; vent installation on ECLSS pressure control assembly (PCA). Then the PDGF (Power and Data Grapple Fixture) will be moved from Atlantis to Destiny. The nadir window shutter will be installed on EVA-3, as will the spare SASA, and PMA-2 to Destiny umbilicals will be connected.

The `incapacitated crew member test' on EVA-3 evaluated two methods of transferring one astronaut pretending to be unconscious. The first method, daisy-chain, with two tethers chained together, worked better than the second `strap' method because there was more distance between the incapacitated astronaut and their rescuer, and so less chance of bumping them and sending them spinning. The astronauts worked within the payload bay for this test.

After undocking, the crew's return to Earth was delayed several times due to bad weather at KSC, and finally Atlantis was brought back to Edwards on Feb 20.


STS-98 
 

DateTimeEventOrbit  

2000 Dec 5   Tow to VAB/3 
2000 Dec 6?  ET mate 
2000 Dec   OV mate 
2001 Jan 2   Rollout interrupted, crawler problems 
2001 Jan 3   Rollout to LC39A 
2001 Jan 19   Rollback to VAB3 
2001 Jan 26  1148 Rollout to LC39A 
2001 Feb 7  2313:02  Launch 
 2315:08 SRB sep 
 2315:18  OMS Assist 
 2317:00  OMS Ass CO 
 2321:25  MECO 
 2321:44  ET sep  74 x 323 x 51.6  
 2356:47 OMS-2 82.9s 38.6m/s  
 2358:10  OMS-2 CO 89.78 204 x 322 x 51.6 
2001 Feb 8  0051  PLBD open go 
 0102  PLBD open complete  
 0249:09  OMS-3 NC 85s 40m/s 
 0250:35  OMS-3 CO 
 1400   91.20 306 x 360 x 51.6 
 2317:55  OMS-4 R 11s 2.5m/s  91.29 313 x 362 x 51.6 
2001 Feb 9  1246:48  OMS-5 NC4 14s 6.6m/s 
 1247:02  OMS-5 CO 
 1326:42  NCC RCS 0.6m/s 

1424:25  OMS-6 L TI burn 14s 3.3m/s 
 1424:39  OMS-6 CO 
 1444  MC1 
 1514  MC2  
 1531  MC3 
 1542  MC4 
 1551  On -Rbar at 250m 
 1610  Range 100m on -Rbar 
 1632  Range 30m 
 1645  Range 10m 
 1650:49  Docked with PMA-3 at Unity nadir 
 1700:00  Hard dock 
 1903  Hatch open to Unity 
 1914   91.67 349 x 363 x 51.6 
 2322? HC to Station, end of ingress 1 
2001 Feb 10  1148:02  RCS COLA 0.8m/s 
 1412:16  RMS grapple PMA-2 
 1500  PMA-2 unberth 
 1528  Go for depress 
 1533  Holding at 4.2psi 
 1536  Resume depress 
 1541  0.7psi 
 1544?  Airlock depressurized 
 1545:50  Airlock reported at vacuum 
 1546  HO 
 1550  Battery power 
  EVA-1 Jones, Curbeam 
 1601  Egress 
 1650  PMA-2 berthed on Z1 
 1703  PMA-2 latched on Z1 
 1709:44  Ungrapple PMA-2 
 1722:23  Grapple Destiny 
 1735  Destiny unberth 
 1751  Destiny free of latches 
 1900  Destiny docked to Unity 
 1912  Destiny latched to Unity 
 1930  Attach cooling lines 
 1935  NH3 leaking from cooling system 
 2040:49  RMS ungrapple Destiny 
 2132  RMS berthed 
 2311? Ingress 
 2318 HC 
 2323:35  Repress EVA-1 to 5 psi 
 2326  At 5psi - 15 min waiting period 
 2342  Begin depress EVA-1b (decontam) from 5psi 
 2350:30  Depressurized 
 2351  HO 
 2352  HC 
 2354:32  Repress EVA-1b 
 2357  Resume repress from 5psi 
2001 Feb 11  0140HO to Station, ingress 2 

1438  HO to Destiny  91.68 350 x 363 x 51.6 
 1715Reboost-1 begins 
 1813  Reboost-1 ends 
 1818  Reboost-2 begins 
 2047  Reboost-2 ends 
 2230HC to Station 91.81 356 x 370 x 51.6 
2001 Feb 12   EVA-2 Jones, Curbeam 
 1537:03  PMA-2 grapple 
 1555:50  Depress airlock 
 1557? Hatch open 
 1558? TC open 
 1559  Battery power 
 1605  Curbeam egress 
 1610? Jones egress 
 1630  PMA-2 unberthed from Z1 
 1728  PMA-2 contacts Destiny 
 1738  PMA-2 latched 
 1743:42  Ungrapple PMA-2 
 1800  Begin work on PDGF 
 2030  PDGF installed 
 2100  Remove window cover 
 2225 Ingress EV1 
 2238 Ingress EV2 
 2240  TC closed 
 2241:30  HC 
 2245  Off battery power 
 2246  Ready for repress 
 2248:35  Repress, end EVA-2 
2001 Feb 13  1210  Z1 CMG's take over attitude 
 1553:02  Reboost-3 burn begins  91.80 355 x 370 x 51.6 
 1953  Reboost-3 ends 
 2006:02  Reboost-4 burn 
 2106  Reboost-4 ends 
2001 Feb 14  0000   91.99 365 x 378 x 51.6 

 EVA-3 Jones, Curbeam 
 1430? At 5 psi 
 1443  Depress complete  
 1445:01  Depress complete (MEL) 
 1445?  HO 
 1446  TC partly open 

1448  Battery power 
 1458  EV1 Egress 
 1507  EV2 Egress 
 1557  Unberth SASA from GABA 
 1620  Deploy SASA on Z1 
 1649  Deploy starboard (+X) TCS radiator on P6 
 1655  Radiator in motion 
 1845? Incap. crew DTO 
 1956  Ingress EV2 
 2005 Ingress EV1 
 2006  TC closed 
 2009  HC  91.98 365 x 377 x 51.6 
 2013:15  Repress 
 2308  Reboost-5 1 hr 
 2314  HO to Station, ingress 3   
2001 Feb 15  0412   92.03 367 x 381 x 51.6 
 1523  Reboost-6 
 1656  Reboost-7 
2001 Feb 16  0319   92.21 375 x 389 x 51.6 

1314  Hatch closed to Station after 38h 
 1404  Driving ODS latches open 
 1406:00  Undocking 
 1406  Sep 0.1m/s 
 1412  At 30m on -Rbar 
 1426  450ft 
 1426  Begin Half-rev flyaround 
 1435  +Vbar (Destiny end) 
 1448  +Rbar 
 1448:18  Sep burn 

1500   92.17 372 x 388 x 51.6 
2001 Feb 17  0629   92.17 372 x 388 x 51.6 
 2059  RCS adjust 1.5m/s 
 2100   92.11 369 x 386 x 51.6 
2001 Feb 18  1408  PLBD close 
 1745 DO cancelled 
 1801  PLBD open  
2001 Feb 19  1508  PLBD closed 
 1810  DO cancelled 
 1824  PLBD open  
2001 Feb 20  1520  PLBD closed  92.11 370 x 386 x 51.6 
 1927:20  OMS DO 2:43 96.9 m/s 
 1930:04  OMS DO complete  50? x 380 x 51.6 
 2001:46  Entry interface 122 km 
 2006  83 km alt 
 2010  74 km alt 
 2015  66 km 
 2018  58 km 
 2033:06  MGTD EAFB RW22 
 2033:17  NGTD 
 2034:02  Wheels stop 
2001 Mar 1 1937  SCA 911 depart EAFB 
 2255  SCA land Altus AFB Oklahoma 
2001 Mar 3 1430SCA 911/OV-104 depart Altus 
 1700SCA911/OV-104 land KSC SLF 

1915  OV-104 tow to OPF/3 