Saturday, July 5, 2008

Ulysses

 1990-090B


The Out of Ecliptic project, later the International Solar Polar Mission, was to have consisted of a US and a European probe in complementary solar polar orbits, but the US cancelled its portion and ISPM became ESA's single Ulysses probe. Ulysses rode into orbit aboard Space Shuttle Discovery on 1990 Oct 6. It was deployed into a 296 x 302 km orbit on the first day of the mission. An hour after deployment, the first stage of the IUS upper stage ignited and placed the stack in an intermediate orbit similar to geostationary transfer orbit, with a velocity of 10.08 km/s (compared to an escape velocity of 10.93 km/s). A few minutes later the IUS second stage, SRM-2, fired to increase the probe's velocity to 11.43 km/s, placing it on an escape trajectory. The cooling line to the RTGs was then separated from ULS (but remained attached to the PAM-S aft adapter on SRM-2?). Then the SRM-2 and its attached adapter separated. The PAM-S kick stage was spun up, the PAM-S 1.3m dia 0.3m long motor support assembly separated, and the PAM-S ignited to increase the probe's speed to 15.25 km/s. The combination was then despun with the release of two small weights and their attached cables, and the PAM-S was discarded one hour and 23 minutes after deployment, with Ulysses now flying free at an altitude of 5247 km, on its way to Jupiter.

C3 is about 130.0 for ULS and PAM-S. It is about 12.9 for IUS-2; this would put IUS-2 in a solar orbit of about 1.0 x 1.65 AU.

PAM-S separates from IUS at 1.7 m/s; the MSA is separated at 1.3m/s.


Ulysses (ULS) 
 

DateTimeEventOrbit  

1990 Oct 6  1147:16  Discovery launch  KSC LC39B 
 1748:15  ULS/PAM-S/IUS deploy  296 x 302  
 1853  IUS SRM-1 burn, 291 km, 148s burn 
 1857  IUS SRM-1 sep, RCS spacing  
 1857  125s coast  564.19 310 x 32168 x 28.47 
 1858  IUS SRM-2, alt 493 km, 91s coast  
 1900  RTG ACS cooling line sep 
 1901  SRM-2/Adapter sep (P-10s) 
 1901  ARC 3s spinup burn (P-10s) 
 1901  Motor support assembly sep 
 1901  PAM-S burn, 1007 km, 87s (P-00s) 
 1902  PAM-S shutdown, despin wt. deploy (P+97s) 
 1902  Despin weights/cables sep (P+102s) 
 1911  PAM-S sep, P+596s 5247 km  310 x -19198  
  Trajectory interface, 24100 km 
  Jupiter transfer orbit 
 2228  ULS pass EL1:4 
1990 Oct 7  0200  Passed orbit of Moon 
1990 Oct 7  0322  IUS stage pass EL1:4 
1990 Oct 8  0713  ULS leave Earth sphere  0.996 x 17.15 AU x 2.00 
 0723  ULS leave Earth sphere (Horizons) 
1990 Oct 11  0709  IUS leave Earth sphere  0.9804 x 1.5438 AU x 1.12 
1990 Oct 16  1600  TCM-1 99m/s pulses; Delta Tarr-60hr 
1990 Oct 17  1000 TCM-1 complete 
1990 Oct 18   Axial jets, adjust aimpoint. 48 min burn 
  6 min touchup burn 
1990 Oct 19   Eject DUST experiment cover 0.131kg 
1990 Nov 2   TCM-2 3.8m/s 
1990 Nov 4   Wire booms deployed 
  Nutation problem developed 
1990 Nov 16   Experiment checkout complete 
1991 Jul 8  1324  TCM-3, 8.5min 0.3m/s, Delta Tarr -4 min 
1991 Dec 28  1500?  Enter J sphere at 51.9M km 
1992 Jan 31   Begin Jupiter encounter phase 
1992 Feb 2  1733  113 RJ, bow shock 
1992 Feb 6  0630  67RJ 
1992 Feb 8  1202  6.31RJ, Jupiter encounter 450000 km 
   378950 x -1878034 x 140.1  
1992 Feb 8  1445  Center of plasma torus 
1992 Feb 8  1815  Exit plasma torus 
1992 Feb 11  0030?  PAM-S Jupiter flyby 
1992 Feb 15   Exit Jovian magnetosphere 
1992 Feb 15   Aphelion 5.4 AU 
1992 Feb 16  0752  Last bow shock crossing, 149RJ 
1992 Feb 17  1700  12.35 Mkm from Jupiter 
1992 Mar 12    1.5 x 5.0 AU x 80 
1992 Mar 21  1000  51.9M km from J, exit sphere 
1994 May 29   Begin solar S pole pass 
1994 Sep 13   S polar pass -80.2 
1994 Nov 4   End solar S pole pass 
1995 Feb 5   Perihelion at solar equator 
1995 May 29  Begin N solar pole pass 
1995 Jul 31   Max lat 80.2 
1995 Sep 11  End N solar pole pass 
1995 Sep 30  End of nominal mission 
1996 May 1   Pass through Hyakutake tail at 0.5Tm from nucleus 
1998 Apr 17   First orbit complete 
1998 Apr 17   Aphelion 2, 5.4AU 
1998 May 9   Ecliptic plane crossing 
2000 Sep 6   Start S Polar 2  
2000 Nov 27   Solar pole pass -80.2 
2001 Jan 16   End S Polar 2 
2001 May 23   Perihelion 2 at 1.34AU 
2001 May 25   Ecliptic plane crossing 
2001 Jul 19   Pass 1.34 AU from Earth 
2001 Aug 31   Start N Polar 2 
2001 Oct 13   N Polar pass 80.2 deg 
2001 Dec 10   End N Polar 2 
2004 Jan   Jupiter Distant Encounter 
2004 Feb 4   Jupiter closest approach, 120.4Mkm 
2004 Apr 1   End encounter 
2004 Jun 30   Aphelion 3 at 5.41AU 
2006 Feb   ULS through tail of McNaught  
2006 Nov 17   Begin S Polar 3 
2007 Apr   End S Polar 3 
2007 Aug   Perihelion 3  
2007 Nov   Begin N Polar 3 
2008 Mar   End N Polar 3 

Payload:

  • Scalar magnetometer

  • VHM/FGM Vector He magnetometer (ICL/Balogh) (Code HED)

  • SWOOPS Solar wind plasma experiment, axial boom (LANL/Bame) (Code BAM)

  • SWICS Solar wind ion composition spectrometer (Bern/UMD/Geiss,Gloeckler) (Code GLG)

  • EPAC/GAS Energetic particle composition experiment, Interstellar neutral gas (MPAe-Lindau/Keppler) (Code KEP)

  • HI-SCALE Low energy ion/electrons (Bell Labs/Lanzerotti) (Code LAN)

  • COSPIN Cosmic ray and solar particle instrument (Chicago/Simpson) (Code SIM)

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...