Monday, February 16, 2009

Omid

 2009-004A


The payload was inserted into a 245 x 378 km orbit, with the stage 2 in a 246 x 438 km orbit. The two orbits intersect at 1842 UTC, which was the expected time of orbit insertion, suggesting payload separation with an 18 m/s ejection. Insertion was at the 246 km perigee over 65E 22N on azimuth 142 deg.


 
 

DateTimeEventOrbit  

2009 Feb 2  1834?  Launch by Safir-2  Semnan? 
 1836?  Stage 1 sep 
 1836?  Stage 2 burn  
 1841?  Stage 2 burnout 
 1842?  Stage 2 sep  245 x 378 x 55.51 
 1843Omid sep 
 2010Stage 2 orbit  246 x 438 x 55

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...