Sunday, May 31, 2009

Fengyun-2-06

 2008-066A


FY2-06 is the 02 batch of service application satellites and the follow-on to FY-2C,D.

It is operated by the Zhongguo qixiangju (Chinese meteorological bureau).

Mass 1390 kg.

The CZ-3A third stage performed the EM-1 extended mission,(EM-1 de kuozhan renwu), coasting for 25 min after payload sep to test extended cooling for deep space launches.


FY2-6 
 

DateTimeEventOrbit  

2008 Dec 23  0054  Launch by CZ-3A  XSC 
  T+2:00 St 1 sep 
  T+4:13 Fairing sep
  T+4:17 St 2 sep  
 0105? T+11:43 St 3 MECO-1  -400? x 300 x 27.4 
 0111? T+17:48 St 3 MES-2  
 0117? T+23:00 St 3 MECO-2  
 0118  Stage 3 sep 
 0143  End of Stage 3 EM-1 
2008 Dec 23    623.48 260 x 35333 x 24.2 
2008 Dec 3  1653  AKM 
2008 Dec 23    1408.86 35055 x 35447 x 2.7 
2008 Dec 24    1415.77 34977 x 35797 x 2.7  

No comments:

Post a Comment

November 20,2006

  https://en.wikipedia.org/wiki/Association_football