1995-059A
The CSA's Radarsat was built by Spar Aerospace. The 4.2m long, 2.8m wide spacecraft bus, built by Ball and based on the RME satellite, carried a large solar array and a 15 x 1.5m C-band synthetic aperture radar. It had a mass of 2750 kg. The radar has a 500 km swath width and can be steered electronically, with a fine (8-m resolution) 50 x 50 km area mode and a scan (100 m resolution) 500 x 500 km mode. It is intended to image the Arctic region and Canada, and will also improve maps of the Antarctic. 15 percent of the observing time is allocated to the US in return for the launch. Radarsat is to be operated by the Canadian Space Agency from the Radarsat Control Center at St Hubert, Quebec. Radarsat was launched into a 6am/6pm sun-synchronous orbit for continuous solar array illumination.
In Sep 1997 the satellite was flipped in orientation (yaw) to begin the Antarctic-1 mapping mission, imaging to the left of the satellite track.
The MDA company operates Radarsat. The Dept. Foreign Affairs and the military DND does tasking for surveillance to MDA; commercial tasking is done directly by MDA, while civil tasking is sent to MDA by CSA.
Payload:
- C-band 1.5 x 15m SAR radar, 5.3 GHz
| Radarsat | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 1995 Nov 4 | 1422 | Launch by Delta 7920-10 | V SLC2W |
| SRM 1-9 sep | |||
| 1426 | Stage 1 sep | ||
| 1426 | Delta stage 2 burn | ||
| 1427 | Type 10 fairing sep | ||
| 1432? | Delta stage 2 cutoff | 190? x 784 x 98.6 | |
| 1523? | Delta stage 2 MES2 | ||
| Delta stage 2 MECO2 | |||
| 1526 | Delta stage 2 sep | ||
| 1552 | Solar array deploy | ||
| 1615 | SAR begin deploy | ||
| 1995 Nov 4 | 100.57 783 x 787 x 98.6 | ||
| 1995 Nov 4 | 1540? | Delta SES-3 | |
| SECO-3 | 786 x 1462 x 98.6 | ||
| 1995 Nov 4 | 1608? | Delta SES-4 | |
| Delta/SURFSAT SECO-4 | 934 x 1494 x 100.64 | ||
| 1995 Nov 7 | 100.57 783 x 787x 98.6 | ||
| 1995 Nov 15 | Begin orbit adjust | ||
| 1995 Dec 16 | In operational orbit | ||
| 1995 Dec 16 | 100.70 791 x 792 x 98.6 | ||
| 1997 Sep 9 | Reorient satellite | ||
| 1997 Sep 11 | Begin Antarctic-1 mission (AMM) | ||
| 2002 Nov | safemode, AOCS problem | ||
| 2002 Dec 24 | Resume ops | ||
| 2011 Mar 31 | 100.70 791 x 792 x 98.6 | ||
No comments:
Post a Comment