Thursday, June 14, 2012

HTV-1

 2009-048A


NASDA's HTV H2A Transfer Vehicle is 4.4m dia. It will fly to ISS and refurbish the JEM. After a 2 week supply mission it will be deorbited. 

In Japanese the HTV is referred to as

\uni{ 宇宙ステーション補給機 }{ }
(Uchu susteshon hokyu-ki, space station supply machine).

Launch mass is 15000 kg. HTV has two sections, pressurized section with 8 resupply racks and unpressurized section with 3 EF payloads. Avionics module and Propulsion Module complete the system. PM has main engine and RCS thrusters, 4 x 500N and 28 x 110N.

Prop is MMH/MON3, total 2432 kg max load. (2400 kg carried)

MHI (Mitsubishi Heavy Industries) with IHI propulsion. four 500N class (R4D or IHI?) thrusters and 28 110N class thrusters, with MMH/MON3.

First flight in 2009 is Technical Demonstration Vehicle (Gijutso jissho-ki,

\uni{ 技術実証機).}{ }

Launch by H2B, with two LE-7A main engines and 5S-H 15m fairing.

The EF pallet on the first mission has two experiments, SMILES and HICO-RAIDS.

The pressurized logistics carrier (

\uni{ 補給キャリア与圧部, }{ }
hokyu kyaria yoatsu-bu) propulsion module (
\uni{ 推進モジュール, }{ }
suishin mojuru) and unpressurized logistics carrier (
\uni{ 補給キャリア非与圧部, }{ }
hokyu kyaria hi yoatsu-bu). and adapter section (
\uni{ 軌道間輸送機部, }{ }
kido-kan yuso-ki-bu).


HTV 
 

DateTimeEventOrbit  

2009 Sep 10 1701:46  Launch by H2B  Tanegashima Yoshinobu Pad 2 
  Az 108.5 deg 
  T+1:54 SRB burnout 53 km  
  T+2:04 SRB1-2 sep 
  T+2:07 SRB 3-4 sep 
  T+3:40 PLF sep 
 1707:33 T+5:47 MECO 
 1707:40 T+5:54 St 1 sep 189 km 5.6 km/s 
 1707:47 T+6:01 SEIG 
 1716:06 T+14:20 SECO 
 1716:57 T+15:11 St 2 sep 287 km 
  Adapter panels sep? 
  200 x 300 km  
2009 Sep 11  0033  TCM-1, orbit raise 
 0230? TCM-2, orbit circ 
2009 Sep 12  0112  Begin simulated rendezvous and CAM 
2009 Sep 12  0734  CAM burn  
2009 Sep 15  1851  PCM1 
2009 Sep 16  0004  Height adjust HAM1  
 0131  M2 burn 
 0218  PM2 burn, range 5300 km 
2009 Sep 17  0924  Height adjust HAM2 
 1227  Height adjust HAM3 
2009 Sep 17  1359  Arrive at AI point, 5 km range  
 1531  HTV AI departure burn at 5 km 
 1638  Arrive at 500m, RI point at ISS nadir  
 1648  Arrive at 300m hold point 
  Yaw delayed 
 1724  begin yaw 180 deg, ready for contingency escape 
 1748  Depart 300m point 
  Retreat test 
 1757  Go to resume approach 
 1800  Crew-commanded retreat along Rbar 
 1808  Command R-bar hold 
 1813  Holding at 300m 
 1820  Go to approach to 30m; within 200m 
 1844  At 30 m hold point 
  SSRMS in grapple pos 
 1914  Approaching, 24m 
 1928  At 9m capture point 
 1944  Go for capture 
 1947  HTV capture by SSRMS 
 2212  HTV latched on Harmony nadir 
 2226  HTV bolted 
2009 Sep 18 
 1825  Crew enter PLC 
2009 Sep 23  0918  SSRMS unberthed EFP 
 1117  EFP handed to JRMS 
 1334  EFP installed on EF EFU-10 
2009 Sep 24    
  HREP moved from EFP to EF with JRMS 
  SMILES moved from EFP to EF with JRMS 
 1612  Transfer completed 
2009 Sep 25  0900  EFP unberthed from EF by JRMS 
  JRMS handed EFP to SSRMS 
  SSRMS berthed EFP on HTV 
2009 Oct 30    
  SSRMS grapple HTV 
  HTV unbolt from Harmony 
 1502  SSRMS unberth HTV 
 1732  SSRMS release HTV 
 1738  IDM-1 sep burn 
 1749  IDM-2 sep burn 
2009 Nov 1  1455  TCM-1 
 1503  TCM-1 complete 

1625  TCM-2  143 x 335 km 
 1634  TCM-2 complete 

2053  TCM-3 Deorbit 89m/s 
 2101  TCM-3 complete 

2125  Reentry over NZ/S Pacific, 120km 
 2138  Impact S Pacific 