Tuesday, June 5, 2012

STS-111 (Endeavour)

 2002-028A


STS-111 carried the Leonardo MPLM to ISS on flight UF2.

The APCU (MPLM shell heater) is activated on Day 1. EVA1 will install PDGF and VSC on the FGB. Grapple MBS and berth to ISS MT. EVA-2 secures MBS to MT, deploys the POA (MBS Payload/ORU Accomodation).

PMA-3 will be transferred to Unity.

EVAs by Chang-Diaz and Perrin will be carried out from Quest. EVA-1 moves the PDGF from the cargo bay to P6, and SMDP (Service Module Debris Panel) shields from the bay to stowage on PMA-1. MBS will be unberthed, and attached to the MT the next day.

EVA-2 will connect cables to MBS and deploy the POA (Payload ORU Accommodation) end effector.

EVA-3 will replace the SSRMS wrist roll joint.

Launch mass 116520 kg; landing 99383 kg; Mass at day 167 (orbit 171) 104203 kg. MPLM returned 2116 kg of cargo to Earth. Cargo transfer STS MD 658 kg up plus 425 kg consumables for total of 1083 kg; 760 kg down - this includes 2 EMUs up and down; MPLM 3657 kg up, 2117 kg down.

Walz, Bursch and Onufrienko became MS3,4,5 on descent.

For three days, weather at KSC prevented landing, and the crew were redirected to Edwards.


STS-111 
 

DateTimeEventOrbit  

2002 Apr 25   Mate to ET on MLP1 
2002 Apr 29   Rollout to LC39A 
2002 Jun 5  2122:49  Launch  
 2124:53  SRB sep 
 2125:03  OMS ASS 
 2125:51  OMS ASS CO 
 2131:10 MECO 
 2131:34  ET sep  58 x 224 x 51.6 

2201:35OMS-2 burn 1:02 
 2202:37  OMS-2 CO 158 x 235 x 51.6 
   88.40 155 x 235 x 51.6 (TLE) 
 2257:55 PLBD open 
2002 Jun 6  0057:20  OMS 3  
 0059:10  OMS 3 CO 
 0100   90.18 232 x 334 x 51.63  
 1429:47  OMS 4 R 
 1429:56  OMS 4 CO 
 2010   90.24 233 x 338 x 51.6 
 2331:18  OMS 5  
 2331:49  OMS 5 CO 
 2330   90.76 233 x 390 x 51.6 
2002 Jun 7  1223:58  NC? OMS 6 
 1225:20  OMS 6 CO 
 1225   92.14 369 x 389 x 51.6 
 1356:49  OMS 7 L TI 
 1357:01  OMS 7 CO 
 1447  MC2 6km 
 1507  MC3 1.5km 
 1517  MC4 0.8km
 1532  On -Rbar at 180m 
 1547  Begin V-bar approach at 120m 
 1618  At 12m 

1624:54  Docked PMA  92.27 381 x 389 x 51.64 
 1726:51  Hard dock 
 1908  HO 
 2255  Seat liner transfer 
 2255  Ex5 begins 
2002 Jun 8  1324:12 RMS grapple MPLM  92.26 381 x 389 x 51.6 
 1345 RMS unberth MPLM 

1428 MPLM berth on Unity 
 1447:53  RMS ungrapple MPLM 
 2130  MPLM HO to ISS 
  ISS Z1 CMG-1 fails 
2002 Jun 9   EVA-1 7:14 Chang-Diaz, Perrin 
 1521  Depress 
 1523  HO 
 1527  Battery power 
  Egress 
 1620? Perrin attach fixture on PMA1 
 1640  PDGF unberth by Chang-Diaz 
 1738  PDGF install on P6 
 1855  Unberth SMDP package (C-Diaz) 
 1925  Attach SMDP package to fixture 
  Inspect failed CMG 
 2117  SSRMS grapple MBS 
 2200  Remove thermal blankets from MBS 
 2221  MBS unlatch 
 2223  SSRMS unberth MBS 
  MBS park for thermal adjust 
 2227  Ingress 
 2234  HC 
 2241  Repress 
2002 Jun 10  1250  MBS/MT grapple 
 1303  MBS berth to MT by SSRMS 
 2053? Reboost begins 
 2153  Reboost ends 0.93m/s 
2002 Jun 11   EVA-2 Quest Perrin, Chang-Diaz 
 1455  Depress resume 
 1514? Depress 
 1516? HO 
 1520  BP 
 1529  C-D egress 
 1532  Perrin egress 
  MT/MBS cable connections 
 1740  POA deploy 
  MBS bolts completed 
 2010  Ingress 
 2016  HC 
 2020  Repress 
  SSRMS ungrapple MBS 
2002 Jun 12  1308  Reboost-2 1hr 
 1403Reboost done  92.28 382 x 390 x 51.6 
2002 Jun 13   EVA-3 Quest Perrin, Chang-Diaz 
 1502  1.6psi 
 1512  Depress 
 1514? HO 
 1516  EVA begin 
 1525Egress 
 1754  Remove SSRMS LEE-A 
 1803  LEE stowed on Destiny 
 1821 WRJ removed 
 1854  WRJ new unberthed from PLB by Perrin 
 1903  WRJ replacement installed on SSRMS 
 1955  LEE-A reinstalled 
 2010  old WRJ stowed in PLB 
 2043  SSRMS reactivated 
 2223  Perrin ingress 
 2225  C-D ingress 
 2229  HC 
 2233  Repress 
  SSRMS LEE A grapple MBS 
2002 Jun 14  0600   92.31 384 x 391 x 51.63 
 1254Reboost-3 
 1430  MPLM HC 
 1649:10  RMS grapple MPLM 
 1918MPLM unberthed from Unity 
 2011  MPLM reberthed in PLB 
 2022:34  RMS ungrapple MPLM 
 2200   92.45 389 x 399 x 51.63 
2002 Jun 15  1223 HC 
 1431:49 Undock 
 1511  On +Vbar at 140m 
 1517  Begin flyaround at 140m 
 1529  On +Rbar 
 1540  On -Vbar 
 1553  On -Rbar 
 1603  On +Vbar 
 1615  Sep burn on +R-bar 
 1757:49  OMS-8 OA 
 1758:16  OMS-8 CO 
 1758   91.91 344 x 391 x 51.63 
2002 Jun 16  1530   91.92 347 x 389 x 51.63 
 1530:00  OMS-9 
 1530:10  OMS-9 CO 
2002 Jun 17  1319:48 PLBD closed 
 1556;51 PLBD open 
2002 Jun 18  1209:13 PLBD closed 
 1453:19 PLBD open 
2002 Jun 19  1105:51  PLBD closed  91.90 347 x 387 x 51.6 
 1650:26  OMS DO 2:55 92.4m/s 
 1653:23  OMS DO CO  88.71 34 x 386 x 51.6 
 1726:32  Entry interface 121.9km 
 1757:43  Landing RW22 EAFB 
 1757:53 NGTD 
 1758:45  WS 
2002 Jun 28  2130SCA departs EAFB 
2002 Jun 29  0610SCA arrives KSC 

No comments:

Post a Comment

These Are Not My Beautiful Stories

  Summary: The chapters within are outlines for both future stories I’ve got planned (in the case that I never get around to writing them) a...