Saturday, March 2, 2013

AEHF-2

 2012-019A


LM A2100M. Hughes will do payload integration and TRW makes the digital processing subsystem. The spacecraft has two small deployable payload wings, a little like small versions of the Milstar, on which antennas are mounted.

Prime contractor is LMSS/Sunnyvale; propulsion module from LM-MSSC at Stennis. AEHF is operated by AFSPC and acquired by the USAF Milsatcom JPO.

AEHF 2 launched by Atlas V AV-031

Launch mass 6200 kg, BOL mass 4080 kg. Size 23.1m span, 9.8m high deployed.


AEHF 
 

DateTimeEventOrbit  

2012 May 4  1842:00 Launch by Atlas V 531 CC SLC41 
  T+1:56 SRB 1-2 sep 
  T+1:57 SRB 3 sep 
  T+3:34 PLF sep 
  T+3:39 CFLR sep 
  T+4:18 BECO 
  T+4:24 Atlas sep 
  T+4:34 MES-1 
 1855:57 T+13:57 MECO-1  185 x 901 x 27.49 
 1904:05 T+22:05 MES-2 
 1909:48 T+27:48 MECO-2 
 1933:11 T+51:11 Centaur sep  927.57 225 x 50031 x 20.62 
  Centaur blowdown  -311 x 45223 km x 20.2 deg 
2012 May 5  0432  Centaur entry over Phillipines 
2012 May 8 LAM-1 
2012 May 11 LAM-2 
2012 May 15?  Solar arrays deployed 
2012 May 16   LAM-3  16331 x 50200? x 6.9 
2012 May 17?  Begin EP phase 
2012 Oct   On orbit tests complete 
2012 Nov 7  Operational 

No comments:

Post a Comment

November 20,2006

  https://en.wikipedia.org/wiki/Association_football