2012-019A
LM A2100M. Hughes will do payload integration and TRW makes the digital processing subsystem. The spacecraft has two small deployable payload wings, a little like small versions of the Milstar, on which antennas are mounted.
Prime contractor is LMSS/Sunnyvale; propulsion module from LM-MSSC at Stennis. AEHF is operated by AFSPC and acquired by the USAF Milsatcom JPO.
AEHF 2 launched by Atlas V AV-031
Launch mass 6200 kg, BOL mass 4080 kg. Size 23.1m span, 9.8m high deployed.
| AEHF | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2012 May 4 | 1842:00 | Launch by Atlas V 531 | CC SLC41 |
| T+1:56 SRB 1-2 sep | |||
| T+1:57 SRB 3 sep | |||
| T+3:34 PLF sep | |||
| T+3:39 CFLR sep | |||
| T+4:18 BECO | |||
| T+4:24 Atlas sep | |||
| T+4:34 MES-1 | |||
| 1855:57 | T+13:57 MECO-1 | 185 x 901 x 27.49 | |
| 1904:05 | T+22:05 MES-2 | ||
| 1909:48 | T+27:48 MECO-2 | ||
| 1933:11 | T+51:11 Centaur sep | 927.57 225 x 50031 x 20.62 | |
| Centaur blowdown | -311 x 45223 km x 20.2 deg | ||
| 2012 May 5 | 0432 | Centaur entry over Phillipines | |
| 2012 May 8 | LAM-1 | ||
| 2012 May 11 | LAM-2 | ||
| 2012 May 15? | Solar arrays deployed | ||
| 2012 May 16 | LAM-3 | 16331 x 50200? x 6.9 | |
| 2012 May 17? | Begin EP phase | ||
| 2012 Oct | On orbit tests complete | ||
| 2012 Nov 7 | Operational | ||
No comments:
Post a Comment