2006-036A
Atlantis was being prepared for the STS-114 launch when Columbia was lost. It was then reassigned to fly STS-115 with ET-118 for the 12A station assembly flight.
ET-118, BI-127/RSRM-94 on MLP2 in VAB HB3. Stack SRB in Jun 2006, ET mate in Jul 2006
Planned mass 90753 at EI, 90502 at landing, 112268 kg at ET sep (RTLS option), 122397 kg at launch. Cargo transfer 511 kg dry, 550 kg consumables; down 450 kg. P3/P4 deploy mass 16126 kg.
Plan: P3/P4 SRMS unberth, handoff to SSRMS. Insall on FD4 during EVA1; SAW deploy on FD6. FD7 Translate MT from W7 to W8 for EVA3, then to W4 for FD8. OBSS handoff, arm to W4 PDGF-1. Release lab PDGF.
| STS-115 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2003 Jan 29 | Roll to VAB | ||
| 2003 Jan 30? | Mate to ET/SRB | ||
| 2003 Feb 2 | Stop work | ||
| 2003 Mar 12? | Destack | ||
| 2003 Mar 14 | Tow to OPF | ||
| 2005 Jul 21 | Roll to VAB HB3? | ||
| 2005 Jul 22 | ET/SRB mate with OV | ||
| 2005 Sep 2 | OV-105 destack | ||
| 2005 Sep 6 | Back to OPF/1 | ||
| 2006 Jul 24 | Tow to VAB | ||
| 2006 Aug 2 | Rollout to LC39B | ||
| 2006 Aug 29 | 1040 | Rollback toward VAB2 | |
| 1215 | Rollback stopped, to LC39B | ||
| 2006 Sep 9 | 1514:55 | Launch | KSC LC39B |
| 1516:57 | T+2:05s SRB sep | ||
| 1517:07 | OMS ASS | ||
| 1520:00 | OMS ASS CO | ||
| 1523:20 | T+8:30? MECO | ||
| 1523:43 | T+8:40? ET sep | 58 x 220 x 51.6 | |
| 1552:15 | T+37:16s OMS-2 | ||
| 1554:41 | OMS-2 CO | 89.64 228 x 284 x 51.6 | |
| 1641:26 | PLBD open | ||
| 1811:31 | OMS-3 T+2:57 NC1 24m/s | ||
| 1812:23 | OMS-3 CO | ||
| 2006 Sep 10 | 90.51 284 x 314 x 51.6 | ||
| 0648s | NC2 | ||
| 0707:39 | NPC | ||
| 0708:12 | OMS-4 CO | ||
| 1529 | 91.06 313 x 340 x 51.6 | ||
| 1829s | NC3 | ||
| 2006 Sep 11 | 0049 | 91.16 318 x 344 x 51.6 | |
| 0636:29 | OMS 5 NC4 | ||
| 0636:44 | OMS 5 CO | ||
| 0808:08 | OMS 6 TI, range 13 km | ||
| 0808:19 | OMS 6 CO | ||
| 0828 | MC1 | ||
| 0856 | MC2 | ||
| 0912 | MC3 | ||
| 0923 | MC4 | ||
| 0933 | 240m on nadir Rbar | ||
| 0950 | Begin flyaround from Rbar nadir to Vbar | ||
| 1005 | Reach Vbar at 116m | ||
| 1031 | At 30m on Vbar, approach to PMA | ||
| 1048:27 | Docking | ||
| 1230? | RMS grapple P3/P4 | ||
| 1235? | HO to ISS, ingress | ||
| 1320? | P3/P4 unberth | ||
| 1452 | SSRMS grapple P3/P4 | ||
| 1503 | RMS ungrapple P3/P4 | ||
| 2006 Sep 12 | |||
| 0727 | Ready-to-latch on truss | ||
| 0835 | Bolts tightened, connected to P1 | ||
| 0900? | SSRMS ungrapple truss | ||
| 2006 Sep 12 | EVA-1 Tanner, Piper | 91.38 334 x 349 x 51.6 | |
| 0909 | 2 psi | ||
| 0912? | Depress Quest | ||
| 0915 | HO | ||
| 0918 | Battery power | ||
| 0929? | Egress Piper | ||
| 0935? | Egress Tanner | ||
| Attach P3/P4 cables, etc | |||
| 1307 | SARJ active | ||
| 1413 | Lose bolt | ||
| 1525 | Piper ingress | ||
| 1535? | Tanner ingress | ||
| 1537 | HC | ||
| 1544 | Repress 6:26 (NASA) | ||
| 2006 Sep 13 | EVA-2 Burbank, MacLean | 91.38 334 x 350 x 51.6 | |
| 0845 | At 5psi | ||
| 0848 | 3 psi | ||
| 0850 | 2 psi | ||
| 0900 | Depress Quest, 0.7psi | ||
| 0901 | 0.5psi | ||
| 0903? | HO | ||
| 0905 | Battery power | ||
| 1110 | MacLean loses bolt? | ||
| Undo launch locks | |||
| Keel pin removed | |||
| 1551 | TC open | ||
| 1552 | Maclean ingress | ||
| 1600? | Burbank ingress | ||
| 1607 | HC | ||
| 1616 | Repress | ||
| 2006 Sep 14 | 91.38 334 x 350 x 51.6 | ||
| 1000 | Begin array deploy | ||
| 1027 | Begin 4A 49-percent deploy | ||
| 1100 | 1st array (4A) fully deployed | ||
| 1203 | 2nd array (2A) deploy begins | ||
| 1211 | Pause for thermal conditioning | ||
| 1238 | Resume 2A deploy | ||
| 1243 | 2A fully deployed | ||
| 2006 Sep 15 | |||
| EVA-3 Tanner, Piper | |||
| 0955? | Depress | ||
| 0959 | HO | ||
| 1000 | Battery power | ||
| 1005 | Piper partial egress | ||
| 1006 | Egress Piper | ||
| 1011 | Egress Tanner | ||
| 1030? | Piper to P6; retrieve MISSE 5 | ||
| Tanner to P6; maintenance, bolt clips install | |||
| Piper to P4; work on TCS | |||
| 1158 | Final TCS restraint removed | ||
| 1215 | To S1 for SASA mount repair | ||
| 1240 | spare SASA off Z1 | ||
| 1306 | TCS radiator deploy begins | ||
| 1312 | TCS deploy complete | ||
| 1350? | Broken SASA off S1 | ||
| 1425 | spare SASA on S1 | ||
| 1443 | Broken SASA being carried to Z1 | ||
| 1500 | Old SASA stowed on Z1 | ||
| 1630? | Ingress | ||
| 1637? | HC | ||
| 1643 | Repress 6:42 NASA | ||
| Plan: MT from WS7 to WS8 | |||
| Plan: MT from WS8 to WS4 | |||
| 2006 Sep 17 | |||
| 1027 | HC | ||
| 1249:50 | Undocking from PMA-2 | 91.38 336 x 347 x 51.6 | |
| 1257 | At 30m | ||
| 1309 | At 120m on +vbar | ||
| 1314 | on +vbar, begin flyaround | ||
| 1324 | on +rbar | ||
| 1337 | on -vbar | ||
| 1347 | On -rbar | ||
| 1400 | On +Vbar | ||
| 1420? | Sep burn on +Rbar (zenith) | ||
| ? | Stationkeep at range 110 km? | ||
| 2006 Sep 18 | 1225 | 91.38 334 x 350 x 51.6 | |
| Orbit tweak | |||
| 1359 | 91.39 334 x 350 x 51.6 | ||
| 2006 Sep 20 | |||
| 0246 | 91.39 334 x 350 x 51.6 | ||
| 1018 | OBSS unberthed | ||
| 1141 | 91.38 333 x 351 x 51.6 | ||
| TPS survey | |||
| 1300? | OBSS reberthed | ||
| 2006 Sep 21 | |||
| 0633:02 | PLBD closed | 91.38 334 x 350 x 51.6 | |
| 0914:23 | OMS DO 2:43 92.6m/s | ||
| 0917:04 | OMS DO CO | 21 x 350 x 51.6 | |
| 44 x 356 (MR) | |||
| 0949:44 | Entry interface | ||
| 1021:25 | Landing KSC RW33 | ||
| 1021:36 | NGTD | ||
| 1022:16 | WS | ||
| 1335 | Tow to OPF/1 | ||