2010-004A
Flight 20A with RSRM 109 and ET 134. Launch mass 121322 kg, landing 91033 kg. Cargo Node 3 13512 kg , 1630 kg Cupola (total 15142 kg) MD 903 kg up, 818 kg down, 507 kg water/O2 up. 343 kg ISP cargo (included in NOD3)
Pre MR - 15142 kg PLB transfer, 902 up 830 down, 508 kg cons.
Carry up 3004 (Behnken), M3005 (Patrick). Down with 3004 and 3018 (Behnken).
EV1 is Behnken, EV2 is Patrick.
Original plan was Behnken 3004, Patrick 3005 for EVA 1-3. In fact,
Pre EVA1: 3004 unserviceable. 3018 resized. EVA1: Behnken 3018 Patrick 3005 Pre EVA2: 3005 suspect, Resize 3004 and replace power harness EVA2: Behnken 3018 Patrick 3004 Pre EVA3: 3005 cleared as OK, 3018 suspect EVA3: Behnken 3005 Patrick 3004 Post EVA3: Resize 3018 for Behnken for trip home.
New plan: 3005? Patrick 3018 Behnken. 3018 was in Columbus. 3005 was in EDDA. Was going to use 3004, transfer flight patch and stripes to 3018 3004 will be temp stow, resized after EVA3 for return home.
3005 in FWD EDDA for Patrick 3018 in AFT EDDA for Behnken.
After fan problems on EVA1, 3005 was replaced by 3004 after some further maintenance.
Planned spacewalks:
EVA-1 will prep the unberthed Node 3 with removal of covers and attachment of cables.
EVA-2 will see Node 3 outfitting.
EVA-3 will see outfitting of Node 3 and Cupola.
NASA 911 is slated for the ferry role.
Docking was on Feb 10. The vehicles continued oscillating for longer than normal and docking ring retraction was delayed. Docked mass is 458000 kg.
Node 3 was installed on Node 1 port.
| STS-130 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2009 Dec 12 | Mate to ET in VAB 1 | ||
| 2010 Jan 6 | Roll to LC39A | ||
| 2010 Feb 8 | 0914:08 | Launch | |
| 0916:14 | SRB sep | ||
| 0916:24 | OMS Assist | ||
| 0918:37 | OMS Assist CO | ||
| 0922:29 | MECO | ||
| 0922:51 | ET sep 6s RCS | ||
| 0923:01 | ET Photo +X, 11s | 61? x 226 | |
| 116313 kg. | |||
| 0951:49 | OMS-2 T+37:30 1:32 43.3m/s | ||
| 0953:22 | OMS-2 CO 114672 kg | 88.82 200 x 231 x 51.6 | |
| 1044:44 | PLBD open | ||
| 1213:25 | OMS-3 both, NC1 114707 kg 66s 31.33m/s | ||
| 1214:31 | OMS-3 CO | 89.91 206 x 333 x 51.7 | |
| 2010 Feb 9 | 0230:03 | OMS-4 NC-2 both, 66s 31.8m/s | |
| 0231:09 | OMS-4 CO | ||
| 1250 | RCS burn | 91.03 301 x 349 x 51.7 | |
| 2010 Feb 10 | 0056:14 | OMS-5 NC4 Burn 14s 7m/s 112121 kg OMS both | |
| 0056:29 | OMS-5 CO | ||
| 0151 | NCC RCS tweak burn | ||
| 0228:25 | OMS-6 TI, 2.1m/s 111867 kg OMS L | ||
| 0228:34 | OMS-6 CO | ||
| 0248 | MC1, 13 km | ||
| 0317 | MC2 | ||
| 0334 | MC3 | ||
| 0344 | MC4 | ||
| 0409 | At nadir, RPM complete | ||
| 0430 | Beginning approach on V-bar | ||
| 0505:56 | Docking with PMA-2 | ||
| 0551 | Retract docking ring | ||
| 0554 | Retracted docking ring | ||
| 0716 | HO | ||
| 2010 Feb 12 | EVA-1 Behnken, Patrick 3018, 3005 | 91.38 334 x 349 x 51.7 | |
| 0145 | SSRMS grapple Node 3 | ||
| 0206 | 2.5 psi | ||
| 0214 | Depress 0.7psi | ||
| 0216 | HO | ||
| 0217 | Battery power | ||
| 0228 | Egress Behnken | ||
| 0231? | Egress Patrick | ||
| Removing MLI covers | |||
| 0405 | Tranquility unberthed | ||
| 0556 | RTL | ||
| 0604 | Node 3 first stage capture | ||
| 0620 | Tranquility installation complete | ||
| 0833 | Ingress Patrick | ||
| 0839 | Ingress Behnken | ||
| 0844 | HC | ||
| 0849 | Repress | ||
| 2010 Feb 13 | 0049 | SSRMS ungrapple Node 3 | |
| 0112 | SSRMS grapple Destiny?, based on Harmony | ||
| 2010 Feb 14 | EVA-2 Behnken, Patrick 3018, 3004 | 91.37 334 x 349 x 51.6 | |
| 0157 | In depress | ||
| 0201 | 5.8 psi | ||
| 0205 | Resume depress | ||
| 0209 | 2.2 psi | ||
| 0214 | 1.1 psi | ||
| 0218 | Depress | ||
| 0219 | 0.5 psi | ||
| 0220 | HO | ||
| 0230 | Egress Behnken | ||
| 0233 | Egress Patrick | ||
| Hook up cooling and cables to Node3 | |||
| 0745 | Ingress Patrick | ||
| 0749 | Ingress Behnken | ||
| 0756 | HC | ||
| 0814 | Repress | ||
| 2010 Feb 15 | 0320 | SSRMS grapple Cupola | 91.37 334 x 349 x 51.7 |
| Problems with unbolting | |||
| 0524 | Unberth Cupola from Node 3 end | ||
| 0625 | RTL Cupola/Node 3 nadir | ||
| 0632 | Cupola berthed | ||
| 1010? | Ungrapple | ||
| 1100? | SSRMS grapple PMA3 on Harmony zenith | ||
| 2010 Feb 16 | |||
| 0052 | SSRMS unberth PMA3 | ||
| 0228 | SSRMS berth PMA3 on Node 3 port (end) | ||
| 0307? | Ungrapple PMA3 | ||
| 2010 Feb 17 | 0208 | 1 psi | |
| EVA-3 Behnken, Patrick | 91.36 333 x 348 x 51.7 | ||
| 0213 | 0.5 psi | ||
| 0214 | HO | ||
| 0215 | BP | ||
| 0223 | Patrick egress | ||
| 0232 | Behnken egress | ||
| 0300 | Activating Node 3 fluid line | ||
| 0345 | Begin Cupola exterior work | ||
| 0526 | Cupola window opened for first time | ||
| 0727 | Returning to AL | ||
| 0737 | B ingress | ||
| 0745 | P ingress | ||
| 0758 | HC | ||
| 0803 | Repress | ||
| 2010 Feb 18 | 0731:07 | Begin VRCS reboost 33 min | 91.40 334 x 351 x 51.7 |
| 2010 Feb 19 | 0808 | HC to ISS | |
| 2010 Feb 20 | 0053:52 | Undock | 91.36 333 x 348 x 51.7 |
| 0116 | At 120m, begin flyaround | ||
| 0126 | At zenith | ||
| 0139 | -Vbar | ||
| 0149 | At nadir, +Rbar at 200m | ||
| 0201 | +Vbar | ||
| 0202 | Sep-1 | ||
| 0231 | Sep-2 1m/s | ||
| 2010 Feb 21 | |||
| 2344:25 | PLBD close | 91.36 334 x 348 x 51.6 | |
| 2010 Feb 22 | 0214:47 | DO PAD TIG 13/17:00:40.0 TGO 02:34 89.6m/s | |
| 0217:22 | OMS DO CO | 30? x 348 x 51.7 | |
| 0248:55 | EI | ||
| 0320:29 | MGTD 13:18:06:24 | ||
| 0320:39 | NGTD 13:18:06:32 | ||
| 0322:00 | WS 13:18:08:03 | ||
| 0700 | Tow to OPF/2 | ||