Tuesday, July 28, 2015

Prisma

 2010-028B


SSC mission for robotic rendezvous. 140 kg chaser satellite and 40 kg target.

Launch to 700 km x 98.2 deg.

Launch by Dnepr; remain together for initial checkout, then separate later. Control from SSC/Solna via Esrange station.

Prisma Main, Prisma Target - Mango and Tango. SSC is prime contractor with structure by Saab. Main is box + 2 panels; 140 kg wet. size 0.80 x 0.83 x 1.30m. AOCS has 6 x 1N thrusters and 11 kg of hydrazine.

Also carries a 'green' propulsion system. HPGP is High Performance Green Propellant, LMP-103S, with an Isp around 250s. 5 kg of HPGP are connected to 2 x 1N thrusters.


Prisma 
 

DateTimeEventOrbit  

2010 Jun 15 1442 Launch by Dnepr  Yasny 
 1443 T+1:50 Stage 1 sep 
 1447? GO sep
 1448? T+5:54? St 2 sep 
 1448? T+5:55? DU on 
 1458? Plume shield sep 
 1458  Prisma sep  726 x 749 x 98.3 
  Platform A sep 
 1459  Picard sep  693 x 728 x 98.3 
  DS orbit  714 x 1267 x 98.2 
2010 Aug 11  1751  Tango sep 
2010 Aug 20   HPGP tests at 600m range to Tango 
2010 Aug 21   HPGP pulse tests at 1 km range to Tango 
2010 Aug 24   MEMS microthruster tests, partial success 
2010 Aug 26   Range 2.5 km  
2010 Aug 27   Reduce range to 500m 
2010 Aug 30   Begin AFF Early Harvest, range 10 km to 18m 
  Activate FFRF system, range 740 m 
 
2010 Sep 1   Approach from 800 m to 500m? 
2010 Sep 1   Move away toward 5 km 
2010 Sep 2  1200? Stationkeep at 5 km 
 2100 Resume retreat 
2010 Sep 3  1400? Skeep at 10 km  
2010 Sep 3  2300? Resume approach 
2010 Sep 4  1500? Stationkeep at 5 km 
2010 Sep 10   Approach to 150m 
  Approach to 50m 
2010 Sep 14 1950  Range 18m in AFF9 
 2000  Retreating 
2010 Sep 14   Complete AFF-EH 
2010 Sep 16   FFRF initialization at 2 km? 
2010 Sep 16?  Safemode at 9 km  
2010 Sep 17  0500? retreat to safe orbit 
 1512  Safemode exit 
 1651  Set up for FFRF experiment 
 1830  Restored correct orbit at 6 km  
2010 Sep 18   End FFRF-I at 80m 
2010 Sep 20 1820 AFC experiment (DLR)  
  Move to new orbit at 500 x 800 x 400 m, 2 km down track 
2010 Sep 21  1820  AFC to open loop 
2010 Sep 23  1755  AFC to closed-loop at 1881 m mean sep 
2010 Sep 25   AFC rendezvous - relocate to 0m mean sep in 400m ellipse 
  Min distance 150m 
2010 Oct 6   Complete AFC 
2010 Oct 7  FFRF envelope 
  Mango move to 100m behind Tango 
2010 Oct   Ranges from 20m to 9 km  
2010 Oct 13   Complete FFRF envelope part 1 
2010 Oct 18  2000 10m prox ops 
2010 Oct 20   Range 20 m 
2010 Oct 20   T+0 Mango Rendezvous and prox ops - approach from 20m 
  Pass Tango at 7 m  
  T+0:40 Back at 20m 
2010 Oct 26   Flyaround at 10m, 3 relative orbits 
2010 Oct 28   CNES-mode experiments 
2010 Oct 30   Stationkeep at 100m 
2010 Oct 31   Stationkeep at 70m 
2010 Oct 31   Collision avoidance 
2010 Nov 9   HPGP 2 
2010 Dec 7   HPGP 3 propulsion tests 
2011 Jan 25   Prox GPS epxeriments to 2 m 
2011 Feb 12   FFIORD experiments 
2011 Mar 13   FFIORD GNC experiment completed, 80 and 20m 
2011 Apr   ARV 3 continues 
2011 Jul 15  Tango in hibernation 
2011 Jul 18   Mango begin AOK experiment - autonomous orbit control 
2011 Aug   End of nominal mission 
2011 Oct   Extended mission FFIORD 
2011 Nov   Complete extended mission 
2012 Mar 22    99.92 723 x 786 x 98.3 
2012 Apr 23  DLR ARGON experiment 
2012 Apr 27   ARGON complete 
2013 Apr   IRIDES mission - rendezvous with Picard 
2013 May 10    99.90 723 x 784 x 98.3 
2013 May 13  DV Transfer orbit to Picard 
2013 Jun 14    99.90 722 x 785 x 98.3 
2013 Jun 15    99.46 684 x 780 x 98.3 
2013 Jun 20  DV for transfer orbit complete 
2013 Jul 28    98.97 648 x 770 x 98.5 
2014 May 21    98.9 650 x 766 x 98.5 
2014 May 24   Peri raise 
  Orbit plane drift stop, 7 m/s 
2014 Jun 18    98.94 655 x 761 x 98.5 
2014 Jul 14    98.94 655 x 760 x 98.5 
2014 Jul 20   Orbit adjust  98.99 664 x 756 x 98.4 
2014 Aug   Problem with propulsion 
2014 Aug  Rendezvous aborted, flyby 
2014 Sep 17    98.987 668 x 751 x 98.4 
  Orbit tweak? 
2014 Sep 19    98.973 668 x 750 x 98.4 
2014 Sep 24   Orbit tweak, retired? 
2015 Mar 18    98.95 668 x 749 x 98.4 

Payload:

  • FFRF Formation Flying RF sensor, metrology formation flying package, (CNES/Alcatel Alenia/)

  • VBS Vision Based Sensor (DTU/) Optical tracking/prox ops system using star trackers

  • GPS GPS Nav and SAFE (Spaceborner Autonomous Formation Flying Experiment) (DLR/)

  • HPGP High Performance Green Propellant, ADN (ammonium dinitramide) propulsion test, 2 x 1N

  • Steady stream N2 microthruster experiment

No comments:

Post a Comment

November 20,2006

  https://en.wikipedia.org/wiki/Association_football