2013-009A
'Satellite with ARgos and ALtiKa', a joint ISRO CNES mission with the Altika altimeter. Saral also means 'simple' in Hindi. CNES is overall mission manager. ISRO supplies the spacecraft bus and the launch vehicle and carries out spacecraft commanding.
Gap filler between Envisat and Sentinel-3 using ISRO SSB (IMS-2 Small Satellite Bus). Mass 346 kg. Box + 2 panels size 1.0 x 1.0 x 0.7m, span around 3.0m? Mono RCS with 1N thrusters and 21 kg propellant.
AltiKa replaces Envisat RA2 altimeter and work with Jason-2.
SARAL is mounted on the DLA-U; NEOSSAT and Sapphire inside. Strand-1 and the NLS-8 satellites are mounted on the second stage forward adapter.
Azmuth 147 in early flight, 178 during PS3 coast.
| SARAL | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2013 Feb 25 | 1231 | Launch by PSLV-CA C20 | SHAR |
| T+1:53 PS1 sep 52 km | |||
| T+1:53 PS2 burn | |||
| T+2:58 HS sep, 116 km | |||
| T+4:25 PS2 sep 222 km | |||
| T+4:26 PS3 burn 224 km | |||
| T+6:40? PS3 burnout | |||
| 1239 | T+8:40 PS3 sep 582 km | ||
| 1239 | T+8:51 PS4 burn 593 km | ||
| 1248 | T+17:20 PS4 cutoff 789 km | ||
| 1248 | T+17:58 SARAL sep | ||
| 1249 | T+18:28 DLA-U sep | ||
| 1249 | T+18:58 SAPPHIRE sep | ||
| 1250 | T+19:23 NEOSSat sep | ||
| 1251 | T+20:12 AAUSAT 3 sep | ||
| 1251 | T+20:52 BRITE sep | ||
| 1252 | T+21:12 UniBRITE sep | ||
| 1252 | T+21:42 STRAND sep | ||
| 2013 Mar 1 | 100.45 771 x 788 x 98.6 | ||
| 2013 Mar 15 | Op orbit reached | 100.54 783 x 785 x 98.5 | |
| 2013 Dec 5 | 100.54 783 x 785 x 98.5 | ||
Payload:
- AltiKA altimeter, Ka-band, 35.75 GHz. 8 km res (CNES/)
- DORIS Precise orbit determination (CNES/)
- LRA Laser Retroreflector array (CNES/)
- Argos-3 Data Collection System
No comments:
Post a Comment