2013-040A
\uni{ 宇宙ステーション補給機}{ }
Uchu suteshon hokyu-ki (HTV)\uni{ 「こうのとり」4 号機}{ }
Kounotori 4-goki.HTV-4 carries 2257 kg of pressurized cargo (54 kg accounted) and 887 kg of unpressurized cargo per NASA Jul 2013 ISS status. This HTV uses the old R-4D engines.
According to the press kit, it carries 3900 kg of PLC cargo including 8 HRR and 1500 kg of EP cargo. Mass at undocking is 13760 kg.
STP-H4 will be installed on ELC1 Site 3; MBSU will be installed on ELC2 Site 1; and UTA will go to ELC4 Site 4.
On Aug 3 Japan launched the fourth H-II Transfer Vehicle, Kounotori-4, to deliver cargo to the ISS. HTV carries pressurized cargo that will be transferred through the Harmony module hatch and an external pallet whose payloads will be installed using the robot arms. Mass of HTV-4 is very roughly 16000 kg.
The EP carries the Space Test Program H4 package to be installed on ELC1, a spare Main Bus Switching Unit for ELC2, and a spare SARJ Utility Transfer Assembly for ELC4. The MBSU is around 100 kg; I haven't been able to find masses for STP-H4 and UTA, but they are each probably around 300 to 400 kg (send me better data if you have it!)
The pressurized cargo is packaged in 8 HTV Resupply Racks and includes the FROST freezer, the Kirobo robot, NASA's RRM Task Board 3 robotics experiment, and two J-SSOD cubesat launchers. The J-SSODs will be taken outside via the Kibo science airlock and will eject their passengers. One J-SSOD carries three 1U cubesats: Vietnam's PicoDragon, and the US company NanoSatisifi's Arudsat-X and Ardusat-1, which use Arduino open-source processors to run experiments. The other J-SSOD carries TechEdSat-3p, a 3U cubesat from NASA-Ames and San Jose State University, which will deploy an 0.6m `Exobrake' sail to test a way to increase the cubesat's drag and make it reenter quickly.
The 319 kg STP-H3 payload will be placed in HTV-4 for disposal.
This is the first H2B launch carried out by MHI rather than JAXA
| HTV4 | |||
| Date | Time | Event | Orbit |
|---|---|---|---|
| 2013 Aug 3 | 1948:46 | Launch by H2B | TNSC |
| T+1:54 SRB burnout | |||
| 1950:53 | T+2:04 SRB 1-2 sep | ||
| 1950:56 | T+2:07 SRB 3-4 sep at 63 km | ||
| 1952:26 | T+3:40 Fairing sep at 120 km | ||
| 1954:32 | T+5:47 MECO | ||
| 1954:40 | T+5:54 St 1 sep | ||
| 1954:51 | T+6:01 SEIG | ||
| 2003:01 | T+14:20 SECO | 89.40 186 x 304 x 51.7 | |
| 2003:35 | T+15:11 St 2 sep | ||
| 2128? | T+1:39? SEIG-2 at end of orbit 1 over Japan | ||
| 2128? | T+1:39? SECO-2 | ||
| 2158? | St 2 entry over S Pacific | ||
| 2013 Aug 4 | 0423 | PCM1 | |
| 2013 Aug 4 | 90.36 281 x 302 x 51.6 | ||
| 0451s | TCM2 | ||
| 2013 Aug 7 | 0935 | 90.36 282 x 301 x 51.6 | |
| 2013 Aug 7 | 1713 | HAM1 burn | |
| 2013 Aug 8 | 92.30 372 x 402 x 51.7 | ||
| 2013 Aug 9 | 0139 | HAM0 burn | |
| 0444 | HAM2 burn | ||
| 2013 Aug 9 | Rendezvous with ISS | ||
| 0531 | AI Approach Init point, 5 km, stop | ||
| 0809 | AI departure | ||
| 0848 | RI burn | ||
| 0908 | R-bar approach begins | ||
| 0911 | Range 500m | ||
| 0929 | At 250m hold | ||
| 1006 | Depart 250m hold | ||
| 1030 | Inside capture envelope, | ||
| 1034 | 30m hold | ||
| 1052 | Depart 30m hold | ||
| 1108 | At 10 m capture point | ||
| 1122 | Grappled with SSRMS | ||
| 1420 | Aligning for install | ||
| 1520 | Ready to latch, contact with Harmony Node 2 | ||
| 1528 | 1st stage capture | ||
| 1538 | 2nd stage capture | ||
| 2013 Aug 10 | 1111 | HO to PLC | |
| 2013 Aug 11 | 2107 | EP removed from ULC by SSRMS | |
| JRMS grapple EP | |||
| SSRMS ungrapple EP | |||
| 2013 Aug 12 | 0359 | EP installed on EF by JRMS | |
| 2013 Aug 24 | SPDM unberth UTA and MBSU | ||
| 2013 Aug 27 | |||
| MT move from WS2 to WS7 | |||
| SPDM pick up STP-H4 from EP | |||
| SPDM put STPH4 on ELC1 FRAM 3 | |||
| 2013 Aug 28 | |||
| SPDM pick up STP-H3 from ELC3.5 | |||
| SPDM put STP-H3 on EP | |||
| 2013 Aug 29 | SPDM stow | ||
| MT move from WS7 to WS4 | |||
| SSRMS base from PDGF3 to N2 | |||
| 2013 Aug 30 | |||
| JRMS pick up EP | |||
| JRMS hand EP to SSRMS | |||
| 1400? | SSRMS begin stow EP in HTV | ||
| 1435 | EP stowed in HTV | ||
| SSRMS grapple HTV | |||
| 2013 Sep 4 | |||
| 0235 | HC to HTV | ||
| 1207 | HTV4 unberth | ||
| 1620 | HTV4 release by SSRMS | ||
| 1623 | Range 9 m | ||
| 1627 | IDM-1 Sep-1 burn | ||
| 1631 | 30m range | ||
| 1636 | IDM-2 Sep-2 burn | ||
| 1643? | DSM-1 Descending Sep-3 burn | 92.76 408 x 411 x 51.6 | |
| DSM-2 burn | |||
| 2013 Sep 5 | 90.58 187 x 408 x 51.6 | ||
| 2013 Sep 7 | 90.48 188 x 407 x 51.6 | ||
| 0007 | Deorbit burn 1 | ||
| 0137 | Deorbit burn 2 | 90.12 151 x 408 x 51.6 | |
| 0611 | Deorbit burn 3 over 128E 35N, 55m/s? | ||
| 0637 | Entry over Pacific 120 km | ||